HomeMy WebLinkAbout2000-11-01 Conservation Commission Minutes Conservation Commission Minutes
DPW Conference Room
November 1,2000
Members Present: Scott Masse, Chairman,Albert Manzi, Vice Chairman, John Mabon,
Robert Mansour, Deborah Feltovic, Robert Cerchione,Associate, Joseph Lynch arrived at 8
p in , James Demotses, Associate arrived at 7 55 p in
Staff Present: Brian LaGrasse, Conservation Associate and Germaine L Ouellette,
Secretary
The meeting was called to order at 7 p in by Scott Masse, Chairman
Minutes: No minutes were accepted
General Business:
242-927 COC - 80 Campbell Rd (Hancock Environmental Consultants)cont fr 10/4/00
This Order was issued on 9/17/98 authorizing the construction of a barn and horse paddock
within the Buffer Zone to a BVW The project is complete The site is stable. The
replication/restoration area is doing well and has completed two growing seasons. The
second growing season was completed in October There are no violations on site. A
motion was made by John Mabon and seconded by Deborah Feltovic to issue a COC for
242-927 and release the remaining $1500 00 Bond The vote was unanimous
242-158 - PCOC - Lot 114135 Bear Hill Rd (N.E. Engineering)
This Order was issued on 6/4/82 authorizing the construction of Bear Hill. There are no
wetlands within 100 feet of this lot Bnan LaGrasse inspected the property on 10/31/00 and
did not have any issues The Bond was released on 4/17/87 for the subdivision This is just
an administrative issue A motion was made by John Mabon and seconded by Deborah
Feltovic to issue a PCOC for Lot 11 #135 Bear Hill Rd The vote was unanimous
242-840 - COC - Lot 1 - Rocky Brook Rd (Stephen Breen)
Brian LaGrasse informed the Commission that this Order was issued on 11/15/97
authorizing the construction of a single family dwelling, driveway, septic system, associated
grading and appurtenances within the Buffer Zone to a BVW 1,500 s f of replication was
approved $3,000 of the $5,000 Bond was released for the house construction last
September when they applied for a COC The only hold up was the second growing season
for the replication area Brian visited the site on 10/31/00. The replication area was
saturated at the time of the inspection and the replication area is dominated by native
wetland vegetation They have submitted a letter from a wetland biologist certifying
compliance. It has completed the second growing season and is satisfactory according to
Brian LaGrasse They have submitted stamped As-Builts and a letter from the engineer
certifying compliance with the Order of Conditions Brian informed the Commission that
when he overlaid the As-Built Plan on the light table he noticed that the replication area
goes onto another parcel of land He spoke with Steve Breen and he indicated that the
owners are OK with it and he is going to get a written letter from them stating that Scott
Masse recommended that we not issue the COC and that the applicant return with a
Modification to the Order of Conditions Albert Manzi suggested giving the applicant a
Bond reduction and letting applicant straighten out the 180 s f of replication. A motion was
made by Albert Manzi to continue the COC to a later date and give the applicant $1,000
Bond reduction now This was seconded by Deborah Feltovic The vote was unanimous
NACC#7 Extension to OOC - Lot#3, Saile Way (Marilyn Elias)(Daniel Bailey,I11)
This Order was issued on 12/4/97 authorizing construction of a single family dwelling
within the Buffer Zone of an isolated wetland subject to protection under the No Andover
Wetlands Protection Bylaw The Order is set to expire on December 4, 2000 This is the
first extension request No work has taken place on this lot A waiver of the 25' NDZ was
granted for the driveway Brian inspected the site and stated that there are no wetland flags
present in the field We also do not have the recording information. Applicant requested a
withdrawal of this request stating that they would refile by Friday A motion was made to
deny the Extension request by Albert Manzi and this was seconded by Deborah Feltovic
Everyone on the Commission was in agreement except for Robert Mansour who abstained
