HomeMy WebLinkAbout1987-05-06 Application & Certification of Action Definitive Subdivision Plan Salem Forest III i
fi'FCE1k1rn
l; " 'notice to APPLICANT/TOWN ffi E and.�erti.fication of Action of Planning Board _
on DefMrS`ve S visi '
�FPa:-------""
' LEF.ORi?
By y George Farr `� ! dated December 8 , 19 86
The North Andover Planning Board has voted to APPROVE said plant aubjeet to the
following conditions:
1. That the record owners of the subject land forthwith execute and record
a "covenant running with the land"l or otherwise provide security for the con-
struction of ways and the installation of municipal services within said sub-
division, all as provided by G.L. c. 41t S. 81-U.
2. - That -all such construction and installations shall in all respects
conform to the governing rules and regulations of this Board.
3. , That, as required by the North Andover Board of Health in its report to
this Boards no building or other 'structure shall be built or placed upon Lots
No. as shown on said Plan without the prior
consent of said Board of Health.
4. Other conditions:
See attached conditions.
In tha event that no appeal shall have been taken from said. approval within
twenty days from this datep the North Andover Planning Board will forthwith
thereafter endorse its formal approval upon said plan.
• X }iX4� �{�li �t8�[ K1�I�t}�$XH� S� X, X�c3�X�li�t�f?�8Y03h�
)MXM iXXX
NORTH ANDOVER PLANNING BOARD
Date: May 6 , 1987 By: Erich W. Nitzsche
a.
SALEM FOREST III
CONDITIONAL APPROVAL
Ai�av�
The drainage computations are technically correct,
however IEP explains the installation of a new 10 ' by 5 '
concrete box culvert will lower the flood stage upstream
of .the proposed 0awkins •Lane from elevation 106 . 2 , to
elevation 105 .6 . This lower -flood stage will result in
a loss of available flood storage in the upstream'
meadow of probably more than 15 acre feet. The flood
-storage capability of the upstream meadow attenuates
flood flows downstream. The loss of available flood
storage in that meadow would in all probability increase
peak flows downstream not only in the 100 year storm but
also in all minor storms. This would, also in all
probability, negatively effect the environmental balance .
of the existing meadow over a long period of time by
lowering of the water surface. In light of the fact
that no testimony has been presented to refute this
belief, the Planning Board requires the applicant to
restore the existing flood stage elevation 106 . 2 and
redesign the crossing to assimilate existing conditions
in all storms. Further , the drainage computations must
be performed by, and signed and stamped by a
professional engineer in the proper discipline of
Hydrology and Hydrablics. The revised . drainage
calculations will include, as a minimum, the topographic .
outline of the upstream meadow and its storage capacity
as well as an inventory of the wetland plant and
wildlife species that may be effected by any change in
the existing conditions.
2. The developer shall not place the coat of bituminous
pavement until an interim as built and 'certification by
the Design Engineer has been submitted and improved by
the Planning Board indicating that all utilities have
been installed and are correct in accordance with the
approved definitive subdivision plans and profiles.
' Said certification will include as a minimum all
drainage facilities.
3 . No lot (s) or group of lots shall be released from the
statutory covenant until the binder coat of bituminous
pavement has been installed and a certification by the
Design Engineer has been submitted stating that the
pavement is in the correct vertical and horozontal
alignment as approved in the Definitive Plan.
4 . The Planning Board recognizes that it would be
environmentally .correct in the minimizing of wetland
filling and therefore waivers the strict compliance with
the rules and regulations in maintaining proper side
slopes. The board will require the applicant to
increase the side slopes in the area of wetland filling
to allow for a 1 to 1 slope provided, however , that a
guard rail of acceptable standards be installed in those
areas where directed by the Division 'of Public Works.
Said guard rail shall be set a distance of six (6) feet .
from the gutter line of the roadway and at the top of
the slope and provided further that the lto 1 side slope
be rip-rapped for erosion control to the satisfaction of
the Division of Public Works. This condition shall be
incorporated and shown on the Definitive Plans.
The applicant shall install three (3) water gates at the
C intersection of Patton Lane and Hawkins Lane in
accordance with the rules and regulation. ,
6 . ' No lots will be released from the statutory covenan
until the Conservation Commission and th Board of
Health have approved such lot construction And an Order
-of Conditions has been issued by the Conservation
Commission.
7 . The plans shall be revised to incorporate detail
construction specifications for proper installation of
the box culverts inluding, but not limited to: time and A /
duration of installation, dewatering , base preparation,
erosion controls and wing wall construction and will '
include a separate topographic at a scale of 1" to 20 '
of the vicinity of the crossing showing existing and
proposed elevations and work with borings and peat depth
for approval by the Planning Board and -the Division of
of Public Works.
V - The applicant shall provide a sepilrate 30 foot wide
parcel of land running from Hawkins Lane to the land of
the Commonwealth .in the -area between lots 1 and 2 . • Said
parcel of land shall be deeded in fee to the Town of
North Andover and will be used as a pedestrian
access/egress right of' way to the land owned by the
Commonwealth. The developer shall not remove any
natural vegetation in this parcel -of land during the
roadway and/or lot construction without the approval of
the Planning Board . Any such removal of vegetation will
require the developer to replant and restore the parcel
to its natural condition.
9 . The applicant shall show the exisitng stone bounds on
Patton Lane and on Granville Lane.
�o construction whatsoever will be allowed on Hawkins
Lane until Patton Lane has been finished in its entirety
to the satisfaction of the Planning Board . and the
Division of Public Works,. and a Certificate of
Compliance has been issued by the Conservation
rj - Commission.
1(1 The plans will not be endorsed by the Planning Board
until the status of Parcel 'A' at the intersection of
Patton Lane and Hawkins Lane has been resolved to the
satisfaction of the Planning Board.
No common driveways will be allowed in this subdivision//J°
without a Special Permit under the Zoning Bylaws of the
Town of North Andover :
13 . The water main and qas ma-i installation shall be shown
on the profile of Hawkins Lane in accordance. with the
rules - and regulations of the Planning Board.
14 . An additional hydrant shall be installed at the end of
the cul-de-sac.
15. All catch basin outlets will discharge on the upstream
side of Hawkins Lane. In order to minimize the
increased rate of runoff from peak storms, the discharge
, from- the catch basins at the intersection of Patton and
Hawkins Lanes will empty into a detention pond to be
designed and located between Hawkins Lane and land of '
McClung . A. detention drainage easement will be
dedicated,
16 . Applicant shall show proposed dwellings, driveways and QN �
septic systems along with proposed lot grading to y
indicate how each lot will support a habitative area and
will not adversely effect abutting properties and other
lots within the subdivision.