HomeMy WebLinkAbout1993-11-12 Def Subdivision PRD DEF SUB AWN
c TOWN OF NORTH ANDOVER
MASSACHUSETTS .
µ4RiH
O,s,i.� a�i1rG
OIL
FO A
Any appeal shall be filed ;x o .r•'
within (20) days after the +0�°,ro•��'~ts
1SSNCHUS��
date of filing of this Notice
in the Offi :e '�e }vvn
NOTICE OF DECISION
Date November 12, 1993, .
. . . . . .
pctober i�, �1993
1993
Date of Hearing November. .;. . . . . .
Petition of Cobblestone Crossing Realty Trust . . . . . . .
. . . . . . . . . . . .
Premises affected „223 .Chickering ,Road . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Referring to the above petition For a special permit from the requirements
of the , , , North Andover Zoning. Bylaw . , section 8.5. - Planned, Residential Development
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . .
so as to permit . . ,the ,construction of .5 single family dwellings,. .creating
. . . . . . . . . . . . . . . . .
7 lots.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
After a ppublic hearing given on the above date, the Planning Board voted
CONDITIONAZLY
t0 APPROVE . . . . . . .the SPECIAL PERMIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
based upon the following conditions
cc: Director of Public Works
Building Inspector Signed Ae-�d-
conservation Administrator Richard Nardella, Chairman
Health Agent . . . . . . . . . . . . . . ... I . . . . . . . . . . . . . . .
Assessors John Simons, Vice Chairman
Police Chief . . . . . . . . . . . . . . I . . . • • • • . • • . • • • • • .
Fire Chief .Ioseph Mahone , Clerk
Applicant . . . . . . . y
. . . . . . . . . . . . . . . . . . . . . . . . .
Engineer Richard Rowen
File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Interested Parties
/f €.+a a:v '� 4 a kY�'7•Z 1�.3.a� irtw v'�i )��`,� �(S 1 titi 1. d�+� -r�.k -..�L•`.,x;...-«-�.,',. .._.. ... ..._,_ S /-: �
+ , r MUM 199
TOWN OF NOATH ANDOVUR ;+
MASSACHUSRTT$ �',:.i• 1 ,��
d.,ors,�♦ i37� ." '',
Any appeal shall be filed
:k; ,.,; r�••6 �,r,� i�.�' •'1"
'1.�•a..�retry. (�.�' J•�,r�31.i+B�'1'VF�i t'
Within(20)days aft'ar the J+u�uss l� `4 dN�C01,'`!
k 4
date of filing of thils Notice s r:
` o to . ��
In the Qf,itr ~'' NOTI CE OF DEC€510Ni•11+,
TNO li 14 co� VW twenty i20€days
hmG4pwft daUaidtdsknNod Tate,t�ovembex 12,
m
wftwW4ofIIlspp"L oulaLur 19, 1903 �
*'' C>m� F—�— ( tinvembor 2; 1993
• � Tate of Hearing .... ..,...
' •. Cobblestone Crossing Realtx Trust j
,.. petition of .... .. .. ,
�+' 223 Chickering Road
�t�,t• ' Premises affected ...........................................................
�f
,Tt��s _ Referring to ,the above petition for a special permit from the requirements' '�CT'.
' ua the Andover Zoning B�+law .Section 8. . Piann/zd Residential ❑uvolopmaannt {
of the . .. ......,... ... ........ .......
'•: , the construction of 5 sin �Eemiiy at;eiiings, creatin
ti.. so as to permit .... ............... �....
7 lots.
..............II,...............t...............................,,.,..
Gl` After a p�u�Ho hearing given on the above data, the Planning Board voted
:... C01TIONA L
#0 APPROVE......the SPECIAL PERMIT o
x,r ...t.......................... .... I''
Ln
.:C
i` based upon the following conditions:
s ccr Director of PuWlic works n s}1{
/C Z Building Inapector Signed x 1.
f { ia
Conaorvatian Administrator Richard Nardullar Chairman r 1
Realth Agent
Auscuaoru Jolm Simousr Vice Chairman
Police Chief t. ••• ' '• '••••
rear: ,Pita chief Jusa h Mahano Cicrk �. �
Applicaq ..l'........Yl,,....,t.t,...... C7
y Engineer i Pile Richard Itowen
.... .........
y.,.
