HomeMy WebLinkAbout2004-09-22 Conservation Commission Minutes Conservation Commission Meeting Minutes
September 22, 2004
Members Present: Scott Masse, Chairman, and Albert Manzi, Jr , Vice Chairman, Deborah
Feltovic, and John J Mabon, Sean F McDonough
Members Absent: Joseph W Lynch, Jr, Beth Wescott
Staff Members Present: Alison E McKay, Conservation Administrator, Pamela A Merrill,
Conservation Associate, Donna Wedge, Conservation Secretary
Meeting came to Order at: 7:10pm Quorum Present.
General Business
242-1252, Modification,315 Turnpike Street-Merrimack College Synthetic Turf Field
(Merrimack College)(Wetland Preservation Inc.)(Recluest to cont. 10/13/04)
No one was present Ms McKay states at the last meeting the Commission requested revised
plans showing the location of the fence Present to vote Scott Masse, Albert Manzi, Deborah
Feltovic, John Mabon and Sean McDonough The applicant has requested a continuance to
10/13/04 A motion to continue to October 13, 2004 meeting was made by Mr Manzi, seconded
by Ms Feltovic Unanimous
242-1203,Modification, 0 Stiles Street-# 10 (Willis)(cont. from 9/8/04)
The applicant Timothy Willis was present Ms McKay states the revised plans have been
submitted showing the adjustment in the scale and a detail section of the proposed Mr Manzi
states are they requesting a waiver? Ms McKay states there is no waiver request everything has
been resolved Present to vote Scott Masse, Albert Manzi, Deborah Feltovic, John Mabon and
Sean McDonough A motion to issue the modification was made by Mr Manzi, seconded by Ms
Feltovic Unanimous
242-1045,Modification,675 Chickering Road-North Andover HiEh School(cont. from
9/8/04)
Fredric W King of Schofield Brothers was present Ms McKay states the applicant has
submitted revised plans showing the berms outside of the 50' buffer zone as requested The
berms in the new locations present the same amount of disturbance of existing vegetation Staff
recommends further preservation of the area in the form of a Conservation Restriction or some
other equivalent Mr Manzi states the berms are totally outside of 50' no-build zone Mr King
states yes the berms moved outside of 50' no-build zone and also we reduced the size of the
berms. Mr McDonough states these berms have been pushed back further Mr King states yes
the have been pushed back further Mr. Manzi states the house at 586 Osgood Street with the
maintained grass should have the Wetland Markers on the property as a warning to stay out of
this area Mr King said that would be no problem at all Present to vote: Scott Masse, Albert
Manzi, Deborah Feltovic, John Mabon and Sean McDonough A motion to issue the
modification was made by Mr Mabon, seconded by Mr Manzi Unanimous
a
242-816,COC, Campbell Forest(Mesiti) (Engineering Alliance, Inc.)(cont. from 9/8/04)
Allen Russell of Mesiti Development Corporation was present Ms McKay states the $ 500
escrow account was set up for outside review by Lisa Eggleston Lisa Eggleston received
paperwork earlier this week The review completed and received late today I did not have a
chance to look at the review prior to writing the recommendations, but in speaking to Lisa
Eggleston earlier in the day, she felt that the additional impervious areas appeared to be
accounted for in the final drainage report and that the system as designed could handle the
additional impervious areas Mr Manzi states he is very pleased with the results Mr Masse
states that Mr Lynch has talked to Lisa Eggleston about the project and he fine with the results
of the review by Lisa Eggleston Present to vote Scott Masse, Albert Manzi, Deborah Feltovic,
John Mabon and Sean McDonough A motion to issue the COC and bond release was made by
Mr Manzi, seconded by Ms Feltovic Unanimous
242-990,COC, Stonewedge Circle (Mesiti) (Engineering Alliance,Inc.)(cont. from 9/8/04)
Allen Russell of Mesiti Development Corporation was present The Commission is very pleased
with the result of Lisa Eggleston review of the drainage for these filings Present to vote Scott
Masse, Albert Manzi, Deborah Feltovic, John Mabon, and Sean McDonough A motion to issue
the COC and bond release was made by Mr Manzi, seconded by Ms Feltovic Unanimous
242-1231,Amendment,North Andover Town Commons Utility Proiect(Mass
Electric)(ENSR)
David Clinch of ENSR was present Mr McDonough read the legal notice Ms McKay states
