HomeMy WebLinkAbout1991-08-07 Conservation Commission Minutes MINUTES OF NACC
AUGUST 7 1991
PRESENT George Reich/Chair Alison Brewster/Vice-Chair
Richard Milliard Don Stanley
Carl Schoene Anne Kasprzyk Acting Admin '
P Tariot - 7 59 P M
B Mansour - 7 58 P M
MINUTES
R Milliard will review July 17 minutes before next meeting
OLD BUSINESS
Lot #41 Candlestick Rd (#242-506)-Partial Compliance (Cont)
Tom Neve the applicant's representative noted that work
encroached intD 25ft no-cut zone He proposed enlarging the no-
cut zone to the rear of the lot to offset this work R Milliard
would prefer not to put future encumbrance on the lot D
Stanley agreed G Reich stated sod isn't preferred due to
maintenance -le was also concerned with precedents A discussion
followed regarding the additional stipulation of an increased no-
disturbance zone
R Milliard motioned to issue with condition that Partial
Compliance be granted seconded by D Stanley G Reich and A
Brewster voted no C Shoene abstained The motion was not
carried
A Brewster offered a modified motion to include an encumbrance
G Reich seconded the motion the motion carried
Lot #4A (4216) Raleigh Tavern Lane (#242-181) -Compliance (Cont)
Tom Neve reviewed his letter and plan The work completed is not
exactly to plan but is in compliance with Order of Conditions
D Stanley motioned to issue a Certificate of Compliance A
Brewster seconded the vote was unanimous
Page 2
August 7, 1991
Minutes (Cont 1
Coventry Estates (#242-324)-Band Seizure (Cont)
J Cristaldi the applicant reviewed the Work Schedule letter
addressed to the Planning Board D Stanley stated that he is
pleased that things are progressing C Shoene feels that while
erosion is a ma]or concern the rest can wait a little A
Kasprzyk agreed that no new erosion and no further impacts are
occurring A Brewster noted that as-builts are needed for the
Conservation Commission as well as the Planning Board
Action was drepped to seize the bond for now The Conservation
Commission will review the schedule
Butcher Boy (#242-473)-Discussion - Erosion Control Modification
Bob Parker reviewed the Order of Conditions and the modification
the applicant would prefer Filter fabric is to be used at the
catch basins instead of hay bales The detention basin will not
be used as a sedimentation basin
D Stanley motioned to issue a Modification to Order of
Conditions P Tariot seconded B Mansour abstained the motion
carried
® McLay's (#242-277) -Discussion of Enforcement Order
Tom Neve stated nothing has been done yet
P Tariot motioned to file a criminal suit B Mansour seconded
A Brewster abstained The motion carried 6-0-1
A Kasprzyk will send a letter to Mr Kaltz
PUBLIC HEARINGS
Lot #1 Hawkins Lane-Request for Determination of Applicability
T Neve represented George Farr Boston Brook flows through lot
N-S The house and septic system are outside the buffer zone but
the driveway is in the buffer zone P Tariot mentioned there is
bordering land sub3ect to flooding 2 1 driveway and still no
work in 25 foot no cut zone Tom Neve stated that usually
haybales are hacked by silt fence Tim Ragonese (36 Hawkins
Lane) stated that the house will be constructed on ledge-
blasting7 Six feet will come off the top but 14 feet down for
cellar
D Stanley motioned to close and issue a decision within 21 days
Erosion contro_ must be according to plan and the wetland line
must be re-established Alison Brewster seconded unanimous
vote
Page 3
August 7, 1991
Minutes (cont
Hidden Court-Lots 6 8 & 10 - Request for Determination
S Giles must send in proof of abutter notification Previous
Order of Conditions was 25 feet no-cut, 50 feet no-build haybale
along no-cut line Check when Order of Conditions for Coventry
II expires P Tariot requested a site visit R Mansour wants
finished grades on plan C Schoene stated that the project is
on sewer A 100 foot buffer zone is needed on the plan and final
grades are required the wetland line must also be re-
established A site visit is scheduled for next Wednesday August
14 at 6 OOPM
P Tariot motioned to continue to August 21, 1991 A Brewster
