Loading...
HomeMy WebLinkAbout1996-04-09 Correspondence Preliminary Plan 47. -,uown of North An 01TIC OF COMMUNITY DEVELOPMENT AND SERVICES 1 in reef 4# A H 4 North Andover, Mass achusetts 0 19 45 1 0. MEMORANDUM O: Planning Board FROM Sandra Starr, Health z.-i Atraor RE; Windt ist Farms DATE, April 11� 199 I arm unable to make any recommendations at this point since no official soils testing has been done. The dates of April 24 t" , 25"' , and 26th have been scheduled for testing at this site. If you have any questions, please do not hesitate to call the Board of Health office at the number below. SS/cjp BOARD of APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688- EAUM 688-9540 PLANNING ti I bj APR t. ATHAM AND LATHAM� 643 MAIN STREET READING, MA SA HU ETTS 01867-3096 KE N5'C`H C. LATHAM2 OF COUNSEL AREA ODE: 617 . B A L Y LATHAM TELEPHONE:NE: S14a4- 505 1 A I J. LATH April � , T LECOPIE ., 4 -7 7 WILLIAM C. WAGNER, OF COUNSEL HEEL H A. GRIFFIN Kathleen Bradley C ldwell, Town Tanner North Andover Town ball 146 Main Street North Andover, MA 01845 FEE: PROPERTY OF CAP BIANC Dear Kathleen: represent the Andover Sportsmen's Club. They are an abutter to the property of Capebioo. We have been told that the Cpblanes may be in the process of developing or selling their property for development. Would you please advise as to whether any inquiries or filings have been made with your off ice with reference to development or use of the Cap blanco property. Further, would your kindly ly advise ups if any filings are made in the future and if any hearings or meetings are scheduled with the Planning Board. 1 thank you for your anticipated cooperation. Sincerely, LA T LATHAM .C, ra ey L 0l3L27:andover:wg i i COL R & COLANTONIOZ ENGINEERS AND SCI.ENTtSTS October 2 , 1996r,... :.. I i Ms. Kathleen Colwell � -4 1.. I r } Planning Director . .. ... .. .... . ........... .... . (.+,Ito Main Street , Andover,North MA 01845 RE: Supplemental Engineering Review Windt ist Farms Residential Subdivision Dear Ms. Colwell: Cofer & Colantonio, Inc, has performed additional review for the above referenced project. Specifically we have reviewed the response letter of Christiansen& Sergi, Inc. dated October 1 o, 1996 and support material provided with this correspondence* We understand that the Planning Board has closed the Public Dearing on the project and issued conditions regarding issues to be addressed prior to endorsement, It appears that most of the issues raised have either been addressed by the Applicant or accepted by the PlanningBoard.. We recommend that the infiltration system be inspected during construction and our comment# 16. be addressed during construction. We also recommend that the detention basin construction be observed and break out o groundwater, if any, be addressed during construction. The Planning Board should review the lot plans to confirm that the proposed lot designs are consistent with the approved definitive plans relative to lot development. We appreciate the opportunity to assist the Planning Board on this project and hope that this information 'is sufficient for your needs. If you have any questions please do not hesitate to contact us. Very truly yours, COLER& COLANTONI , INC. /John C. Chess , P.E. Xc Christiansen& Sergi 101 Accord Park riv , Suite one 1 - - 400 William BARREI F. J. NNE U b 8 $ 3 5 0 @ . & G 0 November , 1999 l J Heidi Griffin 1049 Turnpike Street Town Planner Town of North Andover 27 Charles Street North Andover,M North Andover, Ma o 1845 Dear Heidi, 01845 1 am writing to request a bearing before the board at the next available meeting. My purpose is to request a modification to the conditional approval issued by the Definitive Planning Board on the a 4 wlndkist Farm Subdivision. The original plan approved on November ber 19, 1996 had required a sidewalk on the easterly side of wirrdl ist Farm Road. My problem is this. All the lots on that side of the road had Tel 508 682 ,,2320originally had septic systems planned in the rear of the lots. However, upon completion of the septic system testing it was found that the soils in the rear of the lots would not support the required systems, If it was Fax 2 *2397 determined that the soils at the area closest the road would support the required septic systems. At this point the designs were completed and construction is near completion on all lots.Now that we are read} to E-mail: complete the road, including the sidewalk, we have found the slopes wb,.,i r r c tt @ wI-)rirrettIl i i i es.c0111 required under Title 5 are in conflict with the required subdivision condition requiring sidewalks on the easterly side of wrndl rst Farm Road. b o At this time we would ask the board to consider removing the sidewalk as a requirement and allowing wi dl.i t Farms LLC to donate an equal amount of money to the sidewalk fund to be used in areas of town where sidewalks are a necessity. We thank you for your consideration in this matter. lolo n ial Village Sincerely, le Development William K. Barrett 'orporatforr 8 9 4 # 0 0 f k 6 G 8 r Wind ist Equestrian Centre, Inc. 125 Windkist Farm Road North Andover, MA 0 184 (978) 688-7662 Nove b er 202 1999 Chairman North Andover Planning Board Tows of North Andover Office of Cominunity Development and Services 27 Charles Street North Andover, MA o 184 RE: Sidewalk on Wi d ist Farm Road Dear Sir: I am writing in response to a Notice of a Public Hearing on Tuesday, December 7, 1999 at 7:3 #-M.� the purpose of which is to decide whether or not to elate the sidewalk on the left hand side o in&st Farm Road. As Treasurer and Barn Manager of W dust Equestrian Centre, Inc., I believe that a sidewalk should be built. Due to the amount of both horse and automobile traffic to and from the b ar , I feet that a sidewafk is essential to the safety of pedestrians on the street. Thank You for your attention in this matter. Please feel free to contact me with any additional questions. Sincerely, Catheiine S. Lambei Barti Mai agernrea surer y �l 6 3 ai BARRETT FINE HOMES i i i a r July 72 200 1049 Tur i e` treet Heidi Griffin NorthAndover M 01845Town of worth Andover ' 27 Charles Street North Andover, VIA o 18 4 5 Tel 978 82 * 22 ]ear Ms. Griffin: This letter is in response to your letter dated May 30,2000. Fax 9 8 * 2 * 2397 As I have discussed with you on the phone, my plan is to fittish the roadwork on Windkist by September 15,2000. My objective is to submit the road for street acceptance at the fall Torn Meeting. Should soinetmng arise that .E-mail: modifies this schedule I will be sure to advise you regarding the completion o arr ttCa_)%r a Tettho e .eo Windkist Farm Subdivision, I hope this will satisfy the inquiries of the presidents of WindIdst Farms Road. . Should they or you have additional questions please don't hesitate to call ine at 978 82-220 Extension 202. New floines Ad dition-s& Sineer Y, RemodelingWilliam Barrett Division of Coloivial Village Development co ora-t o'rl A O • e 4 0 O 6 0 0 0 Q Donna MaeD'Agata P root�. Donna na Mae DAg t Sent: Thursday, September 14,200010: AM To: Heidi Griffin Subject: COMPLAINT-PENNAC -97 WIND MST FARM ROAD September 14,2000 @ 1 :3o AM Joan Pen n of 97 Windkist Farm Road came to the building requesting to see the Director of Com munity Development. Ms. Pennace contends; -Fier street never finished-pot holes everywhere-no final grade-the builder is Bill Barrett. Her home phone is 9 -3 2 . Please contact her and provide me nth a wfitten report of the status. Page 1 ti .� Town of North Andover Vso OFTICE 0 -1 * { COMMUNITY AAD SERVICES � T 7 Charles Street N orth Andover, Massachusetts o 1845 '. AE� � Director 978)688-9531 Fax 978)688-9542 September 15, 2000 Mr, William Barrett 1049 Trike Street a North Andover, MA 0 1845 RE: Wi d ist Farm' Subdivision Dear Mr. Barrett: have received a coMplaint filed with the Director of Community Development (attached) regarding the completion of Wldkist Farms Road. As the complaint was filed'. I need to send the home-owner a written response. As you are aware,, you had sent me correspondence dated 7/6/00 indicating that your plan was to finish the roadwork for Wi dklst Farms Road by September 15, 2000. Your letter indicated you would modify this' schedule if completion did not occur. s such, can you kindly provide me with t .e following a modified construction completion schedule of Windkist Farms Road by September 29 2000. Thanking you in advance for your cooperation. Sincerely, fi } Heidi Griffin Town Planner cc: William Scott, Community Development Director North Andover Planning Board Joan Benna ce, Windkist Farms Road BOARD OF APP A 9 688-9541 BUILDING -9 4 ON ATI NHEALTH - 0 PLANNING - �� r i' i i 1 s I 3 `� Y WWilliam BARRETT r.k i FINE HOMES A { 7 ■ 4 • • P R 4 4 ♦ 4 4 � e September 18, 2000 1049 Turnpike Street Town of North Andover Corm-nunity Deelo meat North Andover NSA 01845 Town Planner y Heidi Grinin RE: Free �dLot Windkist Farms Tel 978 682 , 3 0 Subdivision Fax 978 * 8 # 2397 Dear Heidi Griffin, -mail.� l ii, ttc�vl)ai�- t nie . or am writing o irrforn you that �e planting of pine trees at the rear of 6 Jenkins Road and the back of Lot #3 Windkist is complete. I have notified Dot Bragen that it is complete. New lom- . Additions Sincerely Remodeling William K. Baffett. Division,of "calunial Villcige Development `01-poi-all"011 t