Loading...
HomeMy WebLinkAbout1994-10-19 Conservation Commission Minutes NACC MINUTES OCTOBER 19 1994 SENIOR CITIZENS ' CENTER PRESENT George L Reich Deborah Feltovic Kevin Foley Robert Mansour Joseph Lynch Albert P Manzi Jr Susan Ford Acting Administrator Julie Parrino Acting Administrator MINUTES Motion by K -oley and seconded by D Feltovic to accept the minutes of the October 5 1994 meeting as amended OLD BUSINESS Lot 15 (#21) Carriage Chase - Amended Order of Conditions The Commission discussed the amendment and signed the Amended Order of Conditions which had been voted upon at a previous meeting Lot 5 Sullivan- Discussion J Lynch and Julie Parrino inspected the site J Lynch drafted proposed recommendations for dealing with the site Building material within slope that is not stabilized Violation of conditions #22 29 & 35 Jim Grifoni wants specific details of what needs to be done The Commission discussed recommendations of a fining s1stem if work is not complied with in certain time frame Jim Grifoni claimed he will conduct work as soon as possible A group site visit will occur on Saturday October 22 1994 at 8 00 A M This matter is continued to the next agenda November 2 1994 NEW BUSINESS 1780 Osgood Street - Certificate of Compliance & Bond Release (242-557) Land survey in compliance and plans in file Motion by A Manzi to issue a Certificate of Compliance pending a final inspection by Conservaticn Agent seconded by R Mansour Vote Unanimous Lancaster Roac, So Bradford Rd and Blue Ridge - Certificates of Compliances and Bond Releases Lancaster Roac 242- Curt Young of Wetlands Preservation, Inc was present and requested compliance and bond release The commission stated that a site % isit and as-built was needed G Reich suggested NACC -2- 10/19/94 that this request be reviewed when proper documentation is supplied by applicant No action So Bradford Rd Lots 23 24 25 26A & 28A 242-591 Curt Young of Wetlands Preservation Inc was present and requested compliance and bond release The commission stated that a site visit and as-built was needed No action Blue Ridge Road 242-651 Curt Young of Wetlands Preservation Inc was present and requested compliance and bond release The commission stated that a site visit and as-built was needed No action Appleton Street, Hitching Post Road - Certificate of Compliance and Bond Release 242-712 and 242-429 Curt Young of Wetlands Preservation Inc is present requesting a bond release and compliance on DEP #242-429 DEP #242-429 is bonded for $15 000 He is requesting that $10 000 be released and $5 000 be applied to the Order of Conditions DEP #242-712 Bond The detention pond and enforcement orders are completed Motion by A Manzi to issue compliance and bond release of $10 000 for DES #242-429 and apply the remaining $5 000 to DEP #242-712 seconded by J Lynch Vote Unanimous Lot 146 Blue Ridge Road - Certificate of Compliance and Bond Release 242-674 The applicant was present and requested certificate of compliance and a bond release pending a final inspection Motion by G Reich seconded by A Manzi to issue certificate of compliance pending a final inspection seconded by A Manzi Vote Unanimous Sewer Hookup Discussion George Perna Director of Public Works (DPW) was present and stated that 60 houses will need to hook up to sewer Ten houses might be within wetland 3urisdiction It would be very lengthy for each individual to file with the Conservation Commission Mr Perna would like suggestions for the Commission in order to make the process easier The public works department will oversee this p=o3ect R Mansour suggested that the DPW file a Notice of Intent for all lots affected and representing all parties Watershed Bylaw Discussion George Perna Director of Public Works (DPW) was present and discussed basic concepts of the Watershed Bylaw K Foley questioned how pre-existing businesses would be affected G Reich addresses previous concerns over takings J Lynch would like to see slopes incorporated into the Watershed Bylaw i NACC -3- 10/19/94 Foxwood Discussion - 242-683 Mr Steven Stapinski was present and addressed the Commission He stated that the Planning Board has given permission to extend 150 feet of pavement into Phase III Swales and detention pond areas in Phases I and II stabilized Revised construction sequence also requested G Reich and A Manzi claimed site was very stable during rainstorm weeks ago Motion by K Foley for modification to allow paving into Phase III and accept sequence revision, seconded D Feltovic Vote Unanimous Lots 3._ 4. 5 Great Pond Road and Lots 1 & 2 Marbleridge- Amendment to Order of Conditions. T Laudani. 