Members Present: Scott Masse, Chairman, Albert Manzi, Jr, Vice Chairman, Joseph W
Lynch, Jr.,Deborah Feltovic, and Sean F McDonough
Staff Member Present: Juhe Parrino,Conservation Administrator, Alison McKay,
Conservation Associate and Donna Wedge, Conservation Secretary.
Meeting came to order at 7:05pm Quorum was present.
General Business
242-1140-COC, 107 Old Farm Road (Karelas)
No one was present.Ms McKay stated the Order of Condition was issued on 5/14/02 for the
construction of an addition to an existing dwelling in the buffer zone to a bordering vegetated
wetland The addition was proposed to be, at its closest point, 50 5 feet from the resource area
The as-built plan shows the addition, at its closest point, 54 5 feet from the resource area There
was no grading associated with the work. The wetland markers are up. The site is stable. A
motion to issue a COC and to release the bond was made by Ms Feltovic, seconded by Mr
Lynch. Unanimous
242-1084&NACC#13,Modification,443 Boston Street(Mongell)
Mrs. Mongell was present. Ms. Parrino stated the modification was filed for the increase of the
size of the addition and for the addition of two sonotubes to support a roof over hang The work
meets all setback requirements A motion to issue a modification was made by Mr. Lynch,
seconded by Ms. Feltovic Unanimous.
242-1089-COC,Lawrence Municipal Airport(Dufresne& Henry)
Michael Miller,Airport Manager and Jeffrey Dubois of Dufresne&Henry were present Ms
Parrino stated the project was completed last summer Additional clearing was conducted with
review and approval by Ms Parrino, however the clearing was out of the 100-foot buffer zone
The site was reviewed in the field by Ms. Parrino and is stabilized. Commission members
questioned if this work was separate from the VMP filing Ms. Parrino stated this project is
separate from the VMP project A motion to issue the COC and the bond release was made by
Mr. Lynch, seconded by Ms. Feltovic Unanimous
242-1179,Carter Fields,(Tara Leigh Development)
Thomas Zahoruiko of Tara Leigh Development was present Ms Parrino stated the roadway has
been constructed and the site has been continuously monitored by Epsilon Associates Ms
Parrino has reviewed and approved the as-built plans of the crossing and replication area Minor
erosion along the replication slopes are being addressed and the replication area appears to have
sufficient hydrology. Ms Parrino recommended a partial bond release of$24,000 from the total
posted $33,120 Mr Lynch stated the track record of this developer is very good he has no
issues A motion to issue a partial bond release for the amount of $24,000 was made by Mr
Manzi, seconded by Ms. Feltovic. Unanimous.
r -
242-1057,Brooks Academy (RFS), Modification and Extension Permit
John Scott of RFS, Mr Callahan of Brooks Academy, Robert Peterson of Cannon Design, and
Thomas Reagan of Reagan Associates were present Ms Parrino stated the Order of Conditions
was issued on 5/17/01 for construction of a new athletic facility and associated drainage
structures The work is to be located within the 100 foot buffer zone An outside escrow account
was set up for Lisa Eggleston to review the new modified drainage design in the amount $1,500
The applicants stated the changes are primarily interior The revised project is for the same
facility but the building has been reduced in size No impacts to wetland resource areas are
being proposed Drainage structures have been reduced in size to accommodate the smaller
building The building was originally proposed to be two levels but has been revised down to
one level The stormwater management concept is the same The building will have a natural
gas pipeline connection
Lisa Eggleston has reviewed the project and submitted a comment letter She expressed her
concerns about the grading necessary to accommodate breakout on the slope The applicants are
willing to address the concerns in Mrs Eggleston's letter The comment letter also addressed the
potential of adding a forebay into the detention pond This was discussed and applicants stated
they may be able to add a forebay Mr Lynch stated his concerns about the slope and the roof
runoff volume into the detention pond Mr Manzi questioned the soil type in this area and
requested that information be submitted as he is concerned about erosion He feels the changes
are larger than a modification and should be addressed as an Amendment A motion to continue
to the July 9, 2003 meeting was made by Ms Feltovic, seconded by Mr Manzi Unanimous A
motion to issue an extension permit to 5/17/05 was made by Ms. Feltovic, seconded by Mr.
Manzi Unanimous
242-1186,Peach Tree(Northpoint),Request to Reduce required Bond
Jerry Lynn Darcy was present No action taken due to a lack of quorum.
242-968,Mr. Sudsy Carwash (Northpoint), Bond Reduction
Jerry Lynn Darcy was present. No action taken due to lack of quorum
Violation,24 Autran Ave.
