HomeMy WebLinkAbout1993-05-12 Decision PRD DEF SUB HUN HUI
TOWN OF NORTH ANDOVER
HASSACHUSLTTS
„oN
Any appeal shall be filed 0' ,.,• "�
within (20) days
after the
date of filing of this Notice
In the Office of the Town
Clerk,
NOTICE OF DECISION
Date. .P1ay 12, ]993. . . . . . . . . . . . . . . .
Date of Hearing
Mar, 30, Apr. G, & _.
Apr. 29, 1993
Petition of . .White Birch Construction
. • . . . . . • • . . ♦ . . . ♦ . • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ass
Avenue
Premises affected North Side of Pt. . . . . . . . . . . , . . . . . . .
_A.
Referring to the above petition for a special permit from the requirements
of the �q� ll .$ clover Zon:ny BYlaw - Section 8.5 - Planned Residential Development i
5o as to permit •the construe;ion, of lS single family dwellings.. . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . • . . . . . . . . .
• . • . • . . . • • ♦ • • • . . . . • . • s . • • • • . ♦ . • . . . . . . . • • . . • • . • . . . . • . . . ♦ . . • . . . . . . . . . . . . . . . . . . . .
Q
After a ublic hearing given on the above date, the Planning Board voted
CONDITIONAL Y
APPROVE Special Permit ',
to . . . . . , . . • .the . . . . . . . . . . • . . . . . . . . . . . . . . . I . . . . . . . . . . . . .
'this Is to oertlty#W two*(20)daye
have N d km 009 of dsdOm filed
ATMT:, wlthM oa 3
x Trno Co"
b lbwnc
based upon the following conditions :
TOWS k
Signed L
cc: nip :cuoL oL nL,:>: is Works ��G aid.A ,N� cIG},�a,, Ch�ir•�an, , ,
Building Inspector
conservation Administrator V' e Chasrman
SST�4fic . .i� . . . . . . . . . . . . . . .
Health Agent
Assessors
Police Chief
Fire Cltief John Dr.;,I.er
,1pL31ic.-int . . . . . .
1Cobblestone Crossing
Special Permit
Planned Residential Development
Conditional Approval
The Planning Board herein approves the Special Permit for a '
Planned Residential Development of 17 lots re�30ted19 White
Birch Construction Co. Inc. , dated December
Planning Board makes the following findings as required by the
Rules and Regulations Governing' the Subdivision of Land Sections
10 . 3 , and 10. 31.
A. The specific site is an appropriate location
tely 1or3 aacresPlanned
Residential Development and i pp
in
size.
B. The use as developed will not adversely affect the
neighborhood.
C. ' There will be no nuisance or serious hazard to vehicles or
pedestrians.
D. Adequate and appropriate facilities will be provided for the
proper operation of the proposed use.
The Planning Board also makes findings under Section 8 . 5 of the
Zoning Bylaw that this PRD is in harmony with the general purpose
and intent of the Bylaw and that the PRD contains residential
development and open space in a variety to be sufficiently
advantageous to the Town and promotes the public health, safety,
and welfare of the citizens of the Town of North Andover. In
particular, the Planning Board finds that this project will :
A. Promote the more efficient use of land in harmony with its
natural features by preserving additional open space,
reducing the amount of clearing and excavation normally
associated with the construction of residential dwellings on
a site such as this ;
B. Encourage the preservation of open space. The applicant has
provided 3 , 6 acres (35%) of the property as Open Space ;
C. Permit greater flexibility and more attractive and efficient
design of residential development;
D. Meet the Town' s housing needs by promoting a diversity of
housing types.
The Planning ealso PRD. fins that a base Thi density
appropriate forr the
ths number of lots has been determined
1
` r r
r
from a Preliminary Conventional Subdivision Plan provided to the
r Planning Board which satisfies the Town' s requirements for
submission of such a plan, This Preliminary Plan is described as
follows:
Plans entitled: Cobblestone Estates f
Conventional
Prepared by: Environeers, Inc.
