Norse Environmental Services, Ine.
2100 Lakeview Avenue, Unit 3A
Dracut, MA 01826
Ph: (978) 649-9932
Website: ,wvww.norseeuviroumental.com
May 9, 2025
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on 5-9-25 after a significant storm or 1"rain event. The contractors
finished the exterior of the building and driveway. Work is being performed in the interior of the
building. Some of the landscaping around the building needs to be refreshed with loam and seed.
Overall, the project site looks good, and the erosion controls are set and maintained. The site is in
substantial compliance with the Special Permit. Please see the attached photographs below:
w >
U
J °ter.
u
� V
pp
e
„
w ` W r <r
ail i• �� � � �
xis.. �; � �:v �•�c�"��" `� '�"
4 �r
r
� Y
r.
I am requesting to stop inspections. If you have any questions or concerns regarding the above
information, please do not hesitate to call.
Sincerely,
Maureen Herald, PWS, CWS
Cc: SDG Development Construction:
Mr. Greg Susko
Mr. David William
J
Norse Environmental Services, Inc.
2100 Lakeview Avenue, Unit 3A
Dracut, MA 01826
Ph: 4978) 649.9932
Wehsite: www.norseeiiviroiunental.com
March 22, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on 3-17-25 after a significant storm or 1"rain event. The
contractors are finishing the exterior of the building and working on the interior. The erosion
controls are set and maintained. The site is in substantial compliance with the Special Permit.
Please see the attached photographs below:
E S 4��'� � �f�-p�-•�f ham.
yy55 Ff6"��Ea"+•
Si too o y.
71v,
:i
E r .
N�
s8 !�
' x1
I
out
Ilk
4-
how 11
Yu sk
a rrr$�r
s s�
� r
JL
IN,
Af
. . ..............
No - 1
.........
r
a
m�
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
llm'a
Maureen Herald, PWS, CWS
Cc: SDG Development Construction:
Mr. Greg Susko
Mr. David William
Norse Environmental Services, Inc.
2100 Lakeview Avenue, Unit 3A
Dracut, MA 01826
Ph: (978) 649.9932
Website: www.iiorseenviro=nnental.com
December 13, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on December 11, 2024, following a storm event greater than 2" of
rain. The contractors are framing the building and installing the utilities. Dewatering is occurring
on site. The erosion controls are set and maintained. The site is in substantial compliance with
the Special Permit. Please see the attached photographs below:
s
i
onow ummom
FS 1
UMMML
1 _
a 07 m
a 's --
_ Implom _ -
q
MEM
yqpo mom
ON==
1
vf: a4 1� t� '7•' s
r�T s
` p57RMF s
m
R c max' # r a��+ .n. •Jy�,<„ c.S t`a' �s, mIF,� ,{( ::
1 �
1. 1
t/
Norse Environmental Services, Inc.
2100 Lakeview Avenue, Unit 3A
Dracut, MA 01826
Ph: (978) 649-9932
Wehsite: ,t"vw.norseenviroiunental.com
November 22, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on November 22, 2024, following a 1"rain event. The contractors
are constructing stairway B and the elevator core. The grass is sprouting on the slopes along the
east foundation wall. The site is in substantial compliance with the Special Permit. Please see the
attached photographs below:
j r ft
I
'P f
tttp
s;
M .:
xfsa mx �,
'a v `,";'�i " `+':W t�# {('��' -� fit,; 4't- `S� •3-C `y -im,yz'7° �'k `P EI .
P} e - t 3 i '� K S
l
rPs 2 Ck M C>;r Am
�la
Pjllf«
10
A"t1l
n
tea�Lti� .€ C� �,<R 7M1` "`�w"� '.5�.1 � a *�• 1
`xE �-"`y
o�+ 'tea ,- 3
Y
i s
1 ,
.- ...
1 �
V
Norse Environmental Services, Inc.
