BOARD OF HEALTH
*1120
.h
MAIN STREET T TEE, V - 4+
ArtD NORTH AND V E1 , MASS. 01845 Ext. 32 or 33
l H
To: Planning Board
From: Health Department
November 30 , 1989
e: Boston Brook Estates
design approval permit has been issued for Boston Bros proposed
septic system -but a letter outlining additional approvals that will be
needed may be helpful . The project will be subject to Health Dept,
approval during construction to be sure that it does .in according to
plan. Gravity fed collection lines will be tested to confirm resistance
to groundwater intrusion; pump assemblies will be tested to assure
proper functioning; most importantly the contractor will be watched
closely as he installs the leach trenches because as I pointed out to
the designer trenches this size are very difficult to construct in
gravel fill .
n conclusion, while the project will be subject to Health Dept.
approval during and after construction it has received all the approval
it can prior to start of construction,
Sincerely,
Mike Graf
Qf T
+- 41.
a n O
BOARD OF HEALTH
13
{.,..
120 MAIN STREET ,T' ...I -6
4 83
, r NORTH .N VE # MASS. 1845 �'F � 33
. or�
1 A OS
I {
s r
i
R. F. Geisser Inc.
Box 42
East Providence, R. I . 02914 uiy 25 , 1989
re : Boston Brook Estates
I have reviewed the latest revision for this plan and have
several comments:
1 Is there still a proposed retention pond in the c l de sac
nearest the l.eac ielid It would be too close .
2 1 will want to discuss with your installer how be proposes
.o dig the trenches so that the excavations don ' t collapse, before
any permits are issued.
3 Septic tank does not comply with 10 CMR 15 . 06
Dosing tank does not comply with 310 CMR 1 .
Emergency overflow tank does not comply with 310 CMR 15. 09
Sewage connection lines would have to be pressure tested after
installation to stake sure that groundwater intrusion will not
burden the system. This is a responsibility that rests with the
installer that I will wart to make clear to him,
No garbage grinders . This must be a deed restriction but how
will. it be enforced? some condo associations levy fines on members
for infringements like walking on the lawn. This is a serious issue
for community systems and I will have the cooperation of the
building and plumbing departments to guarantee that no disposals
are installed.
The leach trenches may be accepted if you find a - contractor
who can assure one that be will proper.y construct them. The plan
for the leach field seems to meet codes in other respects ,
In conclusion, I have not approved the plan, but the leach area
shows promise. The septic tank and pump cambers are still
serious obstacle and will not be approved as shown.
sincere
cc : Mia o Realty Trust
al `oce die bra . .
Planning Board
f
1
s
J
OR } x
i
BOARD OF HEALTH
120 MAIN STREET
TEL- {J+y /'J�
YlwM
— 4 3
CH NORTH �1 R, MASS. 1 Est. 32 or 33
I k I
Planning Board '2-16-89
,a
:
re: Boston Brook Estates
On 2-15-89 RalphJoyce told e this project would be removed
from the agenda, but here is the current status
Number of buildable lots . The burden of proof for this is
on the developer. I will review any proposal he submits to
make sure the proposed density is supported by suitable site
conditions . I have a meeting with the design engineer scheduled
for 2- - 9 ,
Septic system design. I hacre rejected the current design,
was also rejected by DEQE, The design engineer is working o
revision,
Sincerely,
Michael Ora
I
i
i
s
i
1Eo 16 I
BOARD OF HEALTH
cccH{wl+.[h 120 MAIN STREET t a T L. 682-6483
NORTH
Ext'.:32 or 33
H ; z
To: Planning Hoard `
From: Health Dept, s'
Date: March 15 , 1989
e: Boston Brook Estates
It seems that sty estimate of the maximum number of septic
systems that could be designed for this site has created more
questions than answers . It is an estimate. whether 21 Lots could
e designed to satisfy health and zoning regulations I cannot say,
I based my estimate on health criteria and ten years of experience
in septic systems , there are not 21 plans for septa.c systems and there
are not 42 passing percolation tests . Maybe 40 systems could be
designed for the site, Thence is not enough data to determine exactly
at this time.
It is not the responsibility of the Health Dept. to design
subdivisions , we review proposals that developers submit. If 'you
want to determine exactly how many units of Coven.tional homes could
e built here and an estimate is not satisfactory, you will have to
require a subdivision plan that conforms to zoning regulations an
includes soil tests and individual septic designs which have been
approved by the Health Dept. This will require extensive additional.
testing. At this point I cannot give you any figures for development
density that are any more accurate than my original estimate, which
I still support. I did not take zoning requirements .n.to, account
when I formed the estimate.
In conclusion, if the estimate is not acceptable, the only
alternative is to conduct additional soil tests and design a
conventional subdivision. I am sorry my estimate caused so much
confusion and regret being placed in this position.
Concerning the proposed system itself, I have re3eoted the
design because of several serious flaws which will have to be
redesigned. The engineer is awaiting word on how many units he
will be allowed before submitting a new design, a move which I
agree with.
Sincerely,
Michael Graf « . , CjHeOs
f
F
i
I
ItA Oil
R1
e6
BOARD OF HEALTH
COCKCA.,,,11.1 o MAIN STREET TEL: 682-6483
. ACHUS NORTH ANDOVER, MASS. 01845 Ext. 32 or 33
i
TO: Planning Board i
FROM: Michael Graf
DATE: March 2, 1989
R : Boston Brook Estates
I have been asked to calculate the number of buildable lots
that could have been built on this 28 acre property. After review-
ing it tests, wetland borders and topographic plans, I estimate
that up to twenty one sates could be found for single family sized
septic systems. This means I approve a development density of up
o twenty one units: 3 single family conventional homes on lots
1 , 2 - and, -3 and up to 18 units of clustered 3 bedroom townhouses on
lot
As yet, no septic system plans for the site have been approved,
but the engineer is developing a plan for a large system to serve
the clustered units.
icercl
Michael Graf
cc : Ralph Joyce
I .F. Geiser, Inc. 1) 438-7320
Constiltin Engineers o - 1
47
P,ot Box 4526, East Providence FAX (401) 434-3448
Mode Island 02914
Byron R. Holmes, P.E.
President
September 20 , 1989
Mr , Mike Graf
Health Department
en
Town Hall
120 Main street
North Andover , MA 01
Re: Boston Brook Estates ,.
Proposed Septic system (Revised
Dear Mr , Graf
Enclosed pl ease find revised design plans for a wastewater
collection
and treatment system for the the 18 unit Boston on r•o k
Estates residential
deve e off Salem street for your review and
approval . The submission includes the following :
1 , Application for Disposal Perri
2 , Two 2 copies of the construction drawings
3. Design Calculations
List of Abutters
Copies of the applicable 8oil 1 o s
The proposed leaching system involving two leaching trench systems
located at the northerly her end of the site has not changed from u r July
14p 1989 submittal .. Based on your input, we have revised the wastewater
collection system.. There will be two pump stations ion and associated
septic c tanks serving each end of the development. Plows from pump
stations 1
` and 2 will individually discharge o leaching reach system
1 d 2 , Details of the two pump stations are contained o plan sheet
e depth of the original pump station was 15 . 5 feet, The
modification will set the depth of each station at 9 feet.
e reviewed the locations your office suggested for the two pp
g
or e. review o• the es i t i thenortherly cul-de-sac
sta
depth of feet, Thelocation for the southerly
indicated groundwater um station would be within 100 feet of a wetland area f We have sited
each # area of favorable groundwater conditions and these
station � a
locations r vide for the shallowest possible depth of the p
UMP
stoat i on ,
C I VIL AND ENVIRONMENTAL ENGINEERING s SURVEYING it# A TERI S TESTING
In response to your other comments we offer the following :
-� An above-ground motor control cabinet will contain pump on-off
switches , power shutdown light and generator connection switches ,
10 kw generator will be housed at each station site in case of
power outages
The leaching reaches are interconnected and have surface vents M
Plan sheet contains a note detailing the contractor' s requirement for
field pressure testing of the pump chambers and septic tanks to insure
that these structures will be water-tight .
