HomeMy WebLinkAbout2022-06-07 Monitoring Reports Boathouse & Faculty Housing HALEY WARD. RIGiNcP4iNG IE1i'IEOnivtENTaL I SURVEYNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 7/8/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary EndinjZ July 5, 2024 Site Work ® none Upcoming Site Work ® Remove erosion control upon site stabilization and Town approval Notable Rain Events ® none Action Items ® Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pendingfinal review of Conservation. ® Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster; MA 01453 T:978.537.5296 1 HALEYWARD.COM ii x a � � I Boathouse area Lyman restoration area ME 31, w, I k - E n 4 ;A 4 �'�� mac. � Y 5 vh..�Y' ^e✓ ,. P5 Boathouse area Boathouse staging area F77— — -- -� — ra ter, F K Boathouse lake edge Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 7-5-2024 Page-2- �ro j 1 ^ 1 Faculty Housing area Faculty Housing area im E Faculty Housing stockpile area Faculty Housing area Vl rt f q � x-il .......... YbS' Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 7-5-2024 Page-3- Faculty Housing area 3 IN Faculty Housing-Nam i Faculty Housing swale Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 7-5-2024 Page-4- HALEY WARD. EN(n NEERiNG I ENVIRONMENTAL I SURVEYNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 6/24/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary EndinjZ June 21, 2024 Site Work • Cleanup/touch up Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145? T:978.537.5296 1 HALEYwARD,COM -'•4-:> 4 � Boathouse area Lyman restoration area r i Boathouse area Boathouse staging area � Y��_ai_ 3'�z'n�•� "r.F- �`tis x. �� �. �;-z, �x— b_ c�� .'£"'."Y�` ? .sy>Boathouse lake edge Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-21-2024 Page-2- 11 I a 4 Y Faculty Housing area Faculty Housing area F y .5 xt.p LAIIIM y k i Faculty Housing stockpile area Faculty Housing area x. f r Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward,Inc. Brooks School Boathouse& Faculty Housing Weekly Summary 6-21-2024 Page-3- t v. Faculty Housing area 9 a Faculty Housing-Nam r d. Faculty Housing swale Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-21-2024 Page-4- HALEY WARD.. ENGINFERING E\ti9f.Ofdn4ENiAL 15UP.VEYiNt_ Town of North Andover PlanninjZ and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 6/17/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending June 14, 2024 Site Work ® Cleanup/touch up Upcoming Site Work ® Remove erosion control upon site stabilization and Town approval Notable Rain Events ® none Action Items ® Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. ® Monitor erosion controls during construction weekly and after rain events. 4^46- 510 Mechanic Street, Leominster, MA 0145C T: 978.537.5296 1 HALEYIldARD.COM +'hr i �a �r Boathouse area Lyman restoration area v: a r T' ro r, f' a � a Boathouse area Boathouse staging area vr� .-.„ �� � {E��.g�dCSx���r✓E`>a. '"K y�'G+,�MYyx� Boathouse lake edge Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-I4-2024 Page-2- I ' r Faculty Housing area Faculty Housing area x�t Faculty Housing stockpile area Faculty Housing area J Faculty Housing stockpile area Forrner 1116 GPR driveway Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-14-2024 Page-3- , ƒ ram, Faculty Housing area ( ° � . . .. Faculty Housing-Nam Faculty Housing sw a Haley Ward,Inc. Brooks School Boathouse& Faculty Housing Weekly Summary w120¥ Page-¥- V/ HALEY WARD. E14.3iN-SING I ENVIRONMENTAL I SURVEYiNC, Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 6/10/2024 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending June 7, 2024 Site Work ® Cleanup/touch up Upcoming;Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events ® none Action Items ® Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. ® Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leomirnster, MA 01452 401** T:978.537.5296 1 HALEYWARD,C©M Fray III I) � t' L• e Boathouse area Lyman restoration area r� r � 1 x c-^ 1' - ,;`'i Y+� ✓ , r £ v '>x— �F 'iY a x x ? Boathouse area Boathouse staging area a i f "NAM, � h gM- ti���7 •ate��v2�..+ri- � 3. � ti f - �T . 't Boathouse take edge Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-7-2024 Page-2- Y a5 �, �'� �� �• g xis � � '+����.> �� x3 � �'�'*��`t Yt n�'' F y 4°v ..-_, .si'_ '�s, "�., .: ,�,�„».rig• �:<�a,.a.. Faculty Housing area Faculty Housing area H - t Faculty Housing stockpile area Faculty Housing area r v R F Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-7-2024 Page-3- Y Faculty Housing area Offl@',"r- Pik,; Faculty Housing-Nam K Faculty Housing swale Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-7-2024 Page-4- V HALEY WARD. ENG1ticEkiNG I E14VIRONh4EP:WL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 6/3/2024 Distribution: Jean Enright,Amy Maxner,Paul Griffin,Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending May 31, 2024 Site Work • Cleanup/touch up Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events 5/30/2024— 1.25" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145? T:978.537.5296 1 HALEYWARD,COM "Z:„ �1' I Boathouse area Lyman restoration area max : N7 4 f�� I Boathouse area Boathouse staging area .ra F� Boathouse lake edge Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 5-31-2024 Page-2- v m Ny 71 a � y r fl '� Faculty Housing area Faculty Housing area LIM ., Oil sari r�"p.°`,� Faculty Housing stockpile area Faculty Housing area -- — — — — f. G�`I�I �} •r's s' ' 'aG r I'S ' „ a "�'..-U`„-''k s•: „�'' ,�=s�.,�'i' "'Y�� ,,,fit%.v..,: Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 5-31-2024 Page-3- R+ - A n v x y a x Faculty Housing area ,u Faculty Housing-Nam r Faculty Housing swale with blanket Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 5-31-2024 Page-4- V/ HALEY WARD. ENGNFE.4ING I ENVIRONMENTAL I SUPVEY3NG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 5/27/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox;Lucy Frye Weekly Summary Ending May 24, 2024 Site Work • Cleanup/touch up, hydroseed Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 7:978.537.5296 1 HALEYWARD,COM, F �z - r r x. Boathouse area Lyman restoration area � Y _ � q I Boathouse area Boathouse staging area t; Boathouse lake edge Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 5-24-2024 Page-2- FIR r r »� , ea•�, i �,. 24, Fr'�r QF7hat •�krm, t-`d� `T' a Faculty Housing area Faculty Housing area r � Faculty Housing stockpile area Faculty Housing area — — — M VA. L' �;, sYywSaji " c; j $ 3is s ��h.`"' p��s L��°t,�"•�'' ? Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 5-24-2024 Page-3- Faculty Housing area 2 ' h a K F 5�y7^ / 6MC 3 �9 Faculty Housing-Nam r� s: Faculty Housing swale with blanket Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 5-24-2024 Page-4- .J "KM HALEY WARD. ENv;NEER NG(ENIVIFONMENi4l I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 5/20/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary EndinI4 May 17, 2024 Site Work • Cleanup/touch up Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 T:978.537.5296 1 HALEYWARD.COM �� rh .t� e v,E Ai Boathouse area Lyman restoration area :gym Boathouse area Boathouse staging area m t e Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 5-17-2024 Page -2 - I s �Y s"G_w-.zn.C�fs Faculty Housing area Faculty Housing area - a 5 t Faculty Housing stockpile area Faculty Housing area lia � m Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 547--2024 Page-3- vi n I., w 3- Faculty Housing area �I ,� Faculty Housing-Nain Ae E i Faculty Housing swale with blanket Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 5-17-2024 Page -4- V HALEY WARD. ENGhdE.RJNG I ENVIRONN%ENPAL(SU VEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 5/13/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending May 10, 2024 Site Work • none Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • 5/8/2024—0.49" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 40%00- T:978.537.5296 1 HALRY>1+ARD.COM -•-:.,"`a�„��`-'`S.�l�.x...-�� `S' �' � °yam "P d i� I , k n �Fa E`er:-.--`:..�.ri_..-..T..--- �-.-e�_m-.x,:,...s�a:,.y'�_.__=a.,�• `' ..w., .. Boathouse area Lyman restoration area y m p � Boathouse area Boathouse staging area s S fir 'l .. �,., '; s.. e_'• �L Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 5-10-2024 Page -2 - Faculty Housing area Faculty Housing area F 1� ,Y f Faculty Housing stockpile area Faculty Housing area Xil Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 540-2024 Page -3- 1� F— - ffi a:. Faculty Housing area Faculty Housing-Nam FJ v � Faculty Housing swale with blanket Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 5-10-2024 Page -4- HALEY WARD. ENGiNcF4iNG�8PW9R0NtviENT,4l�Sl!AVEYiNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 5/6/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending May 3,2024 Site Work • General surface restoration, sod, loam and seed Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145U T:978.537.5296 1 HALEYWARa.C4M, y a � f, y Boathouse area Lyman restoration area Boathouse area Boathouse staging area NOW ii: w Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 5-3-2024 Page -2 - :E y Faculty Housing area Faculty Housing area 14 J 3ie srx r SS Faculty Housing stockpile area Faculty Housing area a Faculty Housing stockpile area Former 1116 GPR driveway Haley`yard, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 5-3-2024 Page -3- ,I ,r W Faculty Housing area 1 Faculty Housing-Nam I Faculty Housing swale with blanket Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 5-3-2024 Page -4- HALEY WARD. ENC9N`EER NC I ENVIRONMENTAL I SURVEY3NC Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 4/29/2024 Distribution: Jean Enright,Amy Maxner,Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending April 26, 2024 Site Work • General surface restoration, sod, loam and seed Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • 4/20/24—0.33" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechc7nic Street, Leominster, MA 0145? 40*%001 T:978.537.5296 1 HALEYWARD.COM .a r— , c Boathouse area Lyman restoration area �ive mow 35 tY n� Boathouse area Boathouse staging area s 5. .yy 4'� ._ • h� .r ti ea.d•dLi � r - a`�.�.I�--•+•ik>� Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 4-26-2024 Page -2 - 40*461. ' IN x u ry Aga i:4 Y'.r s a Faculty Housing area Faculty Housing area 4 E t � -- n� E= r ' `• -_ _> v' -x ��Y en.�a....,r pev ?t k Faculty Housing stockpile area Faculty Housing area r"s F ric `rua E z z^ vx Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 4-26-2024 Page -3 - f I � Y Faculty Housing area � s ; Faculty Housing-Nam d i'r &r•,�* —"'3�r'4. i�T, Ls 'fit ' I Faculty Housing swale with blanket Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 4-26-2024 Page -4- HALEY WARR. ENGINEERING(ElYIRONntEN iAL I SIIPVEYNG Town of North Andover Planninjz and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 4/22/2024 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending April 19, 2024 Site Work • General surface restoration, loam and seed Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 T:978.537.5296 1 HALEYWARD.COM 4. si Boathouse area Lyman restoration area (,• W3 i Boathouse area Boathouse staging area I � r �2 Ws� w h M Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 4-19-2024 Page -2 - t' V "All Faculty Housing area Faculty Housing area i Faculty Housing stockpile area Faculty Housing area n ' 1 1 t Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 4-19-2024 Page -3 - 411 1, t. Faculty Housing area Faculty Housing-Nam 1 B ~ h�Ymr:. s Faculty Housing swale with blanket Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 4-19-2024 Page -4- HALEY WARD. ENG11HR;NG I F-POWR,O^!MENi4L 15UFVEYtN,3 Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 4/15/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin,Liz Martin, Andrew Leonard,Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending April 12, 2024 Site Work • Loam and seed existing Faculty Housing driveway edges Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • 4/12/2024—0.66" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145? T: 978.537.5296 I HALEYWA.RD.COM, Ahh.- 1 � xi - i 0*4 Boathouse area Lyman restoration area - - Y Boathouse area Boathouse staging area 00 1 F,cti' Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 4-12-2024 Page -2 - - c ,ry Faculty Housing area Faculty Housing area jis r _ Faculty Housing stockpile area Faculty Housing area o> I Y !y �. L. Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 4-I2-2024 Page -3- Faculty Housing area Faculty Housing-Nam Faculty Housing swale with blanket Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 4-12-2024 Page -4- V HALEY WARD. ENGiN`cRING I ENVIRONMENTAL I SURVEYiftG- Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 4/8/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending April 5, 2024 Site Work ® none Upcoming Site Work ® Remove erosion control upon site stabilization and Town approval Notable Rain Events ® 4/3/2024—0.77" ® 4/4/2024— 1.01" Action Items ® Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. ® Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145? 40^%0001 T: 978.5375296 1 HALEYlNARD.COM &fth' IV 1. it I k t P r' f - _/ l Boathouse area Lyman restoration area ` — b _4 a Boathouse area Boathouse staging area C µi e Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 4-5-2024 Page -2 - IAI Faculty Housing area Faculty Housing area e, " Faculty Housing stockpile area Faculty Housing area jV ' _ - Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 4-5-2024 Page -3 - Faculty Housing area Faculty Housing-Nam l �IN IN � kc �•�� �� �'y`"'_< to I _ � tll ri W" K Faculty Housing swale with blanket Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 4-5-2024 Page -4- V F HALEY WARD. ENGiNEER7NG[ENYLRONNtENv?L I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 3/25/2024 Distribution: Jean Enright,Amy Maxner, Paul Griffin,Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending March 22, 2024 Site Work ® none Upcoming Site Work ® Remove erosion control upon site stabilization and Town approval Notable Rain Events • none Action Items ® Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pendingfinal review of Conservation. ® Monitor erosion controls during construction weekly and after rain events. 510 Mechanic street, Leominster MA 01453 T:978.537.5296 1 HALEYINARD.COM n9e P f oPl _- R• Boathouse area Lyman restoration area 1' r� Boathouse area Boathouse staging area _ c 4 Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 3-22-2024 Page -2 - 1 r � r Faculty Housing area Faculty Housing area Faculty Housing stockpile area Faculty Housing area 3 Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 3-22-2024 Page -3 - p terr- i pi o Faculty Housing area r> Faculty Housing-Nam Faculty Housing swale with blanket Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 3-22-2024 Page -4- V HALEY WARD. L1JGiNERNG(ENNIR iNMENr4L(SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 4/l/2024 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary EndinIZ March 29, 2024 Site Work ® none Upcoming Site Work ® Remove erosion control upon site stabilization and Town approval Notable Rain Events ® 3/28/2024— 1.39" Action Items ® Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pendingfinal review of Conservation. ® Monitor erosion controls during construction weeldy and after rain events. 510 Mechanic Street, Leominster, MA 01453 T:978.537.5296 1 HALEYWARD.Ct3M ' i I Boathouse area Lyman restoration area w<. I - VI 14Y�j , I I u Boathouse area Boathouse staging area 1 � --gym•.. . F a n � 1 Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 3-29-2024 Page -2 - Faculty Housing area Faculty Housing area msR. Faculty Housing stockpile area Faculty Housing area an Ilia I Faculty Housing stockpile area Former 1116 GPR dh-iveway Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 3-29-2024 Page -3 - + ' � � § | | � ^ \�y � ■ ate;�\ . Faculty Housing are J . , . . , . . � Faculty Housing-Nam Faculty Housing sw a with blanket Hale Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 322024 Page -4- V HALEY WARD. ENGiN-IER tdG.I ENVIRONMENTAL r SURVEYNIG Town of North Andover.Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 3/18/2024 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending March 15, 2024 Site Work • none Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • 3/10/2024—0.93" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster; MA 01453 T:978.537.5296 1 HALEYl+ ARa.COA& 9 �as'K �ASj y'' Y r s � µ' 2 PW f _ 77, Boathouse area Lyman restoration area r y4 . Boathouse area Boathouse staging area 4 y 1 •pl p'in C I T � Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 3-I5-2024 Page -2 - � 2 � �", � b"r �'�� mot.