Dated: February 1993
Finally, the Planning Board finds that the Definitive Subdivision
complies with Town Bylaw requirements so long as the applicant
complies with the following conditions:
1. Prior to endorsement of the plans by the planning board and
recording with the Registry of Deeds the applicant shall
adhere to the following:
a. The applicant shall post (per agreement with the North
Andover Planning Board) a Performance Guarantee in the
amount of $15 , 000 (fifteen thousand dollars) to be held
by the Town of North Andover, The Guarantee shall be in
the form of a check made payable to the Town of North
Andover escrow account. This amount shall cover any
contingencies that might affect the public welfare such
as site-opening, clearing, erosion control and
performance of any other condition contained herein,
prior to the posting of the Performance security as
described in Condition 3 (C) of the Definitive
Subdivision Conditional Approval . This Performance
Guarantee may at the discretion of the Planning Board
be rolled over to cover other bonding considerations,
be released in full , or partially retained in
accordance with the recommendation of the Planning
Staff and as directed by the vote' of the North Andover
Planning Board.
b. All designated open space parcels shall be retained by
the owners of the individual lots in trust. A perpetual
restriction of the type described in M.G. L. Chapter
184 , Section 31 running to or enforceable by the town
shall be recorded in respect to such land. Such
restriction shall provide that the Usable Open Space
shall be retained in perpetuity for• one or more of the
following uses : conservation , agriculture, or
recreation. Documents to this effect must be reviewed
by the Planning Staff prior to endorsement.
C. The trust created in Condition 1 (b) above must also
provide for the maintenance of the entrance way fence
2
276 and landscaping.
r
d. Restrictive Covenants must be recorded to insure that
the architectural style and materials of the proposed
structures are in accordance with the architectural
plans shown on Sheet 9 of the Plans entitled
"Cobblestone Crossing, A Residential Single Family
Dwelling Development in North Andover, MA" dated May 3 ,
1993 . Documents to this effect must be reviewed by the
Town Planner prior to endorsement of the plans.
e. Deeds conveying individual lots must contain a
restriction reflecting the 50 foot not-cut requirement
shown on the PRD plans . A sample deed must be reviewed
by the Planning Staff prior to endorsement of the
plans.
f. Landscaping must be in accordance with the recorded
plans and landscaping plans as shown on the "planting
Plan, Cobblestone Crossing at North Andover, MA"
prepared by Miquelle MZO Group.
2 . Prior to any lots being released from the statutory
covenants, the conditions outlined in the Cobblestone
Crossing Definitive Subdivision Conditional Approval
followed and:
a. Copies of the documents concerning the ownership in
trust of the open space, the conservation restriction,
and the restrictive covenants as referenced above, must
be submitted to the Board for review.
b.. A silt fence must be placed along the no-cut buffer
zone on all lots to be released. The placement of the
silt fence will be viewed and approved by the Town
Planner.
3 . Prior to FORM U verification (Building Permit Issuance) for
an individual lot, the conditions outlined in the
Cobblestone Crossing Definitive Subdivision Conditional
Approval must be followed.
4 . Prior to a Certificate of occupancy being issued for an
individual lot, the conditions outlined in the Cobblestone
Crossing Definitive Subdivision Conditional Approval must be
followed .
5. Prior to the final release of security, the conditions
outlined in the Cobblestone Crossing Definitive Subdivision
Conditional Approval must be followed.
3
.27
6. The applicant shall adhere to the following requirements of
t the Fire Department:
a. All structures shall contain residential fire sprinkler
systems the design of which will be approved by the
Fire Department. ,
b. Smoke alarms must be installed.
7 . Tree cutting shall be kept to a minimum throughout the
project to minimize erosion and preserve the natural
features of the site. The tree line as shown on the approved
plans must be marked in the field and confirmed by the Tree
Warden and/or Town Planner. The Town Planner must be
contacted prior to any cutting on site to review the marked
tree line. Efforts to protect trees on site must be made.