We have eliminated the emergency overflow tank' from the site and
detail plans and are proposing the use of an Oran 10 kw portable
generator . This generator will e stored in a common space area in Unit
No. 18 and the condominium association will contract with a maintenance
company to operate the generator in case of power outages .
If you have any questions on this design change , please call us .
Very truly yours ,
Byron F . Holmes , P. El.
President
cc : M ano Realty Trust
Atty . Ralph Joyce
North Andover Planning Board
F .F. Ge ss r# Inc.
Y� 1.■••i NMI rrrt.rs.wtFfrrr4■ ma kl.ii..rt*rfF#+t 4i�liYiFfF�#F�•
THE COMMONWEALtH OF MASSACHUSETTS
BOARD OF HEALTH
TownNorth Andover. , .............++.............+ii4.....I..........,++.f++..*........rt#.,iirt++t..,...ri
Sri...+.....rrrr.,...... , rrrr..++,+-+. .,,
ar Bot'llplulat lujadw Tonotrurfiall rawit
Application is hereby made for a Permit to Construct or Repair an Individual Sewage Disposal
Sy tn i y�+ �'1 T,r�J lo+YY ,.111�i}'�1i
tL}'+7�}F11�{'f Alm+ v ..rrrr. arrsw*f ry.ait *.frr.*arrsa.rf V*` V w.....28.,f ■ . rrsl 4+ar�«L f .r►r.#aii.�s�ws.YFys.i
■.rr•i'l r�. T r +�fafL.Psm f..r. irate*4TT....#asir... #rt
or Leot No.
Location-Address
arra# . . *. • 1 ■i ■•• r • a•..Owner.rrrr la......rrrrrr.ra.T.a.aar..■..�f*. ra*.if..T..a...r rr 4*•T aiTr*r.rt ra ra..T.k.sa'.r•;tr.a•..rtr♦y.y■raiiari*.rs4*a+r.r ara■■i*Yw#.TFr.w.T.•Address
Plaistow, NH
■.... .C'i�i�fr�. iir�i�*�+ {+�.......rt.rr.rt+..rtr.f.f...r.r.rrtrt t.*...rrrr;srs*. .iarr�iiri.iyr.T........r.irs.aff...fraw.at.*r...*..rrr4is.......rrrrrrrr##...arrrafaissse+sa r..s
Address
*ype of Building
Size Lot........i.r*i4t•Tr......•iTTTSq* feet
.. � r garbage Grinder 0
� Dwelling— N . o Bedrooms.... ....... .r .. . p
— o B ildhi Jowuljous.es.. No f erso� s43T. '. oom..... Showers Cafeteria ootl e~ ....... ... p
Other fixtures . l ca .....rrrr.+r+w+f............R.i...........*r.......i.Tf..... .rt*........*rti
+rt...........,��. IIffs�
0
Design n 'lost...... . i,_....rrr...F........4....._gallons per person per day. Total daily flo� ..4.r*......�...T.........................i+ .fto i
Length rr . . .
Septic Tan � 1,,igtilcl�eapaeity2. o(k Motes .r3 .i rr Width iam ter. . .. ... ...... De h........
........
? 20
Disposal Ire� ��_� o� �._r .r..rrt._tt• �c �rrrr,...�rtr.......r � � i . . � l l � �� ..... ...tr..r..r.rsq1 iti
Seepage
Pit
F1� /� is p } belowinlet. . �' Total leaching
T. 11- �LJ rrrr y.r.�++.. ��{41��4��1i....�.•.rr.�r .aaa. Depth .....aa....r.rrss.• r i4a a.......rr►#riT f .
•` _+• rrrr
4i
Other Distribution box X Dosing tan
1988
Percolation
rr77 � ��y�t �y�1 �Y �-y .F `� � . ,.. � + rTrrr.,.i.. fit .... Y' .�
ereolation Test Results Performed by.. .. � *+* .� � .r..rt.iT....... 4rr.;fr.!• **..
1.4 (H)Test
■ III ; �
fit No. .........r,r..._� i t�es p r x e De tl of 'T'e t t.......Uirt..... Depth th to ground wat t.....................i_--
o
Test Pit No. *#......r. ....ininutes per inch Depth of Test Pit.........i rtr�rTr• Depth to ro�lrici 'water r.rr..rtrt44.*r..,
.rT.+.. rs r4Y#..T+++++ .i rr Ysirar Frt.aa.........rr_rtafr#rrrr a.*a*a.TTra T..T...*M&4@P.....{.,+.F►..rrirtrrT.s.t�.r..rtiTrti*+
ravel 9'
ri ii #y {; . ...�R..� . ... .. . ... ' �. rr.� .. �*►�-... ...+.� * ... .rirr.T.....rtrt.rtsrts �.Frrra*;*.#.*wr.ir
Description o Soil.... .... .rT •*T.. *rr. ... ■##w+•
.•rrtl....ir##.*r....4..rTrrr...**a*r............rrTrt.r.a.....rt*-###T���.-.......r*irx.r...........r.r#rr.....r.iatwi...........rr4.i........
rr rr......+.+... ........Tr..........-..4.-........rrt«rrrr..._-.�.................r ......... ................__..........**....................#..... ..irya*......1*i 10*0 i..4......r r r i r#...
4cable
/.� ��y! yy.+; `i]as. �}*�} /��1+F #7 -�- . swe1' ] # . Nt; ■�+r/� rrrr.Nature of RepairY3 i lter►tapplicable................4..� i..• ....4.04. .irt F4T...........rrth4lia#t.�ii
1
a....tY1404..a..i 6/4 Yq 4.a it W*rtrt a&0t a.*omiod rrt#
Agreement:
Theundersigned agrees to install the foredeseribed Individual
sewage Disposal System in accordance �►it�� �
,� _ The undersigned further agrees not to lace the stein In
the provisions of � `� �of t�� state Sanitary Jodie� ���e u��c�er y
operation until a Certificate of Compliance has been issued by the board of health. 9/20/89
Si�r��ed_.r..............;..................rrrr#...*..........................
L7 Date
Application Approved
kkkkxo ed y....................fr..*r......... ........... r.........................rf*..... Da
..#a.4+.rrrr+
Application Disapprovedfor the following a-s t ,.......T...............iT..........rw ...r...a.............f....................................r.r.r.r....
.*..ir*TTYi ..,.y.*rt.... ............. r r...r;#rtr.rTt
Date
PermitNo... ......*.y.wy i4rt...#a...... r.rt#..f.i...* Issued..+.i.rr........... .................stir.......
Df
THE COMMONWEALTH F MASSACHUSETTS '
BOARD of HEALTH
1+.,.0 F ,......i++.i+......laT**+.++aiir**#tiiiri!*all�iTfi#tYili..i*i3t�iialis!***...#i.rtris
Tntiflattr tit To wit I Iaarr
HIS IS TO CERTIFY, That the Individual Sewage Disposal S sten, constructed or Repaired
by......4....ririi#.........ai...........
M...
...................
era..r.*......#r.r.......rr*#T.r....r.r.**T...r..............a#+.rrT.......................a........rrrr..............................
Installer
(4 r.rrrT.T...............T....r T...........r*T.........r....*..T.........ra.............%_.........Tr...ri......r+....r.........r.a..r.....Fr.4..ar...............M.............i A...........rr..r.i.
has been installed in accordance, with the provisions of TITIZ 5 of The State Sanitary Code. as described in the
application for Disposal Works Construction Perinit No.......................................m. dated-__............................
THE ISSUANCE OF MIS CERTIFICATE SHALL NOT BE CONSTRUED AS A GUARANTEE THAT THE
SYSTEM WILL FUNCUON SATISFACTOMI.-
ATE..................r#T Inspector...................... ........M M *a#i•afr.