— ��a � •,� r*'' T I� ®®- — 4w,41?19 Faculty Housing area Faculty Housing area i P� s 4 Faculty Housing stockpile area Faculty Housing area f J n � r e°S �� �r�.try 4£C: '�" Ira�� �.^ �*k- ,�,4.i,� � ,�r`stk ,•,+.`�.€"� i���'4� � +�* ;�C-�kG'" -���c1�• s "'a � �'��'-' ��-n.k:` �, ,�`��a`rS'"�.y_x�` � r ::. .�t°.2�ct a- s .>• � q9"�"' �u' '� a .�i Res �m q'f�`.r�; h� "'�..'��'i �P � "E,�`G3' ,.�� < .�,,� • e•� d� t.R �k F:3 x I' °�s rr i.w r"-, " - ' }w. 'tw`4u' Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 3-I5-2024 Page -3 - Faculty Housing area 4 EY `vslil "r� ax Faculty Housing-Nam P f .K Faculty Housing swale with blanket Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 3-15-2024 Page -4- HALEY WARD. ENGii HRING I ENVIFONNAENTAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 3/11/2024 Distribution: Jean Enright,Amy Maxner, Paul Griffin,Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary EndinI4 March 8, 2024 Site Work • none Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • 3/6/2024—0.32 Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pendingfinal review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 T:978.537.5296 1 HALEYWARD.CC)M i F Boathouse area Lyman restoration area WoO Rv ` B�4 Boathouse area Boathouse staging area a Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 3-8-2024 Page -2 - t_ Faculty Housing area Faculty Housing area �r Faculty Housing stockpile area Faculty Housing area I 1 E., r Faculty Housing stockpile area Fortner 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 3-8-2024 Page -3 - � 401 yl a�. Faculty Housing area a � rt Faculty Housing-Nam S pp Faculty Housing swale with blanket Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 3-8-2024 Page -4- v HALEY WARD, ENGi,,,eEs;NG I E111L111MENiAL I SURVEYING Town of forth Andover Planning and Conservation Commission Deport Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 3/4/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending March 1, 2024 Site Work ® none Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events ® none Action Items ® Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pendingfinal review of Conservation. ® Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01451-- 7: 978.537.5296 1 HALEYA'ARD,COhA i o : K Boathouse area Lyman restoration area Igg M��'.g",,.f�� x� - mar ..zt. •a y—Tysss 4 e. 4i= Boathouse area Boathouse staging area ,ate 5� e��r E Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 34-2024 Page -2 - Faculty Housing area Faculty Housing area z -� r Faculty Housing stockpile area Faculty Housing area s% 'ram v M, P j 1 ® ® �y f Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 3-1-2024 Page -3 - . ^(y`? "Ali Faculty Housing area � �'✓ any,,in j 5.,. a,��. .y� k� RK R�� `°•?5.�"rv"'r"` „v�se�#�yy ICY "yt�� >Y�y$EY�!�t�'.., . ,� +—s-t• ''"Via. 4 z � �' "+' — }n Faculty Housing-Nam Faculty Housing Swale with blanket Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 3-1-2024 Page -4- v HALEY WARD. ENGNIHRcdNG I ENVIROMAENT41 I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 2/26/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard,Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending February 23, 2024 Site Work • none Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 40%111 T:978.537.5296 1 HALEYW.aIMCOM .iM Boathouse area Lyman restoration area t k A. Boathouse area Boathouse staging area W:: t _ ao< Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 2-23-2024 Page -2 - w u�, 1 Faculty Housing area Faculty Housing area z , v • d Faculty Housing stockpile area Faculty Housing area i Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 2-23-2024 Page -3- = . � Faculty Housing are a « w < s>m v2«aw« s Faculty Housing-Nam , zaw Faculty Housing s a with yank! Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 22gU4 Page -4- V HALEY WARD. E'N - ER3NG'I E4YIRQN754ENTAL I SUPVEYiNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 2/17/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending February 16,2024 Site Work ® Complete Nam house inside sewer drop Upcoming Site Work ® Remove erosion control upon site stabilization and Town approval Notable Rain Events ® none Action Items ® Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pendingfinal review of Conservation. ® Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145? T: 978.537.5296 1 HA.LEYWARD.COM t I 6 ` k _ 3i•N� { ION <�.'`,�tY Boathouse area Lyman restoration area � t f�'• �' a 9 s e-- .• r 0 ' .. �,...... d'^-• 3t+c:..._�'>..,�.,"iei 3.x C.3�?�Zt..,,...s..`...`��.c._.. .e.�...�J.. ...,..,.� Boathouse area Boathouse staging area r. s Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 2-I6-2024 Page -2 - x„v F ,F t� a v r�"a �t Faculty Housing area Faculty Housing area Faculty Housing stockpile area Faculty Housing area 3 — —.�•yC44._ _ py Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 2-16-2024 Page -3- ;_ . Faculty Housing area } C r i 2 Faculty Housing-Nam f f v x sli fq r � e F Faculty Housing swale with blanket Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 2-16-2024 Page - 4- . V Wit% �.•^ HALEY WARD. ENGNEE.Irll I ENVIRON^AENi4L I SUPVEYiNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 2/12/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending February 9, 2024 Site Work ® Faculty Housing erosion control maintenance Upcoming Site Work ® Remove erosion control upon site stabilization and Town approval Notable Rain Events ® none' Action Items ® Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. ® Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01452 400%00. T:978.537.5296 1 HALEYWARD.COM - �`'::#: d-lytw '`- �• a� r LFr'F Boathouse area Lyman restoration area Boathouse area Boathouse staging area �t t Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 2-9-2024 Page -2 - a r c, z h 1 Faculty Housing area Faculty Housing area Faculty Housing stockpile area Faculty Housing area aIjI11, 1 _ 4� Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 2-9-2024 Page -3 - Faculty Housing area 1 %I � '� f,E C..• 1 '2 ST Faculty Housing-Nam C — lug a 4>. Faculty Housing Swale with blanket Haley Ward, Inc. Brooks,School Boathouse & Faculty Housing Weekly ,Summary 2-9-2024 Page -4- J HALE'Y WARD ENGtr4EERING I ENV"E.OWNtENiAL I SURVEYING Town of North Andover PlanninI4 and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 2/5/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin,Liz Martin, Andrew Leonard,Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending February 2, 2024 Site Work ® none Upcoming Site Work ® Remove erosion control upon site stabilization and Town approval Notable Rain Events ® 1/28/2024—0.45" Action Items ® Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. ® Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145C- T:978.537.5296 1 HALEYWARD.COM z , IR'r, F 4�1 Boathouse area Lyman restoration area Nr9 FM hat '^ 4 Boathouse area Boathouse staging area F ,.; r } c tyf Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 2-2-2024 Page -2 - P r ■ f� ■ MENEM Faculty Housing area Faculty Housing area >r F e ; w i R' I I _ II Ilj I Az I Faculty Housing stockpile area Faculty Housing area rA t .•� _ 65 t f. Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 2-2-2024 Page -3- a , Faculty Housing area , t Faculty Housing-Nam ®� e I Faculty Housing swale with blanket Haley Ward, Inc. Brooks,School Boathouse & Faculty Housing Weekly Summary 2-2-2024 Page -4- J HALEY WARD. ENGNEER3NG�ENVItGNhdENTAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 1/29/2024 Distribution: Jean Enright,Amy Maxner,Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary EndinIZ January 26, 2024 Site Work ® none Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • 1/24/2024—0.42" ® 1/26/2024—0.67" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01452 T:978.537.5296 1 HALEYWARD.COM Boathouse area Lyman restoration area c Boathouse area Boathouse staging area 5 r � Boathouse lake edge Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 1-26-2024 Page -2 - t, II Iq 1 Faculty Housing area Faculty Housing area h Faculty Housing stockpile area Faculty Housing area fY Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 1-26-2024 Page -3 - Faculty Housing area i Faculty Housing-Nam 8 � _ t Faculty Housing swale with blanket Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary I-26-2024 Page -4- HALEY WARD. ENOI,NHRING I E1111RONh1ENWL I SURVEYING- Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 1/22/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending January 19, 2024 Site Work • none Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • 1/13/2024— 1.11" • 1/16/2024—0.28" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster MA 0145? 4e*40110- T: 978.537.5296 1 HALEYWARD.COM a It I' ,m Boathouse area Boathouse lake edge I !"t - i Boathouse area Lyman restoration area i ,J+ P 1 a "e Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 1-19-2024 Page -2 - 1. . b , i JI YI 41 gj t' Faculty Housing area Faculty Housing area i r Faculty Housing stockpile area Faculty Housing area i h � �• spa:, � Faculty Housing stockpile area Former 1116 GPR driveway Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 1-19-2024 Page -3- � t aF NO- Faculty Housing area Boat launch area � II Faculty Housing-Nam a ° Faculty Housing swale with blanket Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 1-19-2024 Page -4- J HALEY WARD. ENUiNEEF.:NG I ENvRt NMv-NIAL I SURVE iNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 1/15/2024 Distribution: Jean Enright,Amy Maxner, Paul Griffin,Liz Martin, Andrew Leonard,Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary EndinI4 January 12,2024 Site Work • none Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • 1/7/2024—0.53" • 1/9/2024—0.72" • 1/10/2024— 1.72" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pendingfinal review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster MA 0145? T:978.537.5296 1 HALEYWARD.COM Boathouse area Boathouse lake edge pop Yal _ y Y Y � , - y� Boathouse area Lyman restoration area r a r� i .. I Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 1-12-2024 Page -2- mow,. -, u0N1 1 I IAIFt Y' F—I. IN lutttflg D 96t ', , Boathouse building Faculty Housing stockpile area IN i m � u Faculty Housing area Faculty Housing area F ..4�1�a'� Wq' �te•�� r �'� Faculty Housing stockpile area Faculty Housing area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 1-12-2024 Page -3- IMEMEMMIMI, ME, Former 1116 GPR driveway Faculty Housing swale with blanket Faculty Housing area Boat launch area Faculty Housing-Nam Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary I-12-2024 Page -4- .. V HALEY WARD. ENGINEEFING I ENVIROMMENILAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 1/9/2024 Distribution: Jean Enright,Amy Maxner, Paul Griffin,Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox,Lucy Frye Weekly Summary Ending January 5, 2024 Site Work ® Faculty Housing Erosion control updates ® Boathouse tree protection from beaver activity Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events ® none Action Items ® Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. ® Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster,MA 01453 T:978.537.5296 1 HALEYINARD.C+: M ar 1 i z 1{ y , rr � P � 3 . ... ......... } <a Ile At n q.� i 11 1I i1/ I i I I 9P- � ..am 40*4 .mow' Boathouse building Faculty Housing stockpile area Ph f Faculty Housing area Faculty Housing area s j Faculty Housing stockpile area Faculty Housing area Haley Ward, Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 1-5-2024 Page -3'- a 1 61 ,t Former 11 16 GPR driveway Faculty Housing-Nam gill Faculty Housing area Faculty Housing Swale with blanket 1. { Boathouse tree protection from beaver activity Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 1-5-2024 Page -4- V/ HALEY WORD. Ct•i_N`ec4:a�s %aEl•:-al I SUPVEflNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 1/2/2024 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard,Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending December 29, 2023 Site Work • none Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • 12/28/2023—0.80" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145 T:978.537.5296 1 HALEYWARD.0 O lM Boathouse area Boathouse lake edge -011 Boathouse area Lyman restoration area S 1 ar a= a t ti w k 1 ' Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 12-29-2023 Page-2- Boathouse building Faculty Housing stockpile area N r Faculty Housing area Faculty Housing area t m Faculty Housing area Faculty Housing stockpile area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 12-29-2023 Page -3- r Former 1116 GPR driveway Faculty Housing-Nam m ,. f I �N u Faculty Housing area Faculty Housing Swale with blanket � v tom ' +� t �J•" n "I d r • y ' f i Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary I2-29-2023 Page -4- HALEY WARD: ENGINEERING I ENVIR6N^AENTAL I SURVEYNG Town of North Andover PlanninI4 and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 12/22/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin,Liz Martin,Andrew Leonard,Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending December 22, 2023 Site Work • Repair disturbed loam areas-Faculty Housing • Reapply hydroseed-Faculty Housing • Install erosion control blankets -Faculty Housing • Install additional sod—Faculty Housing • Install additional silt socks—Faculty Housing Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • 12/17/2023—0.46" • 12/18/2023—0.47" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster,MA 01453 40*%11- i T:978.537.5296 1 HALEYWARD.COM �— -— Boathouse area Boathouse lake edge k. u. I 5 6 1 4 i it �. r w Boathouse area Lyman restoration area s� � FAX Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 12-22-2023 Page-2- RI!' Y y a Boathouse building Faculty Housing stockpile area X-T r N Faculty Housing area Faculty Housing area 777777 Y M1 Faculty Housing stockpile area Faculty Housing area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 12-22-2023 Page -3- Former 1116 GPR driveway Faculty Housing-Nam Aeel srP: Faculty Housing area Faculty Housing Swale with blanket z` .a�f E of Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 12-22-2023 Page-4- V HALEY WARD. EN GfN"FRIiJG I ENVIRONMENTAL I SUP.VEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 12/18/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo,Kevin Hunt,Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending December 15,2023 Site Work • none Upcoming Site Work • Remove erosion control upon site stabilization and Town approval Notable Rain Events • 12/10/2023—0.94" • 12/11/2023— 1.51" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pendingfinal review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 4e%001 T:978.537.5296 1 HALEYWARD.COM r s. Boathouse area Boathouse lake edge e± re, OEM � f � _ •;z ,41.s cry��.rra`3 � ,t .� f � � Boathouse area Lyman restoration area Y { x r ^ i - s. Me ./ _ e• 1 ^'N Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 12-15-2023 Page-2 - Boathouse building Faculty Housing stockpile area wmoam a R Faculty Housing area Faculty Housing area Faculty Housing stockpile area Faculty Housing area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 12-15-2023 Page -3- i r Former 1116 GPR driveway Faculty Housing-Nam Y kF-s 3 y m l:' Y Faculty Housing area Faculty Housing swale with blanket `,�`l�"��± a ,��—�—� — +� �'? "A •a�°� 1 (i s r: Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 12-15-2023 Page -4- L/ HALEY WARD, r3 I e"\VI^ONPtEN nl I SIi-VEY#NG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 12/11/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending December 8, 2023 Site Work ® Faculty Housing light poles completed ® Faculty Housing reinforced turf completed ® Touch up hydroseeding Upcoming Site Work ® Remove erosion control upon site stabilization and Town approval Notable Rain Events ® 12/3/2023—0.81" Action Items ® Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. ® Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01452 T:978.537.5296 I HALEYd' ARD,CO r Boathouse area Boathouse lake edge G � !V �.'