Loading...
HomeMy WebLinkAbout1993-11-03 Conservation Commission Minutes North Andover Conservation Commission November 3 1993 PRESENT George Reich John Leeman Richard Milliard Robert Mansour Paul Tariot Kevin Foley Richard Doucette, Administrator MINUTES Motion by R Villiard and seconded by J Leeman to adopt the minutes of October 20 1993 OLD BUSINESS #18 Willow Street (#242-676) - Modification R Doucette prodded an overview Mr Mscisz asked to reduce the bond Much discussion R Doucette recommended reducing the bond to $500 Motion by J Leeman and seconded by G Reich to reduce the bond to $500 as long as R Doucette oversees the work Brooks School ,#242-655L - Bond Reduction Frank Marino presented a progress report and requested a bond release R Doucette recommended half the bond be released Motion by P Tariot and seconded by R Milliard to release half the bond Vote unanimous NEW BUSINESS Lot 1 (#t9) Holly Ridge Road (#242-597) - Compliance Motion by P Tariot and seconded by J Leeman to grant the Compliance Unanimous VIOLATIONS Phase II Sewer Line (#242-547) R Doucette proiided an overview of siltation of streams flowing into the Lake Discussion of appropriate action Discussion of the possibility of issuing a ticket Motion by G Reich and seconded by P Tariot to issue the ticket if R Doucette feels it is necessary Vote 5-0-1 J Leeman abstained Boxford Site Visit R Doucette gave an overview of the violation and discussed his memo of October 26 G Reich will contact the chair of the Boxford Conser,.ation Commission NACC 11/3/93 Page 2 NEW BUSINESS (CONT Lot 43A Candlestick (#242-461) - Partial Compliance R Doucette provided an overview Scott Giles requested a Partial Compliance for #242-461 and a full Compliance for #242-646 Motion by P Tariot and seconded by R Milliard to issue the Compliances Vote unanimous OLD BUSINESS E1 Hefni - Discussion Discussion of ongoing application for a criminal complaint Merrimack River Boat Ramp (#242-540) - Extension Motion by G Reich and seconded by R Milliard to issue a extension for one year Vote unanimous Meadowood II (#242-674) - Discussion R Doucette stated that an independent review has not been submitted yet NEW BUSINESS (CONT Lot 33A Lancaster Road (#242-592) - Partial Compliance R Doucette request a Partial Compliance from the subdivision Order of Conditions Motion by P Tariot and seconded by R Milliard to issue the Partial Compliance Vote unanimous #733 Turnpike Street (#242-277) - Compliance R Doucette and R Mansour gave an overview Motion by P Tariot and seconded by R Mansour to issue a Compliance Vote unanimous Cullen Forest Cutting Notice Discussion of Compliance with the Bylaw R Doucette will contact the landowner and request more detail Rea Street - Discussion Motion by G Reich and seconded by P Tariot to send a memo to the Building Inspector to inform him that the NACC would like to be involved in future permitting of the gravel pit Oates Property/Town Farm Access - Discussion K Foley left a message with the homeowner to discuss the no trespassing signs and the gate Route 114 Sunoco R Doucette provided an overview of the diesel spill NACC 11/3/93 Page 3 PUBLIC HEARINGS 1010 Johnson Street - Determination R Cookson appeared and showed plans for drainage work done on his property Discission of drainage and soil stabilization Motion by P Tariot and seconded by R Milliard to issue a Negative Determination with erosion controls and the planting of grass Vote 5-0-1 Vo=e unanimous Lot 2 Johnnycake Street - Notice Ben Osgood Jr presented plans for a single family home with a driveway wetland crossing K Foley questioned the 1 1 replication it's usually more P Tariot stated that there is no compliance on the subdivision and no As-Built has been submitted to the NACC He also stated that the applicant must re-notify the abutters the legal notice was advertised incorrectly B Osgood stated there has been an As-Built drawn and it shows there was some additional filling of wetlands P Tariot stated the applicant ras landlocked himself B Osgood stated he had a permit to cross the wetland but it expired R Milliard discussed the construction near the erosion controls G Reich questioned the cumulative wetland filling B Osgood did not know how much R Doucette will try to determine the cumulative filling G Reich stated if there is no Compliance on the subdivision. the Board should not issue any permits until the subdivision OOC is complied with R Doucette indicated that all of the flag numbers were off by one The delineation needs some minor changes There was excess filling for preāœ“ious subdivision some of the filling was done on this lot Tterefore the construction on this lot is not presently in ccmpliance with subdivision OOC Other access has been attempted =o avoid crossing wetlands this was unsuccessful Ken Brown voiced his concerns of delineation Rich Lowe stated his concerns of flooding and wildlife Muriel Brown as{ed what percentage of trees will remain Mr Donaldson had some concerns with the septic system Joanne Perry questioned the drainage calcs Catherine Jennings asked if bonds can protect abutters Motion by P Tariot and seconded by K Foley to continue the public hearing until November 17 G Reich discussed the Compliance for the subdivision B Osgood stated there will be a dispute if the NACC requires a Compliance on the subdivision OOC Vote was unanimous on the motion to continue NACC 11/3/93 Page 4 Punch list As-Built for subdivision re-notify the abutters R Doucette meet with wetland scientist drainage cals for subdivision should be re-submitted cumulative impacts should be determined locate area for more replication check flag numbers on the plan #1070 Osgood Street (#242-419) - Compliance Jim Bourgeois presented plans for a restaurant G Reich questioned lack of "No-construction" zone and almost no "No- construction" zone J Bourgeois stated most of the site work was completed under the previous (expired) file R Doucette stated the work is too close to the wetland A site visit is needed New drainage calcs are also needed Motion by K Foley and seconded by G Reich to continue the public hearing to 11/17 NEW BUSINESS (CONT Woodland Estates A Cormier requested that the bond be segment with the work Discussion of construction sequence Motion by R Mansour and seconded by K Foley to segment the bond $25 000 will be required at this time No work will progress past station 7+0± Meeting ad3ourned at 10 30 p m George Reich Chairman