HomeMy WebLinkAbout2000-10-04 Conservation Commission Minutes Conservation Commission Minutes DPW Conference Room October 4,2000 Members Present: Scott Masse, Chairman, Albert Manzi,Vice Chairman, Robert Mansour, Deborah Feltovic and Beth Wescott Absent were: Joseph Lynch, John Mabon Also James Demotses and Robert Cerchione, Associates were also absent Staff Present: Brian J LaGrasse, Conservation Associate and Germaine L Ouellette, Secretary The meeting was called to order at 7 p in by Scott Masse, Chairman Minutes: No minutes were accepted General Business: 242-991 Bond Reduction- 140 Willow Street(Dutton& Garfield) This Order was issued on 3/1/00 authorizing the construction of a 7,344 s f two story office building, parking lot, drainage structures, wetland replacement areas and necessary appurtenances within the Buffer Zone to a BVW, Bank, Land Under Water,Riparian Zones to Mosquito Brook and BLSF A waiver of the 25' NDZ was granted for the construction of the detention pond and 14,985 s f of wetland replication was approved The wetland replication was recently planted and passed a pre-construction inspection The applicant is asking for a Bond Reduction,however, the Commission's views are not favorable on partial bond releases for projects of this nature and Brian LaGrasse had discussed this with the applicant but the applicant desired to appear before the Commission Since the plantings have only been in for 30 days the Commission stated it needed to complete a 2 year growing season per Order of Conditions At this point Albert Manzi made a motion to deny the Bond Reduction for 242-991 and this was seconded by Deborah Feltovic The vote was unanimous 242-927 Partial Bond Release— 80 Campbell Road (Hancock Env)cont fr 9/6/00 Julie Parrino of Hancock Environmental presented asking for a release of$3,000 of the $4,500 Bond being held Brian LaGrasse informed the Commission that this Order was issued on 9/17/98 authorizing the construction of a barn and horse paddock within the BZ to a BVW Brian visited the site on 9/6/00 and the project is complete and the site is stable There are no violations on site Scott Masse, Chairman recommended partial release of Bond being held A motion was made by Albert Manzi to release $3,000 of the Bond being held for 242-927 and this was seconded by Deborah Feltovic The vote was unanimous Conservation Commission Minutes 10/04/2000 Page 2 242-17 PCOC -Lot 3 Bridle Path Lane (Diane Matses)(Domenic Scalise, Esq ) Brian LaGrasse informed the Commission that this Order was issued on 1/3/77 authorizing the construction of Bridle Path Lot 3 is all wetlands Apparently Lot 3 and 4 have been combined to create one buildable lot Brian inspected the property on 10/3/00 and had no issues The lot is wetlands and there are no violations on site There is no Bond This seems to be an administrative issue only Deborah Feltovic made a motion to grant a PCOC for 242-17 and this was seconded by Albert Manzi The vote was unanimous 242-940 COC -400 Osgood Street(William Banister)(Joseph Serwatka, P E)cont fr 9/20/00 This was continued from our last meeting for the submittal of revised plans with the buffer zones removed from around the detention pond. The plans requested have been submitted and are satisfactory Brian LaGrasse stated that this Order was issued on 12/3/98 authorizing the construction of a parking area and a stormwater management basin within the Buffer Zone to a BVW They have submitted stamped As-Builts and a letter from the engineer certifying compliance with the Order of Conditions The 25'/50' were mandated and met except at the entrance where the existing gravel drive was paved The site is stable The Commission stated that the applicant needs to install signs for No Disturbance Zone and No Stockpiling Zones before they can issue a COC. A motion was made by Deborah Feltovic to continue 242-940 to our meeting on 10/18/00 and this was seconded by Albert Manzi. The vote was unanimous Robert Mansour excused himself from the meeting at this point and since we didn't have a quorum at that point the meeting was haulted until his return 5 minutes later. 242-920 Modification to OOC - Executive Quarters(Mesrti Dev)cont fr 10/4/00 This was continued from the last meeting so they could submit information regarding noise specifics regarding the chiller. They have submitted a packet and letter from Jeffrey Fullerton, a sound consultant from Acentech, Inc and a letter from Mark West regarding the noise levels of the chiller and their impact The sound consultant does not predict any adverse effects but would recommend a stockade fence reinforced with 1/4"plywood to surround the chiller and act as a solid barrier With the stockade fence the noise levels in the wetland would be 55 dBA and further reduced by requesting that the chiller be specified to have sound reduction option for