the Order of Conditions was issued on 1/15/04 for conversion of overhead utilities to
underground utilities including electric, telephone, cable, and gas along the North Andover
Commons and radial streets The amendment is being requested to place a number of utility
appurtenances a transformer, two switchgear units, three pedestals, and a power supply with
associated housing and two manholes with duct lines onto a vacant lot at the intersection of
Cranberry Lane & Osgood Street Also proposed is the construction of a 12' wide crushed stone
access road, which crosses an existing, unvegetated man-made drainage swale/intermittent
stream, which drains into existing wetland to the rear of the property The amendment is being
requested as the original approved project did not allow for such needed appurtenances The
abutters have been re-notified and amendment advertised Proposed also sent to DEP for review
Only 2 full plan sets submitted The width of the proposed crossing is approx 12 linear feet and
will constructed via installation of a 12" corrugated metal pipe covered with crushed stone over
layer of geotextile fabric No bordering vegetated wetland associated with the drainage
swale/intermittent stream crossing, only bank The lot is open field with no to minimal woody
vegetation Approx 1,050 s f of proposed within the 25' No-disturbance Zone, and 575 s f
within the No-Build Zone (total of 1,625 s f) The applicant requesting a waiver from the
25'/50' setbacks requirements An alternative analysis has been included within the request The
Commission discussed re-open the Public Hearing Present to vote Scott Masse, Albert Manzi,
Deborah Feltovic, John Mabon, and Sean McDonough A motion to re-open Public Hearing was
made Mr Manzi, seconded by Ms Feltovic. Unanimous A motion to continue to 8 OOpm Public
Hearings was made by Mr Manzi, seconded by Ms Feltovic Unanimous
242-1037, Extension,Endicott Plaza (Forgetta Development, LLC.)(Epsilon)
No one was present Ms McKay states the site is an open site we have to have the erosion
controls refreshed The monitory reports states there has been run-off with sediment flowing into
the wetland resource area. I have talked to Michael Howard of Epsilon Associates but I have not
talked to William Barrett at this time The Commission would continue the hearing to October
27, 2004 meeting but would issue the extension but would continue to discuss the erosion
controls problems on the site Present to vote Scott Masse, Albert Manzi, and Deborah Feltovic,
John Mabon and Sean McDonough A motion to issue the Extension was made by Mr Manzi,
seconded by Ms Feltovic A motion to continue to October 27, 2004 meeting was made by Mr
Manzi, seconded by Ms. Feltovic. Unanimous
242-1192, COC,335 Berry Street (Ramos)(Giles)
Socorro & Virginia Ramos were present. Ms McKay states the Order of Conditions was issued
on 5/22/03 for the construction of an attached deck and stairs and an addition and stairs to an
existing dwelling in the buffer zone to a bordering vegetated wetland and within Riverfront The
as-built plans and Engineering certification letter submitted The as-built plans are in
conformance with the proposed plans with the exception of the addition of a bulkhead and
relocation of the two proposed stairways These modifications are minor in nature and all
setbacks are still being met The monitoring reports were submitted and the wetland markers are
up although some interior work may still be occurring, exterior work is completed and the site
has been satisfactorily stabilized and there are no issues Present to vote Scott Masse, Albert
Manzi, Deborah Feltovic, John Mabon, and Sean McDonough A motion to issue the COC and
bond release was made by Ms Feltovic, seconded Mr Mabon Unanimous
DPW sidewalk Project Enforcement Order update:
Ms McKay states she met with Jack Sullivan and John Cyr and Joseph Cristaldi out at the site
told them to stop all work until erosion controls are in place and stabilize the site Mr. Manzi
states to put down rye grass seed this will start growing right away no matting DPW should have
filed a NOI Mr Masse states a one-day fine for $ 100 Present to vote Scott Masse, Albert
Manzi, Deborah Feltovic, John Mahon, and Sean McDonough A motion to ratify the
Enforcement Order and require a restoration plan was made by Mr Manzi, seconded by Mr
Mabon Unanimous
The Commission signed some decision in between General Business and Public Hearings.