Interested Parties
s<��:�. .,..,,.•piunnin��13onrtl..,..... ; 4
kyl r
r x.
4�; '.. J4
t :NELSON Town of 120 Main Street, 01845
i NORTH ANDOVER (508) 582-6483
JILDING V8?ACH U.
45$
1,ONsERVA'TIOI�I niMiorz OF
PLANNNING PLANNING & COMMUNITY DEVELOPMENT
November 12 , 1993
Mr. Daniel Long,
Town Clerk
Town Building
120 Main Street
North Andover, MA 01845 Re: Special Permit
PRD Cobblestone
Crossing
Dear Mr. Long:
The North Andover Planning Board held a public hearing on
October 19, 1993 on the application of Cobblestone Crossing Realty
Trust, 733 Turnpike Street, North Andover, MA. , requesting a
Special Permit under Section 8 . 5 (Planned Residential Development)
of the North Andover Zoning Bylaw. The legal notice was properly ,
advertised in the North Andover Citizen on September 29 and October
6, 1993 and all parties of interest were duly notified. The
following members were present: Richard Nardella, Chairman, John
Simons, Vice Chairman, Joseph Mahoney, Clerk, Richard Rowen and
John Daghlian, Associate Member.
The petitioner was requesting a Special Permit for the
construction of five (5) single family dwellings, creating seven
(7) lots. This is a modification to an approved plan.
Mr. Mahoney read the legal notices to open the public
hearings.
Mr. Nardella asked why this was a modification, not a new
subdivision.
Mr. Steve Stapinski gave the Board the following information:
1. Site adjacent to Cobblestone Crossing 1 - extension of
Copley Circle
2 . former Arcidicono property
3 . it is a modification because it needs to cross land that:
was dedicated as open space under Cobblestone Crossing :I
4 . create one homeowner association with both sections
5. easier to call it a modification so that appropriate
changes can be made to Cobblestone I
r
page 2 :
Cobblestone Crossing II
Modification
Additional information provided:
3501 extension of roadway
subdivide into 5 lots with homes
lots 13 and 14 of Cobblestone I will be 'added to with
original Cobbl.estonr open spat thereto e 7 lots total
are affected but ��_ed
3y 5 new homeswater main conne through to existi water main at
existing house, 1ping water system
catch basins -ipe to detention a - pipe outlet to
swale currently existing t-p---TJ�ain line on Route 125
detention pond mitigates up to .100 year storms
roadway slopes down to existing Copley Circle catch
basins
more mitigation will be provided in the detention basin
that currently exists
total decrease in amount of run off zero % increase peak
rate
Lot 22 built in Cobblestone I open space
balance of houses on Arcidicono property
all different house designs, but are the same designs as
Cobblestone I
driveways, garages provided
22 ' wide pavement on Copley Circle originally permitted,
will continue with 22 ' pavement
propose a cul-de-sac island identical to other cul-de-sac
sidewalk terminate at Lot 19
open space provided
no waivers required
Lot 19 will be moved closer to the street than currently
shown on plan
open space adjacent to old Village Lane
additional plantings will be placed along 199 ' boundary,
plantings will be placed along boundaries where needed to
provide a, visual, screen
open space taken away from Cobblestone Phase I, bu
compensated with Cobblestone Phase II open space
Mr. Mahoney asked about ownership of Lot B. Mr. Stapinski
stated that the developer does not currently own the property.
Mr. Nardella stated that if .Lot B not owned it should not be
shown on conventional plan, need to show a revised conventional
plan, need to eliminate Lot B in all calculations. .
Mr. Daghlian - water main extension - no utility easement
shown.
Page '3 :
Cobblestone Crossing TT
Modification
Mr. Nardella read a letter from D. P.W. received this evening,
dated October 18, 1993 , requirements must be addressed.