2100 Lakeview Avenue, Unit 3A
Dracut, MA 01826
o Ph: (978) 649-9932
Website: ♦"vw.norseenvivoivnental.com
November 15, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on November 15, 2024. The contractors are continuing to construct
the elevator core and stairway B. The erosion controls are set and maintained. The site is in
substantial compliance with the Special Permit. Please see the attached photographs below:
v- t
J ry�l
NMI
y _
g.LP ra�•9'^ 6e�t C J. V�. S f�,..IS �i..�� S' �
-
nr ;
_ s
r
& N
s z AIRS
ls
i� I p VAT A
! � �p➢y, wwlmm
J1FN' ?„ .tlEf?s-f � �i� kni
>,, � ?
Ph
Z �
110 zook
c; I.
low.F : cn
fill!Was I
ly w t
� • • • /" 1 . "1 1 1 1 •
• • 1 1 1 �• 1 � . 1/ / 1 • 1 1 1 • 1
• 1 �
1. 1
Norse Einvironciffsexatal Services, Inc.
2100 Lakeview ven Ue, Unit 3A
Dracut, MA 01826
Pit: (978) 649-9932
Website: www.miorseetivir4biiinteoittal.com
November 8, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on November 8, 2024. The exposed soils around the foundation
walls are hydroseeded. The contractors are constructing stairways A and B, mat slab and elevator
core. The erosion controls are set and maintained. The site is in substantial compliance with the
Special Permit. Please see the attached photographs below:
1
t'
T
ar
a
f
,nr1r 5`
r
r
<
s
r,
rr
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
2eLG2(LQ„lfi ylmla"
Maureen Herald, PWS, CWS
Cc: SDG Development Construction:
Mr. Greg Susko
Mr. David William
Norse Environmental Services, Inc.
2100 Lakeview Avenue, Unit 3A
Dracut, MA 01826
o Ph: (978) 649-9932
Website: wwsv.norseenvironmental.com
November 2, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on October 30, 2024. Construction fencing is being installed
around the perimeter of the foundation. The contractors are foaming and performing earthwork.
Stairway A(northwesterly corner of the building) is being constructed. The erosion controls are
set and maintained. The site is in substantial compliance with the Special Permit. Please see the
attached photographs below:
jli
a
a
r �
0
_
_
}yyhk
'p.
r
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
Maureen Herald, PWS, CWS
Cc: SDG Development Construction:
Mr. Greg Susko
Mr. David William
Norse Environmental Services, Inc.
2100 Lakeview Avenue, Unit 3A
Dracut, PIA 01826
Ph: (978) 649-9932
Website: w "v.Yiorseenviroiimental.com
October 28, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on October 25, 2024. The southeasterly corner of the building is
loamed and(10) arborvitae trees are planted. The contractors are performing earth work and
finishing the backfilling around the building. The contractors are installing crushed stone in the
interior of the building before the slab is poured. The water line is connected to the building. The
erosion controls are set and maintained. The site is in substantial compliance with the Special
Permit. Please see the attached photographs below:
sk
r'
d
144 Amos
f `�' ; ,, .......Ya y z 1 ,,.� �
t t 5 T �.. �s k w a'�,�, t� e 5�y z3
t j �l � t• ; �S 3s Alf
To
a t
l k: Y
BEV r- ffONE
ol
r-^a 7a 5 s
c_
_ � 2
�F �
RR
aim
� � ��•s,,.,����',:..�F" � ''"R`�.aka ' �. �.��� �� ..
Norse Environmental Services, Inc.
2100 Lakeview Avenue, Unit 3A
Dracut, MA 01826
c 1 Ph: (978) 649-9932
' Website: wtvw.norseenviroiunental.com
October 21, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on October 18, 2024. The contractors are waterproofing and
insulating the foundation and elevator shaft. The contractors are performing earthwork on site.
The erosion controls are set and maintained. The site is in substantial compliance with the
Special Permit. Please see the attached photographs below:
a
h�': '
s _
i pp
4
4 $r
y '• ram„ ..
u rvo:
-
Y
A
t
Ar
�n
�a -
i
_
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
Maureen Herald, PWS, CWS
Cc: SDG Development Construction:
Mr. Greg Susko
Mr. David William
Norse Environmental Services, Inc.