the compressor Mark West states that the increase in noise from the chiller will not have a negative impact on aviary wildlife This modification is for a change in the location of the transformer pad and chiller. They are not proposed within the 50' NCZ The 25' NDZ is met on the proposed plans The erosion controls are in the same location Robert Mansour asked if there was a reason why there is Conservation Commission Minutes 10/4/2000 Page 3 an opening in back of the stockade fence surrounding the chillers The answer was that it was for maintenance purposes They need 5 feet all around entire chiller on the inside of the fence for maintenance purposes Mr Mansour wanted to see the gate in the stockade fence moved away from the detention basin Ken Ahern stated that they could flip it around so that no vehicles would be allowed near the detention basin A motion was made to grant the Modification to Order of Conditions for 242-920 by Deborah Feltovic accepting Plans dated 6/30/98 and REV 9/20/00 and incorporating letter from Jeffrey Fullerton and letter from Mark West and this motion was seconded by Albert Manzi The vote was 3 for and one abstained -Beth Wescott, as Ms Wescott had arrived in the middle of this presentation. 242-966 Modification to OOC - 351 Willow St(Thomas Neve)cont fr 9/20/00 This Order was issued on 9/l/99 authorizing the construction of an addition and enlargement of the front parking lot within the Buffer Zone to a BVW The modification is for connecting the concrete pad to the existing foundation The pad itself is in the 50' NCZ as is the additional work proposed Brian LaGrasse informed the Commission that they are trying to work out some details and have not submitted anything at this time Brian spoke with Tom Neve and he has indicated that there is more to this project than originally proposed He stated that they are possibly looking into some type of metal enclosure/structure The applicant would also like to request a site walk with the Commission to look at possible alternatives and mitigation The Conservation Commission does not feel a site walk is warranted now until all plans are submitted. A motion was made by Robert Mansour to continue 242-966 to 10/18/00 and this was seconded by Deborah Feltovic The vote was unanimous 242-1000 COC— 173 Coachman's Lane(Richard& Peggy Issenberg)(Hancock Eng.) Brian LaGrasse stated this Order of Conditions was issued on 3/15/2000 for the construction of an addition, blue stone patio and fire pit and modified at the last meeting to include an addition/storage shed to the northeast corner of the house. They have submitted stamped As-Builts and a letter from the engineer certifying compliance with the Order of Conditions The 25'/50' were mandated and met except to blue stone walkway The site is stable Brian LaGrasse recommended issuance of COC for 242-1000 and release of the $1,500 Bond A motion was made by Albert Manzi and seconded by Deborah Feltovic to grant a COC for 242-1000 and release the $1,500 Bond The vote was unanimous 242-640 COC—295 Candlestick Road(John Kosheff)(Scott Giles) Scott Giles is requesting a continuance of the above COC for 242-640 until our meeting of 10/18/2000 so that he can re-establish the wetland flags A motion was made by Albert Manzi to continue 242-640 to 10/18/2000 and this was seconded by Robert Mansour The vote was unanimous Conservation Commission Minutes 10/04/2000 Page. 4 242-1018 COC -Harkaway Rd -Bay State Gas(Guertin&Assocs ) This Order was issued on 7/5/00 authorizing the replacement of a 2" gas line and associated home connections within the Buffer Zone to a BVW This filing was the result of an Enforcement Order and filed after the fact They have submitted stamped As-Builts and a letter from the engineer certifying compliance with the Order of Conditions The gas line was installed under the existing pavement Brian LaGrasse visited the site on 8/2/00 and had no issues. The site is stable There are no violations on site. Brian recommended issuance of the COC and release of the $2,000 Bond A motion was made by Deborah Feltovic to grant a COC for 242-1018 and release the$2,000 Bond and this was seconded by Albert Manzi The vote was unanimous 242-1023 COC -4 Kathleen Drive(Bruce & Diane Carey) Brian LaGrasse informed the Commission that this Order was issued on 7/19/2000 authorizing the construction of a 12'X12' deck within the Buffer Zone to a BVW They have submitted As-Builts and a letter from their engineer certifying compliance with the Order of Conditions However, the As-Built plans submitted are not stamped by the engineer Mr Carey, the homeowner was present and stated that the original plans were accepted without a stamp, therefore he thought that the As-Builts could be accepted the same as well The Conservation Commission informed Mr Carey that he needed to get his engineer to stamp