•{ uS '. � 1�a'4 quo'.. � Boathouse area Lyman restoration area � � s Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 12-8-2023 Page-2- Boathouse building Faculty Housing stockpile area � z Faculty Housing area Faculty Housing area 777 fc - 4* f4 fib` d Faculty Housing stockpile area Faculty Housing area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 12-8-2023 Page -3- mac, �. r , MA Y c Former 1116 GPR driveway Faculty Housing-Nam r f ! tEXy..s�w�eb6. Faculty Housing area Faculty Housing swale with blanket r ✓ Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 12-8-2023 Page-4- HALEY WARD. ENGiNE6:IN:� ENVI.RUNMENTAL SUk�lEY1N:� Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by.Anthony Cleaves Issue Date: 12/4/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, .Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending December 1, 2023 Site Work • Faculty Housing light pole bases • Faculty Housing reinforced turf Upcoming Site Work • Faculty Housing reinforced turf Notable Rain Events • 11/27/2023—0.43" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pendingfinal review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster MA 0145? T:978.537.5296 1 HALEYWARD.COM bb Agb Boathouse area Boathouse lake edge z fl M ° *mot y. '• E�'' �4 R1 F Boathouse area Lyman restoration area �. 1 - r q t c., f �4 Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 12-1-2023 Page -2- �4. Boathouse building Faculty Housing stockpile area i P a � Faculty Housing area Faculty Housing area _4 j OEM a Y.y t w bro k, Faculty Housing stockpile area Faculty Housing area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 12-1-2023 Page -3- a 14 Om Former 1116 GPR driveway Faculty Housing-Nam kTb" a� t` .t,. Faculty Housing area Faculty Housing swale with blanket y.. gait Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 12-1-2023 Page-4- HALEY WARD. ENGiNMRING I EN:'JI.4GNPA1 NTAL I SLIPVEYiNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 11/27/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo,Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending November 24, 2023 Site Work • none Upcoming Site Work • Faculty Housing reinforced turf • Faculty Housing light poles Notable Rain Events • 11/22/2023— 1.70" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending f nal review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 40*%. T:978.537.5296 1 HALEYWARD.COM .y Boathouse area Boathouse lake edge OWN Ito" 4 J' hd h 3y '� Boathouse area Lyman restoration area l ti7 Vi a ti ti Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-24-2023 Page-2 - Ali Boathouse building Faculty Housing stockpile area i Faculty Housing area Faculty Housing area _ 5, + 1.: Faculty Housing stockpile area Faculty Housing area Haley Ward, Inc. Brooks School Boathouse& Faculty Housing Weekly Summary 11-24-2023 Page -3- , 4 ma. Former 1116 GPR driveway Faculty Housing-Nam AR f r E ® 1= €e en e Faculty Housing area Faculty Housing swale with blanket 3' Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 11-24-2023 Page -4- HALEY WARD.. ENuiNEE.R7113 I F,11R.NMENTAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 11/20/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary EndinjZ November 17, 2023 Site Work • Faculty Housing spread loam&seed • Faculty Housing tree planting • Faculty Housing paving • Faculty Housing walkways Upcoming Site Work • Faculty Housing reinforced turf • Faculty Housing light poles Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic:.street, Leominster. MA 014540P%Ool ? T:978.53Z5296 ( HALEYb ARD.CCM K 2" b �,„, B.:.ii���1ei�" h �' '�f- ^+�l.4h•G. �t °d .�y� F ��1 E✓u�U'��i'� f v�'r--Se - 45tM .'ti� M Boathouse area Boathouse lake edge y si i r' G _ c , Boathouse area Lyman restoration area a r'F •� a k t�c1� '-1e •. �.t�,< 'i�" F„�laA3 � Jr L'q: lsl� -F• il- H 3 ' t Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 11-17-2023 Page-2- low Irfl�l Boathouse building Faculty Housing stockpile area J a a ��I ai9 e V, � m.". o� •✓,'�".ti•. .UT Yam„ .p,°'�,h Faculty Housing area Faculty Housing area 1 .` { llb� a a Faculty Housing stockpile area Faculty Housing area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 11-17-2023 Page-3- �� Former 1116 GPR driveway Faculty Housing-Nam _? a A� i r J 1 t' 1 1. 4E C° Faculty Housing area Faculty Housing area rr Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 11-17-2023 Page-4- V HALEY WARD.: ENG114EERJNG I ENVIRONMENTAL 15UPVEYtNG Town of North Andover Planninjz and Conservation Commission Re ort Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 11/13/2023 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard,Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary EndinI4 November 10, 2023 Site Work • Faculty Housing spread loam&seed • Faculty Housing tree planting • Faculty Housing drip edges Upcoming Site Work • Faculty Housing paving • Faculty Housing seeding and planting • Faculty Housing walkways Notable Rain Events • 11/9/2023—0.32" Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pendingfinal review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster,MA 01453 7: 978.537.5296 1 HALEYWARD.COM t r Sri �M Boathouse area Boathouse lake edge i yy K rl Boathouse area Lyman restoration area T 4 y Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-10-2023 Page -2- Boathouse building Faculty Housing stockpile area p. Faculty Housing area Faculty Housing area v t kY rM Faculty Housing stockpile area Faculty Housing area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-10-2023 Page -3- i y b T Former 1116 GPR driveway Faculty Housing-Nam V Faculty Housing area Faculty Housing area .thy Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-10-2023 Page-4- ` v HALEY WARD. ENCNEER NG I ENVIR.114EMAI(SUR EY?NG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 11/6/2023 Distribution: Jean Enright, Amy Maxner,Paul Griffin,Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending November 3, 2023 Site Work ® Faculty Housing spread loam ® Hydro-seed 1116 Great Pond Rd driveway area ® Faculty Housing tree planting ® Faculty Housing patios Upcoming Site Work ® Faculty Housing spread loam ® Faculty Housing seeding and planting ® Faculty Housing walkways Notable Rain Events ® 10/29/2023—0.32" ® 10/30/2023 —0.56" Action Items ® Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. ® Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 40*%01T:978.537.5296 1 HALEYWARD.GOM r a b �S p� ter, i Boathouse area Boathouse lake edge y, Boathouse area Lyman restoration area x 4. 3 �+ Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-3-2023 Page -2 - Jb r NOW a Y .y 1 Eck v is Y = Boathouse building Faculty Housing stockpile area 1 i -a. tq y� 4 W" A L T 7-1 �d'S �` t���yy � ✓.n.�6 � �L3i.t �QY�..a. �N'S".1.� e SN•�. — Boathouse hydrant area Faculty Housing area T r� n X Faculty Housing stockpile area Faculty Housing area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-3-2023 Page -3 - a rna. Hydro-seed of 1116 GPR driveway Faculty Housing tree planting vox al5 E .#.t .s4, r � rr s r Waters patio Nam patio •�i I S"r .Y Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-3-2023 Page -4- V HALEY WARD. ENC NEEF1NG I EINVIF.QN.-MENTAL I SUP.VEYlNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 10/30/2023 Distribution: Jean Enright, Amy Maxner,Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending October 27, 2023 Site Work • Faculty Housing spread loam • Install stairs of faculty housing • Faculty Housing parking side slopes grading Upcoming Site Work • Restoration of 1116 Great Pond driveway • Faculty Housing patio installation • Faculty Housing spread around rear of houses • Faculty Housing seeding and planting • Faculty Housing walkways Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review — completed areas of Boathouse and Faculty Housing based upon Conservation direction pending final review of Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 400%00" T:978.537.5296 1 HALEYWAdRD.CGAA G m•F$Y, a � Boathouse area Boathouse lake edge vs— �d r I f t t � rO Boathouse area Lyman restoration area l f � 1, A' � t l Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 10-27-2023 Page -2 - r u 77 m MIN Boathouse building Faculty Housing stockpile area !e's•� h i9 � - t �' � s;� W�. ,a ` �,.. p v e G it Bathhouse building Faculty Housing area h d 011 • 9 i' Faculty Housing stockpile area Waters stairs Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 10-27-2023 Page -3 - �z Loam over removed 1116 GPR driveway 1116 GPR entrance area - rn p i I I 4 w - o IY✓"� � ,� a. �, y cat �cr,y.,oh �.. ,�yam"' a .+� � ,�`mt �.c�: : K Cn d. t�.art• •. Nam side entry stair Faculty Housing parking slope grading ;•� 1s t Ley ca "-rd' .1' ,E Ns , .�' "ter •<����. Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 10-27-2023 Page -4- a HALEY WARD. Ei'7GiNEc`4iNG-I ENVIRONMENTAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 10/16/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary EndinjZ October 13, 2023 Site Work • Add stone at boat launch area • Faculty Housing boulder wall • Faculty Housing granite curbing • .Faculty Housing screen loam • Faculty Housing patio prep • Remove 1116 Great Pond Rd driveway • Remove portions of erosion control at Boathouse(per Conservation site walk) Upcoming Site Work • Restoration of 1116 Great Pond driveway • Faculty Housing foundation drains • Grading around Faculty Housing buildings Notable Rain Events • none 10-10-2023 Boathouse Site Meeting(Conservation): • Attendees: Amy Maxner,Anthony Cleaves • Reviewed stabilized areas of Boathouse for removal of erosion control • Erosion controls can be removed with the exception of: silt sock at the base of the stone wall, silt sock in Swale along building entrance walkway, silt sock along east side of vehicle turn around, silt sock below transformer area across from remote toilet. • Reviewed locations of final Conservation sign posts to be installed(6) Action Items • Install 25-ft NDZ signs for Conservation review-completed areas outside of project limits. Done until project areas can be installed andlor as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 04%1�1T: 978.537.5296 1 HALEYWARD.Cc?M � — -- ����� 'u" �� 4 gyv�,�: s~�� '�'-e'•- -tea i �p9,.. t ,..s.3�i.., ..L.. I .rc. _ �F.�.v Y'-1..��F•}",6 KyY�_• Boathouse area Boathouse lake edge VT1j �_7 le Boathouse area Lyman restoration area V a c r Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 10-13-2023 Page -2 - F �3 Boathouse building Faculty Housing stockpile area XIIIIMX�y, m Bathhouse building Faculty Housing area .c c. i I � ,r �a. Faculty Housing stockpile area Faculty Housing loam screening Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 10-13-2023 Page -3 - �. A HIS MON �� .. •ate Removal of 1116 GPR driveway 1116 GPR entrance area t s� � y i a r W r to i F Nam granite curbing Faculty Housing patio prep �'•° ` _i N" F•a< s u E�a� ��-••¢��� - �E .�1w. -'::! _ '.!tJ, ..4r, . t�l.-3 f iNiu��;�. �,_�i_��._.�t�..YL i Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 10-13-2023 Page -4- HAL. EY WARD. ENGiNHIRNG I IN"llG?JIvtEN,L I SURVEY;NG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 10/8/2023 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending October 6, 2023 Site Work • Faculty Housing interceptor drain behind Nam • Faculty Housing boulder wall Upcoming Site Work • Faculty Housing foundation drains • Grading around Faculty Housing buildings • Removal and restoration of 1116 Great Pond driveway Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 40*4%0.� 510 Mechanic Street, Leominster, MA 0145 T:978.537.5296 1 HALEYWARD.COM T: F; x Boathouse area Boathouse lake edge t Boathouse area Lyman restoration area 1 P � , Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary I0-6-2023 Page -2 - �7- r9 - a On IF Boathouse building Faculty Housing stockpile area .z t, I I 1 Z` a A6 1 `. Bathhouse building Faculty Housing area T uek r� i � ra,.4 r . 66 k Faculty Housing stockpile area Faculty Housing boulder wall Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 10-6-2023 Page -3 - lw G Boathouse accessible path 1116 GPR entrance area pe - E .S vI ��• � � n Nam interceptor trench Faculty Housing area 0 r ~7p. 'rr 936F P �� Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 10-6-2023 Page -4- V HALEY WARD® ENC'iNEIRNG I EN1I1O11N4ENTAL(SUP.VEYENG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 10/02/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary EndinV September 29, 2023 Site Work • Faculty Housing water and sewer connections • Faculty Housing foundation drains • Faculty Housing boulder wall Upcoming Site Work • Faculty Housing foundation drains • Grading around Faculty Housing buildings Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mecharnic Street, Leominster, MA 0145? T:978.537.5296 1 HALEYWARD.GOM r Boathouse area Boathouse lake edge f q a 11! I Boathouse area Lyman restoration area i Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 9-29-2023 Page -2 - 6 ` Boathouse building Faculty Housing stockpile area `t r x T, Bathhouse building Faculty Housing area 5f _ Y k 3�� � �� '�C-x"'��a a�'�a-mac.,s. •-�� �K� Faculty Housing stockpile area Faculty Housing boulder wall Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 9-29-2023 Page -3- v c it .y� E tr- y s Boathouse accessible path 1116 GPR entrance area Boathouse sod area Faculty Housing area „ 5 Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 9-29-2023 Page -4- V HALEY WARD. ENGINEERING I ENVIRONMENTAL I SURVEYNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 9/18/2023 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending September 15, 2023 Site Work • Boathouse landscaping& sod • Boathouse reinforced turf • Boathouse final grading • Boathouse access driveway regrading • Bathhouse final grading&landscaping • Faculty Housing grading Upcoming Site Work • Faculty Housing buildings • Faculty Housing utility connections • Continue earthwork at Faculty Housing Notable Rain Events • 9/10/2023 —0.29" • 9/11/2023—0.55" • 9/13/2023—0.33" _ Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145'' 400%0. T:978.537.5296 1 HALEYW,a RD.COM n I Boathouse area Boathouse lake edge W R r r`Boathouse area Lyman restoration area u i r f , r t7� r Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 9-I5-2023 Page -2 - Boathouse building Faculty Housing stockpile area i k u _ I ] N Bathhouse building Faculty Housing area r I' Faculty Housing stockpile area Faculty Housing area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 9-15-2023 Page -3- t. r u.1 Boathouse accessible path 1116 GPR entrance area a Boathouse sod area Faculty Housing area 9 M u Boathouse regraded driveway Boat launch area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 945-2023 Page -4- V . n HALEY WARD. ENGNEEIRNG I ENVIF.ONNtEN fAL I SI.RVEY€NG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 9/11/2023 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending September 8, 2023 Site Work • Boathouse landscaping&sod • Boathouse reinforced turf • Boathouse lake edge stone stabilization • Boathouse final grading • Boathouse channel grates Upcoming Site Work • Boathouse reinforced turf • Boathouse access driveway regrading • Boathouse landscaping • Faculty Housing buildings • Continue earthwork at Faculty Housing Notable Rain Events • 9/8/2023—0.49" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01451-- T:978.537.5296 1 HALEYWARD.COM 4 Ea qy ' � �4 Boathouse area Boathouse lake edge -x �c Boathouse area Lyman restoration area Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 9-8-2023 Page -2 - "=C Boathouse building Faculty Housing stockpile area I �r t Bathhouse building Faculty Housing area 1 l� F rr w Faculty Housing stockpile area Faculty Housing area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 9-8-2023 Page -3 - a . F: la c Boathouse accessible path 1116 GPR entrance area µ Boathouse sod area Faculty Housing area i `c. Boathouse sod area Boat launch area Haley Ward, Inc. Brooks,School Boathouse &Faculty Housing Weekly Summary 9-8-2023 Page -4- 4� 4 HALEY WARD. EN131NEEkiNG(Fl,'111ON11 NTAL I SUPVEMC Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 9/4/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending September 1, 2023 Site Work • Continue earthwork at Faculty Housing • Boathouse landscaping • Boathouse reinforced turf Upcoming Site Work • Boathouse reinforced turf • Boathouse access driveway regrading • Boathouse landscaping • Faculty Housing buildings • Continue earthwork at Faculty Housing Notable Rain Events • 8/30/2023 —0.40" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. .510 Mechanic Street, Leominster, MA 0145' T:978.537.5296 1 HALE WARD.COM i PI Boathouse area Boathouse lake edge 'wo y �s �� �� 771 ■ � �l � t �a rr Y Pz• ��7� � r � e�Y w�4- w., "MI Boathouse area Lyman restoration area y: „s Boathouse area Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 9-1-2023 Page -2 - QQ�� �'VN il9 III Boathouse building Faculty Housing stockpile area jr r a 1 FL CY'es`5P' Y'r t Bathhouse building Faculty Housing area t � q S `a �vY..