Conservation Commission Meeting Minutes
February 2,2005
Members Present: Scott Masse, Chairman, and Albert Manzi, Jr , Vice Chairman, John J
Mabon, Deborah Feltovic, Joseph W Lynch, Jr
Members Absent: Sean F McDonough, Beth Wescott
Staff Members Present: Pamela A Merrill, Conservation Associate, and Donna M Wedge,
Conservation Secretary
Staff Member Absent: Alison McKay, Conservation Administrator
Meeting came to Order at 7:05pm Quorum Present.
General Business
242-871,Partial Bond Release,Berrington Estates (Mesiti Development Corporation)(cont.
from 12/22/04)(Reguest to Cont. to 2/9/05)
No one was present A motion to continue to February 9, 2005 meeting was made by Mr Manzi,
seconded by Ms Feltovic Unanimous
242-1213,Request for a Partial Bond Release, 17 Wildwood Circle (Klipfel)(New England
Engineering Services, Inc.)
Ben Osgood of New England Engineering Services, Inc was present Ms Merrill stated on
behalf of the applicant,New England Engineering is requesting a partial bond release of$1500
The performance outlined in the Order of Conditions was $ 2000 The Order of Conditions
authorized the construction of an addition with the Buffer Zone to a Bordering Vegetated
Wetland The single-family dwelling predated the conception of the bylaw, and as part of the
approval, the applicant was required to restore the 25-foot No-Disturbance Zone (currently as
lawn) A Buffer Zone Restoration Plan was prepared by New England Engineering, which
detailed 12 saplings (9 white pine, 1 red maple, 2 red oak) The staff conducted an inspection on
January 11, 2005 The wetland flags were up, as well as wetland markers The erosion controls
were removed The site appeared stable The construction of the addition is completed Eight
(white pine) out of the 12 saplings were dead at the time of the inspection New England
Engineering documented in the 10/13/2004 monitoring report that several plantings were dead
and will need to be replaced The seasonal monitoring reports were to be submitted by the
Environmental Monitor for 2 growing seasons Status reports (other than regular monitoring
reports) were found in the file This morning I met with Ben Osgood at the site to confirm a
measurement in the field We agreed the measurement is 50' from flag A-2 to addition
foundation The as-built plan has measurement of 52' from the location The 50' No-Build Zone
is still being met A motion to issue a partial bond release of$ 1000 was made by Mr Manzi,
seconded by Ms Feltovic Unanimous
r
242-1262,Amendment,240 Charles Street(Greater Lawrence Sanitary District)(ENSR)
Richard Weare Engineer and Richard Hogan of the Greater Lawrence Sanitary District were
present Ms Merrill stated the applicant is requesting an Amendment to several conditions in the
Order of Conditions, which was issued on 8/5/04 for the construction of several structural
upgrades and process improvements including the installation of stormwater management
controls and associated grading within the existing wastewater treatment facility The applicant
has appealed the Order to DEP in this regard The staff has been working with the applicant over
past few months to discuss the requested amendment The amended conditions have been
drafted The applicant requested similar changes to an Order of Conditions issued in 1999 (242-
952) and the Commission voted to accept the amendment Mdny of the request changes in the
current draft are exactly the same as the amended conditions under the 242-952 filing The
Commission wants more time to review the Amendment to the Order of Conditions A motion to
continue to February 9, 2005 meeting was made by Mr Manzi, seconded by Ms Feltovic
Unanimous
242-885, PCOC, Lot 42, (21 Advil Circle)(Forest View Estates)(Pulte Homes of New
England)(Request to cont. to 2/9/05)
David Farrar of Marchionda Associates was present A motion to continue to February 9, 2005
meeting was made by Mr Manzi, seconded by Ms Feltovic Unanimous
242-885,PCOC & Partial Bond Release-Roadway and Drainage (Forest View
Estates)(Pulte Homes of New England) (Marchionda Associates)
David Farrar of Marchionda Associates was present Ms Merrill stated Marchionda Associates,
is requesting a PCOC for the roadways (Amberville Road, Palomino Drive, Garnet Circle &
Anvil Circle), as well as 6 stormwater detention basins and sewer pump station This project also
qualifies as a limited project (wetland crossing in order to gam access to upland areas) under 310
CMR 10 53(e) As such, the applicant was required to mitigate for 2,519 s f of wetland
alteration Therefore, the 2 1 mitigation ratio equals 5,038 s f of restored bordering vegetated
wetland (Per Condition# 20) In order to mitigate for impact to wetland wildlife,the replication
area shall be supplemented with a series of bird boxes The reports from West Environmental
(Envirommental Monitor)were submitted throughout construction documenting the status of the
replication area, as well as the site's compliance with the COC Per Condition 35, the applicant