the As-Built Plans A motion to continue 242-1023 to 10/18/00 was made by Robert Mansour and this was seconded by Beth Wescott The vote was unanimous 242-784 Modification to OOC -Lot 9 Abbott Village (William Barrett) This Order was issued and amended on 6/19/99 authorizing the construction of Abbott Village Subdivision within the Buffer Zone of a BVW The modification is for a change in the footprint of the house, driveway and grading The house was originally proposed at 62' and is now proposed at 55' from the wetlands The driveway was originally proposed at 40' and is now proposed at 32' from the wetlands The 25'/50' are met on the proposed plans The grading between the house and the wetlands is not as steep as originally proposed The erosion controls are in the same location Bill Barrett informed the Commission that the flags are up in the field Brian LaGrasse stated that this modification would not require any additional conditions and Mr LaGrasse recommended we issue Modification to Order of Conditions for 242-784 and accept plans received 9/21/00 A motion was made by Deborah Feltovic and seconded by Albert Manzi to accept Modification to Order of Conditions for 242-784 and accept Plans dated 9/21/00 The vote was unanimous 242-997 COC - 105 Wintergreen Drive (N E Engineering) Brian LaGrasse informed the Commission that this Order was issued on 1/19/00 authorizing the replacement of a failed septic system within the Buffer Zone to a BVW and riparian Conservation Commission Minutes 10/04/2000 Page- 5 zones to Mosquito Brook They have submitted As-Builts and a letter from the engineer certifying compliance with the Order of Conditions The 25'/50' were mandated and met Brian visited the site on 10/3/00 and had no issues The site is stable There are no violations on site Brian recommended we issue a COC for 242-997 and release the $1,500 Bond A motion was made by Deborah Feltovic and this was seconded by Albert Manzi. The vote was unanimous 242-845 COC—Brookview Drive (Brookview Country Homes)(Paul Marchionda) This Order was issued on 4/3/97 authorizing the construction of a roadway providing access to a planned residential subdivision along with underground utilities within the Buffer Zone to a BVW The houses were not proposed under this filing A wetland crossing was approved with 5,900 s f of replication 24,000 s f of flood plain compensation area was replicated The Order of Conditions requires the wetland replication area to be monitored for 5 growing seasons and it has only been through 3 growing seasons Scott Masse recommended that the growing season be reduced to 3 years instead of the 5 years There is also some rip rap next to Lot 2 that needs to be cleaned up Brian LaGrasse stated that he needs a status report for this growing season At this point the applicant withdrew his request for a COC without prejudice and will reapply when he is ready Ratification of Enforcement Order- 1060 Turnpike Street Enforcement Order was signed for 1060 Turnpike Street Brian LaGrasse will draft a letter to the owner stating that he has two weeks in which to comply with this Enforcement Order A motion was made by Deborah Feltovic and seconded by Beth Wescott to ratify Enforcement Order for 1060 Turnpike Street The vote was unanimous. Decision: 242-1034 210 Farnum Street This was for replacement of a failed septic system It was decided that the shed on the property is too big and too old to be moved further away from the wetlands The shed would fall apart if moved The Order of Conditions was drawn up by Brian LaGrasse to include 10 extra hay bales along with a$1,500 Bond payable to the Town of North Andover A motion was made to adopt as drafted the Order of Conditions for 242-1034 by Albert Manzi and this was seconded by Deborah Feltovic The vote was unanimous Public Hearings(8:00 p.m.) Notice of Intents: 242-1020 492 Sutton St (Mass Aeronautics Com)(Dufresne-Henry,Inc )cont fr 9/20/00 Brian LaGrasse informed the Commission that the Airport has submitted the escrow money and that Patrick Seekamp has started his review Mr. LaGrasse has not received any Conservation Commission Minutes 10/04/00 Page 6 correspondence from Mr Seekamp at this time A motion was made by Albert Manzi to continue 242-1020 to 10/18/00 and this was seconded by Deborah Feltovic The vote was unanimous 242-1036 1070 Osgood Street(Chas Senabunyanthi)(Thomas Neve Assocs)cont fr 9/20/00 Thomas Neve asked for a continuance to our meeting of 11/01/00 A motion was made by Albert Manzi to continue 242-1036 to 11/01/00 and this was seconded by Deborah Feltovic The vote was unanimous 242-1025 Greene St/Kenwood St(Richmond Rlty)(Wetlands Pres)cont fr 9/6/00 This NOI is for the construction of a four story, 44 unit condominium building with parking, cul de sac, stormwater management systems, flood plain compensation,replication and wild life