Loading...
HomeMy WebLinkAbout2025-05-07 EDGEWOOD TRAIL REPAIR corrected 5-27-25 - Plans - 575 OSGOOD STREET 5/7/2025 REMOVE EXISTING TOPSOIL , LEAVES , ETC. TO MAINTAIN MIN 2% SLOPE FOR POSITIVE DRAINAGE. INSTALL STRAW MATTING AND ALLOW TO REVEGETATE. 1"x 1"WOO D E N STAKE 12"COMPOST/BARK MULCH EXISTING GRADE — ----- EXISTING GRADE SOCK SLOPE 2% SLOPE 2% 311-41' 12"MIN FLOW Ranger Engineering Group, Inc. toy 130 MAIN STREET SUITE 202 Salem NH,03079 INSTALL 3/4" CRUSHED INSTALL 3/4" CRUSHED e'. I - - rangerengcom +1 AGGREGATE BASE OVER EXISTING AGGREGATE BASE OVER EXISTING GRAVEL SOIL AND COMPACT TO A GRAVEL SOIL AND COMPACT TO A SMOOTH UNIFORM SURFACE SMOOTH UNIFORM SURFACE SECTION 2 GRAVEL PATH DETAIL 1 GRAVEL PATH DETAIL 2 FLOW NOT TO SCALE NOT TO SCALE STAKE ON UPSLOPE OVERLAP 24"AT ENDS 10'LINEAL SPACING IN 0- Ln\v- COS�C-Oocx ip- 12 FINISH TOP WITH TRAIL SURFACE FINISH TOP WITH 1%Z- DOWNSLOPE TRAIL SURFACE FLAT STONES MIN FLAT STONES s 7 12"COMPOST/BARK MULCH SOCK A- A,> PLAN VIEW 2499+/- 2411+/- NOTES: STONES EXTEND 12"IN FRONT OF OUTLET 1. ALL MATERIALS TO MEET FILTREXX@ SPECIFICATIONS. FOR CHANNEL PROTECTION 2. FILTERSOXXTM COMPOST/SEED FILL TO MEET APPLICATION LIMIT OF STONE 3"TO 16"RANDOMLY DRY 12"HDPE PIPE 3"TO 16"RANDOMLY DRY BENEATH SOIL STACKED FIELD STONES REQUIREMENTS. STACKED FIELD STONES 3. COMPOST MATERIAL TO BE DISPENSED ON SITE,AS DETERMINED DRY STACKED HEADWALL END SECTION DRY STACKED HEADWALL CROSS SECTION BY ENGINEER. 12"COMPOST SOCK HEADWALL DETAIL NOT TO SCALE 4 NOT TO SCALE A- LIMIT OF TRAIL REPAIR (F�� !A I-1vF!A Z) (1,V11F 1a4 LU LO AS3 ? 'I. co (M V11F 94 LLI LL LLI C:) LLI LLI GfM Va F4 TH INSTALL 3" OF 3/4"CRUSHED Lu -Err U) < U) AGGREGATE BASE OVER WETLA1\0 Uj :2 0 w 0 LLI 0 > EXISTING SURFACE 0 0 M/F 6A Uj LU THIS AREA > < U) Z 0 LLJ 0 Q Lo i/PF jA LO r�' z U) LU 7U 0 NOTES: BANK DISTURBANCE z LU 1. THE PROJECT AREA IS ENTIRELY WITHIN THE THERE IS POSSIBLE BANK VVF 5A LAKE COCHICHEWICK WATERSHED DISTURBANCE AT THE END OF EACH PROTECTION ZONE. CULVERT ASSOCIATED WITH THE LU STONE HEADWALL CONSTRUCTION. 2. PORTIONS OF THE PROJECT AREA ARE THE TOTAL MAXIMUM IS 20 L..F.THE INSTALL 611 TO 1211 OF 4 C� LOCATED IN THE NON DISCHARGE AND NON TOTAL BANK DISTURBANCE FOR AGGREGATE BASE OVER DISTURBANCE ZONES OF LAKE THIS PROJECT IS 38 EXISTING SURFACE V11F2B —4— COCHICHEWICK. THIS AREA C� A in I 3. WETLANDS DELINEATED BY NORSE ENVIRONMENTAL IN OCTOBER 2024. 4. EXISTING CONDITIONS FROM SURVEY PERFORMED BY RANGER ENGINEERING Dh a?T�A TH 0 GROUP, INC IN OCTOBER 2024. F tz' 4\1 I IMP\"It! NIKKEI' 25f 5 OFFE17 Z 0 A E U)MWWD RETIREMENT COMIVILWITY WF 8G 10111 ACR FES JA It "'V 7G 1 21`�� 7 LLI LLI (M 141F 5G VI-IF k VvF T 40 t HN 0% W 04F 11vF 1 A 7�,Q All I ILI PROJECTAREA (Iq 14�F 6G v (1,141F U �Ak "�A v %t ox % --k R A A, M I F io x n X, IIIIETLAIVD I "A ""A "al % it ew w X 7 N N N LU r r N LO�01, A N, --ow—w-vasum -mr� x 'N" LEGEND "JA EXISTING PROPOSED . .......... CONTOUR X Q� '7 'N'�",' '01", i WETLAND PROJECT AREA X A V- i 'A A,A I Q> k % -- - - -- -- - - -- - - -- -- - PROJECT GRAVELPATH 24-380 - -- - - -- -- - - - - - - - - N-0- -03-06 DATE 2025 A n\� "N G DRAWING SCALE 1 =30' TREE rF7 DJO DRAWN BY E C A x\ Kv, EROSION CONTROL FENCE EC PPROVED BY BCO Xx 7 i (7, "A -941 ,...... Legend -A�k-Vwi�Pl�nninn, fhzVPC!i jh,'n r�f ? 126 ju SPOT GRADE C�Ic:�L G C &11 &N LOCUS MAP 1 500' 0 30' 601 SHEET 1 OF 2 R POSSIBLE BANK CONSTRUCT 5'STONE WETLAND DISTURBANCE Alf AREA SUBJECT TO FLOODING ZEACH SIDE HEADWALL ON EACH ELEV 153.5+ END OF EXISTING PIPE 4'TOTAL DRAIN INLET RIM 154.0 POSSIBLE BANK flia % 8'WIDE GRAVEL TRAIL DISTURBANCE 12" INV OUT 152.0 ELEV 154.50 ZEACH SIDE ON EACH END POSSIBLE BANK LIMIT OF TRAIL REPAIR 8 TOTAL FEET DISTURBANCE Ranger Engineering Group, Inc. 2' EACH SIDE EXISTING 10"SDR TOTALA 130 MAIN STREET \EXISTING 12" HDPE Salem NH,030 35 P.V.C.'PIPE 12" HDPE FLARED END SECTION Tel:978-208-1762 0 4�? INV= 151.8 z rangereng.com RIP RAP OUTLET PROTECTION 6 1 . ENLARGED P LAN : 1"=10' 2. ENLARGED P LAN : 1 91 of MINUS ANGULAR STONE WF ID list ............ EXISTING 12" HDPE TO REMAIN if 0 WF2D-1 D F § 12 ADD STONE HEADWALLS 4 CR WF2D C1\41 WN 0- 5 COSZ�C-Ooo-ip- WF 17C -Iff % (19 DROP INLET SECTION 1 ci WF 3D 2")L� D SCALE 1" VVERTICAL 1" 3'HORIZONTAL 10 WF 6D flVV,= 125 08' WF IC WF I IC % WF 7D CLEAN THE EXISTING 10" P.V.0 AND ADD _- IN TERMI T STONE HEADWALLS S TREA M MORTARED OR WF IOC it WF 14C 77 BOOTED • 71 flvv= 124,6, CONNECTION 10 f 000000 WF 8D WF 9 fF P .07 *0 WF3C c '111 INTERMITTENT 0 0 0 0 flV-V- �233' ,/, 00 = 7 4F 9D S TREA/14 000000 18 12D 24 W)ff 8C(39,/� 11 0 0 0 0 0 cj ,� 12 000000 (M WF IOD [� ***N�F4C b f SUMP WF 7C(19 *0 WF 17D WF 15D t Sir 6 0 WF6C (3 W.F 5C 0, 10 CAST IRON BASE flVV= IX83f 650- FRAME AND GRATE 7 (71 WF 18D --y-9 126 10 WATER LEVEL ON OCTOBER 28&29 2024 '0000-1-7-1, -N, DROP INLET DETAIL NOT TO SCALE NOTE:WATER LEVEL LOWER THAN CZ, WF 19D NORMAL DUE TO DROUGHT `kNI :7-ff W '�� __Z ............................. WF20D Z) 0 -0/i BVW C/) LLI U) INSTALL 3"OF AGGREGATE Z) O U 00 BASE OVER EXISTING SURFACE U W C:)wWF21DLL w THIS AREA z '0001� jcn Lu U) in ui 2i Ow 0 U-1 0 > 0 0 0 ------------ WF22D W (D LLJ (D 0 (!) > U) Z 111v*- 00 LLJ 0 < 000001� 0 A Lo 46! 1 z <Oeo'c WF23D W L0 LO ti DRAIN INLET 0 WF IA F 11A w RIM = 154.00 0 12" HDPE INV OUT 152.00 O A� (31 WF 10A (SEE DETAIL 1) LAKE COCHICHEWICK WF24D LU ;X, 6e, (F WF 9A -JI LU OA? 2A _ ---- _k -e f WF25D - ---- WETLAND --- _ f WF 8A i - OF ff I A Nv WF 3A IT 'OK All f- -_ _ WF26D (7 4��D WF 4A ------------- ----- ------ ---------- ---- O WF27D 12' OF 12" HDPE PIPE co 00 ---------- It WF 5%A -- ------ - ------ S INSTALL 6"TO 1211 OF ill -------------- ----------- 4 vv ---------- AGGREGATE BASE OVER A EXISTING SURFACE 1 -------- 75Z44' 154�30 THIS AREA an r A J INTERMITTENT od, WF 2B S TREA M WF29D WF 30D X 9 k ", A ----------- WF 6B LU A- .0 WF 7B - - - WF IS -------------- BANK DISTURBANCE > LLI LL] o' 2 L.F. EACH SIDE AI WF 3 ID y- v 06 4 L.F. TOTAL 3'X3' DROP INLET WITH < A k 24"X 24" CAST IRON ee vx 50 f BUFF ERZOIVE FRAME AND GRATE 12" HDPE PIPE 47, INSTALL 3/4" COMPACTED INV OUT= 151.80 CRUSHED STONE xv, 4" DEPTH WF 32D (�j OF -1- - -[ - - 25 BU�ER ZONE -------------------- - - - - 1 - I I - - Iii z WF33D ----------� '00000� ----------- ------ ------ 01 L0 w "0,00� - C4NOEAA YAK ---------------- -------------- ------------ - ------------ LO CA J- LALPVCHAREA Nk�, J/ 12" HDPE PIPE WF2 k11F4G WF 8G E WF IE -0.WF 5G l/C/F G - _-. BANK 18 L.F. M06 4E WF 3E DISTURBANCE WF 2G ---------------------------- - VHF-------- 00 WF 3 G 0 WF WF6G ----------------------------- WF IG --------------- WF IOG ------------------------ - ------------- 5' STONE --------------- WETLAND HEADWALL ON WF I IG END OF PIPE PROJECT 24-380 ------------------- DATE 2025-03-06 ---------- e� 0 z 3. ENLARGED P LAN 1"=10' DRAWING SCALE 1 =30' NOTE: DRAWN BY DJO 1. LAKE COCHICHEWICK DOES NOT HAVE A APPROVED BY BCO MAPPED FLOOD ELEVATION.VISUAL 0 30' 609 OBSERVATION OF THE HIGH WATER MARKS INDICATE A MAXIMUM WATER LEVEL OF APPROXIMATELY ELEV= 115' SHEET 2 OF 2