242-979 COC - 525 Boxford Street(Christopher Coulouras)(Marchionda&Assocs)
Brian LaGrasse informed the Commission that this Order was issued on 10/6/99 authorizing
the construction of a single family dwelling, deck, septic system, well, associated grading
and appurtenances within the Buffer Zone to a BVW. They have submitted As-Builts and a
letter from the surveyor certifying compliance with the Order of Conditions An engineer's
certification was not mandated in this Order The 25'/50' were mandated and met Brian
stated that they have made a few changes from the original approved site plan They have
submitted the Affidavit per the Order of Conditions Brian visited the site on 10/31/00 and
had no issues The site is stable There are no violations on site. Brian recommended we
issue a COC for 242-979 and release the$3,000 Bond. A motion was made by Deborah
Feltovic to issue a COC for 242-979 and release the $3,000 Bond and this was seconded by
John Mabon The vote was unanimous
242-802 COC - Lot 3 Sherwood Drive (Merrimack Engineering)
This Order was issued on 5/6/96 authorizing the construction of a single family dwelling,
driveway, foundation drain, associated grading and appurtenances within the Buffer Zone to
a BVW. The Order was issued one extension,extending the Order of Conditions through
5/6/00 The Order has expired and all work has been completed They have submitted
stamped As-Builts and a letter from the engineer certifying compliance with the Order of
Conditions The 25'/50' were mandated and met Robert Mansour stated that the driveway
on the plan is now on the opposite side but was OK with it Brian LaGrasse visited the site
on 10/31/00 and had no issues The site is stable There are no violations on site. Brian
recommended issuing the COC and releasing the $2,000 Bond A motion was made by John
Mabon to issue a COC for 242-802 and release the $2,000 Bond and this was seconded by
Deborah Feltovic. The vote was unanimous
242-904 Modification to OOC - 144 Cricket Lane(Ronald&Diane Headrick)
This Order was issued on 7/16/98 authorizing the construction of a roadway, eleven
dwellings, utilities, and appurtenances within the Buffer Zone to a BVW The modification
is for widening the driveway on Lot 6 The homeowners, Ronald& Diane Headrick are
making the request because of an accident that has recently happened They have scaled off
the area of the driveway to be widened on the As-Builts The driveway does not get any
closer to the wetlands and is approximately 38' from wetland flag C59 The existing hay
bale line at its closest point is 26'. The owners have proposed to extend the hay bale line
around the work area The hay bale line does not get any closer to the wetlands. The area
they are proposing to re-do is 34' from the wetlands This modification does not pose any
threat to the resource area Brian stated that they will need to schedule a pre-construction
inspection prior to any work being done A motion was made by John Mabon to grant the
Modification to the Order of Conditions for 242-904 and this was seconded by Deborah
Feltovic. The vote was unanimous
Ratification of Enforcement Order-46 Shannon Lane
Brian LaGrasse reminded the Commission that this was the property where there was a
Bobcat on site to extend the driveway They are 62' from the wetland area The fine has
been paid and the driveway has been paved A motion was made to Ratify the Enforcement
Order for 46 Shannon Lane by Robert Mansour and this was seconded by Deborah Feltovic
The vote was unanimous
Ratification of Enforcement Order- end of Bayfield Drive
This Enforcement Order was issued in order to expedite the move of the barn All went well
with the move and steel I-beams were used instead of the plywood A motion to ratify the
Enforcement Order was made by Albert Manzi and this was seconded by Deborah Feltovic
The vote was unanimous The issue to accept withdrawal of the NOI was brought up by the
Commission A motion was made by Albert Manzi to accept withdrawal of the NOI and
this was seconded by Deborah Feltovic This vote was unanimous
Ratification of Enforcement Order—Rae's Pond Pump Station