Boston Brook Estates
North Andover , Massachusetts
Wastewater Collection System Design Calculations
September, 1989
Required : Two wastewater pumping stations serving the north section
and the south section of thetownhouse development that will each
discharge wastewater to a leaching ffi e l d located along the northerly
property line
Each leaching fi e l d contains 10 sets of trench lines each 78 feet
1 see design notes on plan sheet o# 2 . Each leaching i e l d to
be flooded to a depth of 1 . 28 inches in less than a 15 minute
sequence .
Pump Station No. 1
This station will be located adjacent to townhouse unit 16 in the
northerly section of the development arid will serve units - 1 . I
will have an above-ground motor control cabinet and stand-by
generator.
Static Head 12 feet
Length of Force Main 290 feet
B x 10 lines x 3 ' width x 0 . 80 gal . /inch 1 , 875 gallons required
per pumping sequence
1 . 2 depth 7 , 48 gal . cf 0 . 80 gal , per sq * -fit . of trench a :.
1 . 28 water depth in trench
12 i n . l t
Required pumping volume 1 , 875 gallons
set on-off level charge at 1 . 74 feet
11875 coal
1 , 875 gal. 15 minutes 125 gal . /minute minimum pumpingrat
Friction Head Loss 12 feet
TDH 12 . ' + 9 , 51 21 . 5 -feet
Use Myers Model WHRH 20 Pump or equal
Output . 135 GPM at 21 R ' T H
, I of 4
r 'x
Pump Station No. 2
This pump station will located adjacent to townhouse unit #4 in the
southerly section of the site . It will serve townhouse unit nos. 1
10. It will have also an above-ground motor control cabinet and
bar generator.
Static plead = 7 . 3 feet
Length of Force Main � 1 , 340 feet
7 ' x 10 lines x 3 ' width x 0 . 80 gal . /inch 1 , 875 gallons
required per pumping sequence
1 , 28 depth x 7 , 48 gal . 1* 0 , 80 gal , per s . ft, of trench at
1 . 28 trench depth
2 in , /1 .
Required pumping volume 1 , 875 gallons
set on-off level change at 1 , 74 feet
1 i 7 ' l x 12 ' d x 1 'w o.
- 1 , 875 gal
1 , 875 gal. 15 minutes � 125 gal . /minute minimum pumping rate
Friction Head Loss 43 . 9 feet
TDH 7 u 3 ' + 4 * 9 ' 51. 2 feet
Use Enpo Cornell Pump Model - or equal
Output.- 135 GPM at 1 -1, 2 ' T H
. 2 of 4
Il
A)
tiW
' 1
' �'es
............
i sewage m ►oluta a giving full opening for Upp r Sleerry Bearing with Thrust VoluteCass i heavy cast iron, epoxy
Myers IHRH e # � f
ary ' net provide higher p nr llo of liquids.and up to , (381 rn) Wai;her and Lower Sall Bearing are coaled with support Ins. '
' r r e but sti dig. solids. oil lubricated for smooth opertion, long 3' (7 ,2mm) discharge
heads arde h spo flame.
har�dla 1'/2x (38.1 mm) dia. solids. 1 to a i la end three phase) oil pump lilt.
HR rips are ideal for installation filled ford insulation a l l rioat}on otary Shaft Seal has carton and p��ate apac�to� Housing (single
ire here is a fang discharge lino, seal.No tarn swidch ceramic faces for positive seal.�is phase) allows capacitor to a replaced
higher cloy Lion r both{ at la me l anisrn. der cad p ole - tatioriar , pre r is tfir� or trash from without dismantling rotor.
Pump l
1R is re tiorl is wilt i -- three plae o�rerload minding on seal. Metal parts are 03
-- oporates wmplololy out of in control box, stainless stool.
' Dimensions
f�
3-NPI FLANGE
i.
5 i N T FLANGE j
ti8' r
216 m m
y 235 M
wr
a ...W
4 5 k/
130 rnrn
Performance Curve
1 CAPACITY LITERS PER MINUTE
t ', } 2 300
4
ry
80
�Y ` ��. l it I_ 14...'�_.�_._�:— 2
70
20
16
Ul
14
10
30
O
'ies �41
Accessor
' I E 4
ors offersa wide selection of accessory items for use will, t io
' level controls wet sump controls,a rM �
Pumps:ad u table a duty fc 3 �...m_ � _. T_
contr , electrical control boxes and switches, hay l � 4 � I � o
ais, oiyethelene and fiberglass basins{ etc, ,
e e 40 60 80 100 120 �
CAPACITY GALLONS PER MINUTE
' Pe''rformance Capabilities
0 0
CD 492 LPM
0 � Capacitiest 1 GPI
Heads t feet 21.3
r boxes Pump Don Range Variable with Level Swit h
Solid Handling apahilit 112 inch dia. solids 38.1 mm dia. solids
Automatic
controls Liquids Handled S o� ttlu nt
Intermittent liquid Temp. 14 O°
_ Deter , 1, HIS
. . Electrical 115, 200t 230 V 1 ; 200, 230t 460, 575 V 3d)
Discharge 2 or 3 inch 50.8 of7 .2 rim
B n
"' F.E'MYER .a Ptnialf ComgfL y 44805-2285
Check valves
w r
qP
I-moon
� ■ ■■ ■ ■■
■ ■ an
■■■
■■M ■ I I ■�00�= �NMIEEEEX among no
NOVINSIMEN
go I
■ ■■■ ' ■ ■■N■■■■ ■■■■ ■ ■
- ...... ■,
now
MIS 00�010 ME Sam
Marl
�L how MI INN �,� MWOM
■�M■NE�In � � ■
ONO
Elm-
LMOms
� ■■
i � ■�■
-EZ
■■1.lff ' ■■■■ ■■ ■■ ■■■■ ■ ■■
summusussaw
Enpo-Cornell Pump Company A DIVISION
OF
DOUBLER
Roper Industries, Inc. (Ohio)
QUA, 0 H 104 (ALSO MODEL 4DNDL-SS WITH RELIANCE MOTO
i 2
J�Q5TON BEQa ES
LIST of ABBUTERS
}
• Geoe H. and Wanda Farr t
89- Salem Street
N. Andove ` MA' 01845
�t
F
F
F
I
+F 1
L ,
Y
2. Leona Morin �
11 Salem Street
N. Andover, MA 01845F
1
a .
I �
Edwin H & Carol A Frazier
1631 Salem Street
N. Andover, MA o
. Demis P & Mary R. Meyer
1619 Salem Street
N.- Andover, NA 01845
5'
5 .
I1
1
r ;
4
John H. & Mary K. zickel t
t1607 SalemStreet
N. .n , MA 01845
F
F
1
I
Y
Jars F. & Dorothy . Youree
1601 Salem Street:
` N. Andover, M. 01845
/1+5}
of 2 ,
BOSTON BROOK ESTATES ,
NORTH ANR, MA
t
LIST OF ABUTTERS y
f i
I
. Richard Mari a K. Delisle .�
1589 Salem StreetN. �
s
Andover, MA 01845 x
. M. Joseph & Helen R. DeCosta
1577 Salem Street
Ni Andover,, MA 01845
. Lawrence .. Jackson �
1565 Salem Street 4
1
N.
Andover, MA 01845
1�7
.k
10. Donald A. & Bernadette M. Deadder
Salem1557
. `,Andover, MA 01845
x
1 . Michael. & Deborah A. Fried
1535 Salem Street
N. Andover, MA. 018 +5
+
k
1
i
12. Mark R. & Brenda A. Shea. € .
.. . . ,...S em_.S, r e e•t
N. Adore , MAMA 01 - 5 t
• r�
}
d
r
d
1
13. . Peter amela Brown
1701 Salem- Street
N. Andover, MA 01845
14. Robe A. & Jean F. Smith
270 Mayble Ridge Road
N. Andover, MA 01845
15. Conmonwealth of Massachusetts
Department of Environmental Management
State -House
4
Boston, MA 0210
R. F. Geiser & Assoc. Inc.
RE R C 0 L A B I Q N ...T E0 L Q Q_
Consulting Engineers
P.O. Box 4526, East Providence.
