Loading...
HomeMy WebLinkAbout2000-01-05 Conservation Commission Minutes January 5, 2000 Conservation Commission Meeting Minutes Members Present Scott Masse, Robert Mansour, Joe Lynch, Beth Wescott, Jack Mabon Staff Present Richelle L Martin, Conservation Administrator Brian J LaGrasse, Conservation Associate Karen A Fitzgibbons General Business 242-893 Ratification of Enforcement Order(Mesiti) Route 114 Pump Station Scott Masse instructed the Department staff to notify Mesiti Development that the fines start forthwith,Joe Lynch and Robert Mansour agree Joe Lynch motioned to ratify the Enforcement Order, seconded by Jack Mabon, unanimous vote 242-816 Ratification of Enforcement Order(Mesiti) Campbell Forest Subdivision The letter and Enforcement Order were given to the Commission members for their review An inspection discovered a violation, and Richelle Martin issued an Enforcement Order and a$100 fine for encroachment into the 25' No Disturbance Zone General status reports were also missing Robert Mansour stated that some mechanism should be instituted to keep track of status reports Mesiti Development has since submitted the restoration report and all status reports Scott Masse wants the Department staff to issue a letter warning them that non-submittal of any more status reports will result in additional fines Joe Lynch motioned to ratify the Enforcement Order Beth Wescott seconded Unammous vote 242-913-COC- Lot 20A #41 Beaver Brook Road (Mike Eagan) Certificate of Compliance inspection was ok Joe Lynch says the grading was pushed back and the slope is 2.1 instead of 3 1 Unauthorized alteration of rip rap was performed but is acceptable Joe Lynch feels it is minor and motioned to approve the Certificate of Compliance Seconded by Beth Wescott Unanimous vote 242-817 -COC 150 Flagship Drive (MHF Design Consultants Inc) The restoration has been completed and the Certificate of Compliance inspection was ok Jack Mabon motioned to issue a Certificate of Compliance, seconded by Beth Wescott. Unanimous vote 242-818-COC- Lot 59 4197 Bridges Lane(Thomas Higgins) The restoration has been completed and the Certificate of Compliance inspection was ok Jack Mabon motioned to issue a Certificate of Compliance, seconded by Beth Wescott Unanimous vote 242-649 -PCOC-Lots 2,3, 5, 6, 8,9 Stevens Crossing(Evergreen Mgmt and Merrimack Engineering) Lots 4 and 7 need to have the wetland flags re-established by survey in the field Lot 2 Joe Lynch motioned to approve a Partial Certificate of Compliance and then withdrew his motion Joe Lynch motioned to deny the Partial Certificate of Compliance due to comparing the record drawing to the As-Built submitted. Beth Wescott seconded Unanimous vote Lot 3 The house was in a slightly different location and the shape was a little different but did not break any setbacks Joe Lynch motioned to grant Partial Certificate of Compliance Jack Mabon seconded Unanimous vote Lot 5 The house was moved closer to the wetlands but still met the setbacks Jack Mabon motioned to grant a Partial Certificate of Compliance Beth Wescott seconded Unanimous vote Lot 6 Beth Wescott motioned to grant Partial Certificate of Compliance Jack Mabon seconded Unanimous vote Lot 8 A different house was built,part of the driveway was constructed outside the easement and the letter from the engineer did not certify compliance with the 25' No Disturbance Zone Joe Lynch voted to deny the Partial Certificate of Compliance Beth Wescott seconded Unanimous vote Lot 9 Jack Mabon motioned to grant a Partial Certificate of Compliance Beth Wescott seconded Unanimous vote Discussion Joe Lynch does not want to release any bond money at this time Beth Wescott seconded Unanimous vote 242-943 Amendment to OOC Lot 1 Clark Street(RAM Asset Management) The modification request is for removal of existing pavement along the edge of the wetlands, restoration and changing the location of the planned parking spaces Joe Lynch felt there wasn't enough information with out the wetland flags on the plan or the square footage of alteration/restoration calculated Joe Lynch motioned to continue to the 1/19/00 meeting Jack Mabon seconded Unanimous vote 242-893 Amendment to OOC Route 114 Sewer Project(West Environmental) The amendment request is for a location change of the pump station, a de-watering basin and an increase in the limit of work The mandatory setbacks will still be met and no waivers are required Propane tanks will still be outside the 100' Buffer Zone The hay bale line will not change Joe Lynch motioned to issue the amendment by adding the plan dated 10/2/98 REV 9/27/99 to the record drawings Jack Mabon seconded Unanimous vote Public Hearings 242-993 Brooks School 1160 Great Pond Road (Rist-Frost Shumwa_y) cont 12/15/99 John Scott present Drainage reviews are all set and they complied with all other remaining issues Joe Lynch motioned to close and issue a decision within 21 days Beth Wescott seconded Unanimous vote 242-997105 Wintergreen Drive(Wyn Palmer)(New England Eng) cont 12/15/99 Richelle was waiting for a DEP # She received a DEP # Joe Lynch motioned to close and issue a decision within 21 days Beth Wescott seconded Unanimous vote 242-996 1812 Turnpike Street (The Equestrian Shop)Allen & Major Elmer Pease and Mark West present Lance Hill and Tom Donahue from Allen& Major present. The site is presently grass covered. The proposal is for a two story building, the top will be offices and the bottom will be retail. The roof will drain into an infiltration system Detention basins will outlet into a wetland area The applicant chose to use Coler and Colantomo and will post the $3,000 Escrow account for drainage analysis They need to show the de-watering detail and location, soil stockpile area, snow stockpile area and the dumpster location on the plans. They also need to show the distance from the wetland line to the building corner and the limit of work Joe Lynch motioned to continue to the 2/2/00 meeting Jack Mabon seconded Unanimous vote 242-990 Lots 1-5 Campbell Road Map 210 Block 106B (Eng Alliance) cont 12/15/99 Richelle is just waiting for crushed stone adjacent to the driveway Bob Mansour motioned to close and issue a decision within 21 days Beth Wescott seconded Unanimous vote Decisions 242-589 Heritage Estates (Marchionda & Associates) Tom Urbelis and Dave Kindred's lawyer reviewed and are ok with their agreement Richelle Martin had a draft Order of Conditions prepared Joe Lynch motioned to accept Order of Conditions as drafted Bob Mansour seconded Unanimous vote 242-993 Brooks School 1160 Great Pond Road (Rist-Frost Shumway) Richelle Martin had a draft Order of Conditions prepared Joe Lynch motioned to accept Order of Conditions as drafted Beth Wescott seconded Unanimous vote