Loading...
HomeMy WebLinkAbout2009-11-05 As- Built Plan and Request for COC 1 t Tabitroadhurst I ATTORNEys AT LAW 5 Osgood Street Methuen, MA 01844 978-327-5144 November 10 2009 Town of North Andover Conservation Dept. —Attn: Donna RECEIVED p boo Osgood Street, Bldg. 20, Suite 2-3 NOV 12 Z' Noilh A .dovr, NORTH ANUOVER CONSERVATION COMMISSION Fie: 43 Oxbow Circle North Andover•, MA Re nest • Certificate 'C ire Dear{Donna; .s per our telephone conversation this morning, lease find enclosed copies of the As-Built Plan for the above captioned propefty. Please note the house sits outside the 50 foot buffer as required lair. After o have had a chance t � � review the enclosed, please call this office if you have nquestions or need additional i � a nforniation. Thank you for your assistance in this matter. Very truly yours, R , . ST T.AT LLP cr rocs. * i Broadhurst Tabit L . .ArroRNEys AT LAW 45 Osgood Street Methuen, MA 01844 P978-327-5128 4 8- 2 - 1 4 Iviselli@)broadhursttabit.comcastbiz.net r " March 24, 2009 Town of North.Andover Conservation Dept, RECEIVED 1600 Osgood Street, Bldg, 20, Suite 2-36 NOV -1.2 2009 North Andover, MA 08145 , NORTH ANDOVER CONSERVATION COMMISSION Re: Request for Certificate. f CoMpl a . Dear Sig/Madam: Please fired enclosed a completed request for a Certificate of Compliance. Please F also find enclosed a check in the amount of$200.00 to cover the cost of the same. 'lease forward the requested Certificate of Compliance to this office at your earliest convenience. Thy you for your assistance in this ratter. Very truly yours, . r car Eves. i Massachusetts Department of Environmental rtctic Bureau of Resource Protection - Wetlands D Pi`ile Number: WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c, 131 §40 Provided by DEP A. Project When flllin .outI. This request is being yt NOV 12 2009 1 forms on the Arthur Broadhurst, 1 T N V computer, use r C lS V TI COMMISSION or�i the tab m . fey to move your cursor siiir address do not use the return key. ci yffow Staten -- .- P o e r 97-8 27-519P Phone Number . This request is in reference to work regulated by a final Order of Conditions issued to: Applicant '4 6 3 4 Dated BP File Number Upon completion of the work 3, The project site is located at: authorized In 43 Oxbow an Order of Circle � �� N Andover Conditions, the street ddrss City/Town — property owner � rust request a Assess s Map/Plat Number Parcel/Lot Number Certificate of The ulna Conditions Compliance Order fond t or s way recorded the a lstry deeds for: from the issuing authority stating Property Owner if different) that the work or portion of the4 r-1 n 7 27 orb has been County Boost Page satisfactorily completed. certificate if registered land) 5. This request is for certification that chef one : the work regulated by the above-referenced Order of conditions has been satisfactorily f ctor�ly omleted. El the following prtions of the work regulated by the above-referenced Order of Conditions. nd� �ons hae been satisfactorily completed (use additional paper if necessary). EJ the above-referenced Order of Conditions has lapsed and is therefore no logger valid, and the work regulated by it was never started. wpaform8a.doc rav,711 104 Page I of t - 1 F Massachusetts Department of Environmental Protection Bureau f Resource Protection 1�1fis Fil Number: WPA Form 8 Request f Certificateof Compliance ._ ........_ Massachusetts Wetlands Protection Act M.G.L. c. §40 Pr ide D P A. Project Information (c 6. Did the Order of Conditions for this project, or the portion of the project� � subject to this rebut, contain n approval-of any plans stamped by a registered professional engineer, architect, landsoa e architect, or land surveyor's � 1 i i [J' Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the laps approved in the Order. p 210�No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOP). If the project received an from the Conservation Commission,n, submit this request to that Commission, If the project was issued a Superseding Order of Conditions or was the subject of an Ad udi story Hearing Final recision, submit this request to the appropriate DEP Regional Office (see htt ://www.mass, /de /aboutl�- g �on�fNnd � r.htr . F Page 2 of