habitat restoration Michael Howard and Lisa Eggleston have performed the third party reviews and have submitted their comments They have relocated the intermittent stream from under the building to on the side of the building The relocated stream will be an open above ground stream channel Beth Wescott questioned stockpiling areas shown on the plan Any snowstorm that occurs - all snow removal will have to be done right away and not stockpiled on site. This was agreed upon Refueling will be outside the rivefront area There were no abutters present for this project Albert Manzi made a motion to close the public hearing and issue a decision in 21 days However since Epsilon Associates is not completely finished with their review Mr Manzi withdrew his previous motion and recommended an increase in the escrow account to add another$500 00 Albert Manzi made a motion to increase the escrow account to add another$500 00 and this was seconded by Deborah Feltovic The vote was unanimous At this point Albert Manzi made a motion to close the public hearing and issue a decision in 21 days and this was seconded by Deborah Feltovic The vote was unanimous 242-1030 96 Sugarcane Lane (Todd& Karen Clark)(Scott Giles)cont fr 9/20/00 This NOI is for the expansion of an existing deck and sidewalk addition within the Buffer Zone to a BVW At the last meeting Brian LaGrasse mentioned that he wanted the erosion control moved Mr LaGrasse has conditioned this in the Order of Conditions The proposed deck meets the 50' NCZ A motion was made by Beth Wescott to close the public hearing on 242-1030 and issue a decision in 21 days and this was seconded by Albert Manzi The vote was unanimous 242-1026 Lot 33 Abbott Street(No Andover Land Corp )(N E. Engineenng)cont fr 9/20/00 This NOI was continued from our last meeting so that the applicant could explore more alternatives We have received a letter from the DPW today (10/4/00) stating that they Conservation Commission Minutes 10/04/2000 Page 7 would allow a temporary forced main to be installed within the sidewalk currently under construction up to the existing sewer at the intersection of Abbott Street and Nutmeg Lane The DPW will permit the connection subject to their review and approval of plans and specifications for the force main,pumping station and appurtenances A continuance to our meeting of 10/18/00 was asked for and granted A motion was made by Albert Manzi to continue 242-1026 to our meeting of 10/18/00 and this was seconded by Deborah Feltovic The vote was unanimous 242-1029 440 Marbleridge Road (Michael& Mary Borzi)(Scott Giles)cont fr 9/20/00 This was continued from our last meeting in which applicant was requesting construction of a 12'X22' deck within the Buffer Zone to a BVW They have submitted revised plans with a detail added to show the deck cantilevered Brian LaGrasse stated that they have not obtained structural drawings at this time The building inspector will require full structural specifications when a permit is applied for Mr LaGrasse stated that we could condition the submittal of the structural drawing as a pre- construction inspection A motion was made by Albert Manzi to close the public hearing and issue a decision in 21 days and this was seconded by Beth Wescott The vote was unanimous 242-1031 1812 Turnpike Street(Jean Proulx)(Allen&Major) No proof of mailings were brought in When notice was read it was found to be outdated Conservation Commission was very upset especially Albert Manzi who stated"get your act together or we'll throw this application out next time." It was recommended that applicant could either withdraw without prejudice and re-apply, or renotify and re-advertise and start again in 2 weeks Applicant chose to renotify and re-advertise It was also decided that whatever Escrow amount was left in the old filing 4242-996 be brought over to the new filing A motion was made by Albert Manzi to continue 242-1031 to 10/18/2000 and this was seconded by Deborah Feltovic The vote was unanimous 242-???? 209 Johnson St (Robert Nazarian)(N E Engineering) No proof of mailings were received and no abutters were present for this project. Ben Osgood,Jr requested a continuance to our meeting of 10/18/2000 As no DEP #had been issued a motion was made by Albert Manzi to continue this to our meeting of 10/18/2000 and this was seconded by Deborah Feltovic The vote was unanimous 242-1039 148 Bridle Path- (Steven& Linda Weeks)(Terry Gensel) Proof of mailings were presented Terry Gensel was present for this project This NOI is for a sewer tie in within the Buffer Zone to a BVW The tie in will be going down the north Conservation Commission Minutes 10/04/2000 Page 8 side of the driveway The area where the tie in is proposed is between two driveways. This project requires a waiver of the 25' NDZ There are no other alternatives feasible due to the amount of