242-696 Thomas Laudani was present and addressed the Commission The Order of Conditions which was approved at the September 7 1994 NACC meeting was different from those issued September 19 1994 Condition 25 was rewritten to incorporate the need for a water samples before during and after construction The bond to be posted is $15 000 ($3 000 per lot $6 000 for crossing ) These conditions apply to lots 3 4, and 5 only Motion by G Reich to issue amendment as written seconded by J Lynch Vote Unanimous Lot 7 Old Cart Way - Notice - Continued from October 5 1994 The Commission received a letter from Mr Maus to request continuance un-il the Commission's next meeting Abutters were present and were concerned with the request for a continuance Mr Ron Pica claimed that problems with a covenant restrictions might force the house to be set back further Mr Pica asked that this matter be continued to the hearing in four weeks Motion by J Lynch to close the public hearing and issue a decision within 21 days seconded by K Foley as applicant has had sufficient time to correct plans and documentation Vote 4-1-1 G Reich opposed and R Mansour abstained Lots 1-6 (#989. Salem Street - Notice - Continued from 1OZ05/94 Steve Stapinsk_ was present and addressed the Commission A site walk was conducted on Saturday October 15, 1994 Modifications have been made on a new plan submitted to the Commission A stone wall wil_ be added to segregate the lawn and wetland of Mr Grady an abutter Steve Stapinski walked the site Mr Halloran an abutter addressed his water concerns Mr Halloran will be tying into the sewer and will be incorporated under this file Drainage calculations will be conducted by an outside contractor Motion by J Lynch to continue this public hearing in to November 2 in order to await drainage calcs seconded by A Manzi Vote Unanimous NACC -4- 10/19/94 37 Anne Road, Map 37B, Lot 0053 (242- ) - Notice - Continued from 10/05/94 Mr Ron Pica was present and appeared before the Commission The project includes a covered bridge over an existing crossing A Manzi and Susan Ford inspected the site and agreed with wetland delineation A Waiver Request is required for this project Notice of Intent should have the Waiver Request The applicant needs to fill out the Waiver Request as soon as possible Motion by K Foley to close the public hearing and issue a decision within 21 days of receipt of the Waiver Request, seconded by D Feltovic Vote Unanimous Jerad Place Phase III Sunset Rock Road (242- ) - Notice of Intent Thomas Neve was present and appeared before the Commission He is representing the applicant Robert Januscz Construction of Sunset Road and Lots 1 2 12 13 14 15, 16 & 18 within buffer zone Extension off of Candlestick Road Robert Januscz purchased land from Miller PRD approved by Planning 900-foot road with cul-de-sac Bordering vegetated wetlands Property Lot 17 is open space area Sizing of septic systems are permanent 30 X 70 envelopes of houses that might include decks Ponds #3 and #2 constructed for BMP's Drainage calcs reviewed by Bill Merciak Erosion controls will encapture the whole site A site walk wi_1 be conducted Motion by J Lynch to continue to next meeting, November 2 1994 seconded by G Reich Vote 5-0-1 A Manzi abstained Rte 114, Turnpike Street (242-715) - Notice of Intent Steve Stapinski was present and appeared before the Commission presenting plans for a single family home 780 s f of wetland will be fille3 for driveway with a 1 350 ' replacement area Driveway 25 ' f-rom wetland Wetland filled has speckled alder and canary grass Motion by J Lynch to close the Public Hearing and issue a decision in 21 days seconded by D Feltovic Vote 4-0-1 R Mansour abstained Lot B - Summer Street ,(242-717) - Notice of Intent Steve Stapinski was present and appeared before the Commission Single family home within buffer zone Lot adjacent to Foxwood (partly open space) Town water will be connected into home, 53 ' from wetland no wetland alteration Motion by K Foley to close the public hearing and issue a decision in 21 days seconded by D Feltovic Jote Unanimous Lots 1-14 Hidden Pond Road (Road A) (242- ) - Notice of Intent Thomas Neve was present and appeared before the Commission Mr Neve represents David Kindred The request is for a subdivision roadway to serve 14 lots (13 new homes) The roadway will cross NACC -5- 10/1.9/94 a brook. Existing culvert is present. The property was originally owned by Love's Farm off of Duncan Street. Hidden Pond Road is off of Wintergreen. Existing culvert at wetland crossing will be replaced by box culvert. 261 wide road with gravel shoulders. Farm will be kept in a covenant and 6,0-65% land set aside for open space. Common driveway for lots 5 and 6 around wetland will be 10-151 away from wetland. Altering 1, 110 s. f. , replacing 1, 265 s. f. Separate Notice of Intent will be needed for lots. Abutters Martineaus were present they have hired a firm to deal with water problems. Abutters Gary and Susan Wieman were also present, they questioned open space and what will happen to it. Anne Barbagallo, abutter to Lots 5 & 6 concerned with slope of her yard and possible water problems. A site visit is required. Motion by K. Foley to continue to next meeting, seconted by D. Feltovic. Vote: Unanimous. Lot 7 Old Cart Way Mr. Maus appeared before the Commission to discuss 7 Old Cart Way. The public hearing was closed earlier in the evening. Mr. Maus asked for reconsideration. After repeated requests, G. Reich made a Motion to re-open the public hearing on November 2 , 1994 , the Motion failed for a lack of a second. The meeting adjourned at 11: 20 P.M. George Reich, Chairman