Rhode, Island 02914 T A
ENGINEER:
PROJECT: Boston Brook
Gradall 880
MACHINE TYPE:..
i LOCATION: N . Andover
GROUNDWATER EL :
DATE: -28-88
: 48
TIME STARVED:
TEST PIT O, P--2
TIME FINISHED: 32 0
DESCRIPTION '
FTIME
START S RATI Nif+iaaiii+iwy06 #*lfFiiifla■rl#i#Fiis +i#iii■ 4-8 , 1 r
r#■l i a i*#i•i■+F i!i#l i w
JrJ}
FINISH SATURATION . ..-Gallons) 3 -
•*iai■#;ti10■*i00i66iaai■■*#ii0aa46+6645##falit�##iai
R +
' BRING LEVEL TO 12" ..-Gallons)
o
a■•i#fiia■##iii■#i*itFaswr■••##1ari+Ri#{liiti#!4i#ii k
DROP To -' - 8 _
. f•a#��rtr■irtw#+�a♦ter+}a1■a■atsa■flit#�rrafli�i■1#rs♦aar■!#■a#sir■#11■F■4a1ia##f111#ri4iaar#!•#4F+■■aFir.■`u..`�,,,�r
r
Insert Difference Below
DROPTO + ayFf■+a*tiri■■a■a*fwt#f1**!1#*if#000#+4a#►#Fsasar■ii1■isa■■
♦#iriraR#rrt�#a riaa�•�a•riiiaarr�}•la+lili
aY_�■iYr�R,�,,,,�
r
SUMMARY
X PERCOLATION TEST12 Mi FFF mir0■ c
3
8, PERCOLATION TEST FAILED -
r
NQT
■y
x
■
R. F. Gist & Aso . Inc.
+ N .
IEST �OQ
Consulting Engineers
} P.O. Box 4526, East Providence,
Rhode Island 02914TCA
�. ENGINEER: .
WEATHER; err �
PROJECT; Boston Brook t
MACHINE TYPE;
LOCATION: N . Andover
DATE: 3-29- 88 .
GUNWA ` L1 :
j TIME STARTED: 3 3 o
TEST PIT N ; p 5TIM I ■I i-��-W�■IIIY�r■-IW�i __—-,,,■,■,,, E FINISHED: . .. ..
1FrN JJ {/y1 i 2
i [DESCRIPTION • R .
TIME
i START SATURATION... 6 4 1 0f*ia#I€liir606{61{ 0
off i#4i#a 3 a 3
##i#■r4#11###rt#4
FINISH SATURATION Gall6ns)
�tea4F*rtw#•##rtilr♦•'p#iari It*tip I'm i■**iirr*6rsflrii 44 ssasa
+ r
t
: BRING LEVEL T 12" 3 Gallons)
i#•r#Kliialli#ta■##tira###•r■■iiFrts■iariif!#rtftis#itr ,,y .....—..,� A
DROP To - r 3 o
{ r+la#iaaiFsaaar+#a�rr■�*#irrrrr■a0iyar►r}#ras♦I4rirs■r•rrrrr#rtirrl#rrtrtr•rlfa##rrf■■aiala#*#rta#*rl+iarrt
■alYrrr�r�■,�
Insert Difference lw +
DROPTO 6 1irr►1a0*art001tia40*10a6#s11#■a*4Itti4#1i■#0a0001##114#4F04fir0**410ti0aL11irir►4i0s#i4#a r
#tRlii##i0 rti 3 1
42
+
SUMMARY
A. PERCOLATION TEST PASSED-RATE= 12 M10,1
4 minfinch
B, PERCOLATION TEST FAILED DESCRIPTION,
N 0 T E-a
ti
a
1
t
L
• i F t
i
R. F. G 1ss r & Assoc, Inc.
QLATfQ_N
Consulting Engineers
P.C . Box 4,526, Cast Providence,
Rhode Island 02914
ENGINEER:
WEATHER: S U n 0 Y 1Q ' 5
n.,r�i�rr�m��iimmur.�^.�
i t
PROJECT: r� I
. Bostond .l 1 880
MACHINE TYPE.
LOCATION: + N . Andover
GROUNDWATER ELE :
3-2 - 8
TIME STARTED: :.
TEST PIT
+
TIME FINISHED; #
DESC [ TIN
t I M-E
` START S {T PLA 10 N*##*0 4 a i a i 1 4 1 a a/1 1 l d k 4.1 6 0 6 0 0 0 A t a►1 a l i i#a*#'*i#6 4 a a a a a a 0#i l a 6 0 a 0 4 *►#y}#r 4 i#i#0 i 4 0 9 a i 4 r
FINISH SATURATION 1Gallons) .##i11i*�ifi# •F#4 440Ai44i■6♦41106a0060a64*4b406##6#4#4
r
i
f
r -
r ,
t F
' •. BRING LEVEL TO 12 Gallons)
.
k iL�6al4#•�#i#♦0i•��ii4■#f#4�i#iAiotiFw##}##•ii4}*;#6## 54. S
A ,
M �
w +
DROPTO 9 /#d 1a64r14+tart�aR���ii11i�#F•�i�•1#i1►F#}#}4•i�l�f#aaa*##aalf�#i*Ifi�i##f*a#li##1•+la�R�4�f#�ai�#1i#i
-insert Difference Below
DROP $a$a s i i■a��r i a�i 1 1 i�a�f a a a a a i i#�F F J s R s***#i#i!i#a a#1��!�i■
r
SUMMARY
t
A. PERCOLATION TESL .".. 2
mlMnch
B. PERCOLATION TEST FAILED - DESCRIPTION:
r
NOTE-a
Water was percolating throur I i
a�s` a Filled 24 gallons .
Pert rate 2 min /inch .
a
M•
R. F. Gissr & Assoc. Inc.
H.R00LATDN
Cons-ulting Engineers
' P.O. Box 4526, East Providence,
RhodeIsland 02914 ENGINEER:
..,.+..�.�..� 40
PROJECT: Boston r
+ Kok Gl: ] 88
. MACHINE TYPE: .
LOCATION: N .
Andover
GROUNDWATER EEL:
DATE: 3 M 2 -88
+ F TIME STARTED: : 13
TEST PIS"N : P I
TIME FINISHED: . 4..a 3
DESCRIPTION
TIME
1 1
F � '
+. * -� i �S T SATURATION.11.,,,,.,,,,,,,,,...,
a6R16#6•ia##i##f44 ft i4#0!# 1## ##a fi i1# S
y f!i#########
FINISH SATURATION Gallons} 28
•00aa6t1144#iai44}44#ra0ari6i♦�iaaaaa#446164r41*4
wi4 6*4
-3
i
i +
1
BRING LEVEL TO 12H k + f
5 • 1 V i 2 8 '
1 a•i F##•*#a 1k#f####►
DROP TO 9 �,� 3 8
+ r ##i F a a#r#a a f i##w a 1 1#f i r a i 1 a##►#1 4;1 f#i###1 i r 4.1*a#a 1 a 1 1 1 l l l 4 r f 1 a f f t a r a i a#r i E 1 i##4 f 4 1 f a##f#i i 1#a##i i
Insert Difference BelowDROP TO 6 1
#ari}* i ataiar###ariaafr*r#;;** *#aaa**iyi####aa#*#rflaia #•aaa#•Ir#a•i11a4iroi•►ii#iia#a0Fa#10faa; • 3
SUMMARY
A. PERCOLATION TEST PASSED-RATE... 15 M i[h
minfinch
B, PERCOLATION TEST FAILED - DESCRIPTION,
LO T E 29�1 .