was required to secure a Registered Professional Civil Engineer to act as the Project Manager
Marchionda Associates, was retained to supervise the contractor and to inspect the site regularly
where construction occurred within the Buffer Zone, as well as monitoring the stormwater
drainage for proper function Marchionda submitted reports throughout construction, stormwater
drainage for proper function Marchionda&Associates submitted reports throughout
construction, which also documents compliance with the 0& M Plan Due to the abundance of
snow cover, I could not conduct a proper inspection with Marchionda Pulte Homes is
anticipating for street acceptance at Town Meeting They are scheduled to appear before the
Planning Board on April 1, 2005, for roadway approval The applicant is hoping to have PCOC
prior to April I" A motion to set up escrow account in the amount of$ 5000 was made by Mr
Manzi, seconded by Mr Lynch Unanimous A motion to continue to February 23, 2005 meeting
was made by Mr Manzi, seconded by Mr Lynch Unanimous
242-885, Partial Bond Release, (Forest View Estates)(Pulte Homes of New England)
David Farrar of Marchionda&Associates was present Ms Merrill stated on behalf of Pulte
Homes of New England, Marchionda&Associates, is requesting a partial bond release of 87,
000 for 29 lots that have received a PCOC (Lots 1,8,9,11-15, 21, 23-25, 27, 28, 32-37, 45-47, 49,
50, 52-55) The amount requested was calculated using the 29 lots x $ 3K per lot= $ 87K To,
date the remaining performance bond balance is 127K with approx $5K in accumulated interest
The interest will be included in the amount when entire balance is released If the Commission
decides to release the 87K, it will leave a balance of$50K Note items without PCOC's included
drainage and roadway, and lots 22, 26 (denied), 31 (Playground), and 44A all on Amberville
Circle, Lots 38-42, Garnet Circle, Lot 43, Anvil Circle Per calculation sheet wetland replication
area$15K,roadway, roadway crossing, and stormwater management structures $IOK, $3K per
lot (9lots left) Grand total = $ 52K A motion to continue to February 23, 2005 meeting was
made by Mr Manzi, seconded by Ms Feltovic Unanimous
Enforcement Order Ratification
1659 Osgood Street
Ms Merrill stated she performed a site visit because the applicant put in a request for a building
permit for an existing garage A U form goes thru departments to check if they have to file with
conservation before doing work I had spoken to the applicant about being careful to stay outside
of the 100-foot buffer zone A motion to ratify the Enforcement Order was made by Mr Manzi,
seconded by Mr Mabon 3 to I vote
Campbell Forest/Webster Woods Open Space Acquisition
A packet was dropped of at one of the Commission House with a plan The Commission was
reviewing the Open Space Area They were checking out how the property borders Sharpeners
Pond Road The area did not include were the Town of North Andover wants to build the
Hockey Rink Mr Manzi stated Open Space Donation is not a build able area ever
No Recess
Public Hearings 8:20pm
Requests for Determination of Applicability
544 Foster Street(O' Keefe) (Giles)
The applicant Mr & Mrs O' Keefe was present Mr Lynch read the Legal Notice
Ms Merrill stated the filing is for a 2' cantiliver of an existing deck structure and enclosure of
the deck No additional footings or land disturbance is proposed The cantilevered deck is
proposed at 23' from the wetland at its closest point The site was discussed with the
Commission last August per the request of the applicant to determine if the Commission would
allow cantilever further into the 50' no-build The Commission agreed that RDA should be filed
Except for the street frontage, the lot is surrounded by wetlands Therefore, the entire lot is
within the 100-foot buffer zone Rocky Brook runs along the eastern property line The inner
riparian zone encompasses about 75 % of the lot Based on the FEMA data, the 100-year flood
elevation on the site is 124 The existing deck and patio landing (rear bump out) appear to have
been constructed with the existing building (date unknown) The plan notes the existing deck is
cantilevered However, this is incorrect as at least 8 sonotube footings support the deck and
patio A tree house was observed on the site between flags 8 & 9 and is being supported by one
in ground concrete block The plan notes that the wetlands were flagged in 2002 I reviewed the
line and may not agree with several of the flags Due to the nature of the proposed work and the
current weather conditions, I recommend that the wetland boundary be noted as not confirmed if
an approval is issued An overlay of the as-built plan of the pervious filing (last revised dated
6/25/02) with the new proposed plan was done to compare wetland boundaries The wetland
boundary matches exactly, confirming that changes to the boundary may be possible today, since
the boundary was originally flagged in 2001 or before In addition,the overlay indicated that the
stairs and the walkway were constructed without a permit sometime after the COC was issued