seconded the motion motion was carried
Interstection of Cotuit and Dartmouth Sts - RDA
Proof of notice submitted Robert Dion explained the work to be
done to fix erosion Anne Kasprzyk explained the conditions and
offered to supervise the work G Henderson from Andover is to do
work Frank Stewart and Mark Bove discussed flooding on
Dartmouth St Neighbors agree that there is a flooding and
erosion problem D Stanley's motion to issue negative finding
with A Kasprzyk to supervise was withdrawn
C Schoene motioned to close hearing and do site visit Wednesday
August 14 1991 at 6 45PM and to empower the Commission members
attending the site visit to issue a decision A Brewster
seconded the motion the vote was unanimous
GLSD - John Ford / Request for Determination
Atty John Ford represented the GLSD Along the bank of the
Merrimack River the existing sewer line is encased in cement and
rip-rapped The plan does not show wetland lines easement plans
provided
Maintenance cutting has already occured-this an "after the fact"
filing The Conservation Commission must be notified when, where
and how future maintenance cutting will occur
A motion by P Tariot to issue a Negative Determination with
condition that future cutting will require a Determination of
Applicability prior to cutting A Brewster seconded the motion
the vote was unanimous
i
Page 4
August 7 1991
Minutes (Cont )
23A Forest Street (#242-555)-Notice (Cont )
Phil Christiansen represented the applicant The old wetland
line has been taken off the plan Two of the houses have been
built on the six originally proposed lots The proposed house
has been moved somewhat to provide a buffer R Mansour stated
that cross hatching on plan beyond the haybale line should be
fixed A Kasprzyk stated it should be a maximum of about 15 feet
wide The forced main pipe is 4 ' deep Stone and gravel will be
placed in a filtration trench along the driveway The driveway
will be gravel There will be a 25 foot no-cut zone Eric
Nieztche wants to go over the calculations for the infiltration
rates Commission should be particular about the sewer in
wetlands
P Tariot motioned to close the Public Hearing and issue a
decision in 21 days (August 28, 1991) seconded by D Stanley and
A Brewster vote was unanimous
NEW BUSINESS (CONTINUED)
Lot 1 Hillside (242- )-Partial Cert of Compliance
Mike DiBitetto is the applicant P Tariot motioned to issue a
Partial Certificate of Compliance and to transfer the bond B
Mansour seconded the vote was unanimous
Lot 6 Christian Way (#242- )-Partial Cert. of Compliance
Al Shaboo explained they need the Certificate right away The
Commission can keep the bond for now until all the grass is well-
established P Tariot motioned to grant a Partial Certificate of
Compliance and to remove the Enforcement Order A Brewster
seconded the vote was unanimous
The bond will be returned when all areas within the 100 ' buffer
zone are well established with grass
Lot 1 Dale Street (242-421) -Modification of Plans
A Kasprzyk to check on DEP status
Water Treatment Plant (#242-421)-Modification of Plans
More information is needed for the next meeting
-Where does red 10/88 line come from?
-Need elevations to the end of the pipe from 200 ft to the
end of the intake structure
-What are elevations now?
Weston & Sampson representative should attend the next meeting
I
Page 5
August 7, 1991
Minutes (Cont
Lot B Great Pond (#242-260)-Extension
No action taken There was no representation The Commission
cannot extend order of Conditions if it has already expired
The applicant can re-file or the Commission could issue an
Enforcement Order to finish
Lot E Berry Discussion
The Commissior would like to see alternatives in the future
submission
Lot 3 Johnnycake (#242-115)-Partial Compliance Lift Enforcement
D Stanley motioned to issue a Partial Compliance and lift the
Enforcement Order A Brewster seconded the vote was unanimous
D Stanley motioned to adjourn A Brewster seconded the motion
the vote was unanimous Meeting adjourned at 10 50 PM
Peoge each Chairman Approve