8 . This special permit approval shall be deemed to 'have lapsed
after I)*�C4, %two. years from the date permit granted) unless
substantial construction of roadway and utilities has
commenced. This project must be completed by
(within two (2) years from the date of the start of
construction)
9 . Any plants, trees, or shrubs incorporated into the landscape
plan titled "Planting Plan, Cobblestone Crossing at North
Andover, MA" prepared by Miquelle, MZO Group, that die
within one year from the time of planting shall be replaced
by the applicant.
10. The provisions of this Special Permit shall apply to and be
binding upon the applicant, its employees, contractors and
subcontractors and all successors in interest or control.
11. This Special Permit approval is based upon the approval of a
Definitive Subdivision Plan. The Special Permit and
Definitive Subdivision approvals are both based upon the
following plans:
a. Plans entitled: Cobblestone Crossing
A Residential Single Family
Development in North Andover, MA
Dated: December 3 , 1992 , revised March 26,
1993 , May 3 , 1993 .
Prepared For: White Birch Construction Co. , Inc.
38o Essex Street, Suite 1
Lawrence, MA 01841
Prepared By: Environeers Inc.
160 Pleasant Street
North Andover, MA 01845
Sheets: 1 through 9
4
~ I
E � 1
` I
278 b. Plans entitled: Planting Plan
Cobblestone Crossing at North
Andover, MA
Prepared by: Miquelle, MZO Group
Cc. Conservation Administrator
Director .of Public Works
Health Administrator
Building Inspector
Police Chief
Fire Chief
Assessor
Applicant
Engineer
File
Cobblestone. PRD
5
KARE'N H.P. NELSON +
m Town of 120 Main Street, 01845
Director (508) 682-6483
BUILDING +.y•,,;o . ,� NORTH ANDOVER
CONSERVATION SSA°""a`s DIVISION of
PLANNING PLANNING & COMMUNITY DEVELOPMENT
May 12, 1993
Mr. Daniel Long,
Town Clerk
Town Building
120 Main Street
North Andover, MA 01845 Re: Special Permit - PRD
Cobblestone Crossing
Dear Mr. Lang:
The North Andover Planning Board held a public hearing on
February 2, 1993 in the Selectmen's Meeting Room, upon the
application of White Birch Construction, 380 Essex Street,
Lawrence, requesting a special permit under Section 8 . 5 - Planned
Residential Development, of the North Andover Zoning Bylaw. The
following members were present: George Perna, Richard Nardella,
John Simons, Joseph Mahoney, John Draper and Richard Rowen. The
legal notice was duly advertised in the Lawrence Eagle Tribune on
January 18 and January 25, 1993 and all parties of interest were
properly notified.
The petitioner was requesting a Special Permit - PRD for the
construction of 15 single family dwelling units in a Residential-3
Zoning District. The premise affected is located on the North side
of Massachusetts Avenue.
Mr. Simons read the legal notices to open the public hearing.
Comments were also read from the D. P.W.
Al Shaboo, Environeers, gave the Board a brief presentation of
the proposed development.
1. PRD proposed
2 . 'There are Form A lots
3 . proposing two roadways
4 . open space will be provided
5 . Town sewer and water
Mr. Shaboo stated that he wanted to maintain as much of a
green space as possible as shown on the plans. The watermain can
be looped. There are no drainage calculations completed at this
time as the project has not been finalized.
Page 2 •
Cobblestone Crossing
Mr. Draper asked if this development could connect to
Cranberry Lane. Ms. Bradley stated that the houses were too close
together on Cranberry Lane and there were no easements granted.
Mr. Simons stated that this was a transition area because of
the commercial and residential mix. He asked that the developer
look at other alternatives, such as commercial use in the existing
houses. Maybe light business along Route 125.
Mr. Perna asked if there were wetlands on the site. Mr.