from previous filing in 2002 The stairs and a portion of the walkway are within the 50-foot no-
build zone The erosion controls are not proposed None are necessary for the proposed work A
previous filing (242-1063) was issued in 2001for construction of the septic system A COC was
issued for the work Conditions to include Post construction, submission of an as-built plan, and
no dumpsters to be stored within the 50-foot no-build zone A motion to issue a negative
determination with conditions pre-construction and erosion controls was made by Mr Manzi,
seconded by Mr Lynch Unanimous
Lot 2 Summer Street (North Andover Realty Trust)(Christiansen & Sergi)
Eugene Willis of Christiansen& Sergi was present Mr Lynch read the Legal Notice Ms
Merrill stated the filing is for the construction of a driveway and grading associated with the
installation of a septic system for a single-family dwelling The wetland resource area is an
isolated vegetated wetland off property and was approved under a previous filing in October of
2003 (242-1217), 30 Springhill Road) The wetland resource area on the property is bordering
vegetated wetland and a vernal pool, which approved under an ORAD in July of 2004 (242-
1256) However, all work associated with this proposed construction is outside of the buffer zone
to this resource area Proposed work within the buffer zone will be greater than 70-feet from the
resource area The erosion controls are proposed along the limit of work (along the existing
stonewall &property boundary) The markers should be placed at the rear of the lot to indicate
bordering vegetated wetland and vernal pool sensitivity for future homeowners Conditions Pre-
construction, markers (of the rear of the lot), Post construction, and As-built plan A motion to
issue a negative determination with conditions was made by Mr Lynch, seconded by Ms
Feltovic Unanimous
Notice of Intent (s)
242-1208, Foster Farm Elementary School (North Andover Building Committee)(DiNisco
Design)(cont. from 12/8/04)
No one was present Ms Merrill stated a decision would be drafted for next meeting At the
meeting of 12/8/04, the Commission requested the applicant's attendance to speak in regards to
the status of the project and to answer the Commissions concerns (i e traffic, flooding & Beaver,
ect) A letter was written on 1/12/05 to Ken DiNisco and the North Andover Building Committee
requesting their attendance Rick Rice called on 1/24/05 to indicate that himself and Mr DiNisco
had a conflict with the meeting date and asked to be rescheduled to the meeting of 2/9/05 A
motion to continue to February 9, 2005 meeting was made by Mr Manzi, seconded by Ms
Feltovic Unanimous
242-1279,Willow Street(Chatterjee)(CAQ Engineering)(cont from 11/17/04)(Request to
coot. to 2/9/05)
No one was present A motion to continue to February 9, 2005 meeting was made by Mr Manzi,
seconded by Ms Feltovic Unanimous
242-1293, 80 Patton Lane (Palmer)(Kavanaugh)
James Kavanaugh Engineering was present Ms Merrill stated the filing is for the installation of
a replacement septic system and associated grading within the buffer zone to a bordering
vegetated wetland and associated with Boston Brook (RFA) The portions of the site are within
floodplam as documented in a FEMA letter dated May of 2003 found in the building file (FEMA
flood elevation is at 103) The proposed work will greater than 50 feet from the bordering
vegetated wetland and greater than 90 feet from the brook The erosion controls are proposed
around the limit of the work(see NOI application for detail) The wetlands were flagged on
10/7/04 by Jeff Orchard, CWS The edge of the seasonal high water of the Brook was also
marked and depicted on the plan The wetland boundary was reviewed and I am in agreement
with the boundary with the exception of flags W-I I & W-5 The wetland flag W-6 was missing
in the field Any flag changes would be minor in nature and would not affect the project It
would be extremely difficult to re-confirm the wetland boundary with the wetland scientist given
the current snow cover Therefore, I would recommend that the confirmation, or lack thereof, be
noted in the Order DEP comments "Must demonstrate how project meet performance standards
for work in the Riverfront Area(310 CMR 10 58 (4)" The system is a replacement system and
appears to be only suitable location on the lot No alternative9 An existing shed, held up by 9
sonotube footings, is located at the edge of the wetland resource area(also within floodplain&
RFA) No building permit was found for the shed The 25-foot No-Disturbance Zone and the 50-
foot No-Build Zone were not depicted on the original plans, but have been revised to include
these buffer zones The staff recommendations Remove the shed and sonotubes and restore
disturbed area, access from the driveway prohibited, and storage of construction equipment/
materials/dumpsters on driveway prohibited The Commission wanted the shed removed or