No one present Ms Parrino stated the Building Department discovered a violation last year with
the installation of a deck and Jacuzzi built without a building permit, within 50 feet of the
wetland; homeowners are currently before ZBA for a variance. Building Department told the
homeowners last year there may be a wetlands issue The ZBA site plans do not display
wetlands, however, this is a plan requirement. There are many violations on Autran Ave Ms
Parrino stated she submitted a letter to homeowners on Autran Ave informing them of the
presence of resource areas behind their houses and requiring them to removal all debris within
the resource area There has been significant violations and continuous dumping violations_ on
the properties. Mr.Manzi discussed that the houses are 40-years old homes and many are 20 feet
away from the stream. Ms Parrino stated an enforcement order was sent to 96 Autran Ave for
recent un-permitted activities. Commission members voted to issue an Enforcement Order
a
requiring the homeowner to remove the deck and jacuzzi in the buffer zone The fence is
allowed to remain only upon the filing of a Notice of Intent
No Recess
Public Hearings 8:05pm
Abbreviated Notice of Resource Area Delineation
242-1199,Lots 1 & 2 Great Pond Road (Great Pond Road Realty Trust)(New England
Engineering) (Cont. from 6/11/03)
Ben Osgood of New England Engineering was present Ms Parrino stated Mr Osgood is
working on the re-delineation of the site The applicant has requested to continue to the July 9,
2003 meeting Motion to continue to July 9, 2003 was made by Mr Manzi, seconded by Ms
Feltovic Unanimous
Requests for Determination of Applicability(RDA)
43 Nadine Lane(Chamberlin & Babson) (New England Engineering)
Ben Osgood of New England Engineering and Ms Chamberlin were present Mr McDonough
read the legal notice and it was noted that the legal notice read as an NOI, a mistake made by the
paper Ms McKay stated she has reviewed the flags in the field and feels erosion controls
adjacent to the driveway should be a requirement Mr Osgood stated this is property is part of
the Meadows subdivision and work will consist of relocating a driveway, converting a garage
into living space and constructing a deck and shed in the buffer zone Work on the driveway
should be completed within 2-3 days and no grading is proposed A motion to issue a negative
determination with conditions including a pre-construction inspection, as-built plans, and
erosion controls was made by Mr Manzi, seconded by Ms Feltovic Unanimous
Notice of Intent(s)(Continued)
242-1194- 78 Vest Way(Milliken)(New England Engineering)
Ben Osgood of New England Engineering was present The applicant needs additional time to
prepare a landscaping plan within the 50-foot setback A motion to continue to July 9, 2003
meeting was made by Mr Manzi, seconded by Ms Feltovic Unanimous
242-1204,46 Wildrose Drive(Matrage)(New England Engineering)(Cont. from 6/11/03)
Ben Osgood of New England Engineering was present Mr Manzi stated that he and Mike
Howard spent considerable time within this area of the subdivision during it's construction Ms
Pamno reviewed the files to determine if the patio and shed were previously approved As-built
plans of the site did display the patio structure and shed Mr Osgood stated this is the third
owner of the property The wall will only be 1'/2 feet high and is being constructed to level the
land for his children Mr Lynch stated he wants medallions at the 25' No-Disturbance Zone A
fence is to be constructed on top of the wall to prevent dumping Plantings may be required at
the base of the wall upon construction Planting requirements to be determined by the
Administrator A motion to close the hearing and issue a decision in 21 days with conditions
was made by Mr Manzi, seconded by Ms Feltovic
242-1203- 0 Stiles Street(Willis) (Cont. from 6/11/03)
No one was present Ms Parrino stated she told the applicants they did not need to be present.
The revised plans have been submitted depicting the limit of clearing, stockpiling areas, and a
stone wall along 25 foot No-Disturbance Zone In addition, plantings will be required in the 25'
No-Disturbance Zone for enhancement Mr Manzi stated he wants the approved list of
Environmental Monitors to be listed in the OOC, Epsilon Associates, West Environmental and
Seekamp Environmental A motion to issue a decision in 21 days with conditions was made by
Mr Manzi, seconded by Ms Feltovic Unanimous
Decisions
0 Stiles Street(Willis)
The bond amount set at $ 3,000 The boulder wall must be 36 inches height Within the 25' No
Disturbance Zone, highbush and lowbush plantings can be added considered Environmental
Monitors must be chosed from a list of three Epsilon Associates,West Environmental and
Seekamp Environmental A motion to accept as drafted was made by Mr Lynch, seconded by
Ms Feltovic
43 Nadine Lane
A motion to issue a negative determination with conditions was by Mr Manzi, seconded by Ms
Feltovic
46 Wildrose Drive
The bond amount was set at $ 2,000 Requirements include medallions and a fence installed on
the wall A motion to accept as drafted was made by Ms Feltovic, seconded by Mr Manzi
Meeting Adjourned at 9:30pm.