Shaboo stated that there were no wetlands on the site and the
engineers have reviewed the site. There has been a submittal to
the Conservation Commission.
Questions were raised on how the. number of lots were
calculated.
Mr. Perna commented on the following:
1. green space usually connects to other pieces of open
space
2 . commercial /residential buffer needed
3 . no increase traffic on Route 125
4 . Would `not allow roads to be 7 ' o f f each other, have to be
directly across from Phillips Common.
Mr. Simons suggested changing the zoning to allow the houses
on Route 125 to remain but be used as businesses. If torn down,
uses would be lost.
Mr. Perna opened the meeting to the public for comments.
Julia Warchol expressed concerns about wetlands and wanted to
know the zoning requirements. Mr. Shaboo stated that in a
conventional subdivision, the required lot area is 1/2 acre. In a
cluster development 1/4 acre is required. Mr. Shaboo stated that
he is proposing to keep a small strip of land along the Warchol
property as open space. Mr. Perna explained the PRD development.
Amy Olenio expressed her concerns about usage of land as it is
wet. Pumps are used in cellars to keep the water out. She was
told that the site was not buildable. There is also a traffic
issue on Mass Avenue due to the construction and completion of
Phillips Common. Mr. Perna stated that traffic studies were
completed on Phillips Common that stated no major increase in
traffic would occur,
Page 3 :
Cobblestone Crossing
Steve Patterson, abutter, wanted to know how close the house
would be from his lot. Mr. Shaboo stated that the houses would not
be less than 50 ft. in the PRD because of the buffer zone
requirement. Mr. Patterson wanted a green space buffer along Mass.
Avenue and his property. He stated that there was standing water
on the proposed site.
Brian Healy, an abutter, wanted to know what the value of the
homes would be. He also questioned if there would be any problems
with fire engine access. Mr. Perna stated that the concerns of the
fire department would be part of the decision. Mr. Healy also
expressed concerns with problems with the 1199" Restaurant. Mr.
Shaboo stated that the value of the homes would be in the $300, 000
range. Mrs. Healy wanted to know what would happen if the homes
did not sell for $300, 000. She asked if there was a requirement
that homes be sold at a certain rate and where the break even point
was.
Peter Shaheen stated that the PRD may be a better way to go
because there was more control. He stated that the impact on the
119911 ' s expanded parking lot brought concerns to the residents.
Chris Moen lives on the corner of Osgood Street and Mass.
Avenue. He expressed concerns about the water level on the site.
He stated that there were major traffic concerns along Mass.
Avenue. A traffic light at Osgood Street and Mass Avenue or
possibly four way stop signs would help the traffic problem. Mr.
Moen asked if the Board looks at plans architecturally. Mr. Draper
stated that architecture is very important and there is a need for
integration of design and landscaping.
On a motion by Mr. Mahoney, seconded by Mr. Draper, the Board
voted to continue the public hearing to February 16, 1993 . The
applicant was to work with Mr. Simons on re-doing the conventional
plan to coincide with what was proposed.
The February 16, 1993 meeting was canceled due to inclement
weather.
On February 23 , 1993 the Planning Board held a regular
i
meeting. The following members were present; George Perna, Joseph
Mahoney and Richard Rowen.
Peter Shaheen, an abutter was present. Also present was Al
Shaboo, engineer.
Open space will be 35% .
Mr. Perna stated that the development does not appear to be
advantageous as a PRD.
Page 4 :
Cobblestone Crossing
1. more road
2 . sells 1/2 size lots
The lots near the 1199" were questioned.
PRD I alternative suggested by members of the Board. (2 zero
lot line lots, Lot 3 & Lot 5)
A site walk will be scheduled.
Street lighting to be similar to Phillips Common, tied into a
timer and homeowners will pay on their electric bills.
A decision will be drafted for the next meeting for the Board
to review.
On March 16, 1993 , the Planning Board held a regular meeting.
