Loading...
HomeMy WebLinkAbout1995-10-23 Street Acceptance Jerad IV PRD r Town of North Andover f NORTH o OFFICE OFa COMMUNITY DEVELOPMENT AND SERVICES Q 27 Charles Street ti North Andover, Massachusetts 01845 WILLIAM J. SCOTT SSACl1U.- Director (978)688-9531 Fax (978)688-9542 July 14, 1999 Mr. William Barrett 1049 Turnpike Street North Andover, MA 01845 RE: Street Acceptance for Jerad Place IV Development Dear Developer: The Planning Office is in the process of assessing active subdivisions to determine the compliance with the approved plans and the decision. Our goal is to assist you in reaching street acceptance with a completed project. In gouzg through our files, we noticed that you have documentation required to be submitted to'our department to maintain compliance with the Town of North Andover Subdivision Regulations and the Notice of Decision issued relative to your project. In the absence of this information, you will be unable to get your street accepted. On the following page, please find a detailed list of information we will need in order for you to get your street-accepted. The list may refer to conditions in your Notice of Decision, which we are attaching for you to easily refer to. Additionally, I would suggest that you set up a meeting with myself, so that I may explain to you what is left in your subdivision to be completed. At that time we can also schedule an inspection of your subdivision by the Department of Public Works at a mutually convenient time in order for you to be ready for street acceptance. This list is only a preliminary review, and there may be more items outstanding that need to be completed once an inspection has been conducted. Upon further review your subdivision, we will compile a more detailed comparison of your decision(s) and the rules and regulations as it relates to your subdivision. BOARD OF APPEALS 688-9541 BUILDNG 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 I am also attaching street acceptance guidelines with sample letters for you to utilize and inform you how the process will work. Sincerely, ����-�� Heidi GriffmU Town Planner Cc: Tim Willett, D.P.W. Jiln Rand, D.P.W. William Scott, CD&S Director Board of Selectmen Attachments: List of Outstanding Items, Samples of Certificate of Compliance, Warrant Article & Stone Bounds, Notice(s) of Decision, Street Acceptance Guidelines ITEMIZED LIST OF OUTSTANDING ITEMS FOR JERAD IV The following items are presented in three sections. Section 1 is the Recording information required. The information checked in this section is considered missing or incomplete. Section 2 are the items missing or incomplete as required by the Notice of Decision for the PRD, if applicable. Sections 3 are the remaining items missing for the Subdivision Decision. The numbers for sections 2 and 3 represent the item number in the respective decision. Please review your enclosed decision carefully to coordinate with this information. Rather than handle each issue separately we would recommend that all of the necessary research to resolve all of the below issues be conducted prior to contacting the Planning Office. This will insure that meetings to resolve these issues are productive. Section One Recorded Decision Recorded Plan Recorded Form—I Recorded Form-M Recorded Growth Management Form Recorded Form-J Section Two NOTICE OF DECISION ITEMS — PRD 1 1 2. 3 (c) 3. 3 (d) An as-built showing the following: 4. 9 (a) 5. 9 (b) 6. 9 (c) Section Three NOTICE OF DECISION ITEMS —SUBDIVISION 1. 5 (a) 2. 6 (b) 3. 6 (c) An as-built showing the following: 4. 7 (a) 5. 7 (b) 6. 7 (c) 7. 