NORTH ANDOVER FIRE DEPARTMEN"'I
CENTRAL FIRE HEADQUARTERS
Npl�lowu���wry&*
CCP u"t of s"'raimr(meW
6 � r ," E
� G
To: No. Andover Planning Board
From: Fire Chief Dolan
Re: Jarad Place II
�e
Date: December 8 , 1986
I have reviewed the plan and vitisted the site and have the
following comments :
1. All fire hydrants are to be within the 500 ' intervals as
required.
2. Lot numbers are to be posted during construction.
3 . Permanent house numbers are to be posted prior to occupancy.
4. The street shall have at least a binder coat prior to occupancy
for access.
5 . No open burning is to be permitted except during open burning
season under Fire Department Regulations .
6 . All underground fuel storage must be in compliance with 527
CMR 9 Fire Department regulations and the town zoning by-law
4. 133 (2) .
7 . Proper street signs approved by the Highway Surveyor shall be
placed at the intersections of Candlestick and Sugar Cane Lane
and Candlestick and Jarad Place Road.
William V. Dolan, Fire Chief
NORTH ANDOVER FIRE DEPARTMEN"'I"
IRE HEADQUARTERS
V°w a°wej(wwp wuhm
4 r
WH UAKA
f hief of f,a,p,raartroent
! p
r
"
gym, vmw r rnu ramu.. r�.� rur ii.e c;r ..a,n,a,rx.
To: Scott Stocking, Town Planner
From: Fire Chief Dolan
Re: Modifications to Definitive Plan-Jerad Place II
Date: September 2, 1987
I have reviewed the revised plan dated August 21 , 1987 and
my comments of my letter dated May 11 , 1987 are still
applicable. Particularly item #10 in addition to the following:
1 . The water main on Jerad Place should be connected to the
existing water main on Forest Street in order to provide
for a looped system.
2 . As a matter of public safety I strongly recommend the
installation of residential sprinkler systems for all
dwelling units in the subdivision.
3 . The creation of any common drives for this subdivision
would be opposed by the Fire Department.
4 . Street signs approved by the Department of Public Works
shall be placed at the intersections of Jerad Place and
Forest Street and Jerad Place and Candlestick Road.
I intend to be at your September 14 meeting.
William V. Dolan, Fire Chief
,AORTH
x*�0ya�O0 DIVISION OF PUBLIC WORKS
;y r 384 OSGOOD STREET
'OWN OF NORTH ANT,DOVER, MASSACHUSETTS 01845
'SSA�H,SE` 6 8 5-0 9 5 0
William A. Cyr
Superintendent of Highways, Utilities, & Operations
Leo Lafond, William Hmurciak,
Supervisor of Forestry & Grounds Director of Engineering & Administration
683-9381 687-7964
December 15, 1986
Erich Nitzsche, Chairman
Planning Board
120 Main St.
North Andover, Ma. 01845
Re: Jerad Place
Dear Erich:
I have reviewed plan and make the following comments:
1. Two catch basins should be added at intersection of Forest St.
and Jerad Place Road. Two more catch basins at the intersection of
Jerad Place Road and Candlestick Rd. An additional catch basin should
be installed at intersection of Candlestick Rd. and Sugar Cane Rd.
Existing manhole at that location to be changed to catch basin.
2. Granite curb should be used on all grades exceeding 5%.
3. Culdesacs should be paved 120, radius and centered on a straight
line from incoming road. They are bad enough without being off set.
4. Drainage Easements to run continuous throughout the subdivision.
5. All drainage discharges to have headwalls as per Division of
Public Works specifications.
6. No 'Town service will be provided to this subdivision until binder
coat of hottop is applied and road surface is free of excavations or any
other problems that may cause damage to town equipment.
I will be at your meeting Monday evening to discuss this matter
further if you wish.
Very truly yours,
a
William A. Cyr,
Superintendent
WAC/m
%AORTH
!'6OIL
ti
OF "EALTH
120 MAIN STREET
US NORTH ANDOVER, MASS. 01845 TEL. 682-6400
Dec. 15 ,1986
North Andover Planning Board
No . Andover Re : Jerad Place 2
Mass .
Gentlemen:
Most of these lots have been ground
water tested and some have been percolated . The
results are encouraging so far.
Lot 41 looks like it (,jj� be difficult
to develop due to the proximity of wetlands .
Very truly yours ,
Michael Graf
Health Inspector
mg;mj
j
1 9' "9
Massachus
BUILDING
h,4.)1`J`'il';kt'`✓ATIC)N .ea.i=' I>@�/I, Ct)t C)F, r 4775,
PlanningPLANNING PLANNING & COMMUNITY' DEXELOPMENT
Board fff4 "
u n
ea(1w1 �oJ 4 r Place Phase 2
Most of these Lots have had groundwater and percolation
tests conducted. At this time no Septic System pert-nits have
been issued.
Sincerely