HomeMy WebLinkAbout1998-03-18 Conservation Commission Minutes Conservation Commission Minutes
DPW Conference Room
March 18, 1998
Members Present: Joseph W Lynch, Jr , Chairman, Albert Manzi, Jr ,Vice Chairman,
Robert Mansour, Scott Masse, Beth Wescott and John Mabon Deborah Feltovic arrived
at725pin
Staff Present: Michael D Howard, Conservation Administrator, Richelle L Martin,
Conservation Associate and Karen A Fitzgibbons, Secretary
The meeting was called to order at 7:00 PM
Minutes:
February 18, 1998
February 18, 1998 Executive Session
On a motion by Ms Wescott, seconded by Mr Mabon, the Commission voted
unanimously to approve, as amended, the above listed minutes
General Business:
Emergency Certificate DPW/James Rand
Mr Rand,Town Engineer, is before the Commission this evening seeking an Emergency
Certificate for the repair of a sewerage pipe break at 601 Chickering Road Mr Rand
stated that as of 2 00 pm today an 8" bypass was put in place to stop the discharge This
is only a temporary solution An 18" clay pipe was installed in 1923 and the edge of the
wetlands, in some areas, is within 5' of where the piping is There is evidence of
collapsing of an area of Route 125 due to the break in the line Roots, rocks and bricks
were found The water table is above the pipe and Mr Howard stated the state has issued
an Emergency Certificate already The pipe has collapsed causing a large sink hole in the
area Mr Rand stated it is not practical to repair,the only solution is to install a
permanent parallel pipe Mass Highway has given Mr Rand a verbal ok to work on
Route 125 Equipment is coming from Connecticut and New York and the Town will
literally be running 700' of line, bridging a low spot at Route 125 Mr Rand stated this
has been declared an emergency by the Town Manager and it will be a 24 hour a day
operation maintaining the pumps Mr Rand stated he will have proposals from the
contractors by 10 00 am on Friday and work will begin by Wednesday or Thursday at the
latest Mr Lynch stated he's hearing the bleeding has stopped and that's good Mr Rand
stated they will be working away from the wetlands Mr Howard stated there is a swarth
that will require some restoration, and he stated to the Commission that they must
formally declare the situation an emergency then issue an Emergency Certificate for 30
days Mr Howard stated outstanding issues are dewatering, stock piling and erosion
control which Mr Howard will resolve in the field On a motion by Mr Manzi, seconded
by Ms Wescott, the Commission voted unanimously to declare the situation an
emergency and to issue an Emergency Certificate dated 3/19/98
1
242-806 Violation Lot 14 Sherwood Drive (B Janusz)
Due to a death in the family, Thomas Neve could not attend the meeting this evening
Mr Lynch read into the record an undated letter from Mr Neve to Mr Howard regarding
lot 14 (Deb Feltovic just arrived) The Commission agreed they could not make much
sense out of the letter and decided to table discussion until the April 1, 1998 meeting On
a motion by Mr Masse, seconded by Ms Wescott, the Commission voted unanimously to
continue the public hearing until the April 1, 1998 meeting
242-769 COC Lot D #759 Dale Street(AnthonyDidio) Scott Giles
An Order of Conditions was issued on 9/15/95 authorizing construction of a single family
home and necessary appurtenances within the buffer zone of a BVW The Commission
Office is in receipt of a letter from an RPLS certifying compliance, and stamped as-builts
certifying compliance with the OOC Ms Martin states the site is not stable and has
photos dated 2/12/98 Ms Martin recommends the Commission deny the COC request,
but recommends a partial bond release
242-850 Enforcement Order Lot 12 Beaver Brook Rd
Ms Martin stated she conducted a site inspection on March 6, 1998 and as a result of the
violations found, sent a letter to the applicant stating an Enforcement Order has been
issued and requiring the applicant's appearance before the Commission at the March
18,1998 public hearing The violations include deteriorated haybales, inadequate silt
fence and lack of written progress reports Ms Martin performed a-site inspection today
and stated some of the haybales were replaced, but the silt fence is still not adequate
Also,the Conservation Office still has not received a progress report Al Couillard is
present this evening and stated he has sent a contractor out to the site to do the work
mandated by the Enforcement Order, however, a lot of the area is ledge Mr Couillard
stated he will submit a progress report to Ms Martin tomorrow Mr Manzi asked if the
haybales were installed correctly and he was told yes Ms Martin suggests double hay
bales be installed if the area can't be trenched and also stated again the lack of progress
reports Mr Manzi made a motion, seconded by Ms Wescott, to fine the applicant$100 a
day from the date of March 9, 1998 and to cease when compliance is given Mr Masse
stated the Commission doesn't have the authority to assess fines in this case Mr Lynch
agreed Mr Howard suggested the applicant come before the Commission every month
with a progress report Mr Manzi doesn't like this idea, doesn't want the agenda tied up
for that Mr Masse asked Ms Martin if she received a status report today and she replied
"no " Mr Masse made a motion, seconded by Mr Mabon, that the applicant be required
to submit status reports on the 25th of every month or the Commission will revoke the
Order of Conditions Before a vote was taken Mr Manzi stated he wanted to add the
Commission will issue a Cease & Desist on the project if the Commission doesn't get
compliance Mr Masse stated he accepts Mr Manzi's amendment The vote of the
Commission was unanimous Mr Howard stated this is the 3`d time we've had problems
with this lot and Ms Martin should receive status reports and anything else she asks for!