2100 Lakeview Avenue, Unit 3A
Dracut, MA 01826
Ph: (978) 649-9932
Website: wwsv.norseenvironmental.com
October 14, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on October 11, 2024. The contractors installed the forms and
poured the northwesterly foundation wall. The elevator shaft is being constructed and the
contractors are performing earthwork. The erosion controls are set and maintained. The site is in
substantial compliance with the Special Permit. Please see the attached photographs below:
�cb
14 r
s
2 ,�
r
•
i x ,
-
d ; w lu
r
t,
EANMM
IN
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
A�a llv /&a"
Maureen Herald, PWS, CWS
Cc: SDG Development Construction:
Mr. Greg Susko
Mr. David William
t�
Norse Environmental Services, Inc.
2100 Lakeview Avenue, Unit 3A
Dracut, PIA 01826
o Ph: (978) 649.9932
' Wehsite: u,%"v.iiorseeuvu•oinnental.com
October 7, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on October 4, 2024. The contractors are pouring the east
foundation wall, the elevator slab and stairway footing are installed. The contractors are
performing earth work and dewatering. The erosion controls are set and maintained. The site is in
substantial compliance with the Special Permit. Please see the attached photographs below:
-iA
v
y-'
X
t+
4 sY
�a-
hf
r
—r
v
gw
LEA
f
�s
_
s
W d
If you have any questions or concerns regarding the above information,please do not hesitate to
call.
Sincerely,
/-/Lal"
Maureen Herald, PWS, CWS
Cc: SDG Development Construction:
Mr. Greg Susko
Mr. David William
Norse Environmental Services, hic.
2100 Lakeview Avenue, Unit 3A
Dracut, PIA 01826
Ph: (978) 649.9932
Website: www.norseenviroiiunental.com
September 11, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on September 6, 2024. The contractors are installing the footings,
foundation, electrical, water line and performing dewatering on site. The erosion controls are set
and maintained. The site is in substantial compliance with the Special Permit. Please see the
attached photographs below:
i
Y
y
.�"� �r-,�'y ["=3-• �" Ste` �� ' ����`6
�s
SR
a.
If you have any questions or concerns regarding the above information,please do not hesitate to
call.
Sincerely,
/// ,-..d
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David William
,/
Norse Environmental Services, Inc.
2100 Lakeview Avenue, Unit 3A
Dracut, PIA 01826
Ph: (978) 649-9932
Website: vvwtv.norseenviroumental.com
September 13, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on September 13, 2024. The contractors are installing the footings,
foundation walls and weather proofing. The contractors are backfilling the foundation as it is
constructed. The plumbing, oil water separator and sewer manhole are being installed. The
erosion controls are set and maintained. The site is in substantial compliance with the Special
Permit. Please see the attached photographs below:
w
-F
ri
p;�
F
r r _
a
r,fi x
, v
yF
r
E
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David William
V
Norse Environmental Services, Inc.
2100 Lakeview Avenue, Unit 3A
Dracut, MA 01826
Ph: (978) 649-9932
Wehsite: wt"v.norseenviroumental.com
September 20, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA O 1845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on September 20, 2024. The contractors are performing earth
work, installing the perimeter drains, finishing the foundation, weatherproofing and plumbing.
The contractors are backfilling the foundation as the project moves forward. The site is in
substantial compliance with the Special Permit. Please see the attached photographs below:
�t
III
J �
z
u.
f
,j
2 tk a�
x f
t
n E
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely, //
W Za Q.Q� y/Mz-1"
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David William
Norse Enviroinnental Services, Inc.
2100 Lakeview Avenue, Unit 3A
Dracut, MA 01826
l Ph: 4978) 649-9932
Wehsite: ,wvww.norseenvironnental.com
October 1, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on September 26, 2024, following a 0.6"rain event. The
contractors are performing earthwork, installing the perimeter drain and finishing the foundation.
The site is in substantial compliance with the Special Permit. Please see the attached photographs
below:
e
I _
r .
W
ti
.ax•A,v
t
I
i
3z
is
V L*s i
rt r
_ t r
n
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David William
Ncorse Eiavirova-inesiatal Seii-vie.es, hie.