� b^sr^:.. _..,«..�.u..._.,¢ ........� ..._-r._._....._.4,.. ...._..,._::. .....ram.................:.....�^"i_..3,Y a�I&., Faculty Housing stockpile area Faculty Housing area Haley Ward, Inc. Brooks.School Boathouse & Faculty Housing Weekly Summary 9-1-2023 Page -3 - . a � � 1 3Q OnF Boathouse accessible path Faculty Housing area 777 a , Boathouse sod area Boat launch area + ,r t 1116 GPR entrance area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 94-2023 Page -4- HALEY WARD. ENGINF...ING I EP:VIRONhdFNTAL I SURVEYING Town of North Andover PlanninjZ and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 8/28/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending August 25, 2023 Site Work • Continue earthwork at Faculty Housing • Faculty Housing set house("Waters"house) Upcoming Site Work • Boathouse reinforced turf • Boathouse access driveway regrading • Boathouse landscaping • Faculty Housing buildings • Continue earthwork at Faculty Housing Notable Rain Events • 8/24/2023—0.3 8" • 8/25/2023—0.89" Action Items • Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01452 T:978.537.5296 1 HALEYWARD.0 CAA _ � w Boathouse area Boathouse lake edge I IN �6P, Ali Boathouse area Lyman restoration area F II Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 8-25-2023 Page-2- E.o F `lR 7 ;� �i•1�ci� As gill w Boathouse building Faculty Housing stockpile area Bathhouse building Faculty Housing area a e+ �F . Nf h._ x r Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 8-25-2023 Page-3- u q . w a Boathouse accessible path 1116 GPR entrance area E> 4 kA 'aeti.Y Boathouse sod area Faculty Housing area t- k vtie' Faculty Housing existing driveway resurface prep Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 8-25-2023 Page-4- t/ HALEY WARD ENON£ERING I'cP;VIFOivIvlENL4LI SURVEYING Town of forth Andover Planning and Conservation Commission Report Brooks,School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 8/21/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending August 18,2023 Site Work • Continue earthwork at Faculty Housing • Faculty Housing set house("Reis"house) • Faculty Housing secondary power • Boathouse driveway regrade • Boathouse reinforced turf Upcoming Site Work • Boathouse reinforced turf • Boathouse access driveway regrading • Faculty Housing buildings • Continue earthwork at Faculty Housing Notable Rain Events • 8/15/2023—0.72" • 8/18/2023— 1.86" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster MA 01452 40*%Ol T:978.537.5296 1 HALEYWARD.COM MdAhh, Boathouse area Boathouse lake edge { r Boathouse area Lyman restoration area Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 8-18-2023 Page-2- 46 - jq f 4 s I Boathouse building Faculty Housing stockpile area 47 I i 4 Bathhouse building Faculty Housing area k Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 8-18-2023 Page-3- `d- I v�� Boathouse accessible path 1116 GPR entrance area I s e �r aaC¢w" Boathouse sod area Faculty Housing area y 4 ?G l r' o-t 7 V.' e r• i Faculty Housing"Nam"house secondary Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 8-18-2023 Page-4- HALEY WARD. ENviid�EE'iNG(ENVIRONMENTAL I SLRYEYENG- Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 8/14/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending August 11, 2023 Site Work • Continue earthwork at Faculty Housing • Faculty Housing set house("Nam") Upcoming Site Work • Boathouse reinforced turf • Boathouse access driveway regrading • Faculty Housing buildings • Continue earthwork at Faculty Housing Notable Rain Events • 8/8/2023 —6.72" • 8/10/2023— 1.85" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01452 40*%011 T: 978.537.5296 1 HALEYWARD.CUM — — -11, — -v"- Boathouse area Boathouse lake edge 4- --t T u fA W I. v ` Boathouse area Lyman restoration area 4rt '�a a` f t F y Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 8-11-2023 Page-2- T. FORM p" r Boathouse building Faculty Housing stockpile area a, n fir g 4 Bathhouse building Faculty Housing area r ' F vC e w.. a Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 8-11-2023 Page-3- i FEW- Boathouse accessible path 1116 GPR entrance area a i r °ice v (3d Boathouse sod area Faculty Housing area „ Faculty Housing"Nam"house Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 8-11-2023 Page-4- HALEY WARD. ENGB.PF&;NG I ENVIRONN!EN:AL I SURVEYING Town of North Andover Planning and Conservation Commission Deport Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 8/7/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending AujZust 4, 2023 Site Work • Boathouse plantings, loam&hydroseeding • Bathhouse plantings, loam&hydroseeding • Continue earthwork at Faculty Housing • Faculty Housing foundation drainage ("Waters", "Reis","Nam"house) Upcoming- Site Work • Continue boathouse site work • Boathouse reinforced turf • Boathouse access driveway regrading • Faculty Housing buildings • Continue earthwork at Faculty Housing Notable Rain Events • 7/29/2023— 1.90" Action Items • Install 25-ft NDZ signs for Conservation review completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145u T:978.537.5296 1 HALEY?N.+�rRD.CO', i u u Boathouse area Boathouse lake edge 3.-E _ I J G 7 Boathouse area Lyman restoration area E� kQ I k � t m2 { Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 8-7-2023 Page-2- ' � N 5 Boathouse building Faculty Housing stockpile area I r r j R. .:R x q a a r �• sue. Bathhouse building Faculty Housing area - - f y� Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 8-7-2023 Page-3- a I 'I \ � IiRN2 .s Boathouse accessible path 1116 GPR entrance area R, 61 IS P!°� Boathouse sod area Faculty Housing area ------------ _ - _-- - - t w + I Boathouse landing&yard drain Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 8-7-2023 Page-4- V HALEY WARD. ENGIN-PRING I ENVIROWAENTAL(SUF.VEMG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 7/31/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary EndinL,July 28, 2023 Site Work • Boathouse plantings,loam&hydroseeding • Bathhouse site work • Continue earthwork at Faculty Housing • Faculty Housing drainage("Reis"house) • Faculty Housing electric,tel/data installation • Faculty Housing foundation("Waters"house) • Boat launch crushed stone resurfacing Upcoming; Site Work • Continue boathouse site work • Continue bathhouse site work • Boathouse reinforced turf • Faculty Housing buildings • Continue earthwork at Faculty Housing Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145u T:978.537.5296 1 HALEYWARD.COAA �r I a. Boathouse area Boathouse lake edge .t ------- a r T. Boathouse area Lyman restoration area lid Htl¢pY {YI M' �P — r Y jIJ Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 7-28-2023 Page-2- f Abah, 7 F Boathouse building Faculty Housing stockpile area 6 w mowk Z ��iyj4�d'�,:a ,�° �• .g I..$irya,A�'.� �.�� 4 h�.; P"7 Y�}:.3... + a�•.>�„efi'. +a�^sn.�, i � a. s r f x r o+k, � +. e-.,f+.F•,,..; .tis. Bathhouse building Faculty Housing area I i .„. v al •s,���t.��`,r's:�,a A ; ��s ^' .gla'� - .ems ,y�P' � _ c _ Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse& Faculty Housing Weekly Summary 7-28-2023 Page-3- g I � a x r � _ x i1_.wX.` Zta Boathouse accessible path Faculty Housing"Waters"foundation %e,PRI, , r x - = tare .CHw;ce.. `S Boathouse sod area Faculty Housing electric area restoration r ^ck^,f Fa 6 e c 17 Al Boathouse landing&yard drain Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 7-28-2023 Page-4- V HALEY WARD, INCj lE RING I ENVISONMENTAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 7/17/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending July 14, 2023 Site Work • Bathhouse building construction • Boathouse westerly walking path • Boathouse plantings, loam&hydroseeding • Continue earthwork at Faculty Housing • Faculty Housing foundation prep ("Waters") • Faculty Housing electric installation Upcoming Site Work • Continue boathouse site work • Continue bathhouse site work • Boathouse reinforced turf • Boat launch resurfacing • Faculty Housing building foundations • Continue earthwork at Faculty Housing Notable Rain Events • 7/10/2023 —0.69" • 7/14/2023—0.62" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster; MA 0145? T:978.537.5296 1 HALEYWAIRD.COM I� dill a I } Boathouse area Boathouse lake edge I Nil 3� Boathouse area Lyman restoration area asNO Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse& Faculty Housing Weekly Summary 7-14 2023 Page-2- -- w , M fi Boathouse building Faculty Housing stockpile area p I, t i r Y Bathhouse building Faculty Housing area Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 7-14-2023 Page-3- a. R� i4 L s Y!n t - 1 R " oe ^k _ •tea"-�m kk�`. r- e 5. � m Ki,o^ AV- Boathouse accessible path Faculty Housing electric trench f Si � aF .a. 1 Boathouse front walk&landscaping Faculty Housing 1116 construction entrance u Faculty Housing"Waters"foundation prep Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 7-14-2023 Page-4- HALEY WARD. ENO,INEERNG(ENVIRONRA NTAL I SUP,/EYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 7/10/2023 Distribution: Jean Enright, .Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending July 7, 2023 Site Work • Bathhouse building construction • Boathouse westerly walking path • Boathouse plantings, loam&hydroseeding • Boathouse erosion control blankets .• Continue earthwork at Faculty Housing • Faculty Housing foundation prep ("Waters") • Faculty Housing electric installation Upcoming Site Work • Continue boathouse site work • Continue bathhouse construction • Boathouse reinforced turf • Faculty Housing building foundations • 'Continue earthwork at Faculty Housing Notable Rain Events • 7/2/2023 — 1.76" • 7/3/2023—0.55" Action Items • Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145- T:978.537.5296 1 HALEYWARD.COM M � s i V ;x. Boathouse area Boathouse lake edge ------------------- 9 - � t-f - - 3 ��g,¢- �* � � .� : r A f (� n F taw#G yc4P fis;a !3 �E°� r�'4 •.�,> - �'v "� ..s,�' !^� .. "� '-✓,)•; [ '.q�'!'f'r*`y"t t�� m` , �_�' �V�'F���'t Y,�,�i.Et �r��t �p.a: � .: .,,. m;;z4[+�Rom. i.J�� kyF 'y+�`�ff �!^•�a�e.g �4 ��.."'4�� -.g t f 1 P.�'i�T":,T`7 f !y� !' ,.a� Boathouse area Lyman restoration area 'z - r r Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 7-7-2023 Page-2- w� � Y-z i v 79 ' ! Y' 9 9p` fed U 5{� - O Boathouse building Faculty Housing stockpile area Elma J - Bathhouse building Faculty Housing area Y 3! a Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 7-7-2023 Page-3- 0 _ I Y i 31 + S n Boathouse accessible path Faculty Housing transformer pad prep G r Boathouse accessible path boulder wall Faculty Housing 1116 construction entrance Faculty Housing"Waters"foundation prep Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 7-7-2023 Page-4- v ;.r HALEY WARD. ENGINEE PING I F111R.NMENIAL I SUFVEYENG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 7/3/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending June 30, 2023 Site Work • Boathouse building construction • Bathhouse building construction • Boathouse westerly walking path • Boathouse plantings, loam&hydroseeding • Continue earthwork at Faculty Housing • Faculty Housing foundation construction("Nam"& "Reis") • Temporary stabilized slopes with hydro mulch at boathouse Upcoming Site Work • Continue boathouse construction • Continue bathhouse construction • Boathouse reinforced turf • Faculty Housing building foundations • Continue earthwork at Faculty Housing • Additional erosion controls Notable Rain Events • 6/24/2023 —0.51" • 6/25/2023—0.28" • 6/26/2023 —0.42" • 6/27/2023 —0.62" • 6/28/2023—0.50" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145? T:978.537.5296 I HALEYWAftb.CCtM 0 P _ Boathouse area Boathouse lake edge r , pfP. Boathouse area Lyman restoration area - FI .rtb f " Cd~s f'z -�m'� x.x N .;.�z� a' �F.��'" tic-.'�. �'3 '�• '' ? r 5;. € ,i:it x '�l � �s�a'�,�s� Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-30-2023 Page-2- ,asw d Boathouse building Faculty Housing stockpile area .` .. y +ne db i f S. y Bathhouse building Faculty Housing area a Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse& Faculty Housing Weekly Summary 6-30-2023 Page-3- - , I `i Pq�f we A V a a d ,t'«< S ,pa A t� � .t^.vetoy b '{?•t�'�� S.� � � �cr° i^3 �4iW i Z S Boathouse accessible path Faculty Housing"Reis"foundation I II �14 i A Y i a - rn.ra I^ YY � N n I v+f -MSYf Boathouse accessible path boulder wall Boathouse landscaping � I _ r�. �'' „` a err - a• b "x. „�.:u a Faculty Housing"Nam"foundation Boat launch area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-30-2023 Page-4- o � HALEY WARD. ENG7,NEER;NG 15NMRONRhENtaL I SUPVEMC; Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 6/26/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt,.Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending June 23, 2023 Site Work • Boathouse building construction • Bathhouse building construction • Boathouse westerly walking path • Continue earthwork at Faculty Housing • Faculty Housing foundation construction("Nam") Upcoming Site Work • Continue boathouse construction • Continue bathhouse construction • Boathouse reinforced turf • Faculty Housing building foundations • Continue earthwork at Faculty Housing Notable Rain Events • 6/17/2023 —0.98" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 T:978.537.5296 1 HALEYWARD.GC. M I �I j I!I Boathouse area Boathouse lake edge AM f f Boathouse area Lyman restoration area a. YC m v Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse& Facuhy Housing Weekly Summary 6-23-2023 Page-2- K M 1 _ Boathouse building Faculty Housing stockpile area p:. 2 __., _Ott ' • j•.. W ! T 4, { Bathhouse building Faculty Housing area F t we` F .w Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-23-2023 Page-3- ik i a i Boathouse accessible path Boathouse accessible path boulder wall Faculty Housing"Nam"house footing prep Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-23-2023 Page-4- HAL. EY WARD. ENGiNFI$.NG I EAVIRONmENTAL I SURVEY(NG Town of North Andover PlanninI4 and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 6/18/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary EndinIZ June 16, 2023 Site Work • Boathouse building construction • Bathhouse building construction • Boathouse westerly walking path • Install electrical/communications infrastructure at Faculty Housing • Continue earthwork at Faculty Housing Upcoming Site Work • Continue boathouse construction • Continue bathhouse construction • Boathouse reinforced turf • Faculty Housing building foundations • Install electrical/communications infrastructure at Faculty Housing • Continue earthwork at Faculty Housing Notable Rain Events • 6/14/2023—0.37" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145U T: 978.537.5296 I HALEYWARD.CC?M L Y t Boathouse area Boathouse lake edge F f Boathouse area Lyman restoration area 7- . Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-I6-2023 Page-2- I ..ry ry��r Boathouse building Faculty Housing stockpile area j xti, a i Bathhouse building Faculty Housing area d. c u r c » Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-16-2023 Page-3- J 4' Boathouse accessible path r k' I w� re± Boathouse accessible path boulder wall #� 4$'uc3+9• � Faculty Housing electric installation Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-I6-2023 Page-4- V/ HALEY WARE. EN-'NEERING I ENVIRONALENTAL I SLIRVEYNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 6/12/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending June 9, 2023 Site Work • Boathouse building construction • Bathhouse building construction • Boathouse westerly walking path • Boathouse hydroseeding completed areas • Install electrical/communications infrastructure at Faculty Housing • Continue earthwork at Faculty Housing Upcoming Site Work • Continue boathouse construction • Boathouse westerly walking path • Boathouse reinforced turf • Continue bathhouse construction • Continue install electrical/communications infrastructure at Faculty Housing • Continue earthwork at Faculty Housing Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01451-- T:978.537.5296 1 HALEYWARD.COM zr , IY I C_y� � " S Boathouse area Boathouse lake edge �I Ih x ' �'"�.