The following members were present: George Perna, Richard
Nardella, John Simons, Joseph Mahoney, John Draper and Richard
Rowen.
Ms. Bradley read a letter to Mr. Al Shaboo.
Berm along the 11991 , with plantings but concern that would need
a variance to do something in the 50 ' buffer zone.
Wetlands - need letter from the Conservation Commission.
Mr. Nardella asked if there was a validated contract with the
property owner. The Owners are the Messina 's, the developer is
Grifoni.
Mr. Draper wants to see substantial buffer along the 1199"
border.
Mr. Simons expressed concerns about marketability.
i
Mr. James Grifoni, White Birch Construction, stated that the
site has trees, a country setting, and there will be traditional
homes set in the woods, a private site. There are dense woods
along the back of the 1199" Restaurant.
A row of 10 ' pines along the 1199" border, dense bush along the
back may be required. The Board would like to see a final plan
prior to closing the public hearing.
The Board wanted one lot eliminated behind the 1199" .
Mr. Draper would like to see the best effort to create buffer
zone.
f
Page 5:
Cobblestone Crossing
Mitigation plan for noise issues.
Mr. Mahoney stated that home buyers will know that they are
moving in behind the 119911 .
Brian Healy, Mass Avenue, expressed concerns on the following:
1. need to control people leaving the 1199"
2 . construction noise problems
a. limit construction noise, police enforce
Conditions on opening and closing of roadway.
Mr. George Carey expressed concerns about the PRD. Mr. Bill
Hansen also expressed concerns about the PRD.
Mr. Simons had that following comments:
1. 1/2 acre lot zoning
2 . design flexibility
3 . creates larger buffers
4 . keep new housing and roadway away from existing houses
Mr. John Dalkner expressed Concerns about Mass Avenue and the
traffic.
Mr. Perna stated that a traffic study may be required. A
State D. P.W. permit will be required.
Mr. Shaboo stated that the traffic could be re-routed to
alleviate traffic problems in this area. Construction traffic to
be kept to the major roads.
Mr. John Leman, Pine Ridge Road, asked developer to put
stipulations in the deed regarding potential 1199" problems.
On a motion by Mr. Draper, seconded by Mr. Mahoney, the Board
voted to continue the public hearing. Staff was directed to write
a letter to the applicant outlining the issues.
On March 30, 1993 the Planning Board held a regular meeting.
The following members were present: George Perna, Richard
Nardella, John Simons, Joseph Mahoney and Richard Rowen.
D. P.W. issues presented by Mr. Perna:
1. drainage calculations not satisfactory
2 . looping water to Cranberry Lane
3 . natural drainage of land not accounted for
i
Page 6:
Cobblestone Crossing
4 . elevations do not match on separate plan sheets
5 . sewer and water main locations cannot be at the same
elevation
D. P.W. does not have a problem with double cul-de-sac for this
project.
I
Applicant must address issues of D. P.W. with Bill Hmurciak.
Al Shaboo, Environeers, Inc. , showed the Board the following:
1. rendering of entrance to subdivision from Mass. Avenue
2 . renderings of each house to be constructed.
a. house types were designated on each lot
The developer has added existing parcels to the entire project
to create a total of 10. 4+/- acres. This also created additional
open space.
The Board was presented with two options for the additional
open space.
Alternative A
Is to make the Form A lot a 17th PRD Lot and preserve
open space around it. This would create greenspace along
Route 125 to shelter homes.
Mr. Nardella asked if Alternate A was chosen, if there was
anything to do to create more buffer along the back of the 1199" .
Alternative B
Is to dedicate the existing vacant lot bordering on the
1199" Restaurant as open space and keep the lot on the
corner of Mass. Avenue and Route 125 as a For A lot.
Mr. Rowen would rather go with Alternative B because he wants
to buffer the 1199" as much as possible.
Mr. Mahoney agreed with leaving existing Form A lot on the
corner with open space next to the 1199" .
The Board decided to go with Alternative B - dedicate existing
vacant lot next to the 1199" Restaurant as open space. Create Form
A lot on the corner of Mass. Avenue and Route 125
Page 7 :
Cobblestone Crossing
Barrier Issues:
Al Shaboo stated that a berm was infeasible due to large size
of clearing required. A fence was suggested but there are
maintenance issues and the potential for destruction by 1199"
patrons.
Mr. Shaboo suggested the construction of a 4 foot stone wall.
a. minimal maintenance
b. keep in character with surrounding area
C. There would be minimal grading without cutting
trees. Keep people, headlights out of subdivision.
Mr. Mahoney stated that impenetrable landscape barriers exist
in town.
Mr. Rowen asked the developer to plant dense shrubbery in back
of the hemlocks.
Mr. Nardella stated that no planting will block headlights
right away but stone plus plantings would be effective.
No cut zone found on lots must be on plans and in the deed
restrictions
Side setback waivers requested on specific lots were
acceptable to the Board.
There were no abutters present at this meeting.
Ms. Bradley recommended the Board close the public hearing.
On a motion by Mr. Rowen, seconded by Mr. Perna the Board
voted to close the public hearing on both the definitive
subdivision and the special permit.
NOTE: Alternate member is voting member for tonight' s meeting.
On a motion by Mr. Mahoney, seconded by Mr. Rowen, the Board
voted to take the matter under advisement on both the definitive
subdivision and the special permit. Decision will be considered at
the April 6, 1993 meeting.
On April 6, 1993 , the Planning Board held a regular meeting.
Issues discussed were as follows:
1. D.P.W. has to review the newest changes to the plans.
2 . detention pond in no cut zone.
3 . Where are the existing trees in relation to the homes?
Page 8:
Cobblestone Crossing
4 . Locate major trees on plans, give indication of existing
trees,
5. Screening of detention pond.
6. Need to know why no swales in town - from Mr. Hmurciak
7 . 4ft. stone wall to be constructed with plantings.
The question of why raise roadway and house was brought up.
The answer was to keep to existing grade.
The model home must be on sewer system.
No decision was rendered.
On a motion by Mr. Rowen, seconded by Mr. Simons, the Board
voted to continue to take the matter under advisement.
The Police Department will be asked about a right turn only
from the subdivision.
On April 20, 1993 the Planning Board held a regular meeting.
The following members were present: John Simons, Joseph Mahoney,
George Perna and John Draper.
Mr. Al Shaboo gave the Board an overview of the revised plans.
The applicant needs to label lot next to the 1199" as open
space and make sure that it is deeded to trust.
Ms. Bradley read Mr. Richard Doucette's comments regarding the
tree line.
A landscape plan was shown.
The question of who will maintain fence/entry way were brought
up. This needs to be added to the trust agreement. A copy of the
agreement will be reviewed by Mr. Mahoney.
Street lights would be tied into each owner' s driveway and
house.
The developer would Like to start construction in the Spring.
Mr. Rowen and Mr. Hmurciak had a discussion on swales vs.
detention basins.
The Board will review the draft decision and new information
provided. A final vote on the draft decision will be on April 29 ,
1993 .
Page 9 :
Cobblestone Crossing
On April 29 , 1993 the Planning Board held a regular meeting.
The following members were present: Richard Nardella, John Simons,
Joseph Mahoney, Richard Rowen and George Perna.
Mr. Rowen expressed his concerns with the trees being too
close to the houses.
Mr. Simons stated that the outline of the parcel approved is
unclear, need to mark what is part of plan deeded open on final
plans not showing any lot lines. All open space should be labeled
with acreage. Total acreage is 10. 4 .
There was a discussion of the Performance Bond amount.
$800. 00 per lot = $15, 000
Mr. Nardella had a discussion on restrictive covenants.
On a motion by Mr. Mahoney, seconded by Mr. Perna the Board
voted unanimously to approve the definitive subdivision as amended.