Mr Lynch stated Ms Martin is an agent of the Commission and should be treated as
such
2
242-851 Lot 19 Beaver Brook Rd Enforcement Order
Ms Martin stated the DEP sign is not up, no extra haybales are on site, no progress
reports have been received and there is trash everywhere on the lot Ms Martin stated the
developer hired Dave Maynard and the site looks great now, but there are not 20 extra
haybales on site Ms Martin stated a progress report was given today, however it is very
brief Mr Manzi stated to the applicant that the progress reports need to have more
substance to them and be more thorough The applicant claims he now understands and
will comply Mr Masse stated he is not satisfied with the progress report, but will
consider accepting it Mr Masse made a motion, seconded by Ms Wescott, that the
developer be held to the same motion as lot 12 above The vote of the Commission was
unanimous
Mr Howard stated to the Commission that he is very displeased with the way John
Benedetto has been treated in the newspapers He would like to go on record with this
comment and also to write a letter to the editor on behalf of the Commission explaining
the entire situation The Commission members suggested Mr Howard use all their
names in signing the letter Mr Manzi asked if there was a judges appeal pending and
was told"yes " On a motion by Ms Wescott, seconded by Mr Manzi, the Commission
instructed Mr Howard to write a letter on their behalf stating the Commission publically
supports Mr Benedetto The vote of the members was unanimous
Public Hearings (8:00 PM)
242-898 Willow Street South Ext (Channel Bldg) MHF Design cont from 3/4/98
Greg Wiech, Channel Building, is present this evening requesting a continuance, in
writing, until the April 1, 1998 meeting On a motion by Ms Wescott, seconded by Ms
Feltovic, the Commission voted unanimously to grant an extension until the April 1, 1998
meeting
242-897 So Bradford Street(C Deery)Neve Associates cont fr 2/18/98
Mr Howard stated that the Commission Office received, in writing, a request to continue
the public hearing until April 1, 1998 Mr Neve had a death in his family and is unable
to attend this evening On a motion by Mr Manzi, seconded by Ms Feltovic, the
Commission voted unanimously to grant the continuance
Request for Determination of Applicability
Boston Hall Ski Area (Colonial Vlg Dev) Seekamp Environmental cont fr 314198
Patrick Seekamp was present and stated at the site walk we identified areas that we took a
second look at Mr Seekamp passed out revised plans showing the offset wetlands
beyond the edge of the scrub line In one area the groundwater breaks out near the bus
company and ends at the gravel parking area There is an upslope area from the B
wetland flag area that drains to a large maple swamp The area between the two just
mentioned areas doesn't make it on vegetation or soils, it is non-hydric The A flag line
includes an area of breakout Mr Howard recommends issuing a Positive Determination
3
of Applicability referencing the plan of record On a motion by Ms Feltovic, seconded
by Mr Manzi, the Commission voted unanimously to issue a Positive Determination of
Applicability referencing the plan of record
Lot ff16 next to 115 Dale Street (Leonard Saltzman) Scott Gales
Scott Giles was present and proof of mailings were in the file
Mr Howard walked the wetland line and recommends issuing a Positive Determination
of Applicability On a motion by Ms Feltovic, seconded by Mr Manzi,the Commission
voted unanimously to issue a Positive Determination of Applicability
Notice of Intent(s)
242-901 Lot 25A Oxbow Circle (A Cormier) Merrimack Engineering Services
Les Godm, Merrimack Engineering, was present and proof of mailings was given to the
Commission Mr Godm stated the subdivision site has an expired Order of Conditions
and to complete the lot the applicant must come before the Commission requesting a
Notice of Intent The proposal is for a four bedroom house with the septic system 100'
from the wetlands The no-cut, no-disturbance zones are being honored Mr Lynch