wetlands surrounding the property Erosion controls are proposed to the north of the sewer line and in an appropriate location The south side of the driveway there is a 7" asphalt berm in between the work being performed and the resource area The berm is solid and will act as a barrier to the resource area Dewatermg and soil stockpiling locations have been determined in the field and depicted on the site plan Brian LaGrasse walked the site on 10/3/00 with Terry Gensel and confirmed the wetland line. There are no violations on site Hyder Construction will be doing the work A motion to close the public hearing and issue a decision in 21 days for 242-1039 was made by Deborah Feltovic and tlus was seconded by Beth Wescott The vote was unanimous. 242-1040 160 Bridle Path(Patrick& Christina Morgan)(Terry Gensel) Proof of mailings were presented Brian LaGrasse informed the Commission that this NOI is for a sewer tie in within the Buffer Zone to a BVW The tie in will be going down the center of the driveway There are wetlands to each side of the driveway that are connected by a culvert This project requires a waiver of the 25' NDZ There are no alternatives feasible due to the amount of wetlands surrounding the property Erosion controls are proposed around the wetland to the south and are in an appropriate location The north side of the driveway has a 7" asphalt berm in between the work being performed and the resource area The berm is solid and will,act as a barrier to the resource area except for two breaks near the house Hay bales are proposed in the breaks Dewatermg and soil stockpile locations have been determined in the field and depicted on the site plan Brian LaGrasse walked the site on 10/3/00 and confirmed the wetland line There are no violations on site. He recommended closing the public hearing and issuing a decision in 21 days A motion was made by Deborah Feltovic to close the public hearing and issue a decision in 21 days for 242-1040 and this was seconded by Beth Wescott The vote was unanimous 242-1041 122 Boxford Street(Patricia& Paul Passariello) Proof of mailings were presented One abutter was present for this project-Mrs Virgima Campagna Brian LaGrasse stated that this NOI is for the construction of a 6' extension of the garage within the Buffer Zone to a BVW The addition is 79' from the wetlands, but the hay bales are proposed 14' at the closest point The erosion control is proposed along the side of the driveway between the driveway and the resource area This seems to be the only feasible area that the erosion control can go The work is being performed at the top of the driveway and this is the only permeable area that the silt fence can be trenched and the hay bales can be staked The other side of the driveway looks possible but because of the steep slope of the driveway, I feel that any unstable soil at the excavation area will wash down the driveway and end up in the resource area Brian LaGrasse walked the site on 10/3/00 and could not locate all the wetland flags These wetland flags will need to be re-flagged Conservation Commission Minutes 10/04/2000 Page 9 Mrs Campagna thinks that the culvert is not working properly Two years ago it was an intermittent stream and now they have standing water there She is getting water backed up in her backyard Albert Manzi stated that the culvert is working properly. Michael Howard stated that when he was working for the Town of North Andover they had yanked out a steel plate from this culvert Brian LaGrasse will call Bill Hmurciak on this A motion was made by Deborah Feltovic to continue 242-1041 to our meeting of 10/18/00 and this was seconded by Albert Manzi. The vote was unanimous 242-10371210 Osgood Street(Forgetta Development)(Epsilon Associates)cont fr 9/20/00 Michael Howard of Epsilon Associates asked the Commission that this be tabled until later in the evening 242-1038Barker Street(Tara Leigh Dev,LLC)(Epsilon Associates)cont fr 9/20/00 Brian LaGrasse informed the Commission that he had spoken to John Chessia regarding this project and he indicated that the applicant is looking at alternative routes for the sewer line This NOI is for the construction of a cross country sewer line and stormwater management system within the Buffer Zone to a BVW The cul-de-sac roadway and the seven lots are out of the 100' Buffer Zone Three alternate sewer line routes were proposed Route C is the longest and most expensive site but alternate route C is clearly the best site because it complies with the Bylaw and there would be the least disturbance to the area Albert Manzi agreed that alternate route C is also the best one Scott Masse has a letter from Mr Smolak which states that he is satisfied and everything is fine with him A motion was made to continue 242-1038 to our meeting of I I/l/2000 and this was seconded by Albert Manzi The vote was