On a motion by Mr. Mahoney, seconded by Mr. Rowen the Board
voted unanimously to approve the Special Permit for the PRD as
amended.
Attached are those conditions the Board voted.
sincerely;'
PLANNING BOARD
x.chard A. Nardella, Chairman
cc: Director of Public Works
Building Inspector
Conservation Administrator
Health Agent
Assessors
Police Chief
Fire Chief
Applicant
Engineer
File
i
Cobblestone Crossing
,Special Permit
Planned Residential Development
Conditional Approval
The Planning Board herein approves the Special Permit for a
Planned Residential Development of 17 lots requested by White
Birch Construction Co. Inc. , dated December 30, 1992 . The
Planning Board makes the following findings as required by the
Rules and Regulations Governing the Subdivision of Land Sections
10. 3 , and 10. 31 .
A. The specific site is an appropriate location for a Planned
Residential Development and is approximately 10 . 3 acres in
size.
B. The use as developed will not adversely affect the
neighborhood.
C. There will be no nuisance or serious hazard to vehicles or
pedestrians.
D. Adequate and appropriate facilities will be provided for the
proper operation of the proposed use.
The Planning Board also makes findings under Section 8 . 5 of the
Zoning Bylaw that this PRD is in harmony with the general purpose
and intent of the Bylaw and that the PRD contains residential
development and open space in a variety to be sufficiently
advantageous to the Town and promotes the- .public health, safety,
and welfare of the citizens of the Town of North Andover. In
particular, the Planning Board finds that this project will:
A. Promote the more efficient use of land in harmony with its
natural features by preserving additional open space,
reducing the amount of clearing and excavation normally
associated with the construction of residential dwellings on
a site such as this ;
B. Encourage the preservation of open space. The applicant has
provided 3 . 6 acres (35%) of the property as Open space;
C. Permit greater flexibility and more attractive and efficient
design of residential development;
D. Meet the Town' s housing needs by promoting a diversity of
housing types.
The Planning Board also finds that a base density of 17 lots is
appropriate for the PRD. This number of lots has been determined
1
f f
from a Preliminary Conventional Subdivision Plan provided to the
Planning Board which satisfies the Town' s requirements for
submission of such a plan. This Preliminary Plan is described as
follows:
Plans entitled: Cobblestone Estates
Conventional
Prepared by: Environeers, Inc.
Dated: February 1993
Finally, the Planning Board finds that the Definitive Subdivision
complies with Town Bylaw requirements so long as the applicant
complies with the following conditions:
1. Prior to endorsement of the plans by the planning board and
recording with the Registry of Deeds the applicant shall
adhere to the following:
a. The applicant shall post (per agreement with the North
Andover Planning Board) a Performance Guarantee in the
amount of $15, 000 (fifteen thousand dollars) to be held
by the Town of North Andover. The Guarantee shall be in
the form of a check made payable to the Town of North
Andover escrow account. This amount shall cover any
contingencies that might affect the public welfare such
as site-opening, clearing, erosion control and
performance of any either condition contained herein,
prior to the posting of the Performance Security as
described in Condition 3 (q) of the Definitive
Subdivision Conditional Approval. This Performance
Guarantee may at the discretion of the Planning Board
be rolled over to cover other bonding considerations,
be released in full , or partially retained in
accordance with the recommendation of the Planning
Staff and as directed by the vote of the North Andover
Planning Board.
b. All designated open space parcels shall be retained by
the owners of the individual lots in trust. A perpetual
restriction of the type described in M.G.L. Chapter
184 , Section 31 running to or enforceable by the town
shall be recorded in respect to such land. Such
restriction shall provide that the Usable Open Space
shall be retained in perpetuity for one or more of the
following uses : conservation , agriculture, or
recreation. Documents to this effect must be reviewed
by the Planning Staff prior to endorsement.
