HomeMy WebLinkAbout2003-08-27 Conservation Commission Minutes DDD
Conservation Commission Meeting Minutes
August 27,2003 '
Members Present: Scott Masse, Chairman, and Sean F McDonough, Deborah Feltovic, John J
Mabon
Members Absent: Albert Manzi, Jr, Vice Chairman, Joseph W Lynch, Jr, and Beth Wescott
Staff Members Present: Julie Parrino, Conservation Administrator, and Alison McKay,
Conservation Associate, Donna Wedge, Conservation Secretary
Meeting Came to Order at 7:00 pm Quorum Present.
General Business
242-1153,Modification, 178 Granville Lane (Cinseruli)
The applicant, Valerie Cinseruh was present Ms McKay stated the OOC issued on 7/22/02 was
for construction of an addition and screened porch in the buffer zone to BVW The proposed
plan shows construction of a wall, no grading shown on the plan,just proposed spot shots, only a
surveyor stamp on the plan The site has been inspected, is currently stable and appears in
compliance with the OOC Ms Parrino stated that the plans proposing grading would
customarily require an engineered stamped plan Mr Mabon has concerns with the erosion
controls within the 25-feet No-Disturbance area Ms Parrino explained the erosion controls were
placed in lawn, which was a previously disturbed area Mr Mabon questioned the height of the
wall and the amount of fill necessary Ms Feltovic asked if the wetland markers were in place
and Ms McKay responded that they were in place Ms Parrino stated the last monitoring report
submitted was in February and the new work would require environmental monitoring during the
wall construction A motion to issue the modification as submitted, was made by Mr Mabon,
seconded Ms Feltovic Unanimous
Enforcement Order Ratification
242-1071, Lots 5 & 6 Chestnut Street No action taken until the acting Chairman is present
Lot 1 Lyons Way Ms Pamno discussed a wall was constructed in the 25-feet No-Disturbance
Zone and a deck in the 50-feet No-Build Zone Enforcement Order was issued to remove the
deck and to relocate the wall A motion to ratify the enforcement order was made by Mr Mabon,
seconded by Ms Feltovic Unanimous
250 Green Street Ms Parrino discussed the presence of silt in the wetland area, due to previous
heavy rains Restoration efforts resulted in removal of vegetation The EO required the
replacement of shrubs plantings and re-establishment of the wetland flags A fine of$300 was
levied A motion to ratify the Enforcement Order was made by Ms Feltovic, seconded by Mr
Mabon Unanimous
55 South Bradford Street Ms McKay discussed a gazebo was placed within the edge of a
wetland and the EO required relocation of the gazebo, in addition to obtaining a building permit
The applicants had a filing for a sewer connection The conditions required monitoring reports,
however, none were present in the file Ms Pamno discussed it is difficult to see the house from
the main road, due to the lengthy driveway There is a tennis court on site which is outside the
100 foot buffer zone The Conservation Department identified the violation during a building
permit inspection for installation of a pool outside the buffer zone A motion to ratify the
enforcement order was made by Mr Mabon, seconded by Ms Feltovic Unanimous
Wetland Regulation Revisions
Ms Parrino discussed the changes including the new fee calculations The vernal pool language
was clarified to the Commission members and it was stated the language change does not
increase or reduce the ephemeral pool habitat protection area Final changes are underway and
the regulations should be ready for approval at the next hearing The hearing was continued to
the September 10, 2003 meeting
Recess for 5mins.
Public Hearings 8:00pm.