•v�'v '� - , roc + `' - : Boathouse area Lyman restoration area -- y- r� s y1 e G � e ar'• ar _ x � � r r z - - -: ' `k ' Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Sunimaq 6-9-2023 Page-2- r I z zy s t, Qh e Es a Boathouse building Faculty Housing stockpile area IYV� t r � Kek x Bathhouse building Faculty Housing area C, I Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-9-2023 Page-3- Boathouse accessible path Z � r � x Boathouse accessible path boulder wall prep Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-9-2023 Page-4- L,� HALEY WARD, ENG7NEEP.NNG;I EWIPONMEN SAL[SURVEYd(NG Town of forth Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 6/5/2023 Distribution: Jean Enright,Amy Maxner, Paul Griffin,Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Justine Fox, Lucy Frye Weekly Summary Ending June 2, 2023 Site Work • Boathouse building construction • Bathhouse building construction • Continue earthwork at Faculty Housing • Boathouse vehicle turnaround and front walking path area • Temporary stabilized slopes with hydro mulch at boathouse Upcoming Site Work • Continue boathouse construction • Boathouse westerly walking path • Continue bathhouse construction • Install electrical/communications infrastructure at Faculty Housing • Continue earthwork at Faculty Housing • Additional erosion controls Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster MA 0145u T: 978.537.5296 1 HALE`iWARD.COM 9^hh, IB d "4 +• �_ �kk,� �?;�LDS °; 14 Boathouse area Boathouse lake edge �I ci1;Ml Boathouse area Lyman restoration area r Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-2 2023 Page-2- r µ G% I Boathouse building Faculty Housing stockpile area _ l 31 a I b� 9 Bathhouse building Faculty Housing area a Ook ,. fr �,t-r.Gd. r" cif y" ,A. -i w< gr � ✓',� '� FEel M Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-2-2023 Page-3- Boathouse area MOM t Boathouse temporary boat storage Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 6-2-2023 Page-4- v HALEY WARD. ENGayEEkING I EAVI.RONAdENIAL I SURVEYIIG Town of North Andover PlanninLy and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 5/19/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary EndinI4 May 19, 2023 Site Work • Boathouse building construction • Bathhouse building construction • Continue earthwork at Faculty Housing • Boathouse loam and seed completed slopes Upcoming Site Work • Continue boathouse construction • Grade around boathouse foundation • Continue bathhouse construction • Boathouse branch pruning • Install electrical/communications infrastructure at Faculty Housing • Continue earthwork at Faculty Housing Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster MA 01452 T: 978.537.5296 1 HALEYwARD.GOM E �✓ u'q •.1s: S�— n P F r Boathouse area Boathouse lake edge a _ t - t " � _ :✓�'�--ram .a� � ,v,x�;t p`� f"r' �q.. - s 9 Boathouse area Lyman restoration area / 4 I , t�l III yK .. a 7. r. 71 Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 5-19 2023 Page-2- Y Boathouse building Faculty Housing stockpile area Y _ k _ Bathhouse building Faculty Housing area r Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse& Faculty Housing Weekly Summary 5-19-2023 Page-3- li i 777, Boathouse area x Boathouse temporary boat storage aa I ' ,�, ', �'� "s." a tea. j, •z a, ' 11 Ar��'M'REV— �'xu� � z Boathouse loam and hydroseed completed slope Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 5-19-2023 Page-4- HALEY WARD. eNG N ERING I ENV,t^ONnaEr:uL suevEnra Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 5/15/2023 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending May 12,2023 Site Work Boathouse building construction • Bathhouse building construction • Continue earthwork at Faculty Housing • Connect existing faculty housing water service to new main • Install new Faculty Housing water services taps (3) Upcoming Site Work • Continue boathouse construction • Grade around boathouse foundation • Continue bathhouse construction • Install electrical/communications infrastructure at Faculty Housing • Continue earthwork at Faculty Housing Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145U T: 978.537.5296 1 HALEYWARD.COM e w \ ro Boathouse area Boathouse lake edge gg M— .1. 1_ i v Boathouse area Lyman restoration area s s b — .✓"Aa`r�1+'' `^ _c"i ,,. T+. S b}c,@ "ud yy �r '� 3r c& w �SNO Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 5-12-2023 Page-2- HF W-- > s Boathouse building Faculty Housing stockpile area "- �r ' , n E Y' c Bathhouse building Faculty Housing area MON r� Z �+ �„ TS' 19)� ,��h{R�eVJ�f' e✓'F' 4�Z�'W �4 �Y 4 ti. e,.t.. ... <�_ _„ -.. .�...--_ga .' �i�u�'+5x.�.��i^.f.'b.� .1.�LY✓'t•l�'`�.�..u�u� ... Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks Sehool Boathouse&Faculty Housing Weekly Summary 5-I2-2023 Page-3- > I 3 r , i :z Boathouse area 0 Boathouse temporary boat storage r � k- �.�. 2a aF .F' •' 'l 4 Boathouse concrete landing Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 5-I2-2023 Page-4- v HALEY WARD. ENGINEER NG I ENNIF.ONNiENTAI I SURVFMG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 5/8/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick; Taylor Andrews, Lucy Frye Weekly Summary Ending May 5, 2023 Site Work • Boathouse building construction • Bathhouse building construction • Continue earthwork at Faculty Housing . Upcoming Site Work • Continue boathouse construction • Grade around boathouse foundation • Continue bathhouse construction • Install electrical/communications infrastructure at Faculty Housing • Continue earthwork at Faculty Housing • Connect existing faculty housing water service to new main Notable Rain Events • 4/30/23 —2.43" • 5/2/23 —0.49" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145? T:978.537.5296 1 HAEMNARD.COAA F „ x .metOLE, M Boathouse area Boathouse lake edge : �a .: Wk i �xn s s Boathouse area Lyman restoration area 0. A. r axgad�� �"��� ` Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 5-5-2023 Page-2- .,dad J. '<9 c e ?a a. �aYr� � r � Boathouse building Faculty Housing stockpile area e 1 r sx �Y Bathhouse building Faculty Housing area .4* fib• - at'. k's ` R. 2 ' Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 5-5-2023 Page-3- j., I II m YI i i , ........... Boathouse area Boathouse temporary boat storage Haley Ward,Inc. Brooks School Boathouse& Faculty Housing Weekly Summary 5-5-2023 Page-4- HALEY WARD. ENG1NIHR1,112,I E,1R.17vlENiAL I SURVEY3NG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 5/l/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary lEndinjZ April 28, 2023 Site Work • Boathouse building construction • Bathhouse building construction • Continue earthwork at Faculty Housing • Temporary stabilized slopes with hydro mulch at boathouse Upcoming Site Work • Continue boathouse construction • Grade around boathouse foundation • Continue bathhouse construction • Install electrical/communications infrastructure at Faculty Housing • Continue earthwork at Faculty Housing • Additional erosion controls • Connect existing faculty housing water service to new main Notable Rain Events • 4/23/23 — 1.28" Action Items • Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01454 400#61, T:978.537.5296 1 HALEYWARD.COM I .4 t Boathouse area Boathouse lake edge p 1 , P FF R 1� 3 Boathouse area Lyman restoration area i w Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 4-28-2023 Page-2- 14.1 Boathouse building Faculty Housing stockpile area 7 r c f ti Bathhouse building Faculty Housing area �nr `t Cyll�nY. y a�: a q� y �rZia U. ±v�.v" Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 4-28-2023 Page-3- <1 Boathouse area t xx Boathouse temporary boat storage Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 4-28-2023 Page-4- w{`�a HALEY WARD. ENCNIEER NG I ENVIF.,ONMENTAL I SURVEYING Town of North Andover PlanninI4 and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 4/26/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin,Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending April 21,2023 Site Work • Boathouse building construction • Boathouse crushed stone along southeast side of building • Bathhouse building construction • Continue earthwork at Faculty Housing Upcoming Site Work • Continue boathouse construction • Grade around boathouse foundation • Continue bathhouse construction • Install electrical/communications infrastructure at Faculty Housing • Continue earthwork at Faculty Housing • Connect existing faculty housing water service to new main Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. . • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145 7: 978.537.5296 1 HALEYWAIRD.CCJM sI , I _ r i Boathouse area Boathouse lake edge r x i Boathouse area Lyman restoration area Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 4-21-2023 Page-2- .: w.k a Boathouse building Faculty Housing stockpile area c' r r, Bathhouse building Faculty Housing area IiA F j try w F" Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 4-21-2023 Page-3- I I� Boathouse area .�.�v y y Boathouse temporary boat storage Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 4-21-2023 Page-4- HALEY WARD. E4GiN1HRJNG I Ehb9FONMENTAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 4/17/2023 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Endinga April 14, 202 Site Work • Boathouse building construction • Grading around boathouse area • Bathhouse building construction • Continue earthwork at Faculty Housing Upcoming Site Work • Continue boathouse construction • Grade around boathouse foundation • Continue bathhouse construction • Install electrical/communications infrastructure at Faculty Housing • Continue earthwork at Faculty Housing • Connect existing faculty housing water service to new main Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review —completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01452 T: 978.537.5296 1 HALEYWARQ.CO;1. �aF i c ry ., '. v , Boathouse area Boathouse lake edge y ,;r �. � ev F Boathouse area Lyman restoration area -- — . r 'tx a ,..d t+'G �sw A ,��S-r 4` t,3+..`W4•'�v� r yw "'i�`7'`- t - .a Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 4-14-2023 Page-2- a � �f? I v, Boathouse building Faculty Housing stockpile area -07 � 4 t N {{ Bathhouse building Faculty Housing area t r/7 1 v. Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 4-I4-2023 Page-3- i , Boathouse area Boathouse area � ab� IN " Boathouse temporary boat storage Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 4-14-2023 Page-4- V HALEY WARD. ENGINFIRING r ENIII.N&AENYAI I SUPVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 4/10/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending April 7, 2023 Site Work • Boathouse building construction • Backfill boathouse building site walls • Install temporary boat storage area • Adjust boathouse construction fence&erosion control to accommodate school lake access • Bathhouse building construction Upcoming Site Work • Continue boathouse construction • Grade around boathouse foundation • Continue bathhouse construction • Continue earthwork at Faculty Housing • Connect existing faculty housing water service to new main Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 T:978.5375296 1 HALEYW,a RD,COAA R P.. [�`Sp k Boathouse area Boathouse lake edge N- `�1 mom a 5 _ z Boathouse area Lyman restoration area X I r 1 S � S ve Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 4-7-2023 Page-2- , R 9 � Boathouse building Faculty Housing stockpile area F r 4 :s �ryr4;s�-x�•'� k .Y �b Bathhouse building Faculty Housing area Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 4-7-2023 Page-3- t 77 J' c# 1 �.4 I i Boathouse building site wall Boathouse temporary boat storage u — — 3 r- FF� Boathouse building site wall Boathouse temporary boat storage IR - I M F8 i m .. z y d' Boathouse added erosion control uphill of boat ramp Boathouse boat ramp access opened Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 4-7-2023 Page-4- V HALEY WARD. ENG;NFERJNG I ENVIRONM4 NiAL I SLIPVEYNG. Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 4/3/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending March 31, 2023 Site Work • Boathouse building construction • Install boathouse building site walls Upcoming Site Work • Continue boathouse construction • Grade around boathouse foundation • Continue earthwork at Faculty Housing • Connect existing faculty housing water service to new main Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145;- T:978.537.5296 I HALE'f\nJAC':D,COM { 4 Boathouse area Boathouse lake edge Y. a± Boathouse area Lyman restoration area IVVA- > z WA t Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 3-31-2023 Page-2- x T �� � a� - ^� — �, _..�x � - ram•: {S Pi y Ny k. Za.t Boathouse building Faculty Housing stockpile area r i -M Bathhouse foundation Faculty Housing area �� ��� � �� bsr i K'�•� S! i" ., ,. Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 3-31-2023 Page-3- V HALEY WARD. EN—'1F,'HRJNG I E1,W1RONh1,EN—V L I'3LRVEYdNG Town of North Andover Planning and Conservation Commission Deport Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 3/26/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard,Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary EndinI4 March 24, 2023 Site Work • Boathouse building construction • Erosion control blankets placed on Faculty Housing swale. Upcoming Site Work ® Continue boathouse construction • Grade around boathouse foundation • Continue earthwork at Faculty Housing • Connect existing faculty housing water service to new.main Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01455 T:978.537.5296 1 HALEYWARD.COM A £V J �r m Boathouse area Boathouse lake edge ity p ' gp u } 'ct: yF6 3 7 Boathouse area Lyman restoration area ig- �` .`-- ' mot, �"s'`�- tfai�`k- •'Nc e -vsw .. � sz Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 3-24-2023 Page-2- Fit .Y . ....._ � _. ... .. .....,_. �'�.4:!.-'i-�i..n_z.:a5cs,rrsaL..,..,_..-a;s,.E •;S � .. Boathouse building Faculty Housing stockpile area Y� r Bathhouse foundation Faculty Housing area --- . fir ..mx d�-t�tdedv�*�` � x 'F. � e ✓��' r �^"�y� �a�''":,. ,b.'�� as'].i � a�' r ' 2� �k, ..s E Faculty Housing stockpile area Faculty Housing Swale with blankets Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 3-24-2023 Page-3- HALEY WARD, ENGINEERING I ENR.Nv1ENTAL I SURVEMG Town of forth Andover ]Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 3/20/2023 Distribution: Jean Enright,Amy Maxner, Paul Griffin,,Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending March 17, 2023 Site Work • Boathouse building construction • Snow management Upcoming Site World • Continue boathouse construction • Grade around boathouse foundation • Continue earthwork at Faculty Housing • Connect existing faculty housing water service to new main Notable Rain Events • 3/13/2023 —0.31" • 3/14/2023 —2.19" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01451--- T:978.537.529E 1 HALEYWARO.COM Boathouse area Boathouse lake edge 3 s Boathouse area Lyman restoration area 1 i Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 3-17-2023 Page-2- 5: "rl .d4IN �'�7F S'y'e' •f Z t� '? - 1 Boathouse building Faculty Housing stockpile area S �c Bathhouse foundation Faculty Housing area — a Faculty Housing stockpile area Faculty Housing hydrant at end Haley Ward,Inc. Brooks School Boathouse& Faculty Housing Weekly Summary 3-17--2023 Page-3- V/ HALEY WARD, ENc".viNE"tRJNG.I EPFVIRONAAENi4L I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 3/13/2023 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary EndinI4 March 10, 2023 Site Work • Boathouse building construction • Bathhouse concrete floor • Snow management Upcoming Site Work • Continue boathouse construction • Grade around boathouse foundation • Continue earthwork at Faculty Housing - • Connect existing faculty housing water service to new main Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor.erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 T:978.537.5296 1 HALEYINARD.CC3tlti, Boathouse area Boathouse lake edge '.."n'soo " A Boathouse area Lyman restoration area �a Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 3-10-2023 Page-2- .dsNtCdimi`ll�'tfr�avol:j���d�'e� ,�. I— € _ WE e 4 Boathouse building Faculty Housing stockpile area RUN of n r y _�- - � 3p ax Bathhouse foundation Faculty Housing area 5 - PtiW '� z t x Faculty Housing stockpile area Faculty Housing hydrant at end Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 3-10-2023 Page-3- HALEY WARD: ENG NEER!NG I E\VIRONNTN`!AL I SURVEMG Town of forth Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 3/6/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Endinfr March 3, 2023 Site Work ® Boathouse building construction ® Snow management Upcoming Site Work ® Continue boathouse construction ® Grade around boathouse foundation ® Continue earthwork at Faculty Housing ® Connect existing faculty housing water service to new main Notable Rain Events ® 2/28/2023 —0.26" ® 3/2/2023—0.38" ® 3/4/2023—0.71" Action Items ® Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. ® Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145? T:978.537.5296 1 HALEYwARD.COM .z _ F h (, ,, ice, .