HomeMy WebLinkAbout1991-12-18 Conservation Commission Minutes NACC MINUTES
DECEMBER 18, 1991
PRESENT George Reich Chairman Alison Brewster, V-Chair
Paul Tariot Richard Milliard
Carl Schoene R Doucette, Administrator
MINUTES
Motion by P Tariot and second by A Brewster to adopt December 4
minutes as amended Motion passed
OLD BUSINESS
Lot 18 (#200) Haymeadow Road (#242-16) - Partial Compliance
Petitioner Leah McDonough requesting a partial compliance
R Doucette provided an overview The Compliance was issued in
1986 and was evidently not recorded by the applicant Upon
motion by P Tariot and second by R Milliard the Board unanimously
voted to issue the Partial Compliance
North Andover Wetlands Regulations - Discussion
• Commission reviewed draft wetlands regulations Public hearing
planned for early 1992
Non-Criminal D_sposition Statute Tickets - Discussion
Format for tickets was discussed Input from the Police Chief,
Town Manager District Court and Town Counsel will also be
sought
NEW BUSINESS
Lot 3 ,4 ,5 So Bradford Street (#242-519) - Compliance
Mr Bardascino, the owner requested a compliance R Doucette
gave an overview of the pro3ect R Milliard motioned to grant a
partial bond release of $9, 000 and hold $1, 000 Second by
P Tariot Motion passed unanimously A compliance was not issued
at this time
Lot 28 Tanglewood Lane - Determination
A letter has aeen submitted from a Mr DeNuccio requesting a
compliance Thomas Evangelista represented Kevin McCann
prospective buyer R Doucette provided an overview - while the
plan shows no work in wetlands the order of conditions has some
additional conditions that indicate a culvert was placed in a
wetland crossing on this lot Mr Evangelista stated that there
was a culvert cn the property No certification or as-built plan
from an engineer has been submitted as required by the notice
C Schoene motioned to deny second by A Brewster Motion passed
N �
Agricultural License for Mazurenko Farm - Discussion
Proposed agricultural license agreements were distributed for
NACC comment
PUBLIC HEARINGS
Lot 3 Marbleridge (#242- ) - Notice (to be continued)
The applicant is seeking the assistance of an engineer and
requests a further continuance to 1/8/92 Commission voted to
continue to 1/3/92
Lots 1 & 2 Lac,i Street (#242- ) - Continued
Jim Bourgeois represented Mr Follansbee Site is now cleaned up
Fill material das placed by the tenant to fill the pot holes No
info was presented as to the origin of the fill material as
requested at the last meeting Motion by P Tariot and second by
A Brewster to close and issue a decision within 21 days of
receipt of information as to the origin of the fill and the
removal as required by Administrator Motion passed
Lot 1 Old Village Lane - Determination
P Tariot abstained since he is an abutter Mr Tariot reserved
his right to speak as an abutter, not as a commission member Ben
Osgood, Jr represented the General Store Trust Mr Osgood
• described the property There is some wetland vegetation but no
apparent connection to a water body R Doucette and A Brewster
visited the site and discovered a possible connection to a water
body The NACC will do a site visit
Various abutters attended Marie Geggis was concerned with the
flow of water onto Village Lane from driveway Barbara Dillon
asked if filling of land would affect drainage of her land
Paul Tariot also questioned drainage of Old Village Lane
R Milliard motioned to continue to 1/8/92, second by A Brewster
The vote went as follows 4-0-1
Cyr Recycling ex Recreation Center - Determination
R Doucette represented the North Andover Trails Committee The
proposed project is to locate 2 sections of a trail along the top
of a stone wall The stone wall passes through BVW The wall
will be rebuilt to be more stable and passable Motion by
P Tariot and second by A Brewster to issue a negative
determination Passed unanimously
Campbell Forest (#242- ) - Notice
David Jordan represented the applicant and presented the plans
1 1st crossing- 1070 s f of BVW filling
2 2nd crossing- 1500 s f of BVW filling
3 3rd crossing- 220 s f of BVW filling
• 4 4th crossing- 1080 s f of BVW filling Less shoulder width
5 Cross intermittent stream no BVW for driveway
6 8 point source discharges one right at wetland edge, one
within 20 ' six others as far away as possible
Replacement of culvert under Campbell Road (2) - 4 'X2 ' box
culverts will replace (1) 18" culvert This should alleviate
flooding that is caused by flow off Campbell Forest property
C Schoene voided concerns of flooding and discharge of matching
peak flows CBA filling and steep slopes to wetlands and lack
of flood detention
Dave Jordan suggested the Commission hire an independent
consultant to review the drainage study
P Tariot asked if enlarging the culvert at Campbell Road could
dry up wetlands D Jordan answered groundwater will not be
altered and wetland will not be affected
P Tariot asked if there could be more filling for house lots
D Jordan said there would be no need for additional filling
R Milliard asked about 1 1 slopes on road shoulders
D Jordan describe slopes and method of riprap placement
G Reich asked if these plans reflected the Determination issued
earlier by the NACC to determine the exact wetland edge
D Jordan stated that the applicant accepted the Determination
R Doucette
if there is any connection between the wetland resource area on
Lot 10 and the larger wetland
D Jordan wil- show the connection on plan
- the Notice indicates haybales and silt fence while the plans
show only one barrier The NACC will ask for both
Please submit one plan with roads Lot lines topo and
wetlands Applicant agreed
- A PRD plan was discussed with the applicant almost a year ago
yet none was submitted R Doucette will ask the Planning
Board to request that one be submitted
D Jordan stated that the soils might not support SSDS for PRD
- applicant to consider asking for a Planning Board waiver from
maximum road grade to lessen buffer zone impacts
- the proposed lack of flood detention could alleviate local
flooding as part of this project but (a) might add to future
flooding downstream and (b) would not attenuate stormwater
pollution
- look into a waiver from the centerline radius to bring the
roadway away from the wetlands as it nears Campbell Rd
- Floodplain is a wetland and should be indicated as such on the
plan
- Applicant shculd flag crossings and roadway for NACC review
- Wetland habitat assessment needed? Bank impacts">
- Endangered species habitat found nearby
- No need to fill any wetland resource area for lots?
D Jordan stated no
Abutters
Fundeklian - Roadway impact near Hagelin
Meyer - The NACC should hire an independent consultant
- EIR needed (RPD-not likely to pass thresholds)
- Hydro study takes lot development into account? yes
- Discussion of pond.
Mary LaChapells - Started water overflows onto Salem Street
- Who will guarantee she will not be flooded
- goes not believe the brook will take more flow
Goodwin - Discussion of culvert at Campbell Road
Dave Jordan stated the culvert will still flood to el. 101, just
below pavement.
C.Schoene discussed increase of runoff.
Dave Jordan and R.Doucette discussed increased rate vs. volume.
Motion by P.Tariot and second by A.Brewster to continue to
1/ / 2 .
Mass D.P.W. Route 114-Turn ike Street - Determination
Motion by P.Tariot and second by R.Milliard to issue a. Negative
Determination with condition to use haybales.
DECISIONS
Great Pond Estates ACC- 3
R.Milliard moved to adopt. Great Pond Estates as amended. Second
by A.Brewster.
North Andover Mills 242- 3
Motion by R.Milliard and second by A.Brewster to adopt No.Andover
Mills as amended. Motion passed 3-2 . P.Tariot and C.Schoene
against. There was discussion about a proposed modification that
may be submitted at the next meeting.
Motion by A.Brewster and second by R.Milliard to adjourn at
12: 45 a.m.
i
j George Red h, Cairmar
i