'
S
4
+ 1
R. F. Geiser & Assoc. lac.
PERCOLAIDN
Consulting Engineers
P.O. Box 4,526, East Providence.
Rhode Island 01 III •
. i w WEATHER: Srdi��:I:nonn ,... !0 I' i
PROJECT: Boston Brook
MACHINE' dl 1 880
LOCATION: N . Andover GROUNDWATER ELEV6
DATE: 3-29-88
TEST PIT NO:
TIME WISHED: 4
DESCRIPTION `
TIME - F
{ F ,
START SATURATION., 3 • 5
1 `
4
FINISH SATURATION Gallons) 3 20
#airrallarrli#f#L■ii■■#•fF•riar0LLita#i#i##a•♦fa064&
' BRING LEVEL TO 12 Gallons)
3 2
� � F M *iii�##*i#1#•a�■iwlLi!#���aL**■iiiiyili##fiLL��*�Li�## {
DRO
i
f -• `' : 1
•#�al►f liaaia■ria.a�afiaaaxaa#,r<+##say•sir.i.•1 iaartwa#•sia��iilaaai#•iii laaai i i1##it4aaii rii<a 1+iwi11 ter_„�r_r,_
Insertiffr *c Below
DROP TO " 4 : 1
■�saaarlaaaa+Ella■##araai4Larr##1#■!a#!r##a♦aaaa####+ara*4#4#4La■aF##*###afa•aiaiiafal##L###aa•L}#i}•
SUMMARY
A. PERCOLATION TEST PASSED-RATE.. M j[j 12 minfinch
3
Bi PERCOLATION TEST FAILED - DESCRIPTION:
NOTEa F
i
uon5umng Lngineers
P. , Box 4526, EastProvidence, r
Rhode Island 02914
Res ell `. "Bu " ei ser1.E.
Pros fd n
TEST PIT FIELD
. ...........
k '
CLIENT o Boston r brook TEST PIS` N , D 1
ROJEC�`
. . FILE NO,
t DATE 3-28-88
EXCAVATIONEQUIPM-ENT {
NG CONTRACTORDorusa. Brothers
iiY1.Y�ll Ylii.S�l�l4ryM1�l.pli��..11_
10 dr OPERATORGROUND ELV
o
ATHER MAKEMODEL 88 MMEJJ.+.�� e�JJ'
!� RTE 4 JJlYD
x T * w
CAPA ��R �lwllll5�i REACH Y[}{IME*w.TI CO PLE 111
� Y
• X CAV. BOULDER REMARKI
DE
P` SOIL DESCRIPTION � NT No,
TY, CLASS
" Dark Topsoil
E
Brown Soil
Large rocks and cobbles
D
' r D
�i#yat #rrs i..+
' i•Ms_ tiFfay
Grey course soil
D
• D
#..�1
D
Stopped here
12
REMARKS:
EGEND;
P. ,."N R
-OULQEB N6BBKV
.."..
Y iT I D Np
Rf f 1
L # -FIN W.G&RA
SIZE AGETRACE ffR) o # � �Y
"-1 * �` (U) C-WAS •`EL LO —MOD AT
01`360 SOME 4 35% /!-FINE To MEDIUMr ICULT
"' LAB AND 35-� IC•FINS M o�As
V-VERY ��
,. R, F. Geiser Assoc. Inc, 01� � -73 0
Consulting Engineers
. . Box 4526, East Providence, �.
Rhode Island 02914
Russ ell F "Bud"Geiser P.E.
TEST PIT' FIELD LOG
CLIENT Mi ano PROJECT Boston Brook TEST PIT No.
DH#2
FILE NO.
DATE
EXCAVATION EQUIPMENT
CTACTorsa rohrs {
ENGINEER 1 GROUND LV
-- OPERATOR i Cry
oy 30 MAKE Gr MODEL --
TIME STARTED
.,.' REACH
15 FT TIME COMPLETE
XCA , BOULDER REMARK
DEPTH SOILDESCRIPTION � � ,
TY, CLASS
E
Dark soi 7
E
Brown Soil
M
4
f Mii�_iwyf '
Grey soil and cobbles; some
D
+ Tar Targe stones
i rrr r ryw
D
D
�*ii �AAi
Bedrock
I"OEM
1 Ii
MARKS:
BBQPOBM ABBRE.Vj6T10Lja
ULQE8--Q0U U S E D mm"E"WRIMMOW
L E7 -FW W-GRA
SIZE AGE D S#G ATE # TRACE (M) 0 1()% M.WDtum 13N E--EAS
„* ' A ALE I) 10 20% 0-COARSE YEL#YELLS M'�'M 0 D E RATE
SOME S 20-3 . /*FINE MEDIUM
P6"AND C AND 35-� I FINE COARSE F.
LARGER •VERY \
r; 14
i
I
5 ,
f -
7320
R.F. Gelsser, Inc. (508) 314
ConsultIng Engineers
FAX 4 1 434- 44
P.O. Box 4526, East Providence
Rhode Island 02914
Syron R. Holmes, P.E.
President
June 13 , 1989
Planning Board
Town Hall
Main street
North Andover , MA 01810
Re: Boston Brook Estates
Dear Beard Members
Based on your comments presented at the June 8, 1989 Planning
Board Meetingv we
offer the following information concerning
this cluster development for your approval .
1 . CLARIFICATION P PROPERTY LINES - This site will have 92 . 77
linear feet of frontage can Salem Street in order to provide the
roadway access to the residential units . This will combine two
frontage lots owned by George Farr into one lot on Salem Street
south of our proposed roadway .. sheet No, 1 of the 4 lot
subdivision l a now has the perimeter shaded in order to
highlight the property.
2 , TYPICAL BUILDING ELEVATIONS - we have prepared architectural
elevations of the � 3 and 4 unit townhouses for your review.
3 , PERSPECTIVE PLAN FROM SALEM STREET - Two she ohes has been
submitted that illustrates the anticipated view of this
development looking from Salem Street. There will he a 500 foot
horizontal separation from these existing homes to the Boston
Brook Estate8 units . All mature trees will be preserved along
the brook and the bank leading o the proposed units thus
reducing the visibility 'to these existing homes throughout all 4
seasons.
4. OPEN SPACE PLAN Are 80 some plan has been prepared
telineating in green the proposed open space on this
Supporting ca l U f a i ores have been attached that summarizes the
open space area provided and is in compliance with section 1 ,
5b of the local Planned Residential Development Regulations
TRAFFIC ISLAND - The traffic island proposed for the "T#
intersection at the private driveway is now shown,
DESIGN• CONSUL TATION•S UPERVISI N a REP REPOR TS
i
5 j
CONSTRUCTION BENCHMARKS benchmark has been added to al I
three grading plans (Sheets 3 , 4 and in order to provide the
contractor will easily accessible vertical control .
ROADWAY WAIVER REQUEST -- Attached is a letter dated December
13y 1988 previouslysubmitted o your office for your approval ,
8. STREET LIGHTS - We have added 4 more street lights on these
roadways as suggested by the hoard .
F you have any questions on this information , l ease contact
s,
Very truly yours ,
Byron R. Holmes , Pa ,
President
I . F. GEISSER, INC,
R.F. Geissert Inc.
R. F. Geisser & Assoc. I nc. 401-438-7320
Consulting Engineers
P.O. Box 4526, East Providence,
Rhode Island 02914
Russells'. "Bud GeisserP.E.
December 13 , 1988
Planning Board
Town Hall
Mar Street
North Andoverg MA 01810
RE: Roadway waiver Request
Boston Brook Estates Subdivision Submittal
Dear Members of the Board
on behalf of M i ano Realty Trust, we have submitted definitive
plans for a four lot subdivision off Salem Street, The proposed
p
b l i c roadway I ead i rig 1 nto the deve l opment, Part r i dge Dr i ve , i s 6 o
feet long . T 1*s is in excess of the Soo foots maximum roadway length
as specified by your board . we respectful-ly request a waiver on
this rov i s i ors based on the following reasons:
1 . This foot road allows the two pr i vate driveways off
Partridge Drive to extend between existing wetlands on the site
vegetated wetlands to the west and the Boston Brook to the
east i ng any adverse impacts o these natural res rces
2 , Extending his roadway an additional 100 feet allows the
cul-de-sac to be positioned at the top of an existing l •
This will eliminate any major regrading in thecul-de-sac and also
allow better visibility for automobiles in this rite rect i ors ,
3 . This subdivision roadway alignment 0 public road and two
private drives) was chosen based on a review of several
preliminary road sketches for this development . Input leading to
this final design was provided by this office, Gates, Leighton
Associates , Landscape Architects and North Andover Planning
Department staff . It was felt that this read layout allows for the
optimum building layout and greatest preservation of existing
vegetation and wetland areas*
Very truly yours ,
df�1,000
Byron R , Holmes , P,, E.
Vice President
I . I= , GEISSER & ASSOCIATES, INCI
cc; Miano Realty Trust
DESIGN•CONSUL TA TION•SUPER VISION•REPORTS
ELLIS BUILDING
95 MAIN STREET
NORTH ANDOVERo MA OIB4
(61 7) 6B - ss
VIKEN MANOUGIAN
rr
August 7, 1989
F
Town of North Andover
MICHAEL GRAFF, BOARD of HEALTH
120 Main Street
North Andover, MA 01845 f
RE: BOSTON BROOK ESTATES
SEPTIC INSTALLATION
Dear Mr. Graff:
Enclosed herewith please find a permit restriction that is
intended to be appended to and made a part of the system permit
issued above.
Items 2 and 8 with respect to your letter of July 25, 1989
are addressed by paragraph 4 of the restrictions and Item 6 o
your letter was addressed in paragraph 3.
Item 7 was attended to through our previous correspondence
and there is on file with the Planning Board a Master Deed and
Condominium -Law provision together with examples f the Unit
Deed which will be used in this development. I appended them t
the permit restriction and submitted the same for your review,
understand that Geiser and Associates amended the plans
to reflect the other comments made by your input of July 25,
1989 and request your final review of the permit application.
Very truly yours,
Ralph R. Joyce
RRJ*,mjj
enc,
cc: Planning Board
George Myers
R.F. Geiseer Associates
S
S
_ 2
i TOWN OF NORTH ANDOVER, 1 ASSA U 'r
r
DIVISION PUBLIC WORKS
384 OS GOOD STREET, 01845 �
a
1
FOA L S, NIMAN TELEPHONE687-7964
DIRECTOR FORTH i
June 12, 1.989
AT
`T S 4 US
Mr. Paul Hedstrom, Chairman
Planning Board ;
120 Main Street
North Andover, 1A 01845
e: Boston Brook Estates
Dear Mr. Reds tro
The Division of public works has previewed the revised plans of the
Boston Brook subdivision dated April 28, 1989 and have the following comments
to made
1. The cross-section of the roadway as designed is unacceptable,
Our typical cross-section requires 26 foot wide pavement, 8 foot
wide shoulders at a ' slope and 2 to I side slopes. Any
slopes greater than 2 to I should be rip-rapped.
2. The bridge detail is incomplete. The finish grading is not
shorn completely in the areas adjacent to the box culverts,
giving the appearance that they are not backfilled. As shown,
wingwal.l.s are obstructing the two outer box culverts.
The entire area over the bridge should be backfill.ed to a
grade which maintains a standard cross-section. Headwall
should be instal.l.ed at the same grade at the roadway and
wingw l.l.s shod match the grade of the side slope.
8. The Flared ends of the 86" culvert on the east side of
the bride does not extend far enough to meet the proposed
finish contours.
4. The drain in the public roadway should be located near the
edge of pavement, not at the centerline, with manholes off
the road wherever possible. A catch basin to catch basin
configuration may be used to facilitate installation.
. It is unclear where property lines exist or if the town
. .w. is wider than 50 feet, If the , .w. is 50 feet
wide, the intersection with the street line of Salem St.
shall have a transition radius of 30 feet.
6, The plan does not show NGS benchmarks,
, Electric telephone and, cable should be installed in the
shoulder and remain within the town R.O.W.
k Page 2 - Boston Brook ',O`tates
,r
8. The existing water rain on Salem Street is located approximately
at the east edge of pavement, not as shown on the plan.
. The connection to the water main shall be a 1 " x 8" tapping
sleeve and valve. The size and type of pipe should be shown
n the plan.
to. The hydrants along the public roadway shall be located on the
same side of the road as the water main,
11. The main line gate valve and hydrant near the intersection
of the public and private Broadway shall be located on the
town ,o.W.
12. The water maim shall be installed over the box culverts, properly
insulated with styro oa . and stainless steel. wrap, and encased
in concrete,
1.8. Sloped granite curb shall be installed on grades greater than .
1.4. Move the hydrant on the south driveway to station 4 + 80 to avoid
conflict with sewer,
,
15, Install the hydrant on the north driveway at the end of the
gar main.
16. Install an emergency outlet control structure on the discharge
from Detention Basin # l at the property line. The inlet pipe
to the catch basin shall be as designed, the outlet shall be
designed for a 100 year storm while assuming that the " v
from the pond is plugged.
ve `y, rijly you ,
4 1
f
J. William 1hurcia
Director of Engineering
Administration
Jw :lb
cc: R.F. Ceisser, Inc,
4
' y;oRrh 1 Tow I2 l iinSit-eel
OFFICESOff':
BUILDING
NORTH ANDOVER
DIVISION.OF
PLANNING
PLANNING COMMUNITY V PMEN T
K REN H.P. NELSON, DIRECTOR
Atty;s Ralph Joyce
95 Main stt.%eet
i Boston B�NookEstates
Dears Ra. ph I
Board ip.At their Akne 81 1989 m0etingft
�jany 01900r� were y%aiesed last night a r,cj they i n ud ? the
ollowi %
pill lead owners u sign both the Special et-111i
application and the DefinitiveSubdivision APPYv0v l
application.
pr_%Oper_%ty lines of all putNcels involved in i h t� th0i.
ia= l Flerrait or theDefinitive u di i ion must be
clearly delineated. 'I would sugest that vmN),cy be drDi--ip.
which will show both existingr tst:y lines and r�so po d.
l v o i t-13 of Proposed attamhomd un i .dri must be W'%0 v td d
X would rer.ommend that if colored r L-1n d e ri nf�� e t�r }
they be broLkHtital Ong for your" next r amen t r:,:+1 i.
l have been mnt-xble to find a copy of theivi, Nonrji tt al.l
please submit a copy to my attention. If ye.-,u h�k.�w.3 Y'lljt had
tli r of the pl i4 i� done therty
Duo o the amount Of L-lonf�tsjonlast nights meeting, I would
You meet with me to review all of the above mentirined ci r,C U
will mako myself o va ir--I h l ear`l y rl rz.x t week. P I e c �)e cont ac t m
1 is-C�A
F Ai A T a i,.A run u T 8
r
r,-a6o-
�. 1ycel
ELLIS BUILDING
95 MAIN STREET
NORTH AND❑Y E , MA 01B4S
RALPHF . JO
VIKEN MANOUGIAN
November 2 r 1989
Town of North Andover
PLANNING BOARD
120 ' ain Street
North Andover, MA 01845
RE: MIANO REALTY TRUST
BOSTON BOOK ESTATES
Dear Sirs:
We are presently continued through your November 16, 1989
meeting. T enclosed for the record the Board of Health arual
on the system design.
The last two items required per your draft decision are
the landscape plan and the phased development and erosion plan.
The former was previously submitted but we will resubmit same
together with the phasing and erosion plan during the week o
the 6th,
Please advance this matter to your agenda of November 16,
1989 at which time a closed hearing ing and decision is
anticipated,
e ry� t r Your.
RRJ*Omjj
nc.
..... ........................ . ....... .... ...._.. ............. . ........ ....................................................... ............................................................_......._...... ........._... ........... ...................................... ................................ ........ . ...... .. .... .. .... . .... . . . . . .. ............... ............. .. .. .
�.,.� t_ TM .. - ,. .. __ , __ �. - �w —____'-_.,,._ � T_� ..�. _ �,.._.� —__�....,r, -.... ----- _ - ,....._,.._.r
. y .
- .
-,;;
,F. :1
+k -.. �. :
' ter r �� .� �::::::: -
. - . - ,'
BA .
# ■.LI. -
+1OT . . '4
s yy
.'..e
# 7/� ..•r.'. .a.•
.. .�
..
•
ram► .
..-...... .'
-
:<¢
. .
..
.. f.,
.
. -
. . .. ...
ryl
.
. .. . .
.. ::�
. .
. .. :;.
::'�.
r ,
i. ..r'.
'?t`
_ -__
'k=a•. {'
4,'' µ.
'..(:-t.
.:f'..:
wY
.. :5'i'
. :M1:'''..' +..,i.:.
y
}'.,.
/ K
�� � �. _
�:. ''
4
C'i
x':4M1'.
t`:
'f.:...?
.. .: ... .. ..... ..... .. ..... .. .. -
.1.. ,..j;.... z
... .kk� .......k.•., .:.,::
..
_ .. ..... .. _.k. .......... _
k
_ .. -
;'r'
_`
.. _ .. .I
_ :'F..
.
`.-
_ �.t>:::
. `{:
- - ;;tf':
b::i?` -
M1e.:' .:}
* _ .'I -g
.'•'
k:1:
*:\:'
:4'
.-.:.. ,s::.
_ {i::.....v
t.
\-'
.,.
..y.
"%.
.-. A
....:. :.k .. _.
;�.
!.:
k.
t f
`."4...... -
_ .. -
*'i .I
a' -�
;:�
At _ _
`='.
. , .. .. ....... ...
/. ;:dry.
...' .. F.
s _.' ...
..... ...... .
..
':iY��{' :kki
. .C .�.:
.
.....
:.'t V.ns,.'''
r:M1 +
s
•
.E;'`:;
'.,.
2
k,:
. .. , .... .. 5`
. .. _ .,,
tin
��
:.
:...... ..... .. ... ....................
::f::
4..
': ::'-t.r I:.v.*.
. ';5t}i:
F.
f _ _.. - -
.. .. _ ::T::.;':
"'
�'
r Sv
.Y...
:: _
1
_ eN
'.i.
f fi:';
:�r..
7�'
.. '~'::
_ .-X...
..`.
1' d
.. '.kx 4,4...:}.. .fit.
..
i
:%''-`'x
t
r�r
:.
M1.
. '
::.
..
... .....
: .. .. ...
... .. .... ..:.....
C
.. - ':c
.. ..
........
xi.
. i r r f ' ' �. �:-�.sew4 7:.,-. i :. . .stem:. :�. . --.t �.ad: ���-�=:e�
}.::
� rc n r-are-.I .M. .. ..::%, :...
. :._ _.. ...r ........'..'.. ..
;;::
r: r.
o
... n .. .. ..........
. .. - _ -f}'fk2
.. ,.;+,y
`:rt._
:`jM1.
.#..'..
s
I.
:.::..:.,,: -
k't
! 'c,v.
::fi':
r:
r� - ::
:`!.....
a �.
.. .. ........... .
......_...,...:;;,.....
:.
k;..;..
;:.':'«
::::t
x................
}
:::...
.,. .,..... f :.:}
_ . ..:.
; ._.
:..'•:x<
r {.. :_
. .. ..
�..
.. .. ..
':;:
. .s...-t.:_µ
{,.
:,.
t
.
:;:
- ..
.. - ., :a.
;':'
`.
).'
. :: :;{
�1
.. 1'. -
.: .. .
r`
.: ,. '
-;:..
... .- .. .. .. ,..:..:...
I ..-_
.. .. ..:.:.._:
X
.. .. .. .-...... ....
�:i. :.:.:.:'...i.:
.. .. .. .... ..... .........._�,,:.-
.. .. r .. . .. .. .:... :. _
.. _....t .... ..... .. .. .... .... ..
.. .. .... ... .... ...} a.. xi
.... .. .. .. .. .. .. ...... ........<.....
... .............. .,...
.'.E�. :'( re
t .......
..v.. _ .. ..............:. ........'
:::..:
... ... ... ...... ..._.-.. _
:I: .x.
..
... �h
* ':f
' :`s
.. #
''zi'.
.. �:.
;J .
f
. ... .. -
M1cS
* - .- . .
. : -
:
. .
:...:'
.-
. __:.
. - ... ..
=:<�_.
.. .. .. .s.. .
:�
•''
,
.. ....:�... :..
.. .. .. .. .. t.... • ..... 1.. .::}.:.
.. ..... .. .. ....t .. .. .. r ',#x .... fa::
•.'-.:::
... -,.... .. r... ..,-. ... I ... L .4.,.-:.*.,
... ........ ........ .: ..
_.... .._ ..; .. .. .. .. ..... .:..
...... .:. .. - ... ♦ _. t... , { :.. :'{._:r \' 'L. ._ tip.
.. ... _.. z .. ._ -<k�....._.r ..5.. ..._...�. ....... _..t t.... ..� .,. ,4.. 4� s "'�:� ;:.: x�Ei' {k .f�.{',��,'. L k,7�-. '+i:"` —.'�C'�"65�.s��._.
..,. ..�.::x b. ,. ��.�>} �:,L��•r.<-.....: .,.,1t,...,"ems � ,Cz�_:§ �L �. .F. a�_r<:M��� ,.F.��x—�.—�:�ac�aY� ,;;�:�^,�5.=--4:t�7_�' 'S� k:�� FT:�,:.�'.s.i+� ? �x�.3��
4
{
Ir
qa �# " .
ELLIS BUILDING ��a, �,{�v:
95 MAIN STREET
NORTH ANDOVER, MA 01845
r
IKEJ MANOUC31AN 4%555
February 16 1989
t
`own of North Andover
PLANNING BOARD
120 Main Street
North Andover, MA 01845 �
R : MIANO REALTY RUST BOSTON BROOK ESTATES
Dear Sirs:
Since our last meeting substantial progress has been made
with the Board of Health, The proposed system has gone through
extensive review with respect to technical compliance with
Title 5 standards and the necessary adjustment8 made as
suggested by Mr. Graf.
We scheduled a 10 :00 A.M. meeting with Mike on February
2 l 1989 at which time a comprehensive analysis of all soil
tests will be reviewed. It is expected that the Board of Health
will submit recommendations shortly thereafter.
Actor inglyr further deliberations with your Board at this
time are premature. Please accept this letter as authority to
exceed any statutory time constraints that may be working
against you until the date of your next regularly scheduled
meeting.
V t y y -�
a p .
R :m j
cc: George dyers
Philip Ragusa
ELLIS BUILDING
5 MAIN STREET
NORTH ANDO E , MA 01B45
VI KEN MANOI. GIAI
January 2 y 1989
Town of North Andover
PLANNING BOARD {'
5,
120 Main Street
North Andover, MA 01845
RE: BOSTON BROOK ESTATES MIANO REALTY TRUST
S L M STREET, NORTH ANDOVERF MA
Bear Sirs:
Your Applicant consulted extensively with the Board o
Health on the above cited development and Mr. Graf offered the
observation - that unit owners in the condominium may at various
times in the future install garbage disposal appliances in
their units without knowledge of the Town and/or Condominium
Organization. Mr. Graf feels that this would substantially
impact the efficiency of the septic system and, acc rd .nglyr we
offer the following to deter and enforce against such
circumstances.