Abbreviated Notice of Resource Area Delineation
242-1199, Lot 1 & 2 Great Pond Road (Great Pond Realty Trust)(New England
Engineering)(Cont. from 7/30/03)
Ben Osgood of New England Engineering was not present The applicant, Joseph Pelmch, and a
representative of Epsilon Associates were present Ms Pamno discussed this site was previously
reviewed by the Commission under a former filing, in which work never commenced, the new
delineation is significantly different and changes have been carefully reviewed The Commission
requested outside consultant to review Epsilon was hired on behalf of the applicant to look at the
site Pat Seekamp was hired on behalf of the Commission Ms Pamno stated during the site
walk, the lots were carefully reviewed and it was agreed the previous delineation was
conservative and it was agreed that the line could be substantially changed to reduce the amount
of wetland on the site as a result of the soil investigation Mr Masse stated he is comfortable
with the change if agreed upon by Patrick Seekamp, Julie Parr no and Michael Howard The
Commission requested that review letters be submitted by Epsilon and Seekamp A motion to
continue to September 10, 2003 meeting was made by Mr Mabon, seconded by Ms Feltovic
Unanimous
242-1211, 1025 Osgood Street (Daniel Corbetts) (Wetlands and Land Management)
William Manuell of Wetland and Land Management was present Mr McDonough read the legal
notice Ms Pamno discussed the filing and stated the site is extremely disturbed as evident by
the filling activities The portion of wetland within the field has been recently disturbed by
mowing equipment, as evident by the deep ruts from the vehicle This portion of the wetland
should not continue to be mowed Mr Manuell stated he had flagged the area late May, early
June Ms Pamno met Mr Manuell on site to review the delineation as several flags had been
removed A small change to the wetland was agreed upon and the field New plans will be
submitted to reflect the change in the delineation A motion to continue to September 10, 2003
meeting with a requirement for revised plans was made by Ms Feltovic, seconded by Mr
Mabon Unanimous
Requests for Determination of Applicability (RDA)
101 Crossbow Circle (Brakely) (New England Engineering) (Cont. from 7/9/03)(Reauest to
Cont. to 9/10/03)
No one was present The applicant has to re-advertise due to the length of time for the
continuation A motion to continue to September 10, 2003 meeting was made by Ms Feltovic,
seconded by Mr Mabon Unanimous
Notice of Intent(s) (Continued)
242-1194, 78 Vest Way(Milliken) (Cont.from 6/30/03) (Cont. to 9/10/03)
No one was present Ms Parrino stated the planting plan has been submitted and reviewed,
changes have been requested by the Conservation Administrator The Conservation Department
is awaiting revised plans to reflect the proposed grading changes on the abutting lot Mr Masse
questioned the constant continuations Ms Parrino stated she believes Ben Osgood is waiting for
the applicant to forward over the grading changes so that they can be applied to the engineering
plan The Commission decided to continue the hearing to October 22, 2003 with the requirement
to re-advertise In addition, the Commission voted to issue an Enforcement Order requiring the
applicant to install the restoration plantings, no later the October 2003 A motion to issue an
Enforcement Order and Re-Advertise and continue the hearing to the October 22, 2003 meeting
was made by Mr Mabon, seconded by Ms Feltovic Unanimous
242-1212, 33 Morinoide Lane (American Sunroom Co.)(Cont. from 8/13/03)
No one was present Ms McKay stated the DEP number has been issued She recommends a
planting plan requirement, wetland markers, Environmental Monitor, and brush and debris
removal A motion to close the hearing and issue a decision in 21 days with conditions was made
by Ms Feltovic, seconded by Mr Mabon Unanimous
242-1210, Lot 3 Forest Street(Finocchio) (Hancock) (Cont. from 8/13/03)
Richard Albano of Hancock Environmental Consultants and John Meyers of 1500 Forest Street
Extension, an abutter,were present Ms Parrino left the room due to a conflict of interest Ms
McKay stated that the applicant had retained the services of Seekamp Environmental to review
the delineation On August 27, 2003, Ms McKay, Patrick Seekamp and Richard Albano met to
,review the wetland line Mr Seekamp was of the opinion that the current standing water
conditions, along the edge of the proposed driveway, could be up to 15 feet upgradient of the
original flags in some locations The wetland line should be re-delineated to reflect any field
changes Beaver activity was observed on the pond attributing to the high water conditions
Hancock learned that an Order of Conditions was issued by the Town of Boxford in June of this
year to install a beaver deceiver at the pond outlet, where the beaver dam is located Ms McKay
will contact Dave Rimmer at Essex County Greenbelt for more details on the installation of the
beaver pipe and the pond elevations A motion to continue to the September 10, 2003 meeting to
t
make changes to the wetland delineation were proved inaccurate was made by Mr Mabon,
seconded by Ms Feltovic Unanimous
Decisions
242-1207-31 Wood Ave.
This will be a straight denial, no revised plans have been submitted A motion to deny as drafted,
by Ms Feltovic, seconded by Mr Mabon Unanimous
A motion was made by Ms.Feltovic, seconded by Mr.Mahon to adjourn the meeting at
9:OOpm.