No Recess
Public Hearings 8:00pm
242-1231,Amendment,North Andover Town Commons Utility Project(Mass
Electric)(ENRS)
David Clinch of ENRS was present Ms McKay states the plans are not engineered stamped Mr
Masse states has the area been re-flagged? Mr. Clinch states yes the area has been re-flagged
Mr Manzi states the Commission wants to know who is company that owns the land for the
easement for Mass Electric Mr Mabon states identify the specific reason why this area cannot
be avoided major impact to the wetland resource areas Mr Clinch states the Common was the
first choose for an area to use The Town of North Andover told Mass Electric they would not
allow us to go thru the common we found out 2 months ago Mr Clinch states the French drain
buffer zone upland no trees but scrubs drainage in land bank deep canopy going thru culvert the
impact would be 1,000 s f and 900 s f replication area Mr Clinch states the bidding for
outside contractors has begun Present to vote* Scott Masse, Albert Manzi, Deborah Feltovic,
John Mabon, and Sean McDonough. A motion to continue to October 13, 2004 meeting to
address concerns was made by Mr Manzi, seconded by Ms Feltovic Unanimous
Abbreviated Notice Of Intent(s)
242-0000, 55 Amberville (Martin)(Gouveia)(cont. from 6/23/04)
No one was present The applicant is still working with DEP Present to vote Scott Masse,
Albert Manzi, Deborah Feltovic, John Mabon, and Sean McDonough A motion to continue to
October 13, 2004 meeting was made by Mr Manzi, seconded by Ms Feltovic Unanimous
242-1268, 1135 Great Pond Road (Brooks School)(Rist-Frost-Shumway Engineering,P.
C.)(cont.from 8/25/04)
No one was present Ms McKay states the comments received from Natural Heritage No
adverse affects on actual habitat of the state protected rare wildlife species Present to vote Scott
Masse, Albert Manzi, Deborah Feltovic, John Mabon, and Sean McDonough. A motion to close
and issue a decision in 21 days was made by Mr Manzi, seconded by Mr McDonough
Unanimous
Requests for Determination of Applicability
43 Mill Road (Kober)(New England Engineering)(cont. from 9/8/04)
No one was present Ms McKay states the escrow set up for third party review I meet with
Patrick Seekamp, Ben Osgood on the site we walked the line the wetland line reviewed and
changes were recommended by the consultant The revised plans have been submitted reflecting
these changes Mr Masse states we should continue this because Ben Osgood or the Applicant is
not present Present to vote Scott Masse, Albert Manzi, Deborah Feltovic, and John Mabon,
Sean McDonough A motion to continue to October 13, 2004 meeting was made by Ms
Feltovic, seconded by Mr Mabon Unanimous
25 Mill Road (Dellea)(Merrimack Engineering)
The applicants David and Janet Dellea and John Murphy of Merrimack Engineering were
present Mr McDonough read the legal notice Ms. McKay states the filing is for the expansion
of an existing deck and conversion of a portion of the deck°into a sunroom in the buffer zone to a
bordering vegetated wetland An Order of Conditions was issued on 1/9/97 for construction of
the home and associated driveway, septic, utilities, and site grading (DEP# 242-844 as noted on
submitted plans) A COC was issued in 1999 The earthwork activities associated with the
project will be limited to excavation for frost walls and footings There would be no grading The
work will be approx. 76' from the closest wetland point The erosion controls are proposed The
wetland boundary was most likely not reevaluated as the boundary on the As-Built Plan exactly
matches the new submitted plan However, upon field review, most of the old flagging was still
present and the boundary as previously delineated is still accurate The staff did not review or
approve the off property wetland flags (A6 &A7) The wetland resource area is the same
resource area associated with the 43 Mill Road Project No apparent violations were noted on the
site Present to vote- Scott Masse, Albert Manzi, Deborah Feltovic, John Mabon, and Sean
McDonough A motion to issue negative determination requirements pre-construction meeting
and erosion controls was made by Mr Manzi, seconded by Ms Feltovic Unanimous
Notice of Intent(s)
242-1261, Cotuit Street& Leyden Street(Burke)(New England Engineering)(cont. from
8/4/04)(Reguest to cont, to 10113/04)
No one was present Ms McKay states the plans are being re-designed/adjusted to meet
Stormwater Management requirements The applicant has not submitted revised plans but is
requested the Commission to set-up an escrow account for the drainage review now to avoid any
further delays Mr Masse states the applicant has to Re-notify the abutters Also call Ben
Osgood to get the new plans earlier so time can be taken to review new changes Present to vote
Scott Masse, Albert Manzi, Deborah Feltovic, John Mabon, and Sean McDonough A motion to
continue to October 27, 2004 meeting requirement to Re-Notify abutters was made by Mr
Manzi, seconded by Ms Feltovic Unanimous
242-1264 Massachusetts Avenue, Andover Street, Osgood Street and Salem/Johnson Street
Junction (North Andover Old Center)(cont. from 9/8/04)
No one was present Ms McKay states a revised set of plans have been submitted to include the
extension of the of the rip-rap apron at the Mass Ave outlet and a crushed stone strip at the back
of the parking lot behind the brick store A revised detail of the rip-rap apron at the Mass Ave
outlet has also been provided I have no further issues Present to vote Scott Masse, Albert
Manzi, Deborah Feltovic, John Mabon, and Sean McDonough A motion to close and issue a
decision in 21 days was made by Mr Manzi, seconded by Ms Feltovic Unanimous
242-1233, Lot 6 Ogunquit Road,Rocky Brook Estates (Breen)(Neve-Morin Group,
Inc.)(cont. from 8/4/04)
The applicant Peter Breen and John Morin of Neve-Morin Group, Inc were present. Ms McKay
stated the concerns from the last meeting The Commission was concerned with the proximity of
the driveway location to the 25' no-disturb because of potential impacts, specifically snow
plowing into the protected area The Commission also asked the applicant to consider rotating
the house as an alternative so that there would be lesser potential impact for snow storage into
the no-disturb The Commission felt that the proposed retaining wall around the driveway might
not deter snow stockpiling from being pushed over into the no-disturb areas The house was not
rotated for reasons as noted in Neve' s letter dated 9/15/04 (3`d paragraph) John Morin
explained in further detail Revised plans were submitted showing a proposed picket fence, in
addition to the wall, along the driveway in the area in which the driveway was closest to the 25'
no-disturb Also included on the revised plans was a detail of the retaining wall, a proposed
deck, a front walkway, and the approx location of the proposed utilities as requested The plan
also noted a snow stockpiling area at the end of the driveway The additional engineering details
of the wall were provided. Mr McDonough asked how many garage bays were proposed and
asked what the length of the house, including the garage would be Mr Breen stated that there
were three stalls being proposed and that the third stall would be used for storage (lawn mowers
bikes, lawn equipment, etc ) Mr Morin indicated that the house would be 56 feet long. A
motion to close and issue a decision in 21 days was made by Mr Manzi and seconded by Ms
Feltovic Unanimous Present to vote Scott Masse, Albert Manzi, Deborah Feltovic, John
Mabon and Sean McDonough.
