Ms. Jean Enright, Director
Planning Department
Town of North Andover
120 Main Street
North Andover, MA 01845
RE: Watershed Special Permit &
Site Plan Review Special Permit
Brooks School New Boathouse Building
1160 Great Pond Road
Dear Ms. Enright and Planning Board Members:
This letter is intended to satisfy Condition #37 of the Watershed Special Permit and Condition#38
of the Site Plan Review Permit for the Brooks School Campus Improvements project, specific to
the New Boathouse portion of the project. The Planning Board decisions were dated June 7, 2022.
Haley Ward, Inc. (formerly Whitman & Bingham Associates (HW)) was responsible for the
stormwater, sewer and water systems portion of the project design. Upon review of the New
Boathouse building project during construction and upon construction completion of these
components, we have found that these portions of the project substantially complied with the
approved project plans.
Additionally, HW has inspected the exterior stormwater system structures that were installed as
part of the Boathouse project. There were no illicit connections found in any of the project
stormwater structures.
If you should have any questions or require any additional information regarding this or any other
matter, please do not hesitate to contact me at this office.
Sincerely,
Anthony M. Cleaves, P.E.
X,
Senior Project Engineer
V
510 Mechanic Street, Leominster,MA 01453
...........................
T:978.53Z5296 I HALEYWARD.COM
mot
t A499ple 19",
hh,
A. T. Leonard & Associates
Landscape Ardfltedim, I Planning
September 13, 2023
Ms. Jean Enright, Director
Planning Department
Town of North Andover
120 Main Street
North Andover, MA. 01845
RE: Watershed Special Permit & Site Plan Review Special Permit
Brooks School New Boathouse Building
1160 Great Pond Road
Dear Ms. Enright and Planning Board Members,
The letter is intended to satisfy Condition #37 of the Watershed Special Permit and Condition
#38 of the Site Plan Review Special Permit for the Brooks School Campus Improvements
project, specific to the New Admissions Building portion of the project. The Planning Board
decisions were dated June 7, 2022.
A. T. Leonard &Associates was responsible for the building siting, site grading, site lighting,
walkways, and landscaping portions of the project design. Upon review of the New
Boathouse Building project during construction and upon completion of these project
components, we have found that these portions of the project substantially complied with the
approved project plans.
If you have any questions or require any additional information regarding this or any other
matter, please do not hesitate to contact me.
RNdrew
s,
LO/ard, RLA
Principal Landscape Architect
A. T. Leonard & Associates
1.
675 Jones Hill Road-Ashby,Massachusetts 01431 P:978.386.1212 www.atleonard.com
�� | � �J
�� � � �� | �
\�/ |
_ _ -
A R C U IT [ CTS
September l4' 2O23
Ms. Jean Enright
Planning Department
Town of North Andover
l2O Main Street
North Andover, M/\ 10845
Re: Watershed Special Permit &3i1e Mon Review Special Permit
Brooks School New Boathouse Building
1160 Gn*u| Pond KOOd' North Andover
Dear Ms. Enright and Planning Board Members,
This letter is intended to satisfy Condition #38 of the Site Plan Review Special Permit for the Brooks School
new Boathouse and Remote Toilet Facility projects.The Planning Board decisions were dated, June 7,2022.
OLSON LEWIS +Architects (OL+A) was responsible for the building portion of the project design and were
present at various stages during the construction process. We have determined that the work was
performed in a manner consistent with the construction documents and complies substantially with the
approved project plans.
P.S.
Please also refer to the letters submitted by Andrew Leonard of A.T. Leonard &Associates for landscape,
lighting, and site layout (dated Sept. 13th,2023) and Anthony Cleaves of Haley and Ward for Civil responses
(dated Sept. |2m2023) io Conditions #37. #38& #39.
.60
MANCHESTE
MA
OF tA
Sincerely,
Christopher T. OoWorA|A' LEED AP
OLSON LEWIS + Architects
ord'i|�c|oro u|onvk`Q in|o,iuo
|7Bm Street Manchester, MAO|944
i
Final Construction Control Document
w To be submitted at completion of construction by a
a ' F Registered Design Professional
fy
for work per the ninth edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: BROOKS SCHOOL BOATHOUSE Date:AUG 28,2023 Permit No.69783 )
,l
Property Address: 1160 GREAT POND ROAD, NORTH ANDOVER, MA 01845
r
Project: Check (x) one or both as applicable: X New construction Existing Construction
Project description:The project includes construction of a new, freestanding,2-story building.The lower level
will provide boat storage, and the upper level will provide program,exercise, and training space
I Christopher T Doktor,MA Registration Number: 7349 Expiration date: 8/31/2024 , am a registered design
professional, and I have prepared or directly supervised the preparation of all design plans,computations and
specifications concerning:
X Architectural Structural Mechanical
Fire Protection Electrical Other:Describe
for the above named project. I, or my designee, have performed the necessary professional services and was
present at the construction site on a regular and periodic basis. To the best of my knowledge,information, and
belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved
as part of the building permit and that I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other
submittals by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with
the progress and quality of the work and to determine if the work was performed in a manner consistent
with the construction'documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
Enter in the space to the right a"wet"or RvI.D Af C(, I
electronic signature and seal: QryC� 0,
No.7349 o
�H
�y
Phone number: 978-704-6255 Email:doktor«olsonlewis.com F,�( Of 6gPG
Building Official Use Oily
Building Official Name: Perinit No.: Date:
I
I
4
version ol_01 2018 j
�r
Final Construction Control Document
To be submitted at completion of construction by a
a a Registered Design Professional
for work per the 9°t edition of the
Massachusetts State Building Code, 780 CMR, Section 107.6.4
Project Title: Brooks School Boathouse Date: 69783' Perrmit No.July 11, 2023
Property Address: 1160 Great Pond Road, North Andover, MA 01845
Project: Check one or both as applicable: N New construction ❑ Existing Construction
Project description: New,freestanding 2-story building for boat storage and associated program space.
I Christopher P. Milano MA Registration Number: 33917 Expiration date:June 30,2024 'am a
registered design professional, and hereby certify that I have prepared or directly supervised the preparation of all design
plans,computations and specifications concerning:
[ ] Entire Project [ ] Architectural [X] Structural [ ] Mechanical
[ ] Fire Protection [ ] Electrical [ ] Other:
for the above named project. I certify that 1, or my designee,have performed the necessary professional services and was
present at the construction site on a regular and periodic basis to determine that the work proceeded in accordance with
the requirements of 780 CMR and the design documents prepared by me and approved as part of the building permit and
that I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
Enter in the space to the right a"wet"or
electronic signature and seal: °s
c �
RISTOPNER
P.MILAN0
u STRUCTURAL y
q No.339V q
9o�FS310NAL
Phone number: 781-670-9990 Email: epmf- m-se.com
Building Official Use Only
Building Official Name: Permit No.: Date:
Trial Version 10 09 2012