This Enforcement Order was issued for replacement of a check valve within the Buffer Zone
to a BVW and Lake Cochichewick watershed This Order was issued on 10/20/00 The
repair was to be completed no later than 10/31/00 A motion was made to Ratify the
Enforcement Order by Deborah Feltovic and this was seconded by John Mabon The vote
was unanimous
Ratification of Superceding Enforcement Order- 1060 Turnpike Street
This was for the moving of a shed The applicant had spoken with Brian several times and
had been into the office stating that he had eight men over the weekend trying to move the
shed to no avail Applicant realizes that the shed needs to be moved A motion was made to
ratify the Superceding Enforcement Order by Robert Mansour and this was seconded by
John Mabon. The vote was unanimous
Appropriation of Wetland Filing Fees for Conservation Associate
Scott Masse, Chairman, verbally recommended extending the Conservation Associate's
contract through December 6, 2000 A motion was made by Albert Manzi to extend the
contract as it presently exists through December 6t", 2000 and the motion was seconded by
Deborah Feltovic The vote was unanimous
Discussion of Quorum for November 15tt'Conservation Meeting
The Commission decided to keep the November 15t"meeting on as scheduled If we have a
quorum problem we may have to schedule a special meeting to issue decisions only Scott
Masse informed the Commission that he has drafted a document to allow associates to vote
This will be presented at the next Town Meeting to see if this will pass their vote
Public Hearings (8:00 p.m.)
Notice of Intent(s)
Lots 5 & 6 Saile Way
Both these applications have been withdrawn for the time being per Brian LaGrasse
242-1020 492 Sutton Street (Mass Aeronautics Com)(Dufresne-Henry)cont fr 10/18/00
Patrick Seekamp has completed the field work but has not drafted a report yet A motion to
continue 242-1020 to our meeting of 12/6/00 was made by Albert Manzi and this was
seconded by Deborah Feltovic The vote was unanimous
242-1036 1070 Osgood Street(Chas Senabunyanthi)(Thomas Neve)cont fr 10/4/00
Brian LaGrasse informed the Commission that Epsilon has been working on the review A
copy of their latest comments was in their packets They are still working on their
alternatives at this time They have submitted a letter requesting a continuance to 12/6/00.
By that time they should have exhausted all of the alternatives and have something
substantial A motion was made by Albert Manzi to continue 242-1036 until 12/6/00 and
this was seconded by Deborah Feltovic The vote was unanimous
242-1032 127 Bridle Path(George & Kimberlee Chatson)(Thomas Neve)cont Er 10/4/00
The applicant is still discussing the alternatives with the homeowner at this time According
to Brian LaGrasse they were supposed to have something for this meeting but he has not
received anything and Brian received a request today for a continuance A motion was
made by Albert Manzi and seconded by Deborah Feltovic to continue 242-1032 to our
meeting of 12/6/00 The vote was unanimous
242-1044 428 Winter Street(Irene & Andrew Soucy)(Merrimack Engineering)
Proof of mailings were presented No abutters were present for this project which is for the
construction of a replacement septic system and associated grading within the Buffer Zone
of a BVW The septic replacement is proposed outside the 50' NCZ and they have erosion
controls proposed from one corner of the house and around the limit of work. The hay bales
are proposed outside the 25' NDZ They are proposed in an appropriate location Brian
LaGrasse reviewed the wetland line before the last meeting and had no issues There are no
violations on site. This project was submitted for the last meeting but could not be heard
due to an error at the Town Citizen newspaper A new notice was published for this
meeting Brian recommended closing the public hearing and issuing a decision in 21 days
A motion was made by Albert Manzi to close the public hearing and issue a decision in 21
days for 242-1044 and this was seconded by John Mabon The vote was unanimous
Robert Cerchione left the meeting at 8:15 p.m. and returned at 8:20 p.m.
