Notice to APPLICANT/TOWN CLERK and Certification of Action of Planning Board
on Definitive Subdivision Plan entitled: Modification of _
JERAD PLACE II
By: -Thomas Neve Associates dated May+15 , 19 87
I
The North Andover Planning Board has voted to APPROVE said plan, subject to the
following conditions:
1. That the record owners of the subject land forthwith execute and record
a "covenant running with the land'19 or otherwise provide security for the con—
struction of ways and the installation of municipal services within said sub—,
division, all as provided by G.L. c. 41., S. 81—U.
2. That all such construction and installations shall. in all respects
conform to the governing rules and regulations of this Board.
3. That, as required by the North Andover Board of Health in its report to
this Board, no building or other structure shall be built or placed upon Lots
No. as shown on said Plan without the prior
consent of said Board'of Health.
4• Other conditions:
NOTE: This decision replaces the original decision
issued by the Planning Board on April 10 , 1987
c.J
C>
In the event that no appeal shall have been taken from said approval within
twenty days from this date, the North Andover Planning Board will forthwith
thereafter endorse its formal approval upon said plan.
The North Andover Planning Board has DISAPPROVED said plan, for the following
reasons:
NORTH ANDOVER PLANNINU BOARD
Date: October 22 , 1987 By: Paul A. Hedstrom, Chairman
JERAD PLACE II
CONDITIONAL APPROVAL OF DEFINITIVE MODIFICATION
OCTOBER 22, 1987
A. All Planning Board Order of Conditions are to be placedion the
recorded definitive plan, (cover sheet) , t6 si' 4na�ure at a
Planning Board Meeting .
B. Prior to signing the definitive plans all executed deeds of
easements and parcels shall be submitted to the Planning Board
and held in escrow until completion. At the time of completion
and prior to final security release, the developer shall
record said documents for the Town.
C. A certified document shall be submitted to the Planning Board
after the completion of each phase verifying that all utilities
(including electric , telephone, sewer, and cable) have been
installed prior to binder coat of application. Installation
shall be in accordance with plans and profile prior to the
release of any lots .
1 . A Notice of Intent shall be filed with the NACC as required
under Chapter 131 - Wetlands Protection Act, and local
Conservation Commission Regulations and any changes required
by an Order of Condition, shall be resubmitted to the
Board under a Definitive Modification.
2 . Temporary cul-de-sac language for the easement should be
included. Note on the recorded plan that the Sugarcane Lane
may become a through street in the future under the Subdivision
Control Law. At this time a temporary turnaround easement
shall be placed upon lots 32 and 33 . All pavement and
utilities within temporary turnaround easements with the
exception of driveway and services to dwellings on lots 32
and 33 will be removed and the area loamed and seeded, upon
extension of Sugarcane Lane into Seven Oaks Subdivision,
if approved.
3 . The temporary cul-de-sac on lots 9 and 10 Candlestick Road
shall be removed. Pavement and utilities within shall be
removed and temporary easement area shall be loamed and seeded.
4 . Recorded plans shall be revised to show drainage easements with
metes and bounds to include drainage to a waterway and include
headwalls and detention ponds .
5 . No lot (s) or group of lots will be released from the Statutory
Covenant until all street utilities have been installed to the
satisfaction of the Division of Public Works and further that
certification and As-Built Plan and profile shall be
submitted for approval to the Planning Board indicating that
all drainage has be installed in accordance with the approved
plans . In the event any drainage has not been installed with
the approved plans , the Design Engineer shall substantiate with
revised drainage computations that the incorrected installation
shall not adversely effect any downstream abutter and/or the
overall drainage design of the subdivision to the satisfaction
of the Planning Board. The As-Built Plan and certification
shall include all utilities installed within the street;
including, but not limited to drainage, sewer , gas, water ,
telephone , fire cable and electric and further that all
detention basins and off street drainage has been completed
satisfactorily.
Page 2 :
6 . No lot (s) or group of lots shall not be released from the
Statutory Covenant until the binder coat of bituminous pavement
has been placed to the satisfaction of the Division of Public
Works and certification from the Design Engineer certifies the
horizontal and vertical location of the binder coat is in
conformance with the approved plans .
7 . The As-Built and Acceptance Plans shall be accompanied by a
Certificate of Compliance from a Registered Professional
Engineer certifying that the grades on all lots and streets
have been established in compliance with the Definitive Plans
and that such grades do not create adverse drainage patterns
onto adjoining lots , streets and/or abutters .
