Loading...
HomeMy WebLinkAbout1996-10-24 Correspondence DEF SUB f 5 fown oNorth Andover r o M A CE of 16 COMMUNITYDEVELOPMENT AND SERVICES 30,School Stir *yy Wt T {` kArL4 Forth Andover,Massachusetts 01 4����.t�x�,.c��Ilk IT Director; ` October 8, 1998 Mr, William BatTett 1049 Turnpike Street North Andover,MA 0 1845 .e: Wind ist Farm—stabilization of slope Dear Mar. Barrett, Thy you for meeting me on site to review the slope bead Lot 3. As requested you placed rosinn control matting on the slope and planted an appropriate grass seed mix on the slope. The slope is now stable and will return to goods over time. Hemlocks or other similar species may need to be planted in the future if determined necessary by the Planning Board as the Wearing did encroach upon theno-cut line. If youhave any questions please do not hesitate to contact me at 8 - 535. Very truly yours, Kathleen Bradley Colwell Town Planner e. R. Rowen, Chairman B D. Brage . S. Starr, Health Agent BOARD of APPEALS, - 541 BUILDING - i VA.'Y'ION 688-9530 HEALTH 688-9540 PLANNING - , Town of North A v r 1 6 CE OF . COMMUNITY DE AND SERVICES 27 Charles Street �`'�� tot.:;A*M41 North Andover, Massachusetts 0 1845 40'qA 0 WLLtA.M J. SCOTT Director -95 1 Fax 978)698-9542 May 30,,2000 11rir. Wf11iam Barrett 1049 Turnpike Street North Andover,MA. 0 1845 RE: . Completion of WindIdst Farris Subdivision Dear Mr. Barrett: I have had several inquires from presidents of the windkist Farms Subdivision as to when the roadway Nvill be completed. From my and rstaliding, the biggest concern is as to when the fmat coat of the road will be, completed, along wide sonic cleanup items hi the right-of-way. Can you please provide ire with a construction schedule as to when this work will be completed by niday, June 9,2000 so that I my update both the neighbors and the Plan=i g hoard as to the status of completion of Ws subdivision? Thais ng you in advance for your cooperation. Sincerely, r Heidi Griffin Town Planner cc: Jim land,Department of Public Works North Andover Pla l=4 ig Board WilWm Scott, Conimurdty Development t irc for BOARD OF APPEALS 88- 541 BUILDING 688-9545 CONSERVATION - 0 HEALTH 688-9540 PLIk ING689-9535 Town of North Andover t r COMMUNITYDEVELOPMENT AND S Rv CEO ..Y. ,. 7 Charles Street � �� f �<;:.- • � Forth Andover, assachus "s o 1845 JILIP � Director 9 6 -9 31 Fax 9 688-9542 June 9, 2000ti Mr. William Barrett 1049 Turnpike Street North Andover, MA 01845 RE: Tree Planting Reid Lot 3, Windkist Farms Subdivision Dear err. Barrett: As a follow-rip to our site visit of Wednesday, May l 2000, 1 am writingto inform you that lane Cronin of Andover, NIA has agreed to your proposal of planting 3-4 pine trees in her backyard along the back of lot 3 of the Widist Farms Subdivision. As you'll recap, we discussed on site that the planting of 3-4 pine trees along the back of her lot would be acceptable. Kindly let me know when this tree planting will commence. Sincerely, Heidi Griffin Town Planner BOARD of APPEALS 688-9541 BUILDING 688-9545 CONSERVATION - 3 HALTH 688-9540 PLANNING 688-9535 1—18-202 1 1 19AM FROM P, 2 am BARRETT ja.nuary 18,2002 FINE HOMES Ms.Jackie Byerly IntcrU* n Assistant Town Planner 27 Chules Street North Andover, MA 01845 Ro: Windkist Vain Road. 1049"ILimpike Street Dear Ms. Byerly; NOVIII Andover, NIA 01845 A5 requested by you on the phone Tueqdgy, I arm pv.tting in Wridng Ouf PrOPOsal.to fix the dewy MU02icknent on Lot 10. The,plan indicaws that the right side of the i faifly accurate in i road is ts placement. Th(: toad NVIdth was increased from the required 26' to as inucb as 30 thearca of the WUM. This is what caused the Tel 978 -682 -232() encroadnient on to Lot 10. To Late the problem we propose the following: I Cut the left side of the,road to the reqx&ed 20>width. Fax 978* 682 1,2%197 W1 14move the side%valk in the area cif iexic'roachment and 2,-M 4111- instaU MW Nvidiin the right of way, Replant the grass strip. Upon or let g I WM q urvey 4P A A 0 0 A 0 and prepare an as-built of the atea to confa-fln we have accomplished our objective, Neu)Hom-es This work can be do rie some�e between March or early Apt Addition,j& depending on the weather. We xxM have the work one by Town Rem