Each unit deed shall contain the following language:
"This conveyance is made subject to Paragraph �
Section r of the Condominium Bar-Laws with
respect to the installation and/or maintenance of
garbage disposal appliances or other such systems in
the unit conveyed herein. 11
This clause in the deed would run with the title of the
unit and establish conclusively that the unit owner took title
with knowledge of the provisions in the By--Laws with respect to
garbage disposal systems. While theBy-Law ro isi s are
themselves binding, the unit deed serves to emphasize the
following provision,
The By-Laws shall contain the following enforcement
procedure:
'Each individual unit owner is prohibited - from the
installation, maintenance, and/or use of a garbage
disposal appliances for the - purposes of grinding
household garbage or waste and causing the same to
flow into the common sewerage and waste disposal
system installed in the condominium.. it . is
acknowledged that such garbage disposal substantially
deters from the efficiency of the sewerage disposal
system, . reducing its life, and resulting in
maintenance problems. The Board of Trustees has
authority to impose fines - for the ]reach of this
clause in the amount of actual damages shown t
result therefrom, or in the amount of $lrOOO .00
whichever shall be the greater . The Board of Trustees
shall have the power , and authority to compel the
removal of such garbage disposal appliances by the
enforcement procedures for breach of the Condominium
By-Laws set out in Paragraph hereof. "
h -1eeloper offers the proposed Mechanism to address the
concerns ' of the Board of Health and raises no objections to a
special. ' permit condition to effect the suggestions herein.
IANO �R- ALT. TRUS
by the r to
R.a ph R. oyc
RR / i j
cc. Geisser - & Associates
Board of Health
Miano Realty Trust
i
o
�.
} FELTS BILLING i
95 MAIN STREET
NORTH ANDOVER, MA (318
VIKEN MANDUGIAN
January 2 , 189
'own of North Andover
PLANNING OA
120 Main Street
North Andover, MA 01845
S ON BROOK ESTATES MIANO REALTY TRUST
SALEM STREET, NORTH ANDOVER, MA
F
Dear Sirs:
Your Applicant consulted extensively with the Board of
Health on the above cited development and Mr. Graf offered the
observation that unit owners in the condominium may at various
times in the future install garbage disposal appliances in
their units without knowledge of the ' win and/or Condominium
Organization. Mr. Graf feels that this would substantially
impact the efficiency of the septic system and, accordingly, we
offer the following to deter and enforce against such
+circumstances.
Each unit deed shall contain the following language:
"This conveyance is made subject to Paragraph ,
Section of the Condominium By-Laws with
respect to the installation and/or maintenance o
garbage disposal appliances or other such systems in
the unit conveyed herein."
This cause in the deed would run with - the title of the
unit and establish conclusively that the unit owner took title
with knowledge of the provisions in theBy-Laws with respect t
garbage disposal systems. While theBy-Law provisions are
themselves binding, the unit deed serves to emphasize the
following provision.
TheBy-Laws shall contain the following enforcement
procedures
"Each individual unit owner is prohibited - from the
installation, maintenance, and/or use of a garbage
`e
dispose
fiances for the purposes of grinding
household garbage o waste and causing the same to
low into the common sewerage are waste disposal.
stem installed in the condominium. it is
acuoled such garbage disposal substantially
deters from the efficiency of the sewerage disposal
system, , �
stem , ucin its life. and resulting i
e g
maintenance problems. The Board o Trustees
uthor t to impose fines- . for the breach of this
y
clause in the amount of actual damages shown to
result therefrom, or in the amount of $1,000-00
whichever shall be the greater. The Board of Trustees
shall have the . power , and authority to compel the
removal of such garbage disposal appliances by the
enforcement procedures for breach of the n to i iu
en
-Laws set u in arag�raph h eof -�
� � 7 ����
e eloper o fens the prop sed mechanism to address the
The concerns of the Board of Health and raises no objections to
spec permit condition to effect the suggestions herein*
special
141ANO REALTY TRUST
by their attorney,
ti
Ralph Ro Joyce
RRJ/mjj
cc Geisser - & Associates
Board of Health
iano Realty Trust
r
/ f 4
SEQUENCE OF CONSTRUCTION AND
PHASED DEVELOPMENT PLAN
�Y i1F M�1Mr# ��������Y�iY �1�*�*•^Mr*�M+F MIS•Y �!���d�1��WkY�F iw4 RW4����F�iF�f 4YY ibrF�\��������4YN!Ywr YMf MMt�
#9PI�F����i�}�1 IhM�i1w�Y �Ifs�F�P Irk��� ����1�F�l YY Y'*iS4���d iMi��1�k Zvi W4■P FY?�4�!MW4��f�•��iM1F i'14 FI��!!!F��� .
6 Ray bales and erosion controls shall be installed as noted
in the Orders of Condition issued by the Conservation
Commission.
2. Partridge Drive construction shall be undertaken and
completed with the Sequence of Construction Plan approved
by the Conservation Commission Orders Condition and
referenced on Sheet L2 of the Details of Boston Brook
Estates as shown on a Plan dated March 188, revised April
26, 1988, and May 6, 1988 and prepared by - Gates Leighton &
Assoc. and submitted to the Planning Baord herewith#
n the first year of development upon posting of the
appropriate tri-party mortgage agreement and/or cash bond
for both Partridge Drive and the private way to serve
condominium development to be known as Boston Brook
Estates, the following lots shall be released for building
permits:
Lot 1 and Units 11, 12, 1 , 16, 17, 18, on Lot 4 a
shown on a plan of land entitled "Subdivision Plan of
Land, Boston Brook Estates for Miano Realtor Trust" ,
R.F. Le sser, Inc. , April 1989.
n conjunction therewith, the construction of the private
way servicing the condominium ]mown as Boston Brook
Estates shall commence together with all drainage,
utilities, septic systems, detention and retention ponds,
and all grading limited, however, to the northeast portion
of the premises.,
50 No work shall be conducted on the southwest portion of the
premises during the first year of construction.
. During the second year of con t uct i n r the following lots
on said plan shall be released for building permits.
Lot 2? Units 1, 2, 3F 41 1.4, & 15 on Lot 4.
7 . The private road construction on the southwest portion of
LAW OFFICES OF the premises shall be completed in the second year.
ALPH R. JOYCE
95 MAIN STREET
NORTH T A DOVER,MA 0184
( 0 )65 -4655
FAX:( OS)685-3148
8 Du r ire g the third year of coast ruct for r the remaining lots
shall be released for building permits and all
construction to be completed:
Lot 3 and Units 5, 6, 7, 8, 9, & 10 on Lot 4.
MIANO RtALT)tx TRU"c"T
by a o rn
RALPHR. CE
LAW OFFICES OF
RALPH R. JOYCE
95 MAIN STREET
NORTH ANDOVER,MA 01845
(508)685-4555
FAX:(608)685-3148
��4#��p�{7�.i. i � f+r� d I 7 1.� a,. �•Y•F F
OFFICES OF: 4{ Town o f f {`++` I� f�4 }'+ i�
1.2.0 Main Street
APPEALS lis 0 184-5
BUILDING �;; NORTH ANDOVER --
A HUB
CONSERVATION DIVISION OF (508)C)"82-6483
HEALTH
PLANNING PLANNING & C MM NI'"I`Y DEVELOPMENT
KAREN H.P. NELSON,SON, DIRECTOR
MEMORANDUH
TO : Mike Graf, Board of H Ith
FROM Scott i. Stocking Town Manner
DATE., February 14 1989
Boston Brook PRD
Mike , Just a reminder, the Planning Board needs our input on
the above cited protect with regards to the following issuest
. . Number of buildable lots under the subdivision proposal.
under Title V. for purposes of determining inin housing
dens..
The design of the septic system for the PRD Project
under Title Ve
Please supply this input o the Planning Board prior to their
February 16 , 1989 meeting . Thanks ,,