21.00 Lakeview Avenue, Unit 3A
Draemit, MA 01826
Ph: (978) 649-9932
Website: wwu,.iii.orseenviro)iiiiiatemital.coi)m
September 4, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was perfornned on August 29, 2024. The contractors are installing the foundation
footings and performing dewatering on site. In addition, the contractors are installing the water
line on the northerly side of the building. The erosion controls are set and maintained. The site is
in substantial compliance with the Special Permit. Please see the attached photographs below:
,
}
I
i
k
n
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David Williams
Norse Evivirozianem.tal Services, tvac.
2100 Lakeview Aveiname, Unit 3A
Dracut, 31A 0 1826
Pit: (978) 649-9932
Website: www.viorseenvi-roitiiiiijiejiital.coiiti
August 23, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01.845
Ms. Enright,
An inspection was performed on August 19t", following a significant storm event. The
contractors are continuing to install the footing for the foundation and dewatering on site. New
and additional erosion controls have been added around the perimeter of the project. The erosion
controls are set and maintained. The site is in substantial compliance with the Special Permit.
Please see the attached photographs below:
c
r
r.
k
�j
S
a t-Y
If you have any questions or concerns regarding the above information,please do not hesitate to
call.
Sincerely,
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David Williams
Norse Emaviromanzentai Services, Inc.
2 100 Lakeview Avemme, Ujixit 3A
Dracut, MA 01826
Ph: 49780 649.9932
Website: ,t"vw.ma4Drseeiiiviro-imiteiii.tal.cojin
August 16, 2024
Director of Planning
M. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on August l6t" and the contractors are installing the footings and
crushed stone for the foundation. Dewatering is occurring on site. The slide rail has been
extended to the back comer of the slope. The grass is growing and established on parts of the
slopes. The erosion controls are set and maintained. The site is in substantial compliance with the
Special Permit. Please see the attached photographs below:
,
i
�°- ,-�,; Ufa `� �• �"" �`� �.{
y� {
A
e.
y ,, 1 Edr�o4arsi n�N � �I
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David Williams
Norse Evivirovimirieiiatal Seo-vkes, luie.
2100 Lakeview Avenue, Unit 3A
Dracut, MA 01826
Ph: 4978) 649-9932
Website: w,.vw.xiorseenwiro.viniaemital.coin
August 9, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on August 5t", following a significant storm event greater than I
of rain. The contractors began installing the crushed stone, rebar and forms for the foundation
footings under the slide rail. The site is being dewatered. The grass is growing on the slopes. The
erosion controls are set and maintained. The site is in substantial compliance with the Special
Permit. Please see the attached photographs below:
...........
si
i
S �
s
—
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
l/e4,a"
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David Williams
V/
Nom-se Evivirojinnaental Sex-vices, Ivic.
1 r21.00 Lakeview Avenue, Unit 3A
Dracut, MA 0,1826
w�w�; Ph: (978) 649-9932
Website.- ww-*v.iiiorseenviroiaimeimtal.comita
August 7, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on August 1, 2024. No new work has been performed on site. The
grass is growing on the slopes. The erosion controls are set and maintained. The site is in
substantial compliance with the Special Permit. Please see the attached photographs below:
Ii
14
44%
ti
3 }t a
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely, YY[1�
�
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David Williams
No-rse Evivirommajaematal Services, Inc. L/
21.00 Lakeview Avenue, Unit 3A
Dracut, IM 01826
Ph: 4978) 649-9932
Website: w%"v.ijiorseenvi-rolijillite lita.l.coin
August 1, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701. Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on July 25, 2024. The contractors have not performed any work on
site this week. The grass is growing on the slopes. The erosion controls are set and maintained.
The site is in. substantial compliance with the Special Permit. Please see the attached photographs
below:
'Var n nu
---------------
t
Y
a
Rn
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David Williams
V/
Norse Emiaviromi-jinental Services, litic.
2100 Lakeview Avenne, Unit 3A
Dracut, IVIA 01826
Ph.- 4978) 649-9932
Website: www.11lkorseelilvi.11-olilimellotal.efam
July 23, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701. Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on July 18, 2024. The contractors are performing earth work,
excavating the foundation, dewatering the site and installed a slide rail system to support the
slopes. The site is in substantial compliance with the Special Permit. Please see the attached
photographs below:
!WW VJII
�t<
1
rM
u
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David Williams
V/
Norse Eitavirossinexatal Services, Inc.