242-1046 314 Rea Street(Ernest Alvarez)(Merrimack Engineering)
Proof of mailings were presented This NOI is for the construction of a replacement septic
system and associated grading within the Buffer Zone of a BVW The septic replacement is
proposed outside the 50' NCZ except for part of the sand bed and they have erosion controls
proposed from the retaining wall and around the limit of work to the street The hay bales
are proposed outside the 25' NDZ They are proposed in an appropriate location Brian
LaGrasse reviewed the wetland line on 10/31/00 The wetland borders an intermittent
stream and the BZ between wetland flags 2 and 4 have been previously cleared Brian
thinks there should be a BZ area along the intermittent stream that is allowed to revegetate
naturally The 25' NDZ goes into the driveway and may not be appropriate,but a 10' buffer
along the stream would serve as an adequate buffer and still leave 10' to the driveway
Brian can condition this in the Order of Conditions Brian LaGrasse recommended closing
the public hearing and issuing a decision in 21 days A motion was made by Albert Manzi
to close 242-1046 and issue a decision in 21 days and this was seconded by Deborah
Feltovic. The vote was unanimous
242-9?99 659 Forest Street(Robert Reed)(N E. Engineering)
Brian informed the Commission that this NOI is for the construction of a replacement septic
system and associated grading within the BZ of a BVW They are also proposing some
additional site work in the back yard which is clearing out some brush and then loaming and
seeding the site after The septic replacement is proposed 51' from the wetlands The
erosion controls are proposed outside the 25' NDZ and around the limit of work. The hay
bales are 27' at the closest point Brian reviewed the wetland line and did not have any
issues with it There are no violations on site Brian also reviewed the FEMA maps and
they are not in a flood plain. Since we did not have a DEP#we were not able to close this
item tonight Ben Osgood, Jr stated that he would send a copy of the NOI certified mail to
DEP A motion to continue this project to our meeting of 11/15/00 was made by Albert
Manzi and this was seconded by Deborah Feltovic The vote was unanimous
242-1047 Haymeadow Road(Leo Quinn)(N E Engineering)
Proof of mailings were presented. This NOI is for the construction of a replacement of a
failing septic system and associated grading within the BZ of a BVW The septic
replacement is proposed 51' from the wetlands The erosion controls are proposed outside
the 25' NDZ and around the limit of work The hay bales are 27' at the closest point Brian
LaGrasse reviewed the wetland line on 10/31/00 The only issues he had are the wetland
flags are labeled backwards on the Plan of Record and there is a pile of yard waste between
wetland flags A2 and A3 The yard extends up to the wetland boundary and in this case the
25' NDZ should be allowed to revegetate naturally Brian can condition this in the Order of
Conditions It is not clear if the subject lot is in a flood plain or in the riverfront area of
Rocky Brook This information needs to be submitted and Ben Osgood,Jr needs to check
the FEMA maps
Julie Durkee, an abutter, asked if the leeching fields will be coming onto her property? Ben
Osgood, Jr stated that it will be 100 feet from her property The new system is in the same
place but will be raised The water will still go in the same direction but won't travel as fast
The street drainage drains out of the property A motion was made by Robert Mansour to
continue 242-1047 to our 11/15/00 meeting and this was seconded by Deborah Feltovic
The vote was unanimous
242-1037 1210 Osgood St (Forgetta Development)(Epsilon Associates)cont fr 10/4/00
Michael Howard of Epsilon Associates was present along with William Barrett and Mike
Rozatti Mr Rozatti spoke for the project and informed the Commission that the retaining
walls will be built with versa lock blocks and not concrete as versa lock is much better to
work with and would have a lesser impact on the wetlands. Robert Mansour would like to
see in writing the pressure in the force main to be used
This NOI is for a mixed use development within the BZ to a BVW They are proposing an
office building, a 102 room hotel, a retail building and a sewer force main on Rte 125. The
25' NDZ and 50' NCZ are met for the proposed buildings and development They are
requesting a waiver of the 25'NDZ for the force main, which is proposed in the existing
pavement of 125 and the demolition of the existing greenhouses and sheds. Brian LaGrasse
stated that the mitigation report is sufficient. He walked the site and confirmed the wetland
line Erosion control is depicted in an appropriate location Brian has not received any
correspondence from John Chessia as of this time The applicant's engineers sent a response
to Mr Chessia's comments to him on 10/25/00 and he has not had a chance to review them
at this time The last set of comments that we received from Mr. Chessia was on 9/26/00.
