HomeMy WebLinkAbout1998-10-22 Correspondence Stormwater Pond Replacement Plan 95 Lyons Lana Engineering
4
.,environmental Services, Inc.
Environmental eF
CONSULTING CIVIL ENGINEERS&LAND SURVEYORS
130 MIDDLESEX ROAD,SUITE 11 rA
'°BN°TYNGSBORO,MA 01879 11'[NTi�iti
TELEPHONE(978)649-4642 1 FAX(978)649-0981
"'D- /C-
TO
C/
2
z;_1 _ = � �
WE ARE SENT YOU ❑ Attached ❑ Under separate cover via the following items:
❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications
❑ Copy of letter ❑ Change order ❑
ColplEs DINE NO. DESCRIPTION
r
-3 J le ze
1
V_LIL.114�v).............2L
THESE ARE TRANSMITTED as checked below:
❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval
❑ For your use ❑ Approved as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corwtad prints
❑ For review and comment 0
❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS
COPY T
SIGNED.
LandEngineering
130 Middlesex Road !
Environmental Services, Inc. Tyngsbor o f MA 01879
f
CIVIL ENGINEERING &LAND SURVEYING TELEPHONE(978)649-4642 1 FAX(978)649-0981
1
October 30, 2019
Ms. Monica Gregoire,Staff Planner `
Ms.Amy Maxner,Conservation Administrator
Town of North Andover
120 Main Street
North Andover, MA 01845
RE: 95 Lyons Way
Stormwater Pond Replacement Plan
Dear Ms. Gregoire and Ms. Maxner,
Enclosed, please find the revised drainage Improvement Plan and Stormwater Pond Replacement Plan �
s
that have been updated to address the comments from the August 141h Public Works review as follows:
1.- Per the Massachusetts Stormwater handbook,a minimum of 1 test pit per 5,000 feet of infiltration
area is required to determine the existing soils and Estimated Seasonal High Groundwater Table
(ESHGwT).The test pit shall be observed by a licensed soil evaluator. No testpit information has
been submitted for the proposed infiltration area.
Two test pits have been witnessed in the area of the proposed pond as shown on the revised
plan. The soil evaluation forms are included in the appendix of the updated Stormwater Report.
2. A minimum of a 2 foot separation is required between the ESHGwT and the bottom of the
infiltration system.This shall be verified using the test pit information from Comment#1.
The test pits confirm that the ESHGWT to be at elevation of 105, two feet below thebottom of
the proposed pond.
3. Per the North Andover Stormwater Management and Erosion Control Regulations,the 24-hr
rainfall intensity rates to be used for the 2, 10, 25, and 100 year storm events shall be as follows:
2-'yr, 24 hr event=3.2 inches
10-yr, 24 hr event=4.8 inches
25--yr,24 hr event 6.0 inches
100-yr,24 hr event=8.6 inches
The proposed HyrdoCAD drainage calculations shall be updated using these rainfall intensity rates
and the design adjusted accordingly.
The revised HydroCAD calculations have been prepared using the above rainfall intensity rates.,
i
i
{
I
1
4. Page 5 of the Stormwater Pond replacement Plan report identifies the following:
"Culvert flow calculations contained in the Closed Drainage Computation Worksheet in the
appendix were performed using the Rational Method."
There does not appear to be any culvert flow calculations included in the appendix.
The Closed Drainage Computation Worksheet has been included in the appendix of the revised
Stormwater Report.
5. The HydroCAD calculations do not appear to evaluate the proposed 24--inch HDPE inlet pipe that
connects the forebay area to the proposed Cultec chambers.This pipe needs to be evaluated in the
drainage calculations.
The proposed 24"HDPF pipe has been added to the HydroCAD model and is included in the
Closed Drainage Computation Worksheet. ,
I
6. Per the Massachusetts Stormwater Handbook,an evaluation of the draw downtime shall be
calculated to confirm the Cultec chambers empty fully within 72--hours of the end of a storm event.
I
The Applicants Engineer shall provide these calculations. f
The proposed pond drains in 67.5 hours has shown in the revised Stormwater Report. I,
7. The Operation and Maintenance plan shall be updated to include a restriction that no structures of
any kind including but not limited to trees and or plantings with a substantial root system other
than grass shall be allowed to be planted above the infiltration chamber area in perpetuity.
Furthermore,the Conservation Commission may want to consider including a similar restriction
within the order of Conditions for the lifetime of the property.
The operation and Maintenance Plan has been so revised.
8. According to the Outlet Control Structure detail,the top elevation of the weir is equal to 110.45
and the proposed rim of the manhole cover is equal to elevation 111.50. This leaves approximately
12 inches between the top of the weir and the top of the manhole cover.A manhole cover and
frame are typically 8 inches and a manhole concrete flat top is typically 6 inches thick totaling a
minimum of 14 inches being required:There does not appear to be sufficient depth from the top of
the weir to the rim ❑f the manhole cover.These dimensions and elevations shall be verified.
The Cutlet Control Structure has been revised to provide three feet from the top of the weir to the
rim of the structure.
Thank you for the opportunity to address these comments and please feel free to contact me if you have
any questions.
Sincerely
g ee
cc: Richard & Robin O'Neill
letter of Transmittal
NORSE ENVIRONMENTAL SERVICES, INC. Date: November 1, 2019
92 Middlesex Road—Suite 4
Tyngsboro, MA 01879
TEL: (978)649-9932
FAX: (978)649-7582
www.norseenvironmental@verizon.net
To: North Andover Planning Department From: Maureen Herald
Ms.Monica Gregoire Pages:
Re: 95 Lyons Way—No.Andover—DEP File No.242-1762 Date: November 1,2019
❑ Urgent For Review ❑ Please Comment O Please Reply ❑ Please Recycle
Please see the enclosed LEES letter, Stormwater Pond Replacement Plan & Drainage Improvement Plan
latest revision date 10-30-19.
Sincerely,
Maureen Herald, PWS
TOWN OF NORTH ANDOVER
DIVISION OF PUBLIC WORKS
384 OSGOOD STREET
NORTH ANDOVER,MASS ACHUSETTS 0 1845-2909
JIM STANFORD
DIRECTOR
John J. Borgesi PE Telephone (978) 68'5-0950
DII-ector ofEngineering Fax(978) 688-9573
November 20, 2019
Ms. Monica Gregoire Ms. Amy Maxner
Staff Planner/Conservation Agent
Town of North Andover
120 Main Street
North Andover, MA 0 1845
RE: 95 Lyons Street
Re iced Stormwater Pond Replacement Plan
Dear Monica/Amy
As requested, the Engineering Department has reviewed the comment response letter dated
October 30, 20191 that included a revised Stor,mwater Pond Replacement Plan, revised drainage
caiculations, and a revised drainage improvement site plan for the project located at 95 Lyons
Street as prepared by Land Engineering & Environmental Services, Inc. and submitted on behalf
of Richard & Robin Lynne O'Neill.
Based on my review all of my original comments from a letter dated August 17, 2019 have been
adequately addressed.
Given the nature of the project, I recommend that an engineer's certification letter and an as-built
plan that includes surveyed elevations of the infiltration chambers, stone bedding, stone cover,
outlet control structures, pipe inverts, etc. that is stamped and certified by a registered
professional engineer be conditioned as, a requirement of the permit approvals.
Please do not hesitate to call if you have any questions.
Sin
hn, J. Borgesi, P.E.
Town Engineer
Cc file