HomeMy WebLinkAbout1991-07-21 Conservation Commission Minutes MINUTES OF NACC
JULY 17 1991
PRESENT George Reich/Chair Alison Brewster/Vice-Chair
Paul Tariot Richard Milliard
Carl Ehoene Donald Stanley
Linda Dufresne Sec'y Anne Kasprzyk Act Admin
MINUTES
Paul Tariot motioned to accept June 19, 1991 minutes as amended,
Richard Milliard seconded motion passed
Paul Tariot motioned to accept July 10 minutes as amended
A Brewster seconded unanimous
ODL BUSINESS,
Chestnut Green (#242-243)-Compliance (Cont )
Brian Sheehy of Kebb Properties was present as well as Dr John
Mallet Lengthy discussion ensued regarding whether the
replication area is successful Dr Mallet contends that Spring,
Summer and Fall are separate growing seasons and although clover
is a FACU species its presence in the replication area is
satisfactory and should be included as a wetland species in
calculating 75% wetland plant species coverage Dr Mallet
provided the above information in a letter dated July 16,
submitted at the hearing Dr Mallet submitted indicator status
of species as requested in Anne Kasprzyk's letter of June 24
1991 but did nct provide sample plots indicating percent cover of
wetland species
A Kasprzyk will check with DEP regarding growing season and the
use of FACU species in a replication area issue will be
continued until the August 21 hearing at the request of the
applicant
NEW BUSINESS,
LOT #5 (#489) SHARPNER'S POND ROAD (#242-386)-COMPLIANCE
Judith Dolan former owner of land requested Certificate of
Compliance Linda Galvin is now the owner C Schoene indicated
that culverts must be cleaned P Tariot motioned to issue the
Certificate cf Compliance subsequent to notification and
verification of the proper maintenance of the culverts
R Milliard seconded Passed unanimously
• Page 2 / NACC JULY MEETING
#125 SALEM STREET (#242- )- DETERMINATION-PUBLIC HEARING
Walter Demers homeowner, explained landscaping was done in
buffer zone A Kasprzyk explained a filing was required after the
fact and that erosion controls have been properly installed
P Tariot motioned to issue a Negative Determination with erosion
control condit-on A Brewster seconded Passed unanimously
LOTS #6B & #9A BOXFORD STREET (#242-537) - PARTIAL COMPLIANCE
Dave Kindred requested Partial Certificate of Compliance
A Kasprzyk explained that a previous request was made and
withdrawn Renediation work has since taken place P Tariot
motioned to issue Partial Compliance A Brewster seconded Passed
unanimously F Tariot motioned to reduce the bond by $7,000
leaving $6, 000, R Milliard seconded Motion passed unanimously
LOT #44 STAGECOACH ROAD (#107) (#242-544)- PARTIAL BOND RELEASE
Joe DiMartino owner Commission denied request since there is
some question as to whether work has occurred within 15' no-cut
zone Applicant noted that R Doucette had approved erosion
control placement A Kasprzyk will call R Doucette and the
Commission will schedule a site visit
SHARPNERS POND ROAD (#242-546) - POSSIBLE VIOLATION
A Kasprzyk will contact applicant to have him fix erosion
control Will issue Enforcement Order if not rectified in a
timely fashion
LOT #25 GRANVILLE LANE (#242-160)- COMPLIANCE
George Farr as applicant A Kasprzyk had completed and okayed the
site visit an3 had no problems P Tariot motioned to issue
Certificate of Compliance R Milliard seconded Motion passed
unanimously
DISCUSSION OF POLICY RE LETTERS FOR CERTIFICATE OF COMPLIANCE
Put on agenda at request of Scott Giles not in attendance
Reviewed state regulations Letters from professional engineers
or surveyors nust indicate whether or not the pro]ect is in
accordance with the Order of Conditions as well as the plans Any
discrepancies must be pointed out
LOT #3 JOHNNYCAKE STREET (#242-115)- PART COMP /BOND RELEASE
Continued to August 7 1991 at request of applicant
FOR U & COMPLIANCE SIGN-OFF POLICY
P Tariot motioned to accept the Draft Form U and Compliance Sign-
off procedures as Commission Policy R Milliard seconded Motion
passed unanimously
•
Page 3 / NACC .DULY 17, 1991
MERRIMACK RIVER TRAILS
P Tariot motioned to endorse the endeavors of Cathy Hirsch, of
Merrimack River Watershed Council, to create a trail system along
the Merrimack River R Milliard seconded D Stanley abstained
Motion passed with five in favor and one abstention
BMP'S - NANCY SULLIVAN (EPA)
P Tariot will give Nancy Sullivan feedback on this
OTHER BUSINESS
G Reich will pursue new commission members
Commission will perform site visits on Wednesday, July 24 at 6 00
P M at Lot #44 Stagecoach Lane to be followed by South Cross
Road and Lot #23A Forest Street
P Tariot motioned to issue an Enforcement Order to GLSD if they
do not file within 10 days of notice R Milliard seconded Motion
passed unanimously
P Tarlot motioned to issue another Enforcement Order regarding
Liberty Hills II ordering applicant to stop all work seconded by
D Stanley Motion passed unanimously
P Tariot motioned to ad]ourn at 10 00 P M , R Milliard seconded
Motion passed unanimously
eorge Rei h Chairman Approved August 21, 1991
•