He wanted some additional information to be provided to him and he received them on
10/25/00 Mike Rozatti addressed several issues and submitted a revised Hydrology Report
tonight
The Conservation Commission needs to have a final sign off by the consultant Michael
Howard spoke at this time and stated that there is no one at the present time in a role to
mediate between the Commission and the applicant Scott Masse, Chairman stated that he is
satisfied with the applicant for this project who is very reliable and stated that both
representatives here tonight for this project are very reputable also. Albert Manzi didn't
have a problem with closing this project that night and stated so A motion was made by
Robert Mansour to close 242-1037 and issue a decision in 21 days and this was seconded by
Deborah Feltovic The vote was unanimous
242-1038 Barker Street(Tara Leigh Development,LLC)(Epsilon Assocs)cont fr 10/4/00
Brian LaGrasse stated that this NOI is for the construction of a sewer line and stormwater
management system within the BZ to a BVW The cul-de-sac roadway and the seven lots
are out of the 100' BZ They are requesting a minor waiver of the 25' NDZ for the sewer
line on Barker's property The wetland lines were approved through an RDA previously per
Brian LaGrasse Erosion control seems to be depicted in appropriate locations
Mike Howard presented and advised the Commission that there will be no wetland
relocation All work to be done to pavement, driveway and field itself There will be no
open trench Mr Howard stated that the kiosk will be rebuilt in the same location Bird
boxes will be put into open space which is deeded to the Town They have devised a
planting list around the four seasons The farm will go back to a farm when all work is
done Brian LaGrasse recommended closing the public hearing and issuing a decision in 21
days A motion was made by Deborah Feltovic to close 242-1038 and issue a decision in 21
days and this was seconded by Joseph Lynch The vote was unanimous
Decisions:
242-1041 122 Boxford Street
The Order of Conditions was read by Brian LaGrasse for this NOI which was for the
construction of a 6' extension of the garage within the BZ to a BVW A motion was made
by John Mabon to accept the Order of Conditions as drafted for 242-1041 and this was
seconded by Deborah Feltovic The vote was unanimous
242-1026 Lot 33 Abbott Street
The Order of Conditions was approved as drafted and amended for a single family dwelling
and all associated appurtenances A motion was made by Albert Manzi to accept as drafted
and amended 242-1026 and this was seconded by Deborah Feltovic The vote was
unanimous
242-1043 209 Johnson Street
Brian LaGrasse read the Order of Conditions for this NOI which was for the installation of a
sewerage pump in the existing septic tank and a 3"PVC force main within the BZ to a
BVW A motion to accept as drafted the Order of Conditions for 242-1043 was made by
John Mabon and this was seconded by Albert Manzi The vote was unanimous
242-1037 1210 Osgood Street '
Brian LaGrasse prepared the Order of Conditions for this NOI which is for a mixed use
development within the BZ to a BVW They are proposing an office building, a 102 room
hotel, a retail building and a sewer force main on Rte 125 The Bond was established at
$25,000 A motion was made by Robert Mansour to accept the Order of Conditions as
drafted and this was seconded by Deborah Feltovic The vote was unanimous
242-1038 Barker Street
The Order of Conditions was presented by Brian LaGrasse and a Bond was established of
$25,000 for this project This NOI is for the construction of a sewer line and stormwater
management system within the BZ to a BVW A motion was made by Joseph Lynch and
seconded by John Mabon to accept the Order of Conditions as drafted for 242-1038 The
vote was unanimous
A motion to adjourn was made by Joseph Lynch at 9:55 p.m. and this was seconded by
Beth Wescott. The vote was unanimous.