asked Mr Howard if the line was accurate and Mr Howard apologized to the
Commission, he did not walk the lineāhe forgot' The line was delineated over three
years ago, therefore, Mr Howard must walk it again Mr Manzi feels the wetland line
may have changed On a motion by Mr Mansour, seconded by Ms Feltovic,the
Commission voted unanimously to continue the public hearing until April 1, 1998 to
allow Mr Howard or Ms Martin to walk the wetland line
242-999 1600 Osgood Street Lucent Tech Sewer Line (Camp, Dresser& McKee)
Proof of mailings was given to the Commission Peter Major from Lucent Technologies
stated they are proposing to install a force sewer main to GLSD They have been working
with Elena Proakis from Camp, Dresser& McKee and she is present this evening Ms
Proakis stated there are 4 areas of wetland going thru or adjacent to the property There is
a stream crossing(intermittent), two areas of BVW and another stream crossing Six inch
diameter force mains are proposed to be installed The soils will be excavated and
returned in the same way The stream will be dammed, banks will be seeded and an
erosion control blanket placed on top Sedimentation erosion control is shown on the
plan Mr Howard walked and approved the wetland line with Dwight Dunk in late '97 or
early 1998 Ms Proakis stated the flag numbers have been added to the plan, riverfront
area and BLSF are now shown and the 100' buffer zone is shown in yellow As to the
alternative routes instead of a wetland crossing there is insufficient depth of cover and
other utilities previously installed could pose a problem If installed too close to the
railroad crossing there could be vibration problems Ms Proakis stated they looked into
tying into Sutton Street,but DPW stated there was insufficient capacity in those pipes and
they don't want industrial waste anyway There will be one stockpile location outside of
the Commission's jurisdiction Mr Howard suggested he review the plan and the
Commission continue the discussion at the April 1, 1998 meeting Mr Mansour
expressed concern about the pipes encased in concrete and will specifications show the
depth of cutting and shoring? Ms Proakis stated"yes " Mr Mansour asked if there was
4
access possible on the other side of the stream and was told yes, from Holt Road and the
commission should specify the wetland crossings Mr Lynch stated about 1 to 1 1/2 years
ago we looked at the master plan for the airport and does anyone remember if there was a
discussion about gravity pump? Mr Howard stated this project is due north of the airport
project Mr Lynch to talk with Bill Scott and see what this means in relation to the
master plan Mr Howard stated with how government works the master plan has
regressed Mr Manzi stated this will be done during the driest part of the year, and if you
miss the window it will be too late and you'll have to wart On a motion by Ms Feltovic,
seconded by Mr Masse, the Commission voted unanimously to continue the public
hearing until April 1, 1998
Decisions:
242-892 Walnut Ridge Subdivision(Copley Dev)Merrimack Eng
Mr Howard had a draft denial (due to a lack of sufficient information by the applicant)
Order of Conditions prepared for the Commission's review On a motion,by Mr Manzi,
seconded by Ms Wescott, the Commission voted unanimously to approve the draft denial
Order of Conditions as drafted by Mr Howard
242-899 122 Boxford Street (Fred Chaput) S & W Landtech
Mr Howard had a draft Order of Conditions prepared for the Commission's review On
a motion by Mr Manzi, seconded by Ms Feltovic, the Commission voted unanimously to
approve the Order of Conditions as drafted by Mr Howard
242-900 Route 495/Marston Street Interchange MA Highway Dept) LEC, Inc
Mr Howard had a draft Order of Conditions prepared for the Commission's review On
a motion by Mr Manzi, seconded by Mr Mansour, the Commission voted unanimously
to approve the Order of Conditions as drafted by Mr Howard
Before adjourning,the Commission authorized Mr Masse to deal with the Toll Brothers
fine
Scott Masse, Vice Chairman
5