� ..�."•� - r - j '�► s .44 Boathouse area Boathouse lake edge t az; T b Ear � Boathouse area Lyman restoration area y+ `6% Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 3-3-2023 Page-2- v I 'i Boathouse building Faculty Housing stockpile area MT 09 Bathhouse foundation Faculty Housing area a .t s d L . k _ , f Faculty Housing stockpile area Faculty Housing hydrant at end Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 3-3-2023 Page-3- HALEY WARD. ENGd�%Ek':JG I ENVI-ONM NAL I SLIPV-Y:NG Town of North.Andover Planning and Conservation Commission Roo Brooks School Boathouse&Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 2/27/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard,Mike Cataldo, Kevin Hunt,Josh Beauregard,Chris Merrick, Taylor Andrews,Lucy Frye Weekly Summary Ending)February 24, 2023 Site Work ® Boathouse building construction ® Continue earthwork at Faculty Housing ® Connect bathhouse plumbing to sewer main Upcoming Site Work ® Continue boathouse construction ® Grade around boathouse foundation ® Continue earthwork at Faculty Housing Notable Rain Events ® 2/23/2023—0.44" Action Items ® Install 25-ft ND.z signs for Conservation review—completed areas outside ofproject limits.Done untilproject areas can be installed and/or as directed by Conservation. ® Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145 T:978.537.5296 1 HA1.EYVJA RD.CO1 C � s ` r y s- Boathouse area Boathouse lake edge --7771 777777777777 ._tee -cs ' Boathouse area Lyman restoration area s M. 4 ti v Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 2-24-2023 Page-2- c �fl \ "v 1 y I h t a _ Boathouse building Faculty Housing stockpile area v ... Jt— w,a fq r _ ,r Bathhouse sewer excavation Faculty Housing area All a day ti Faculty Housing stockpile area Faculty Housing hydrant at end Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 2-24-2023 Page-3- HALEY WARD. g Ei"3'i E41NG I ES:'JIF,ONI�tENTAI SUFt EY;NG Town of North Andover Plannin and Conservation.Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 2/20/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard,Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending February 17, 2023 Site Work • Boathouse building construction • Continue earthwork at Faculty Housing • Completed Faculty Housing water main installation • Temporary stabilized slopes with hydro mulch at boathouse Upcoming Site Work • Continue boathouse construction • Continue earthwork at Faculty Housing • Bathhouse sewer connection • Additional erosion controls Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01451-- T: 978.537.5296 1 HALEYWA D.COM tl Boathouse area Boathouse lake edge t 7 i7 a a i I t '-�° ;.'"' �•. -cat - rs®•: a 5 Boathouse area Lyman restoration area a t �rs a Boathouse floor Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 2-17-2023 Page-2- Lf- 1 ,-r Boathouse building Faculty Housing stockpile area xN __ Bathhouse foundation Faculty Housing area w ' Faculty Housing stockpile area Faculty Housing hydrant at end Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 2-17-2023 Page-3- } HALEY WARD, EN'&N-PRiNG I ENVIRONMENTAL I SURVE'i;NG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 2/13/2023 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary EndinIZ February 10, 2023 Site Work ® Boathouse building construction ® Bathhouse interior plumbing ® Continue earthwork at Faculty Housing ® Completed installation of Faculty Housing sewer main ® Begin Faculty Housing water main installation Upcoming Site Work ® Continue boathouse construction ® Continue earthwork at Faculty Housing ® Faculty Housing water system Notable Rain Events ® none Action Items ® Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation: ® Monitor erosion controls during construction weekly and after rain events: 510 Mechanic:Street, Leominster, MA 01453 T:978.537.5296 1 HALE WARD COO - 'date Boathouse area Boathouse lake edge "OAR fir="• � �..�, Boathouse area Lyman restoration area yYk l • I � 6 1 ..w~wt ,� °>�'x•'� era ,,. �x Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 2-I0-2023 Page-2- 5; x Boathouse building Faculty Housing stockpile area ------------ to S,yu uk� t _ a✓p =rms .cam `.+.k Bathhouse foundation Faculty Housing area � •a Faculty Housing stockpile area Faculty Housing water main Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 2-10-2023 Page-3- L/ HALEY WARD. ENGNEER!NG I ENVIRONMENTAL I SUPVEY3NG Town of North Andover PlanninLy and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 2/6/2023 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending February 3, 2023 Site Work • Continue earthwork at Faculty Housing • Boathouse building construction • Begin installation of Faculty Housing sewer main Upcoming Site Work • Continue boathouse construction • Continue earthwork at Faculty Housing • Faculty Housing sewer system Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145? T:978.537.5296 1 HALEYWARD.COM a 'a" Boathouse area Boathouse lake edge I ,a, i • ce y i sad yy i Piµ Y i t ` I Boathouse area Lyman restoration area �t h w N ,�+ ..a .:?•. .'n Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 2-3-2023 Page-2- s Boathouse building - Faculty Housing stockpile area a wz. 1 �M G Bathhouse foundation Faculty Housing area v r1 t Ysn — �t%"4 apt Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 2-3-2023 Page-3- V HALEY WARD. ENGNEERING I EPN'IRONNalENi4L I SUP.VEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 1/30/2023 Distribution: Jean Enright,Amy Maxner,Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary EndinL,January 27,2023 Site Work • Boathouse building construction • Electric connection to bathhouse • Continue earthwork at Faculty Housing Upcoming Site Work • Continue boathouse construction • Continue earthwork at Faculty Housing • Faculty Housing sewer system Notable Rain Events • 1/22/23—0.29" • 1/23/23—0.80" • 1/25/23—0.48" • 1/26/23—0.67" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01452 T: 978.537.5296 1 I-IALEYUUARD.COAA x . LEON w Boathouse area Boathouse lake edge R &�.a._ �.. Boathouse area Lyman restoration area to a Boathouse area Boathouse staging area Haley Ward,Ine. Brooks School Boathouse&Faculty Housing Weekly Summary I-27-2023 Page-2- o qar. a.Boathouse building Faculty Housing stockpile area �t i '" is "' .• J`b% d '4_ - _ Bathhouse foundation Faculty Housing area a F � Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 1-27-2023 Page-3- ` HALEY WARD.. ENGNEERiNG I EiNVIRONIMENIAL I SURVEYsNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 1/23/2023 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary EndinI4 January 20, 2023 Site Work • Backfill/grading around boathouse foundation • backfill bathhouse foundation • Install boathouse yard drain • Connect boathouse foundation drain to outfall • Complete water connections into boathouse • Complete water connection to bathhouse • Electric connection to boathouse • Electric connection to bathhouse • Continue earthwork at Faculty Housing Upcoming Site Work • Continue gradingg around boathouse foundation • Continue earthwork at Faculty Housing • Faculty Housing sewer system Notable Rain Events • 1/19/23 —0.40" • 1/20/23 —0.48" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, t A 0145? T: 978.537.5296 I HAtEYWA€ D.COM Boathouse area Boathouse lake edge M • I 'A d Boathouse area Lyman restoration area y 2, Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 1-20-2023 Page-2- r , � a m 4 i Boathouse building connections Faculty Housing stockpile area lm x � it Bathhouse foundation Faculty Housing area Faculty Housing stockpile area Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 1-20-2023 Page-3- , V HALEY WARD.:. ENG'.IHRING I ENVIRONMENTAL I SL;P,VES'NNG Town of North Andover PlanninjZ and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 1/16/2022 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending January 13, 2023 Site Work • Poured boathouse slab • Backfill/grading around boathouse foundation • backfill bathhouse foundation • Begin earthwork at Faculty Housing • Water connection to boathouse • Water connection to bathhouse Upcoming Site Work • Continue grading around boathouse foundation • Continue boathouse foundation drainage • Continue earthwork at Faculty Housing • Electric connections to boathouse and bathhouse Notable Rain Events • 1/12/23 —0.45" Action Items • Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic_:Street, Leominster,MA 0145? T:978.537.5296 I HALEYWARO.COM, :z I Boathouse area Boathouse lake edge MINIM Boathouse area Lyman restoration area v� 1 ; �m w, a � � k Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 1-13-2023 Page-2- �2 1 � r Boathouse slab pour Faculty Housing stockpile area Bathhouse foundation—sewer connection core Faculty Housing stockpile area SO 34 4f' t d e Boathouse water connection valves Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 1-13-2023 Page-3- G :J Faculty Housing area Faculty Housing area MIS fi a e w, a Faculty Housing area . . .............. Faculty Housing area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 1-13-2023 Page-4- HALEY WARD EN6hIEERING I ENVIRON'rAENTAL I SURVEYNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse&Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 1/9/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard,Mike Cataldo, Kevin Hunt,Josh Beauregard,Chris Merrick, Taylor Andrews,Lucy Frye Weekly Summary Ending January 6, 2023 Site Work • Prepare for boathouse slab • Install boathouse foundation drainage • backfill boathouse foundation • backfill bathhouse foundation • Begin vegetation removal at Faculty Housing Upcoming Site Work • backfill boathouse foundation • Continue boathouse foundation drainage • Pour b o athouse slab • Earthwork at Faculty Housing • water sel vice lines for boathouse Notable Rain Events • 1/3/23 —0.33" • 1/4/23 —0.28" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside ofproject limits.Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 0145? T:978M7.5296 1 HALEYINA?D.COM Boathouse area Boathouse lake edge p L r kr _ k Boathouse area Lyman restoration area Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 1-6-2023 Page-2- J is ydd Aa nw nEpl"" Boathouse slab prep Faculty Housing stockpile area z 6a � " �� 501-1 Bathhouse foundation Faculty Housing stockpile area Boathouse foundation drainage Vegetation removal 1116 GPR Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 1-6-2023 Page-3- V HALEY WARD. ENGiNE"R r' (E\VIROtitviENTAL SL�P.VEYif�iG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 1/2/2022 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard,Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary EndinjZ December 30, 2022 Site Work • Prepare for boathouse slab • Install Boathouse foundation drainage • Complete demolition of 1116 Great Pond Road house • Bathhouse foundation waterproofing Upcoming Site Work • backfill boathouse foundation • Continue Boathouse foundation drainage Pour boathouse slab • Begin earthwork at Faculty Housing • water service lines for boathouse Notable Rain Events • 12/31/22—0.29" Action Items • Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 513 Mechanic Street, Leominster, MA 0145? 40%001 -- T: 978.537.5296 1 HALEYWARD.COM G i [ Boathouse area Boathouse lake edge Boathouse area Lyman restoration area u x - , � 4 i mg y Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 12-30-2022 Page-2- F t..d tit ndw q't 1 Boathouse slab prep Faculty Housing stockpile area } f. V 9 III i I i III � 1 s- Bathhouse foundation Faculty Housing stockpile area P k{ N 1 3 3,4 4 t,y.4 vy n 1 � ' y f Bathhouse foundation drainage House removal 1116 GPR Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 12-30-2022 Page-3- HALEY WARD ENGINEERING I ENVIRONMENTAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 12/27/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary EndinjZ December 23, 2022 Site Work • Prepare for boathouse slab • Continue demolition of 1116 Great Pond Road house • pour Bathhouse foundation Upcoming Site Work • backfill boathouse foundation • Boathouse foundation drainage • Pour boathouse slab • Continue demolition of 1116 Great Pond Road house • Begin earthwork at Faculty Housing • water service lines for boathouse Notable Rain Events • 12/17/22—0.25" • 12/23/22— 1.92" Site Inspections 12-21-2022 NA Conservation Pre-winter inspection: • Attendees: Amy Maxner,Anthony Cleaves,Michael Cataldo, Josh Beauregard o Reviewed boathouse area for winter conditions o No additional protections needed at this time o Continue to control and monitor erosion Action Items • Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. 510 Mechanic Street, Leominster, MA 01453 T: 978.537.5296 1 HIALEYWARD.COM I •max � .-. Boathouse area Boathouse lake edge .a •t�w Boathouse area Lyman restoration area c w r Boathouse area Boathouse staging area Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Summary 12-23-2022 Page-2- f r Boathouse slab prep Faculty Housing stockpile area ff'.r a� 4 'Y •N '1' -^�i l Bathhouse covered foundation House removal 1116 GPR Ir -S s 9� H � Faculty Housing stockpile area House removal 1116 GPR Haley Ward,Inc. Brooks School Boathouse&Faculty Housing Weekly Suninzary 12-23-2022 Page-3- V t HALEY WARD. ENGINEERING I ENVIRON.-NAENT,%L I SUFVEYENG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 12/19/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending December 16, 2022 Site Work ® Pour Boathouse foundation walls &prep for slab ® Continue demolition of 1116 Great Pond Road house ® continue prep for Bathhouse foundation Upcoming Site Work ® backfill boathouse foundation ® Boathouse foundation drainage ® Bathhouse foundation installation ® Continue demolition of 1116 Great Pond Road house ® Begin earthwork at Faculty Housing ® regrade above Lyman stone wall ® water service lines for boathouse Notable Rain Events ® 12/16/22— 1.77" Action Items ® Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. ® Monitor erosion controls during construction weekly and after rain events. ® Pre-winter inspection with Conservation scheduled for Wednesday December 21,2022 510 Mechanic Street, Leominster, MA 0145 T:978.537.5296 1 HALE'tINARD,COM Tw: I `kt� J bw. p Boathouse area Boathouse lake edge W s I s Boathouse area Lyman restoration area Boathouse foundation Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 12-16-2022 Page -2 - 4 f � 5 � x: ^r ' A AS pf - Boathouse slab prep Faculty Housing stockpile area M. s w�T^_ ,lF✓ "u :rp A art Bathhouse foundation excavation House removal 1116 GPR } rr Faculty Housing stockpile area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 1246-2022 Page -3 - V HALEY WARD:. ENGi,iEE�3NG I EIIIR.INIENTAL I SURVEYEN 'town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 12/12/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending December 9, 2022 Site Work ® Prepare Boathouse foundation walls for pouring ® Complete Boathouse water main installation ® Continue demolition of 1116 Great Pond Road house ® Begin excavation for Bathhouse foundation Upcoming Site Work ® Continue boathouse foundation ® regrade above Lyman stone wall ® water service lines for boathouse ® Continue demolition of 1116 Great Pond Road house ® Continue excavation of Bathhouse foundation Notable Rain Events ® 12/7/22—0.75" Action Items ® Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. ® Monitor erosion controls during construction weekly and after rain events. ® Pre-winter inspection with Conservation scheduled for Wednesday December 21, 2022 510 Mechanic Street, Leominster MA 0145:° T:978.537.5296 1 HALE`INARD.COM t I � r t Boathouse area Boathouse lake edge I OR NT IN Mi� u, ax A Boathouse area Lyman restoration area PW u z �T` �L. k� ��''�{�„�Td r`�.