242-1272,Lot 5 Gray Street(Litchfield)(Serwatka)
Joseph Serwatka of Serwatka Engineering was present Mr McDonough read the legal notice
Ms. McKay states the filing is for the construction of a single-family dwelling with associated
grading within the Buffer Zone to an isolated vegetated wetland The work also includes grading
associated with the construction of a septic system to the rear of the lot All the work, including
proposed grading will be outside of the 50' no-build The erosion controls are proposed around
the 25' no-disturb zone The staff recommends the construction of a boulder wall barrier around
the isolated vegetated wetland for protection the (isolated vegetated wetland is more vulnerable
for disturbance the way it is situated on the lot) The staff also recommends that the erosion
controls be set further away from the 25' no-disturb,closer to the work activities to the limit
existing vegetated disturbance The isolated vegetated wetland was approved under an ORAD
issued 4/11/02 Mr Mabon states the set backs from the wetland the grading looks very close to
the wetland area Mr Manzi states the deck is within the 100' walkway and wall the record
drawing needs to have this added Present to vote Scott Masse, Albert Manzi, Deborah Feltovic,
John Mabon and Sean McDonough A motion to continue to October 13, 2004 meeting was
made by Mr Manzi, seconded by Ms Feltovic Unanimous
242-1271, Lot 8 Gray Street (Litchfield)(Serwatka)
Joseph Serwatka of Serwatka Engineering was present Mr McDonough read the legal notice
Ms McKay states the filing is for installation of a driveway with associated clearing and grading
in the Buffer Zone to an isolate vegetated wetland All work, including proposed grading, will be
outside of the 50' no-build. The erosion controls are proposed The isolated vegetated wetland
boundary approved under an ORAD issued 4/11/02(same isolated vegetated wetland as noted on
lot 5) The scale is 1" =40'. The plan indicates the scale is 1"=20' The staff feels that a 40'
scale plan is acceptable for this project The as built plans to be submitted at same scale if
approved Mr Manzi states needs to accompany more information. Present to vote Scott Masse,
Albert Manzi, Deborah Feltovic, John Mabon and Sean McDonough. A motion to continue to
October 13, 2004 meeting was made by Mr Manzi, seconded by Ms Feltovic Unanimous
242-1269, 100 Raleigh Tavern Lane(Arsnow)(New England Engineering)
No one was present Mr McDonough read the legal notice Ms McKay states the filing is for
installation of a replacement subsurface sewage disposal system and associated grading in the
buffer zone to a bordering vegetated wetland The work will be within 18' of the resource area
and the system within 32' of the resource area A waiver is being requested for the work, as
location of the system is the only suitable area on the site The erosion controls are proposed and
will be 13' from the wetland at its closest point There are no records on file that indicate when
the house and rear decks were constructed Most likely prior to the Bylaw and maybe even the
WPA Recommend conditioning some enhancement plantings in the areas where the wetland
edge is in close proximity to the lawn or other areas of disturbance A large pile was observed
between wetland flags 5A & 6A and should be removed by hand as a condition The staff
reviewed and approved the wetland delineation Mr Manzi states they need to put up
Medallions and 6 Wood Duck Boxes 10-feet high to 12-feet high Present to vote Scott Masse,
Albert Manzi, Deborah Feltovic, John Mabon, and Sean McDonough A motion to continue to
October 13, 204 meeting was made by Ms Feltovic, seconded by Mr Mabon.
242-1270, 69 Milk Street(Tomasz)(New England Engineering)
No one was present Mr McDonough read the legal notice Ms McKay states the filing is for
construction of an addition to a single-family dwelling, installation of a driveway and associated
grading activities in the buffer zone to a bordering vegetated wetland The addition will be 50 5'
from the wetland at its closest point The erosion controls are proposed and are adequate A soil
stockpiling area is shown on the proposed plan The staff has reviewed and approved the wetland
delineation The condition enhancement plantings at wetland edge There are no issues as
proposed Mr Manzi states at the northeast of the property should be planting a vegetable garden
and enhancement plantings Present to vote Scott Masse, Albert Manzi, Deborah Feltovic, John
Mabon, and Sean McDonough A motion to close and issue a decision in 21 days was made by
Mr Manzi, seconded by Ms Feltovic Unanimous
Decisions
242-1264, Massachusetts Avenue, Andover Street, Osgood Street and Salem/Johnson Street
Junction (North Andover Old Center)(Town of North Andover)(Guertin Elkerton)
Present to vote Scott Masse, Albert Manzi, Deborah Feltovic, John Mabon, and Sean
McDonough A motion to accept the Order of Conditions as drafted and set the bond amount at $
5,000, was made by Mr Manzi, seconded by Ms Feltovic Unanimous
242-1268, 1135 Great Pond Road (Brooks School)(Rist-Frost-Shumway Engineering, P. C.)
Present to vote Scott Masse, Albert Manzi, Deborah Feltovic, John Mabon, and Sean
McDonough A motion to accept the Order of Conditions as drafted and set the bond amount at $
2,000, was made by Mr Manzi, seconded by Ms Feltovic Unanimous
A motion to adjourn the meeting at 9:30pm was made by Ms. Feltovic, seconded by Mr.