del ing a A Sincerely, A Div de of W Col nni il Villagse Wiffiam K. 13arrett,Manager mew ind st rm Development,LLC Desvelop C"orporarion 10001 Y TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS 4 SGOOD STET Y ,WIL IAA RMURCIAK,DIRECTOR,P.E. Telephone (978) 685-0950 Timotby J. Willett Staff Engineer �'��; °f Fax 688m9573 Ms.,J ki Byerly Inter Assistance Town Planner 27 Charles Street North.mdo er, CIA 0 1845 " RIE:Windkist Farms Subdivision— Street Frees e `fir , erl : t s the opinion of the Division of Public Works that all subdivisions should have street trees unless specifically waived. thQ Plying Board. We feel that the lack of street trees on the De i Subdivision Plan for Windkist Fps oversight and not sufficient reason to relieve the developer of f responsibility, Please rote that street trees are a. elu fed i the subdivision bond set in May 1997. Very ply yours,, db 7 ,, Timot4Ji Oft Sty Firer CC:Bill Hmucia TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS 384 OS GOOD STREET J. WILLIAM HMURCIAK, DIRECTOR,P.E. Timothy J. Willett j%0HTJj Telephone(978) 685-0950 Staff Engineer 'r F (978) 688 #." 0 °4A'rit))6 October 18, 2002 CHU B Ms. Kathleen McKenna E Town Planner �Y 27 Charles Stree ?. IV. North Andover MA o 1845ej RE: Windkist Farm Subdivision t. Dear Ms. Mk ea: Apparently the iss ie street trees at Wind ist Farms has surfaced again (see letter dated January 18, oo . Mr. William Barrett, the developer, believes street trees are not required because they are not shown on the approved subdivision plan. This Division has not changed its position. We strongly believe that street trees should be installed in the subdivision. They are required under the Planning Board's Rules and Regulations and are part o the subdivision bond. Very truly yburs, Timothy J. Willett Water&Sewer Superintendent Donna M "Agate From; Donna Mae D'Agata Sent: Thursday,r, September 14,2000 10:45 AM T : Heidi Gruen Subject: COMPLAINT-PENNAC -97 WINDKJST FARM ROAD September 14,2000 @ 10:30 AM Joan P nn oe of 97 Windkist Farm Road came to the building requesting to see the Diretor of Community Development. Its. Pennaoe contends: -her street never finished-pot holes everywhere-no final grade-the builder is Bill Barrett. Her hone phone is 6 3 2 . Please contact her and provide me with a wriUen report of the status. r Page 1 'own of North Andover or OUICE OF COMMUNITY DEVELOPMENT AND SERVICES Ch27 arles Street ��cac«ct»c v North Andover, Massachusetts 1845 '01VACkUS Director 978 88-9531 Fax 88-95 2 September 15, 2000 Mr. William ,.i rrett 10 'urpile Street North Andover,MA. 01845 RE; Wi d ist Farm' Subdivision Dear Mr. Barrett: have received a complaint filed with the Director of Community Development (attached) regarding the completion.of Windkist Farms Road. As the complaint was fled, I need to send the home-owner a written response. As you are aware, you had sent me correspondence dated ' o indicating that your plan was to finish the roadwork for Wi d ist Farms Road by September 15,, 2000. Your letter indicated you would modify thl schedule if completion did not occur. s such, can you kindly dly provide rye With the following a modified construction completion schedule of Windkist Farms Road by September 29, 2000. Thanking you In advance for your cooperation. i Sincerely, Heidi Griffin Town Planner cc•. William Scott, Community Development hector North Andover Planning Board Joan Pennance, Windkist Farms Road BOARD of APPEALS - 541 BUILDING 688-9545 CONSEATION 688-9530 HEALTH 688-9540 PLANNI688-9535 Witham BARRETT l -�* � I-'('INE ES � i i September 18, 2000 1049 Turnpike Street i 'down of Noi-th Andover Community Development North Andover MA 01845 Town Planner Heidi Griffin RE; Tree Planting Behind Lot Windkist 'ate Tel 978 682 2320 Subdivision Fax 97 ,# 6 -, 2; Dear;Heidi Griffm wbai-iiett v ai-r tt onies,w i I am writing to inform you that the planting of 4 pine trees at the rear of 6 Jenkins Road and the back of Lot ##3 6 9 0 IR 4 a 0 a # Windkist is complete. I have notified Dot Brae that it is complete. New Homes Additions Sincerely Remodeling o s 0 a a a 0 it # a o William K. BmTett Division of Colonial Village Development Corporation, 0 tl k� 0 O 9 0 4 9 0 0 a