HomeMy WebLinkAbout1987-10-22 Certification of Action Definitive Subdivision Plan MODIFICATION Salem Forest III Notice to APPLICANT/TOWN CLERK and Certification of Action of Planning Board
on Definitive Subdivision Plan entitled: MODIFICATION OF
SALEM FOREST III
By: George Farr dated July 27 198J-7
The North Andover Planning Board has voted to APPROVE said plan, subject to the
following conditions:
1. That the record owners of the subject land forthwith execute and record
a "covenant running with the land", or otherwise provide security for the con-
struction of ways and the installation of municipal services within said sub-
division, all as provided by G.L. c. 419 S. 81-U.
2. That all such construction and installations shall in all respects
conform to the governing rules and regulations of this Board.
3. That, as required by the North Andover Board of Health in its report to
this Board, no building or other structure shall be built or placed upon Lots
No. as shown on said Plan without the prior
consent of said Board of Health.
NOTE : This decision replaces the Planning Boards initial decision
on this definitive subdivision issued on May 6 , 1987 .
The reason for this modification is to incorporate the
Board' s list of conditions into the plan as well as
address the Order of Conditions issued by the
=` Conservation Commission on April 1 , 1987 .
See attached conditions . '
a
In the event that no appeal shall have been taken from said approval withi6
twenty days from this date, the North Andover Planning Board Will forthwith z'
thereafter endorse its formal approval upon said plan. ---
The North Andover Planning Board has DISAPPROVED said plan, for the following
reasons: ATTEST:
A True Copy
Town Clerk
NORTH ANDOVER PLANNIM BOARD
Date: October 22 , 1987 By: Paul A. Hedstrom, Chairman
SALEM FOREST III
CONDITIONAL APPROVAL ,
R i n'i
4 . The developer shall not place the cast .,6f fziin&�s pavement
until an interim As-Built and certification by the Design
Engineer has been submitted and approved by the Planning Board
indicating that all utilities have been installed and are
correct in accordance with the approved definitive subdivision
plans and profiles . Said certification will include as a
minimum all drainage facilities .
5 . No lot (s) or group of lots shall be released from the statutory
covenant until the binder coat of bituminous pavement has been
installed and a certification by the Design Engineer has been
submitted stating that the pavement is in the correct vertical
horizontal alignment as approved in the Definitive Plan.
6 . The Planning Board recognizes that it would be environmentally
correct in the minimizing of wetland filling and therefore
waivers the strict compliance with the Rules and Regulations
in maintaining proper side slopes. The Board will require the
applicant to increase the side slopes in the area of wetland
filling to allow for a 1 to 1 slope provided, however, that a
guard rail of acceptable standards be installed in those areas
where directed by the Division of Public Works . Said guard
rail shall be set a distance of six (6) feet from the gutter
line of the roadway and at the top of the slope and provided
further that the 1 to 1 side slope be rip-rapped for erosion
control to the satisfaction of the Division of Public Works . -
This condition shall be incorporated and shown on the Definitive
Plans.
7 . No lots will be released from the statutory covenant until the
Conservation Commission and the Board of Health have approved
such lot construction and an Order of Conditions has been issued
by the Conservation Comission.
8 . The plans shall be revised to incorporate detail construction
specifications for proper installation of the box culverts
including, but not limited to: time and duration of installation,
dewatering, base preparation, erosion controls and wing wall
construction and will include a separate topographic at a
scale of 1" to 20 ' of the vicinity of the crossing showing
existing and proposed elevations and work with borings and
peat depth for approval by the Planning Board and the Division
of Public Works .
9 . The applicant shall provide 30 foot wide easement granted to
the Town running from Hawkins Lane to the: land of the
Commonwealth in the area between lots 2 and 3 . Said easement
will be used as a pedestrian access/egress right-of-way and
provide emergency access to the land owned by the Commonwealth,
The developer shall remove a 15 ' area wide of all natural vegetation
found within this easement, grubed and cleared. Stone monuments
shall be placed adjacent to the Hawkins Lane right-of-way at
each easement line. The monuments shall include the wording:
"Public Access" .
SALEM FOREST III 8�
10 . The applicant shall show the existing stone bounds on Patton
Lane and on Granville Lane. -
11 . Parcel 'A' shown on the plans at the intersection of Patton
Lane and Hawkins Lane shall be eliminated. Area shown as
parcel 'A' will be deemed part of the right-of-way for both
streets .
12 . The water main and gas main installation shall be shown on the
profile of Hawkins Lane in accordance with the Rules and
Regulations of the Planning Board.
13 . An additional hydrant shall be installed at the end of the
cul-de-sac.
14 . Applicant shall show proposed dwellings, driveways and septic
systems along the proposed lot grading to indicate how each
lot will support a habitative area and will not adversely
effect abutting properties and other lots within the subdivision.
15 . All easements shall be submitted and executed by the Planning
Board prior to endorsing the plans.
16 . A letter from DPW stating that the DPW has no problems
regarding the redesign of the roadway, prior to endorsing
the plans.
cc: Director of Public Works
Public Works Department
Highway Surveyor