unanimous Albert Manzi left the meeting at 9:05 p.m. to go to work. 242-1037 1210 Osgood Street (Forgetta Dev)(Epsilon Associates)cont fr 9/20/00 This NOI is for a mixed use development within the Buffer Zone to a BVW They are proposing an office building, a 102 room hotel, a retail building and a sewer force main on Rte 125 The 25' NDZ and 50' NCZ are met for the proposed buildings and development They are requesting a waiver of the 25' NDZ for the force main, which is proposed in the existing pavement of 125 and the demolition of the existing greenhouses and sheds. The mitigation report is sufficient Brian LaGrasse walked and confirmed the wetland line and erosion control is depicted in an appropriate location John Chessia has started his review and we've received his comments on 9/26/00 He would like some additional information to be provided to him and he would also like permeability tests done for the infiltration system. Mr Chessia had comments regarding maintenance procedures of the subsurface infiltration systems and recommended that the applicant install monitoring wells The spill ways should be rip rapped to avoid erosion and siltation Conservation Commission Minutes 10/04/2000 Page 10 The DPW is in the process of reviewing the sewer capacity There will be a forced main all the way up to the manhole by the airport A 6"forced main will be used Beth Wescott feels it is a long forced main and asked what will the head pressure be? Stormwater management will also be a big issue on this project Brian LaGrasse asked that applicant submit a revised O&M Plan To meet the setbacks they'll be doing a series of versa-lock walls The Commission wanted to know how high the walls would be Some spots will be 12 to 14 feet high Versa-lock blocks have a certain way of building these walls in order to make them safe Brian LaGrasse stated we can make this a pre-requirement before construction A motion was made by Robert Mansour to continue 242-1037 to I I/1/00 and this was seconded by Beth Wescott The vote was unanimous 242-1032 127 Bridle Path(George Chatson)(Thomas Neve Assoc)cont fr 9/20/00 Mr Thomas Neve is requesting a continuance to our meeting of 1 I/I/00 in order to fulfill mitigation requirement A motion was made by Deborah Feltovic to continue 242-1032 until 11/1/00 and this was seconded by Robert Mansour The vote was unanimous. 242-1042 Bayfield Drive(Benjamin Farnum)(Thomas Neve) Proof of mailings were presented Thomas Neve was present This NOI is for the leveling of a mound in the 25' NDZ to a resource area to provide access to Bayfield Drive from Route 125 for moving of the Barn Venzon has been on strike and this has hampered the moving of the barn The proposed route along Hillside would take 3 to 6 months to move due to fiber optic cables which would be a very time consuming job and cost prohibitive The new route will go down Rte 125 and take a right onto Bayfield Drive which is about 28 to 30 feet wide The barn would need about 40 feet to go through this route They are proposing to clear vegetation, take soil out, stockpile it then put soil back They are proposing to put down 2 layers of plywood then put a cribbing section on the wetland surface. The cribbing will be built of 8X8 timbers, then steel plates will be placed upland on either side making it possible for the barn to pass over this site on dollies Brian LaGrasse suggested revegetating with more valuable plants when returning soil to original area Robert Mansour was concerned about the 2 layers of%"plywood. He didn't think it would be structurally sound Scott Masse asked that the applicant supply the Commission with a mitigation plan and a letter from Venzon A motion was made by Beth Wescott to continue 242-1042 to 10/18/00 with a decision to be ready that evening and this was seconded by Deborah Feltovic The vote was unanimous Conservation Commission Minutes 10/04/2000 Page 11 Decisions: 242-1030 96 Sugarcane Lane Brian LaGrasse read the Order of Conditions for the above project and a motion was made by Robert Mansour and seconded by Beth Wescott to adopt the Order of Conditions for 242- 1030 as drafted The vote was unanimous 242-1033 110 Laconia Circle The Order of Conditions was prepared and read by Brian LaGrasse All conditions were accepted as read except that stabilization should be in 30 days A motion was made by Robert Mansour and seconded by Deborah Feltovic to adopt the Order of Conditions for 242-1033 as drafted and amended and the vote was unanimous 242-1034 399 Summer Street Brian LaGrasse read the Order of Conditions for 242-1034 and a motion was made by Robert Mansour to adopt the Order of Conditions for 242-1034 as drafted and this was seconded by Deborah Feltovic The vote was unanimous A motion to adjourn was made by Robert Mansour at 10:00 p.m. and this was seconded by Beth Wescott. The vote was unanimous.