Mr. Daghlian asked if the developer had permission from the
State to tie into the State system. Mr. Stapinski stated that he
had a letter from the State stating no permit required if no direct
connection.
Mr. Nardella questioned the standing water in the detention
pond. Mr. Stapinski said no, shallow detention pond.
Mr. Nardella asked how many acres was involved. Mr. Stapinski
told him there were 4 . 5 acres.
25, 000 sq. ft. required in R-3 for each lot
Mr. Nardella asked does modification comply with all
subdivision/PRD requirements. Mr. Stapinski answer - yes.
Mr. Nardella asked if homeowners association owns open space.
Mr. Stapinski stated that no Lots have been conveyed yet, therefore
homeowners association redone to accommodate new open space.
Mr. Nardella asked what Lot 12A and 13A did to the open space.
Mr. Stapinski stated that 35% open space originally provided, open
space being adjusted over the entire parcel. House on Lot 19 can
be moved closer to the road. Fence on Lot 19, wood fence along
property line to stone wall in woods on Lot 19 . open space
easement on Lot 19 to provide continuous open space,
Mr. Nardella noted that the detention pond is close to Lot 18 .
Mr. Nicetta stated that this may be a problem, may need a fence.
Mr. David Lanzoni, 99 Restaurant, stated that he had no
objections to the proposed development. There are inherent
problems with restaurants next to residential areas. He wants
landscaping consistent - with 199 ' requirements and protecci..,.sx
barriers along boundary.
Mr. Nardella wants an answer on doors to dumpsters from the
1991 . Mr. Lanzoni told Mr. Nardella that he has been working with
staff to come to a resolution. ,
Mr. Perna stated that the 22- roadway was consistent with
Cobblestone T, but not consistent with the D. P.W. policy of 241 .
5
Page 4 :
Cobblestone Crossing
Modification
Mr. Nardella asked how do Lot .A and B effect total number of
lots in the overall calculations for the subdivision. Mr.
Stapinski stated that subdivision shows them as Form A Plans. Lot
B needs to be eliminated from conventional plan.
Mr. Rowen said that if Lot A is being adjusted, it should be
reviewed as a lot like Lot 6.
Ms. Colwell asked that the center line of the roadway be
staked by the weekend, Board to review site on their own.
On a motion by Mr. Rowen, seconded by Mr. Mahoney, the Board
voted to continue the public hearing to the next meeting of
November 2 , 1993 .
On November 2 , 1993 the Planning Board held a regular meeting.
The following members were present: Richard Nardella, Chairman,
John Simons, Vice Chairman, Joseph Mahoney, Clerk and Richard
Rowen.
Mr. Steve Stapinski presented a conventional subdivision plan
showing 5 new lots and one lot with an existing lot. He presented
a PRD plan with Lot B eliminated, ' explained calculation of open
space.
Mr. Nardella - When Board entered into discussions of
Cobblestone Modification, assumed that new documents and plan filed
at Registry.
Mr. Stapinski - Plan filed, but new documents never filed,
easements, open space documents need to be created and filed, house
designs need to be modified. Mr. Nardella asked at what point in
the process do these new documents get filed. They will be filed
when modification approved and new documents are drafted,
119911 needs to get gates on dumpster.
Add 501 buffer zone and no-cut to plan.
On a motion by Mr. Rowen, seconded by Mr. Simons, the Board
voted to close the public hearing on the Special Permit, PRD and
the Definitive Subdivision for Cobblestone. Crossing II.
On a motion by Mr. Mahoney, seconded by Mr. Simons, the Board
voted to approve the definitive subdivision as amended.
A
Page 5 :
cobblestone Crossing 1S
Modification
On a motion by Mr. Mahoney, seconded by Mr. Simons, the Board
voted to approve the Special Permit for a PRD as amended. The
Chairman voted in the affirmative.
Attached are those conditions.
Sincerely,
North Andover Planning Board
wax
Richard Nardella, Chairman
cc: Director of Public Works
Building inspector
Conservation Administrator
Health Agent
Assessors
Police Chief
Fire chief
Applicant
Engineer
File