^`r•� r-zr y� "mot":,, "� Y t ��L °'�fr',s`�. Boathouse foundation excavation Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 12-9-2022 Page -2 - r 7 � sr s c utS rk '��✓��n�,�—Er �� � � Y Boathouse hydrant at water main end House removal 1116 GPR Y/d�32 / F Faculty Housing stockpile area House removal 1116 GPR 7 rSs •P �^ [} .. �`� � rr,�7 � R 4 ��>". � :4�RY�7-Q ���t;, t ��a�,,e..'�*` i;� �r log ' B � Yq Faculty Housing stockpile area Bathhouse foundation excavation Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary I2-9-2022 Page -3 - may' . HALEY WARD.. Ery�;,NEEGr:G ENVI!ONM N AL I SL'VEY?N 'down of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 12/5/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary EndinLy December 2, 2022 Site Work • Install Boathouse footings &steel for foundation walls • Continue Boathouse water main installation • Begin demolition of 1116 Great Pond Road house Upcoming Site Work • regrade above Lyman stone wall • Continue water line for boathouse • Construct boathouse foundation • Continue demolition of 1116 Great Pond Road house Notable Rain Events • 11/27/22—0.68" • 11/30/22—0.52" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weeldy and after rain events. • Setup pre-winter inspection with Conservation 510 Mechanic. Street, Leominster, MA 01453 40*%Ol. T:978.537.5296 1 HALE`WARD.CO , '. 3 Boathouse area Boathouse lake edge 1 1 e t AA 1 I l ���41` 1�•r. �uc++GY"�R,4 ,+L� .row �w fie' Boathouse area Lyman restoration area _jA a u s try dakj. Boathouse foundation excavation Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 12-2-2022 Page -2 - r r s m i�4 � I 1 1 8�N Boathouse water main installation House removal 1116 GPR £ i 1 .k ... a.. ..-- ... ..-,v Faculty Housing stockpile area House removal 1116 GPR � lR a> Faculty Housing stockpile area House removal 1116 GPR Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 12-2-2022 Page -3 - HALEY WARD. INGINEERING I ENVIRONMENTAL f SUFVEYNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 11/28/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending November 25, 2022 Site Work • Form and set steel for boathouse footings • Begin Boathouse water main installation • Install security fencing around 1116 GPR area Upcoming Site Work • regrade above Lyman stone wall • Continue water line for boathouse • Construct boathouse foundation • Demolition of 1116 Great Pond Road house—Tentative start 11/29/22 Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. • Setup pre-winter inspection with Conservation 510 Mechanic Street, Leominster, Mt-\0145: 40"%ol T:978.537.5296 1 HALEYWARD.COM 4 � f k b�i� f• Boathouse area Boathouse lake edge I , I < F� �'tEf1 •dyyr .y k 1 vi Y. i t s t � I Boathouse area Lyman restoration area I # Boathouse foundation excavation Boathouse staging area Haley Ward, Inc. Brooks,School Boathouse & Faculty Housing Weekly Summary 11-25-2022 Page -2 - Boathouse water main installation Fencing around 1116 GPR y � f Faculty Housing stockpile area Fencing around 1116 GPR r �n 0* Faculty Housing stockpile area Fencing around 1116 GPR&NAFD training Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-25-2022 Page -3 - HALEY WARD. ENGINcERING I ENVI.40NA•tENTAI I SI;f.VEYNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 11/21/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary EndinI4 November 18, 2022 Site Work • Continue excavation for boathouse foundation(including ledge removal) • Prepare excavation for foundation forming • Abandon 1116 Great Pond Road water service • Added tracking stone around security shack and end of 1116 GPR driveway Upcoming Site Work • regrade above Lyman stone wall • Install water line for boathouse(Begin installation of water line for boathouse) • Construct boathouse foundation • Demolition of 1116 Great Pond Road house Notable Rain Events • 11/16/22—0.70" Site Inspections 11-14-2022 Town Review of Faculty Housing Erosion Control: • Attendees: Jean Enright,Amy Maxner,Anthony Cleaves o Exposed earth areas at the South Entrance security shack and end of the 1116 GPR driveway are to be covered with tracking stone—Completed 11-18-22 Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. • Setup pre-winter inspection with Conservation 510 Mechanic Street, Leominster, MA 0145:1 4^bo- T:978.537.5296 1 hALEYWARD.001A - — z 4' Boathouse area Boathouse lake edge w N. pow ,ripS flc� r Boathouse area Lyman restoration area 4 ! AIN EQ Boathouse foundation excavation Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-18-2022 Page -2 - x M r. r pp ey- t Faculty Housing stockpile area 1116 driveway erosion control&tracking stone y. 1 - 'jf k Faculty Housing stockpile area 1116 driveway erosion control&tracking stone I � F�ty"• 1116 driveway erosion control&tracking stone 1116 driveway erosion control&tracking stone Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-18-2022 Page -3 - HALEY WARD. ENGINHRIN.G I ENNIRONMENTA!I su&v EY N.= Town of North Andover PlanninjZ and Conservation Commission Report Brooks School Boathouse & Faculty Housing Iraprovernent Projects Project Update by Anthony Cleaves Issue Date: 11/14/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary EndinIZ November 11, 2022 Site Work • Continue excavation for boathouse foundation • Decommissioned septic tank of 1116 Great Pond Road • Installed remaining erosion control at Faculty Housing Upcoming Site Work • regrade above Lyman stone wall • Install water line for boathouse (Begin installation of water line for boathouse) • Continue excavation and preparation for boathouse foundation • Abandon 1116 Great Pond Road water service • Demolition of 1116 Great Pond Road house Notable Rain Events • 11/11/22—0.50" • 11/12/22—0.14" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. • Setup pre-winter inspection with Conservation in November 510 Mechanic Street, Leominster, MA 0145 4^401011 T: 978.537.5296 1 HALEYWAI RD.COAA �geY1F`W"� Y Boathouse area Boathouse lake edge i7 s� P 0Q Y J_ z F x rb Boathouse area Lyman restoration area 4; - A r; ae- , 1 3 rd Boathouse foundation excavation Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-11-2022 Page -2 - — r fi �F t 1116 driveway erosion control Faculty Housing stockpile area 6 Faculty Housing stockpile area vk+ A 1116 driveway erosion control Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-11-2022 Page -3 - v HALEY WARD..: ENGINEERING I ENVIRONt 'NSAL I SURVEYING Town of North Andover PlanninjZ and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 11/07/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending November 4, 2022 Site Work • Excavation for boathouse foundation Upcoming Site Work • regrade above Lyman stone wall • Install water line for boathouse(Begin installation of water line for boathouse) • Continue excavation and preparation for boathouse foundation • Decommission septic tank 1116 Great Pond Road • Abandon 1116 Great Pond Road water service Notable Rain Events • none Site Inspections 11-04-2022 Town Review of Boathouse progress: • Attendees: Taylor Andrews,Anthony Cleaves Action Items • Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. • Setup pre-winter inspection with Conservation in November 510 Mechanic Street, Leominster MA 01452 4e%00T:978.537.5296 ( HALEYWARD.COM Abb, I (:t Boathouse area Boathouse lake edge x ON It I x ? I �._ K Boathouse area Lyman restoration area C � k.1. q MSy p°ar Y e� 1A�LP Boathouse foundation excavation Boathouse staging area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-04-2022 Page -2 - Faculty Housing stockpile area s� f F _ sg II k dry... �.. 7 Faculty Housing stockpile area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 11-04-2022 Page - 3- HA LEY WARD. ENGiN-IRING I E;;Vh4:ID^!MEN iAL I SURVEY3NG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 10/31/2022 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending October 28, 2022 Site Work • Watering of Lyman restoration area and lakefront sod • Dewatering frac tank delivered to boathouse site • Install new water main connections for Faculty Housing&Boathouse Upcoming Site Work • regrade above Lyman stone wall • Install water line for boathouse • Excavation for boathouse foundation Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. • End of October-setup pre-winter inspection with Conservation for beginning of November 510 Mechanic Street, Leominster, MA 0145 40%010. 7: 978.537.5296 ( WQLE WARD.CCJM rt, a 'I s - Boathouse area Boathouse staging area I ' f T — Boathouse lake edge Boathouse frac tank ,a < v f i' r- v Lyman restoration area Faculty Housing stockpile area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 10-28-2022 Page -2 - v HALEY WARD ENvINEE�7N%i(ENVIRONNAEN IAL I SURVEYNG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 10/24/2022 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard,Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending October 21, 2022 Site Work • Watering of Lyman restoration area and lakefront sod • Install insertion valve on water system Upcoming Site Work • regrade above Lyman stone wall • Install water line for boathouse • Excavation for boathouse foundation Notable Rain Events • 10/17/2022—0.87" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. • End of October- setup pre-winter inspection with Conservation for beginning of November 510 Mechanic Street, Leominster, MA 01454 T: 978.537.5296 1 HALEYWARD.0 OM i — - x [ at aa+i S"`�6'y�` J1 .g� 4� :gyp t p.. t 7e✓d Boathouse area Boathouse staging area z Z a td� p5- t �r Boathouse lake edge Faculty Housing stockpile area d 5=:t e�µr _y 1 Il Lyman restoration area Faculty Housing stockpile area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 10-21-2022 Page -2 - v HALEY WARD. ENG7\EFRRIG J 111'RONh4ENPAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 10/17/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending October 14, 2022 Site Work • Grade Holcombe Boathouse area • Temporary stabilize Holcombe area • Watering of Lyman restoration area and lakefront sod • Install temporary services to project trailer Upcoming Site Work • regrade above Lyman stone wall • Install water line for boathouse Notable Rain Events • 10/13/2022— 1.07" • 10/14/2022—0.90" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. • End of October-setup pre-winter inspection with Conservation for beginning of November 510 Mechanic Street, Leominster, MA 0145,: T: 978.537.5296 1 HALEYWARD.COAA rm i - aa; . i i x Boathouse area temporary stabilization 10-13-22 Boathouse lake edge—during storm 10-14-22 1: Boathouse trailer temporary service area Boathouse lake edge—during storm 10-14-22 r , JJ e i r 3 1 Boathouse area—during storm 10-14-22 Lyman restoration area—during storm 10-14-22 Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 10-14-2022 Page -2 - x� at Boathouse area—post storm 10-14-22 Faculty Housing stockpile area nn h<r, Boathouse staging area Faculty Housing stockpile area Fa v<'e Faculty Housing stockpile area Faculty Housing driveway sweeping Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 10-14-2022 Page -3 - V HALEY WARD, ENGINEERING I ENVIRONMENTAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 10/11/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin,Liz Martin,Andrew Leonard,Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary EndinIZ October 7, 2022 Site Work • Removed Holcombe Boathouse foundation • Grade Holcombe Boathouse area • Watering of Lyman restoration area and lakefront sod Upcoming Site Work • regrade above Lyman stone wall • Temporary stabilize Holcombe area • Install water line for boathouse Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. • End of October-setup pre-winter inspection with Conservation for beginning of November 510 Mechanic Street, Leominster, MA 01453 T:978.5375296 1 HALEYWARD.COM Boathouse staging area Lyman restoration area M1a 4 Area of former Holcombe boathouse Faculty Housing stockpile area r Sod watering Faculty Housing stockpile area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 10-7-2022 Page -2 - to HALEY WARD. ENGINEERING I ENVIRONMENTAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 9/30/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Endinlz September 30, 2022 Site Work • Regrade lakefront area&stabilize with sod • Lyman restoration area seeded with wetland mix • Stabilize staging area surface with compacted graded base Upcoming Site Work • regrade above Lyman stone wall • Remove Holcombe Boathouse foundation Notable Rain Events • none Site Inspections 9-29-2022 Town Review of Boathouse progress: • Attendees:Amy Maxner,Jean Enright,Paul Griffin,Andrew Leonard,Mike Cataldo,Mark Canfield, Anthony Cleaves o Add erosion control at end of new stone wall—completed 9-29-2022 o Relocate boat-completed 9-29-2022 o Follow up site visit to be scheduled for the beginning of November to ensure adequate stabilization/protection prior to winter. Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. • End of October-setup pre-winter inspection with Conservation for beginning of November 510 Mechanic Street, Leominster, MA 01453 T:978.53T5296 1 HALEYWARD.COM stti k �a w" Boathouse area Boathouse lake edge 1° �f lhu j 43'.'f'L# }5V.•-ij5,;py t�,t`''P a, -tT.k'.�e s { i� �•+.�., y,..�. Boathouse staging area Boathouse lake edge ..t.ti Boathouse lake edge Boathouse lake edge/boat launch Haley Ward, Inc. Brooks School Boathouse c& Faculty Housing Weekly Summary 9-30-2022 Page -2 - ah � d dam Lyman restoration area seeded Faculty Housing stockpile area y A — . r Added silt sock at end of stone wall Faculty Housing stockpile area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 9-30-2022 Page -3- HALEY WARD. ENGINEERING(ENVIRONMENTAL I SURVEYdNG Town of forth Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 9/26/2022 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending September 23, 2022 Site Work • Back fill of stone wall along Lyman restoration area • Lyman restoration area grading&plantings Upcoming Site Work • Restoration&regrade boathouse lakefront area • Remove Holcombe Boathouse foundation Notable Rain Events • 9/19/2022—0.6" • 9/22/2022— 1.22" Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. • End of October- setup required pre-winter inspection with Conservation 510 Mechanic Street, Leominster, MA 01453 400%01 T:978.5375296 1 HALEYWARD.COM Boathouse area Lyman Boathouse rip rap pad Lyman Boathouse restoration area Faculty Housing stockpile area Lyman Boathouse restoration area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 9-23-2022 Page -2 - V HALEY WARD: ENGINEERING I EN1IR0WAEN?AL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement 4te: 9/19/2D022 Project Update by Anthony Cleaves Issue Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leon Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending September 16, 2022 Site Work • Continue installation of stone wall along Lyman restoration area • Remove docks from the lake Upcoming Site Work • Back fill of stone wall • Lyman Boathouse area restoration • Restoration&regrade boathouse lakefront area • Remove Holcombe Boathouse foundation Notable Rain Events • none Action Items • Install 25-ft NDZ signs for Conservation review— completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events. • End of October-setup required pre-winter inspection with Conservation 5101viechanic Street, Leominster, MA 01453 T:978.537.5296 1 HALEYWARQ.COM --7 - �iU SS E kt flu. Boathouse area stone wall work area Boathouse area stone wall N. E� r Boathouse area stone wall work area Boathouse area completed stone wall 1_ n�a Boathouse area stone wall work area Boathouse area completed stone wall Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 9-16-2022 Page -2 - n,W �yrs I s � , x t� � S t Faculty Housing stockpile area d �X � T Faculty Housing stockpile area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 9-16-2022 Page -3 - v HALEY WARD, EAGi>.IER:NG I E-4111I04MEN3AL J,WPIVEYING Town of North Andover Plannin;^ and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Proje Project Update by Anthony Cleaves Issue te: 9/12/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonar Mike Cata , Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary EndinI4 September 9, 2022 Site Work • Install Boathouse construction trailer • Begin stone wall along Lyman restoration area • Remove stump pile Faculty Housing stockpile area Upcoming Site Work • Continue install of stone wall along Lyman restoration area • Stump and grub Boathouse area • Lyman Boathouse area restoration Notable Rain Events • 9-5-20221.25" • 9-6-2022 0.6" • No erosion/sedimentation concerns seen during storm event Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after rain events • End of October-setup required pre-winter inspection with Conservation 40**4400-, 510 Mechanic Street, Leominster, MA 01453 T:978.53Z5296 I HALEYWA D.COM _w fJ r� n a - Boathouse area construction trailer Faculty Housing stockpile area I I s Boathouse area construction trailer Faculty Housing stockpile area 5,,, s 4 P•l Boathouse area stone wall foundation prep Boathouse area stone wall Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 9-9-2022 Page -2 - n HALEY WARD. IIIGN'FE.