8 . Developer shall reserve the fee in the roadway from any lot
conveyance.
9 . Candlestick Lane and Jerad Place Road will be constructed and
brought to binder and connected to Forest Street prior to any
construction being started on Sugarcane Lane, on lot 28
thru 37 .
10 . The developer shall submit for approval to the Planning Board
an erosion control plan.
11 . In accordance with the Rules and Regulations , there shall be no
driveway curb cuts constructed in the locations of catch basins
or stone bounds . Prior to release of any security any and all
driveways so constructed, whether by the developer and
individual owners , shall be removed and reconstructed elsewhere
as approved by the Planning Board at the developers expense .
This condition shall be placed in the Statutory Covenant.
12 . Granite curbing shall be installed along siding where roadway
grade is steeper than 4% .
13 . A bond in the amount of $24 , 000 , for the As-Built Plans shall
not be released until approved by the Planning Board.
14 . Proper sight distance easements will be provided as necessary
and/or required at the roadway intersection with Forest Street.
15. The applicant shall confer with the Department of Public Works ,
the Highway Surveyor, the Tree Warden, the Fire Department and
the Planning Board regarding the widening of Forest Street and
the provision of safe access to the subdivision including
adequate site distances . The Planning Board shall approve the
final road alignment and insure that appropriate sight easements
are obtained and recorded. Also, there shall be no tree
cutting in the public way except as in accordance with
MGL, Chapter 81 and the approved subdivision plan.
16 . The applicant shall comply with the Tree Wardens recommendation
dated April 30 , 1986 erquiring security in the amount of
$14 , 000 to preserve existing trees and for new planting.
Page 3 :
17 . In accordance with the Fire Chief ' s recommendations:
- Fire hydrants must be installed at 500 foot
intervals .
- Hydrants shall be relocated 'to the end of the
cul-de-sac of the proposed subdivision.
- Lot numbers are to be posted during construction.
- Permanent house numbers shall be posted on
dwellings prior to occupancy.
- No open buring is to be permitted except during
open burning season under the Fire Department
Regulations .
- All builders must comply with the Fire Departments
underground fuel storage regulations .
18 . A stump pit burial plan shall be submitted to the Board and
Highway Surveyor for review and approval prior to any on
site construction.
19 . Lot 29 shall not be built upon until a Definitive Subdivision
Plan is submitted to the Planning Board.
cc :
Director of Public Works
Public Works Department
Highway Surveyor
Tree Warden
NACC
Building Inspector
Board of Health
Assessor
Police Chief
Fire Chief
Applicant
Engineer {
Interested Parties
File ,
Jerad Place II
D(-f ini tiVe Modi f icat iol-I
Condition #21.)
T h e B 0,-=k T-(J grant S t t I r-7 �l P P I i C a i t .4 tda i verfrom e l o;rns P u 1 �7 �I it I
Regulations s ta rid a i-d s i--e oa i-cl i ng t h c- C a i)d I e s t i r-k Road r i c!h 1: o I cr
pertaims: tj3 r:1--c1s,3ing a .-vic- tkirld areo b'-- t men
station 17+oo , (*.lore or les,3 . T I i P Boa r(I sl la 1 1 a 11 ut.) .-3 r i n
wide *v)hi(:h contain .9 27 ' L-jjdi pavE�rll,-nt :r-?rtion cEml;ei- ed in th(-
r i gh t-o f--t-jay- The r21evatirl, Of thp, headt-!--il I should be
the f'i n i shed Q at t I I e r.(19 e of P Avc`("P 11 t - A quard rail
installed on the I iT-1 rloa I A the dcii (In for the qu ar-d r a j I
approved by the D .P .H . to endor,.:ierriont
The roadway Fhall 11;1\/F? a P;' i '' l;c-d r-.�rl.ei Iiiie --irid travel I a i ic, I :m
with posted signs which ro,,.i Pozidway" or, beth
-
This condition and t\-3ivl�-- w. d u i-ie i TI Q1 -(JQ I to -11 IQ V) the I
cross the t --i ci --11; ion in accordance with ;111 Ul-d-I ')f-
Con(.! i t i c)n s i co j E,(I b the NOC
C=
cr
Ld
t.D
CD
LL) C)
>—J_j
C:D
UWX
X
Lu 31:
01- r-_
C)
Y