moved outside of the 50-foot No-Build Zone A motion to close and issue a decision in 21 days
was made by Mr Lynch, seconded by Mr Manzi Unanimous
242-1296, Molly Towne Road (Chestnut Development, LLC)(West Environmental)
Mr Masse and Mr Manzi recuse from voting Mr Manzi stated third party review on the
wetland line verification by Patrick Seekamp Mr Lynch read legal notice Ms Merrill stated
staff has not reviewed the project Recommendation to set up escrow account amount $ 5, 000
for drainage review by a third party consultant Mr Lynch stated no Quorum to vote
242-1294, 1659 Osgood Street(Tyler Munroe) (New England Engineering)
Ben Osgood of New England Engineering Services, Inc was present Ms Merrill stated the
filing is for installation of a replacement septic system and associated grading within the buffer
zone to a bordering vegetated wetland The proposed replacement leach field will be constructed
no closer than 63 feet from the wetlands and installation of a new septic tank will be no closer
than 107 feet away from the wetlands The proposed grading will be no closer that 50 feet from
the wetlands The existing gravel driveway will be replaced in the same location at the new
elevations shown on the plan as noted The erosion controls are proposed around the limit of
work The erosion controls are proposed within the 25-foot No-Disturbance zone along the upper
portion of the existing driveway to accommodate the proposed driveway replacement The
wetlands were delineated by Steven D'urso (date unknown) I do not agree with the delineation
in several areas Specifically, WF B5 is located on the other side of the stream and not on the
side closest to the work In, addition, wetland flag B1 should be located 10-12' upgradient from
the current location(after determining this, I observed and old wetland flag in the exact location
where the revised flag B 1 location should be) Also, it appeared that wetland flag in the exact
location of where the revised flag B-3 was missing in the field at the time of my review I also
question the wetland delineation for the reason that another plan dated 9/13/04 by Scott Giles
was found in the building file This plan doses not indicate who delineated the wetland but may
be different from the delineation of the submitted plan The flag numbers do not match on the
submitted plan The scales are different so an overlay of the two plans could not be done The
Giles plan was submitted for a building permit for removal of an existing residential 2-stall
garage to be replaced with a 53'x 35' garage for commercial use A variance was needed by the
Board of Health and was granted Ms Merrill signed off on the building permit on 11/4/04 as she
measured 101' from proposed work to the resource area She spoke with Tyler Munroe and said
that he would not have to file given that work would be outside the buffer zone,but that erosion
controls would be required Mr Osgood' s plan dated 1/11105 indicates that the existing garage
is located within the buffer the 100-foot buffer zone to the resource area to the resource area
(approx 87 +/-foot away) When I conducted my inspection on 1/20/05, a new foundation was
observed within the 100-foot of the resource area in this location It appears Mr Monroe
constructed the new garage closer than what was shown on the approved building permit plan,
thus work is being done within the buffer zone without a conservation filing Perhaps an
amendment can be requested to include this work with the septic project, instead of filing a
separate NOI/RDA In addition, no erosion controls were observed on the site as requested by
Ms Merrill and the site was observed to contain a significant amount of loose materials running
off of the existing gravel driveway It is difficult to determine, given the snow cover, of other
areas of the site were unstable I have a drafted Enforcement Order to address this concern and
notified the applicant A motion to continue to February 9, 2005 meeting was made by Mr
Manzi, seconded by Ms Feltovic Unanimous
242-1295, Bridle Path-Lot 20A (Kucharzyk)(Wetland Preservation, Inc.)
James Bolduc of Wetland Preservation, Inc was present Ms Merrill stated the plans have been
revised to correct the erosion control detail No further concerns The conditions should include
staking all house corners and deck prior to construction, markers, interim As-built plan, ect A
motion to close and issue a decision in 21 days was made by Ms Feltovic, seconded by Mr
Mabon Unanimous
Decisions
242-1292,35 Wright Avenue, (Hanson)(New England Engineering)
Ms Merrill stated condition # 54 redirect the discharge water from the pool out side of the 50-
foot No-Build zone,No Dumpster within the driveway area, the shed must be moved outside the
50-foot No-Build zone and let the wetland area reestablish on it own A motion to accept the
Order of Conditions as drafted and set the bond amount at$2,000 was made by Mr Manzi,
seconded by Ms Feltovic Unanimous
A motion to adjourn the meeting at 9:45pm was made by Mr. Manzi, seconded by Mr.
Mabon.