2100 Lakeview Aven He, Unit 3A
Dracid, 31A 01826
Ph: 4978) 649-9932
July 19, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An. inspection was performed on July 12, 2024. Most of the slopes are hydroseeded. Earth work
is being performed on site. The erosion controls are set and maintained. The site is in substantial
compliance with the Special Permit. Please see the attached photographs below:
^,yet ..,o; ,. ..
...................... ........I'll.... ........... ............ ..... ..........I
{+
r
r
r.
x
c
If you have any questions or concerns regarding the above information,please do not hesitate to
call.
Sincerely,
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David Williams
V/
Norse Emavirommaverttal Seit-vices, tne.
2100 Lakeview Avenave, Unit 3A
Draeut, .MA 0 1826
Ph: (9780 649-9932
Website: www.maorseetivii-t)iitjiaaeiiittal.4-4)mn
July 5, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on July 2, 2024. The existing headwall and 18" RCP are removed.
The contractors installed the new headwall, 1.8"RCP, drainage manholes and connected into the
existing drainage system. Earth work- is being performed on site. The erosion controls are set and
maintained. The site is in substantial compliance with the Special Permit. Please see the attached
photographs below:
w
n t'
k
h
Ng
n
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely, �/
Yr 2/�
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David Williams
Nom-se Emiaviii-tbiatiomeintal Services, Inc.
21.00 Lakeview Avenue, Unit 3A
Dracut, MA 01826
Pla: (978) 649-9932
June 28, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 1845
Re: 1.701. Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on June 28, 2024. The contractors removed the existing drain
manhole and 18" RCP to reroute the drainage. Earthwork is being performed and the erosion
controls are set and maintained. The site is in substantial compliance with the Special Permit.
Please see the attached photographs below:
rs�
7.a,�21
K r'Y
K
%f ,f7*� 3 - ��73a � ��#zr� S+e` tY� � .��� -w..� ^'y�•}�6Y � � Y
,e ? ..+� 3
3
ta
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David Williams
Norse Evavirovamne�aital Services, liac.
21.00 Lakeview Avenue, Unid, 3A
Dralent, MA 0 1826
Ph: 4978) 649-9932
Website: w,&vw.jl,orseen,%,irovailjkellital.c4)1111
June 25, 2024
North Andover Planning Board
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Commissioners,
An inspection was perfonned on June 21, 2024. The contractors are performing earth work and
excavating the foundation. The erosion controls are set and maintained. The site is in substantial
compliance with the Order of Conditions. Please see the attached photographs below:
"a
it
'P '7
a
WNA
�r
LAN' �
e.
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
Maureen Herald, PWS, CWS
Cc: Greg Susko
Norse Euvirmutiaeirital Services, Irie.
2 2 100 Lakeview Avenue, Unit 3A
Drar"t, 11A 01826
too Pla: (978) 649-9932
Website:
June 21, 2024
Director of Planning
Ms. Jean Enright
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Ms. Enright,
An inspection was performed on June 21, 2024. The contractors removed the existing septic
system and performing earth work on site. The erosion controls are set and maintained. The site
is in substantial compliance with the Special Permit, Please see the attached photographs below:
AM*
114A
If you have any questions or concerns regarding the above information, please do not hesitate to
call.
Sincerely,
ly1mel-"
Maureen Herald, PWS, CWS
Cc: SDG Development Construction
Mr. Greg Susko
Mr. David Williams
Nov-se Emiivi.jromiaivae:ntaI Seirvices, III.C.
21,00 Lakeview Avenue, Unit 3A
Dratecit, MA 01826
649-9932
Website: s"vw.iii.orsee.iii,%,irojiimexi.tal.e4onaii
June 21, 2024
North Andover Planning Board
120 Main Street
North Andover, MA 01845
Re: 1701 Osgood Street
North Andover, MA 01845
Commissioners,
An inspection was performed on June 13, 2024. The trees and stumps are removed. The
contractors are performing earthwork and grading. The wattles are installed upgradient of the site
or at the limit of work. The erosion controls are set and maintained. The site is in substantial
compliance with the Order of Conditions. Please see the attached photographs below: