HomeMy WebLinkAbout1991-07-10 Conservation Commission Minutes Minutes of NACC Meeting July 10, 1991
Present George Reich Chairman, Alison Brewster, Vice-Chairman,
Carl Shoene Richard Milliard Anne Kasprzyk, Acting Admin and
Linda Dufresne Secretary
MINUTES
P Tariot and Carl Schoene motioned to accept the minutes of May
1, 1991 as amended, R Milliard seconded, motion carried
Carl Shoene will revise minutes of June 19
Lot B-2 Dale Street (#242-515) -Compliance (Cont
Steve Smolak requested a Certificate of Compliance and bond
release A Kasprzyk noted that the house was constructed 60 feet
from wetlands rather than the approved 70 feet as noted in Phil
Christiansen' s letter Mr Smolak noted it was moved due to
ledge A deck is proposed in the future which will require the
filing of a Request for a Determination of Applicability
P Tariot motioned to grant a Certificate of Compliance with the
stipulation that the silt fence be removed any grade
inconsistencies be rectified by hand and the area seeded and
mulched prior to issuance A Brewster seconded Motion passed
unanimously
Lot 64 Haymeadow Lane (#242-413) -Modification to Plans
Jeff Smith of Concrete Systems, Inc discussed his pre-cast
concrete bridge products and requested that this product be used
rather than aporoved cast-in-place steel and concrete bridge
File number was wrong - final approved project was NACC #2 Pre-
cast footings would eliminate the need for a coffer dam and would
require two weeks work time (shorter than usual) Slightly
larger impact =or center footing (plus or minus 8 sq ft ) but
need much less for end footings Commission would approve the
substitution if less wetland impact Applicant should come back
with new construction sequence, detailed plans and the name of
people responsible for various aspects of work
Lot _24 Candlestick Rd (#242-453) -Certification of Compliance and
Bond Release
Ken DiRaffael was present to request a Certificate of Compliance
and bond release Commision denied Request for Certificate since
the wetland reolication area is not yet 75- revegetated with
wetland plants A Brewster motioned to grant a reduction in the
bond by $1 500 leaving $500 remaining P Tariot seconded Passed
unanimously
r
1 Lot #2 (#21) South Cross Road (#242-494) -Partial Compliance
Pat Murphy requested a Partial Certificate of Compliance
A Kasprzyk revieded findings of site visit some erosion in lawn
at rear of drive, grading and clearing of some vegetation within
25 ' no-cut zone deck within 50' no-build zone, stock piled loam
immediately ad3a=ent to wetland Commission denied request Pat
Murphy will get developer to remove loam and Commission wil
schedule a full site visit upon the loam removal i
Lot 19A Bear Hill Rd (#242-158) -Partial Compliance
George Schruender made a request for a Partial Certificate of
Complaance P Tariot moved to grant a Partial Certificate,
A Brewster seconded, passed unanimously
Lote 1A, 1B, 1C Tarnpike St -Request for Determination-Continued
Public Hearing
Scott Giles explained new plan submitted July 8 with topography
indicating all tzree houses outside a no-cut zone of 50 feet a
portion of one Irive within 45 feet Septic systems have not
been designed yet C Shoene requested a snow fence in some
areas P Tariot motioned to issue a Negative Determination of
Applicability wlzh conditions that erosion controls be installed
at no disturbance zone of 50 feet with the one driveway exception
• of 45 feet and additonal snow fence to be placed according to
agent' s discretion near grading work A Brewster seconded,
motion passed unanimously
Lot 23A Forest St (#242-555) Notice of Intent-Continued Public
Hearing
Phil Christiansen represented applicant Moved house back 6 feet
from wetland, put additional wetland boundaries on plan
A Kasprzyk noted plans only received today need time to review
and review new boundary in field Phil Christiansen presented
copy of driveway easement Discussion ensued with comments from
public Now 595 square feet of temporary wetland impact
proposed Eric Nieche of 1253 Salem St (N Andover Realty Trust)
asked questions regarding increase in run-off as Ellen Dewallaby
of Lot 1 Salem St and Ed Shaw Commission voted to require
applicant to shod no net increase in run-off from site Septic
system approved application must be submitted as well as
certified list of abutters and proof of notification,
construction access and sequence new house corners should be
stated in field P Tariot motioned to continue to August 7,
R Milliard seconded Passed unanimously
•
i
Coventry Estates (#242-324) -Public Hearing re Bond Seizure
Victor Hatem appeared one of principals of Coventry Development
Corp also Mr Cristaldi He has met with Planning personnel and
received list of concerns from D P W and home owners He
agreed to submit a schedule and list of action to remedy
situation to a technical review committee within two weeks
Discussion ensued Joe Cushing representing Lexington Savings
Bank indicated Lexington Savings is involved with Orchard Path
not Coventry Estates with exception of lift station on Lot #1
P Tariot motioned that Coventry Development Corp must install
hay bales at all drainage outlets and clean catch basins per
Enforcement Order by 5 00 P M July 12 P Tariot motioned to
continue hearing to August 7 R Milliard seconded Motion
passed
Lot 2 (#44) Oaks Drive-Public Hearing for a Request for a
Determination
Dennis Toomey propses an additon to an existing house in the
buffer zone A Brewster motioned to issue a Negative
Determination w-th erosion controls as a condition and reference
to the plan R Milliard seconded Motion passed, P Tariot
abstained
Liberty Hills II (#242-486) -Enforcement Order
George Secchiaroli stated that the Order was recorded 7/10/91, no
proof submitted Septic system within 100 feet of wetlands in
N Andover A Kasprzyk will check with Health Dept
P Tariot motioned to lift Enforcement Order upon filing of the
$4 000 bond and proof of recording the Order of Commitment,
R Milliard seconded Unanimously passed
Jerad Place Phase II , Lot 24 (#242-506) New Plans-insignificant
change or modification to Order
Jim Bourgeois of Neve Assoc stated that Jack Magee wants to buy
Lots 24&26 Commission ruled that 25 foot buffer must be
maintained Retaining wall must be moved so that it will be at
least 30 feet from wetland New plans must be submitted within
two weeks indicating such change P Tariot motioned to accept
the changes in the plan revised 6/26/91 and accept the
Modification of Order of Conditions, R Milliard seconded Motion
passed
Jerad Place Phase II , Lot 26 (Determination) -New Plans
P Tariot motioned to Modify the Negative Determination to include
• the plan date E/17/91 to be further revised to indicate erosion
control along no disturbance zone, A Brewster seconded Motion
passed
z
Merrimack River Trail
Cathy Hirsch of Merrimack River Watershed Council would like to
help initiate a trails committee to install trails along the
river already owned by Town which runs from the boat ramp to
Haverhill Appalachian Mountain Club can help in 1991 but no
guarantee for 1992 Commission supports her efforts and
Administrator will help answer any questions regarding filings
but will not loin committee
Expenditures/Subscription
Commission allowed A Kasprzyk to attend next MSMCP meeting in
Greenfield on 7/17/91 regarding wildlife habitat evaluations
Commission requested A Kasprzyk to appropriate funds from filing
fees to pay MACC dues Reviewed legal costs regarding Great Pond
Estates
Lot 61 Newcastle (#242-385) -Discovery
Applicant must request a Partial Certification of Compliance with
as-builts etc and submit a new filing for additional work
proposed on lot
Lot 4 (#2125) Turnpike St (#242-541) -Enforcement Order
Ed Plugis did not appear as required A Kasprzyk indicated he
had fixed erosion control as best he could and he had indicated
he had no funds to complete work or post bond Commission
requested A Kasprzyk discuss with Town Counsel and investigate a
lien on proprty, make sure Order of Conditions recorded
Lot E Berry St (9242-549) Notice-Decision
Discussion P T3riot motioned to issue Order of Condition to
deny pro3ect as discussed, R Milliard seconded Motion passed
unanimously
Dryad & Belfast Streets (4242-548) -Decision
Discussion A Bre,aster motioned to issue Order of Conditions as
amended G Reich seconded motion passed unanimously
Lot 11 (#100) Tucker Farm Rd (#242-435) -Certificate of Occupancy
Applicant requested Certificate of Occupancy sign-off but has not
posted $2 000 bond on recorded Order of Conditions etc
Commission indicated entire bond must be posted prior to sign-
off
Lot 41 Candlestic} Rd (#242-506) -Partial Compliance
Tabled since there has been work within 25 feet of no-cut zone
Lot 53 Blue Ridge Rd. (#242-453) -Partia1 Compliance
No action-wrong file number. Determination issued on lot, not
Order of Conditions.
R.Milliard motioned to adjourn at 1: 06 A.M. , P.Tariot seconded,
motions passed unanimously.
Approved July 17, 1991
Gq�6rge Reich Chairman