°?NG I IN11101,1ndEN?AL I SURVEM4G Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Prcje is Project Update b Anthonyleaves Issue ate: 9/2/2022 J p y y Distribution: Jean Enright, Amy Maxner, Paul Griffin,Liz Martin,Andrew Leonard, Mike- ataJzlo Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews, Lucy Frye Weekly Summary Ending September 2, 2022 Site Work • Adjust erosion control for next phase of Boathouse • Adjust security fencing Upcoming Site Work • Lyman Boathouse area restoration • Install stone wall along Lyman restoration area Notable Rain Events • None greater than 0.25" Action Items • Town review of adjusted erosion control for next phase of Boathouse—Planning Director reviewed on 9-1-2022 • Install 25-ft NDZ signs for Conservation review —completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after • End of October-setup required pre-winter inspection with Conservation 510 Mechanic Street, Leominster, MA 01453 40"%11 T: 978.537.5296 1 HALEYWARD.GOM Y ` i� Boathouse area updated erosion control Boathouse area updated security fencing r i 1 f.. M t Y �- ,�..@ �r raFx $ �4:.9 ._s.`...f.a P._.__�.�i�'��ee�.�§�n-.cu-.• ,1 - ...:^h'7�Jf �F• . Boathouse area updated erosion control Faculty Housing stockpile area �P^ `_ Cr 7 .. id'. Boathouse area updated erosion control Faculty Housing stockpile area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 9-2-2022 Page -2 - V HALEY WARD,, ENGINEERING I E\VIRONMENT.AL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Proje Project Update by Anthony Cleaves Issue D te: 8/29/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin,Liz Martin, Andrew Leonar e Cata , Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews Weekly Summary Ending AuLyust 26, 2022 Site Work • Boathouses demolition—Lyman&Holcombe boathouse structures demolished and debris removed from site • Lyman Boathouse foundation removed Upcoming Site Work • Adjust erosion control for next phase of Boathouse • Stump and grub Boathouse area(upon Town acceptance of erosion control) • Begin Lyman Boathouse area restoration • Remove Holcombe Boathouse foundation Notable Rain Events • None greater than 0.25" Action Items • Town review of adjusted erosion control for next phase of Boathouse • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after • End of October-setup required pre-winter inspection with Conservation 510 Mechanic Street, Leominster, MA 01453 T:978.5375296 1 HALEYWARa.COM M p� Lyman Boathouse demolition Lyman Boathouse demolition Ad Lyman Boathouse demolition Holcombe Boathouse demolition i Lyman Boathouse demolition Holcombe Boathouse demolition Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 8-26-2022 Page -2 - V/ f'=y� HALEY WARD. ENGfNFRI NG I HIQ"4F.INIENV%L I Sup,%IEY3NG Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 8/22/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews Weekly Summary Ending August 19, 2022 Site Work ® Construction entrances at end of boathouse access drive and at Faculty Housing stockpile area. ® Stump removal at Faculty Housing stockpile area Upcoming Site Work • Boathouses demolition(week of 8/22/22) Action Items ® Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. ® Monitor erosion controls during construction weekly and after ® End of October-setup required pre-winter inspection with Conservation 510 Mechanic Street, Leominster, MA 01452 4^000.. 7:978.537.5296 1 hiALEYWARD,COM v P � f y a... • u . CT Boathouse construction entrance Faculty Housing stockpile area I ill Boathouse pipe storage area �eY - nd' _ ram. '.�` ia•.•v`x- ..�.e.'�� _ol?_...a�_"`��"��i6.�_� � .._....r,..._e.....4�..�v4rh^�vLv'_. y[=, Faculty Housing construction entrance Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 8-19-2022 Page -2 - V HALEY WARD, ED7G'.NEEFiNG """R6NhhENTAL I SURVEYFNG Town of North Andover PlanninI and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Proje Project Update by Anthony Cleaves Issue D e: 8/15/2022 Distribution: Jean Enright,Amy Maxner, Paul Griffin,Liz Martin,Andrew Leonard, i e ado, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews Weekly Summary EndinV August 12, 2022 Site Work • Installed security fencing in Boathouse area • Cut trees in Boathouse Area Upcoming Site Work • Install construction entrances • Boathouses demolition Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after • End of October- setup required pre-winter inspection with Conservation 510 Mechanic Street, Leominster, MA 01453 T:978.537.5296 1 HALEY�NA[RD,COM kq S r � A Boathouse security fencing @ driveway Boathouse trees cut Boathouse security fencing @ lake Boathouse tree cut T �' 3v e Boathouse security fencing Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 842-2022 Page -2 - HALEY WARD. ENGINEERING I ENVIRONMENTAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Project-'—', Project Update by Anthony Cleaves Issue ate: 8/5/2022 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin,Andrew Leon d 1'Iil;G�atai- o, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews Weekly Summary Ending August 5,2022 Site Work • Installed 25-ft NDZ signs for Conservation review—completed areas outside of project limits • Seeded the area of 1116 where debris was removed and growth had not yet begun. • Begun installation of security fencing in Boathouse area Upcoming; Site Work • Install Boathouse security fencing(8-8-2022) • Boathouse tree removal(8-11-2022) • Boathouses demolition(week of 8-15-2022) Action Items • Install 25-ft NDZ signs for Conservation review—completed areas outside of project limits. Done until project areas can be installed and/or as directed by Conservation. • Monitor erosion controls during construction weekly and after • End of October-setup required pre-winter inspection with Conservation 510 Mechanic Street, Leominster,MA 01453 T:978.537.5296 t HALEYWARD.COM J HALEY WARD. ENGINEERING I ENVIRONMENTAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Date: 7/25/2022 Wetland sign along lake at boathouse work limit Wetland sign @ 1116 GPR yard area Wetland sign/post @ 1116 GPR driveway area 1116 GPR debris removal area restoration beginning 400%10- 510 Mechanic Street, Leominster,MA 01453 T:978.537.5296 1 HALEYWARa.COM - -a d� '1 Boathouse security fence poles Boathouse security fence poles Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 8-5-2022 Page- 3- J HALEY WARD. ENGINEEP.ING I ENVIRONMENTAL(SUPVEYWG. Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects Project Update by Anthony Cleaves Issue Da•e: 8/1/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leon t7� e C 'ald0, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews Weekly Summary Ending July 29, 2022 Site Work • None Action Items • Install 25-ft NDZ signs for Conservation review—in progress • Seed the area of 1116 where debris was removed with New England Wetland Shade and Forbs mix • Monitor erosion controls during construction weekly and after • End of October-setup required pre-winter inspection with Conservation 510 Mechanic Street, Leominster,MA 01453 T:978.537.5296 1 HALEYWARD.COM / HALEY WARD.: ENGINEERING I ENVIRONMENTAL I SURVEYING. Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projects---- Project Update by Anthony Cleaves Issue ate: 7/25/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonar , -ker atatdo, Kevin Hunt, Josh Beauregard, Chris Merrick, Taylor Andrews Weekly Summary Ending July 22,2022 Site Work • Tree cutting(Faculty Housing stock pile area), cutting only,no stumping • Erosion control blanket delivered 7-18-22, stored in erosion control stockpile area at the boathouse. Action Items • Have extra erosion control blankets on site for emergency use—delivered 7-18-22 • Install 25-ft NDZ signs for Conservation review—in progress • Seed the area of 1116 where debris was removed with New England Wetland Shade and Forbs mix • Monitor erosion controls during construction weekly and after • End of October-setup required pre-winter inspection with Conservation 40*4%0. 510 Mechanic Street, Leominster, MA 01453 T:978.537.5296 1 HALEYWARD.COM r ,r r-� Erosion control blankets at boathouse erosion control Tree clearing at Faculty Housing stockpile area storage g 64`.414af Al t Po U Y tea': Tree clearing at Faculty Housing stockpile area ITT Erosion control blanket label Tree clearing at Faculty Housing stockpile area Haley Ward, Inc. Brooks School Boathouse &Faculty Housing Weekly Summary 7-22-2022 Page -2 - � tl, F a 1 Tree clearing at Faculty Housing stockpile area xi r r f Tree clearing at Faculty Housing stockpile area Tree clearing at Faculty Housing stockpile area Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 7-22-2022 Page -3- HALEY WARD, ENGWEERING I ENVIRONMENTAL I SURVEYING Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Pror7, 4 ti Project Update by Anthony Cleaves Issue Dat18/2022 Distribution: Jean Enright,Amy Maxner, Paul Griffin, Liz Martin,Andrew Leonard, kke Catal&6, Kevin Hunt, Josh Beauregard, Chris Merrick . Weekly Summary Ending July 15, 2022 Site Work • DEP signs installed(2)—located at the lake facing the water and at the South Entrance facing road. • Dirt Bag delivered to site, stored in erosion control stockpile area at the boathouse. • Begun 25-ft NDZ sign installation(along boathouse access driveway) Action Items • Record Planning and Conservation designs and provide recorded copies to Town o Completed 7-13-2022 o Zoning Board of Appeals Variances—Brooks School-Book 17506 Page 173 o Planning Watershed Special Permit—Brooks School-Book 17506 Page 176 o Planning Site Plan Review—Brooks School-Book 17506 Page 183 o Conservation Order of Conditions—Brooks School-Book 17506 Page 225 • Finalize Conservation Bond after decision is recorded- Completed • Install DEP signs - Completed • Have dewatering BMP's on site for Conservation review(excluding sediment tank) - Completed • Have extra erosion control blankets on site for emergency use—delivery expected 7-18-22 • Install 25-ft NDZ signs for Conservation review—in progress • Seed the area of 1116 where debris was removed with New England Wetland Shade and Forbs mix • Monitor erosion controls during construction weekly and after • End of October-setup required pre-winter inspection with Conservation 510 Mechanic Street, Leominster, MA 01453 T:978.537.5296 1 HALEYWARD.COM DEP sign at South Entrance Wetland sign along boathouse access drive NA DEP Fl tl Z121-te]e s� DEP sign at Holcombe Boathouse Wetland sign along boathouse access drive gMnrrt Dirt Bag at boathouse erosion control storage Wetland sign along boathouse access drive Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 7-15-2022 Page -2 - k -s yu. 1 ' t `el e" Ig 00 E r"� z r .i *� 3 y�•`fx� � t;16 ,'V. f � 1 V HALEY WARD, ENGrsEEsNG I Etwip 0VfiaE\7AL I supvEmo Town of North Andover Planning and Conservation Commission Report Brooks School Boathouse & Faculty Housing Improvement Projeot Project Update by Anthony Cleaves Issue ate: 7/11/2022 Distribution: Jean Enright, Amy Maxner, Paul Griffin, Liz Martin, Andrew Leona d, Mike Cataldo Kevin Hunt, Josh Beauregard, Chris Merrick Pre-Construction Summary Ending July 8, 2022 Site Work • Phase 1 erosion controls installed for Town review • Historic yard waste areas removed at 1116 Great Pond Road(per Conservation Order of Conditions) • Reestablished missing wetland flags and delineated 25-ft wetland Non-Disturbance Zone(1116 GPR) Site Inspections 6-29-2022 Pre-Construction Site Meeting(Planning): • Attendees: Jean Enright, Paul Griffin, Liz Martin, Andrew Leonard, Mike Cataldo, Chris Merrick, Anthony Cleaves • CE Floyd provided copies of documents required in Planning decisions • CE Floyd will provide contact list of the project team and electronic copies of documents to Planning —Completed 7-6-2022 • Brooks School will be recording permit decisions and provide copies to Town when complete • Electronic copy of SWPPP to be provided to Town—Completed 7-8-2022 • Reviewed Boathouse erosion controls, including stockpile area located at Faculty Housing (phase 1 controls—prior to building demolition) o Areas noted to be adjusted for overlap of silt sock to be in the direction of flow—adjustments made 6-29-2022 o Town must be notified to review next phase erosion controls upon installation and prior to land disturbance. o Additional erosion controls will be needed at the area of the remote bath house prior to bath house construction o Silt sack to be added in catch basin in Swale in front of Thompson House- Completed 7-6-2022 Pre-Construction Site Meeting(Conservation • Attendees:Amy Maxner,Liz Martin,Andrew Leonard,Kevin Hunt,Chris Merrick,Anthony Cleaves • CE Floyd provided copies of documents required in Conservation decisions • Brooks School will be recording permit decisions and provide copies to Town • Reviewed Boathouse erosion controls, including stockpile area located at Faculty Housing(phase 1 controls—prior to building demolition) o Town must be notified to review next phase erosion controls upon installation and prior to land disturbance. • Noted that existing boat racks previously located in wetlands near Lyman Boathouse have been removed. • Confirmed DEP sign locations to be installed—one at the lake (facing the water) and one at Great Pond Rd.,near the new south entrance 510 Mechanic Street, Leominster, Mn 01453 40*4%00. T:978.537.5296 I HALEYWARD.001A ', t. • Verified Silt sack was added in catch basin in swale in front of Thompson House • Verified historic yard waste areas were removed at 1116 Great Pond Road and major invasives were cut • Area of removed debris pile to be restored with NE Wetland shade/forbes mix • The Order of Conditions needs to be recorded. This also impacts the processing of the bond. • Dewatering controls must be on site and reviewed by Conservation before construction. Discussed the added protection of a sediment removal tank but this will not be onsite until active dewatering takes place. The Dirt Bag and pump will be brought to the site. • Extra erosion controls are on site except for the erosion control blankets which should be on site soon. • A. Cleaves reviewed SWPPP with A.Maxner. Will provide electronic copy upon activation of NPDES NOI • Reviewed areas for 25-ft NDZ delineation. Areas to be delineated at this time include Boathouse areas outside of project work area(WF series I to 7, 11A to 30A) and 1116 GPR areas. Remaining boathouse area to be done after construction. Signs to be purchased from Conservation office and placed on trees where possible and filled in with 4x4 pressure treated posts such that spacing is no larger than 40-ft. • Project Team must touch base with Amy near the end of October to setup required pre-winter inspection Action Items • Record Planning and Conservation designs and provide recorded copies to Town • Finalize Conservation Bond after decision is recorded • Install DEP signs • Have dewatering BMP's on site for Conservation review(excluding additional sediment tank) • Have extra erosion control blankets on site for emergency use • Install 25-ft NDZ signs for Conservation review • Seed the area of 1116 where debris was removed with New England Wetland Shade and Forbs mix • Monitor erosion controls during construction weekly and after • End of October-setup required pre-winter inspection with Conservation Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 7-8-2022 Page -2- �y Removal or debris at 1116 GPR tl� 4 9 ro� r ` Area of removed boat racks @ Lyman Y a.g Invasives cutting at 1116 GPR Erosion control barriers along Lyman Boathouse Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 7-8-2022 Page-3- ftbld ' I Erosion control barriers along lake Erosion control around boathouse walking path f _a .ate Erosion control barriers along lake I Erosion i n control alongboathouse access drive rw p �F Erosion control barriers along Holcombe Boathouse Haley Ward, Inc. Brooks School Boathouse & Faculty Housing Weekly Summary 7-8-2022 Page -4-