C. The trust created in Condition 1(b) above must also
provide for the maintenance of the entrance way fence
2
6. The applicant shall adhere: to the following requirements of
the Fire Department:
a. All structures shall contain residential fire sprinkler
systems the design of which will be approved by the
Fire Department.
b. Smoke alarms must be installed.
7 . Tree cutting shall be kept to a minimum throughout the
project to minimize erosion and preserve the natural
features of the site. The tree line as shown on the approved
plans must be marked in the field and confirmed by the Tree
Warden and/or Town Planner. The Town Planner must be
contacted prior to any cutting on site to review the marked
tree line. Efforts to protect trees on site must be made.
8 . This special permit approval shall be deemed to have lapsed
after M1 i,g-1 1{ij!"two years from the date permit granted) unless
substantial construction of roadway and utilities has
commenced. This project must be completed by
z./ (within two (2) years from the date of the start of
construction)
9 . Any plants, trees, or shrubs incorporated into the landscape
plan titled "Planting Plan, Cobblestone Crossing at North
Andover, MA" prepared by Miquelle, MZO Group, that die
within one year from the time of planting shall be replaced
by the applicant.
10. The provisions of this Special Permit shall apply to and be
binding upon the applicant, its employees, contractors and
subcontractors and all successors in interest or control.
11. This Special Permit approval is based upon the approval of a
Definitive Subdivision Plan. The Special Permit and
Definitive Subdivision approvals are both based upon the
following plans:
a. Plans entitled: Cobblestone Crossing
A Residential Single Family
Development in North Andover, MA
Dated: December 3 , 1992 , revised March 261
1993 , May 3 , 1993 .
Prepared For: White Birch Construction Co. , Inc.
380 Essex ,Street, Suite 1
Lawrence, MA 01841
Prepared By: Environeers Inc.
160 Pleasant Street
North Andover, MA 01845
Sheets: 1 through 9
4
5
and landscaping.
d. Restrictive Covenants must be recorded to insure that
the architectural style and materials of the proposed
tructures are in accordance with the architectural
plans shown on Sheet 9 of the Plans entitled
"Cobblestone Crossing, A Residential Single Family
Dwelling Development in North Andover, MA" dated May 3 ,
1993 . Documents to this effect must be reviewed by the
Town Planner prior to endorsement of the plans.
e. Deeds conveying individual lots must contain a
restriction reflecting the 50 foot not-cut requirement
shown on the PRD plans, A sample deed must be reviewed
by the Planning Staff prior to endorsement of the
plans,
f. Landscaping must be in accordance with the recorded
plans and landscaping plans as shown on the "planting
Plan, Cobblestone Crossing at North Andover, MA"
prepared by Miquelle MZO Group.
2 . Prior to any lots being released from the statutory
covenants, the conditions outlined in the Cobblestone
Crossing Definitive Subdivision Conditional Approval must be
followed and:
a. Copies of the dricuments concerning the ownership in
trust of the open space, the conservation restriction,
and the restrictive covenants as referenced above, must
be submitted to the Board for review.
' b. A silt fence must be placed along the no-cut buffer
V zone on all lots to be released. The placement of the
silt fence will be viewed and approved by the Town
Planner.
3 . Prior to FORM U verification (Building Permit Issuance) for
an individual lot, the conditions outlined in the
Cobblestone Crossing Definitive Subdivision Conditional
Approval must be followed.
4 . Prior to a Certificate of occupancy being issued for an
individual lot, the conditions outlined in the Cobblestone
Crossing Definitive Subdivision Conditional Approval must be
Jfollowed .
5 . Prior to the final release of security, the conditions
outlined in the Cobblestone Crossing Definitive Subdivision
Conditional Approval must be followed.
3
b. Plans entitled: Planting Plan
Cobblestone Crossing at North
Andover, MA
Prepared by: Miquelle, MZO Group
CC. Conservation Administrator
Director of Public Works
Health Administrator
Building Inspector
Police Chief
Fire Chief
Assessor
Applicant
Engineer
File
Cobblestone.PRD
5