June 29, 2017
North Andover Planning Board
120 Main Street
North Andover, MA 01845
RE: Beechwood Drive,North Andover, MA
Dear Planning Board Members;
In August 1994 the Board issued approval of a three lot subdivision of land known as
Beechwood Hill located at 1755 Osgood Street which subdivision is now Beechwood Drive. The
Subdivision Plan was recorded on September 4, 1996 as Plan No. 12902 along with the Form I
Covenant dated July 31, 1996 recorded at Book 4586 Page 50.
In August 1996 the Board approved a Site Plan Review Special Permit for construction of a
30,000 square foot building on what was originally Lot 2. As part of the approval the owner
agreed to move the building as originally proposed closer to Osgood Street creating an additional
50 foot buffer between the residential neighborhood to the east of Lot 2, and not allowing
vehicular access to the east side of the building. In order to accomplish this, additional land was
required for vehicle access and parking on the west side of the building. This was accomplished
by taking Iand from Lot 1, and a new plan was recorded showing Lot IA, Lot 2A and Lot 3 (Plan
No. 12911), The Notice of Decision of the Board granting the Special Permit references Lot 2
while the decision itself references Lot 2A. The Form J Release dated September 17, 1996 and
recorded at Book 4595, Page 215 releases only Lot 2, Since Lot 2A includes a portion of the
former Lot 1, a release is needed to include that portion of Lot I now a part of Lot 2A.
There has been no construction.on Lot IA, and Lot IA will still require a Site Plan Review
Special Permit before any construction is allowed,
Lot 3 consists of an office park which was constructed prior to the subdivision, and should not
have been included in the original Covenant.
The owner is seeking release of all three lots from the Covenant. As Lot 3 was previously
constructed and Lot IA is vacant land, we request that the board approve the modification of the
Site Plan Review Special Permit as an unsubstantial change.
North Andover Planning Board
June 29, 2017
Page 2
RE; Beeehwood Drive,North Andover, MA
If you have any questions, please contact me.
Very truly yours,
seph Bowl ger
JEB/jea
sp
PLANNING DEPARTMENT
Community& Economic Development Division
Form J - LOT RELEASE
The undersigned being a majority of the Planning Board of the Town of North Andover, MA hereby certify that the
requirements for work on the ground called for by the Conditional Approval dated J2jl_ l, 199§9 and
recorded in Essex North District Registry of Deeds, Book 4586 , Page 50 (or registered in
Land Registry District as Document No, , and noted on Certificate of Title No. , in Registration
Book , Page ) have been com�leted to the satisfaction 9f the Planning Board as to the following
enumerated lots shown on Plan entitled Defini ive P an of Beechwood HT11 in recorded with said Deeds,
Plan gook , Plan 12'g1J(or registered in said Land Registry District, Plan Book _, Plan )and
said lots are hereby released from the restrictions as to sale and building specified thereon, Lots designated on said
Plan as follows: Trot 1, Lot 3
(To be attested by a Registered Land Surveyor)
l hereby certify that lot number(s) 1 and 3 on Beechwood Drive Street(s)
—x ,cto conform to layout as shown on Definitive Plan entitled` echwood Hill in
_Section Sheet(s) 1�-5 [forth Andover., HA
eg6tered Land u eyor
Majority of the Planning Board of North Andover
COMMONWEALTH OF MASSACHUSETTS
Date
Then persona€ly appeared the above-named and acknowledged the foregoing
instrument to be his/her free act and deed before me.
Notary Public
My commission Expires
120 Main Street North Andover, Massachusetts 01845
Phone 978,688.9535 Fax 978,688.9542 Web www,norfhandoverma.aov