7 (d) In accordance with section 9a of the subdivision rules and regulations of North Andover, you must request a certificate of compliance for a street acceptance. A copy of the subdivision rules and regulations are available in the Planning Office located at 27 Charles Street for$10.00. We recommend that ifyou do not have a copy you purchase one. Obtaining specific pages from the Regulations may not provide all of the information necessary to address your issues. Y August 28, 2002 Mr. Robert Janusz 15 Clement Court Haverhill, MA 01832 Subject: Jerad IV— Sherwood Drive Dear Mr. Janusz: Please find attached a memorandum regarding the roadway conditions at your development. We have received a resident complaint regarding issues 9, 10 & 11 -these items require your immediate attention. Please contact this office as soon as possible with the date you plan to &x these three issues. Very truly yours, Robert E. Beshara, P.E. Director of Engineering Cc: J William Hmurciak, P.E. Director DPW Tim Willett, Superintendent Water& Sewer John Cyr, DPW Operations Heidi Griffin, Community Development Clay Mitchell,North Andover Planning 08-28-02 Sherwood Drive#67 Roadway Punch List j, MEMORANDUM DATE: July 23, 2002 TO: File FROM. Bob Beshara RE. Sherwood Drive—derad IV—Site Visit 0 7-22-02 The following issues should be addressed before final paving: A) Install 5' sidewalk with 18" grass strip 13) Install sloped granite edging around cul-de-sac Q Clean-up Open Space lot, install drive, parking area and other facilities as required. The following roadway issues have been identified and should be reviewed and addressed prior to or during final paving. The locations are identified from Boxford Street into subdivision. (E/R=edge of road): (We have received a resident complaint regarding issues 9, 10 & 11 below- these items need the Developer's immediate attention): 1) Pave around CB right side at Boxford Street 2) Repair pavement at E/R right side opposite tree with wall around it 3) 1" DMH—jack hammer old pavement and install patch 4) Remove old pavement and pave around C13's left and right side of just after V DMH 5) Repair E/R pavement and pothole before#33 driveway 6) Remove damaged pavement and patch at#33 driveway 7) Patch E/R at#44 driveway 8) Adjust curb box at#55 driveway 9) Adjust curb box at #67 driveway 10)Adjust CB at#67 driveway 11)Repair pavement around C13 opposite #67 driveway 12)Repair E/R pavement between DMH and#86 driveway 13)DMH opposite#86—jack hammer old pavement and install patch 14)Adjust CB and install pavement around CB @#86 driveway 15)Adjust CB and install pavement around CB opposite #86 driveway 7-23-02 Sherwood Drive Punch List Before Final Paving Page 2 09/04/02 16)Fix pothole at #93 driveway 17)Repair E/R pavement opposite house # 104 18)Repair damaged pavement at E/R at centerline, of house#10 1 19)Adjust curb box at#10 1 driveway 20)Repair pavement at E/R about 10' long before driveway at#115 21)Repair pothole at E/R across street from#115 driveway 22)Pave around CB past#116 driveway 23)Adjust curb box at#125 24)Remove oil/gas damaged pavement and patch opposite centerline of house#125 25)Repair E/R pothole on left side at cul-de-sac entrance 26)Repair•pothole at 3 o'clock in cul-de-sac 27)Repair pavement at DMH at E/R at 2 o'clock in cul-de-sac 28)Repair pavement at CB at 12 o'clock in cul-de-sac 29)Remove pile of stone at CB at 12 o'clock in cul-de-sac Page I of I Woods, J. Justin From: Justin Woods Uwoods@townofnorthandover.com] Sent: Wednesday, June 25, 2003 11:38 AM To: 'eralcbob@aol.com' Subject: Jared IV Dear Mr. Janusz, The Planning Board has asked me to contact you regarding remaining items at the Jared IV subdivision. These items are outlined in Bob Beshara's punch-list generated July 23,2002. It is my understanding that you split your time between the sunshine and bay states. If you do not have a copy of the punch-list,please reply to this email and indicate to which address you would like me to me send a copy (or you can provide a fax number). Lastly, kindly call me to discuss the remaining items and to arrange a schedule for their completion. I encourage to call me soon as the Board indicated it would like to see these issues settled soon. Thank you in advance for your prompt attention to this matter and look forward to collaboratively resolving any outstanding issues with Jared IV. Sincerely,jam'. J. Justin Woods Planning Director Town of North Andover 2 Community Development Division k'� "J 27 Charles Street North Andover,MA 01845 P(978) 688-9535 F(978) 688-9542 6/25/03 Town of North Andover NORTH Office of the Planning Department w�. Community Development and Services Division 27 Charles Street " °* °�= " North Andover,Massachusetts 01845 "ssACH�s�``h htip://www.townofnorthandover.com Town Planner. jpar•rixlo<?townoffixorthandover'coin P (978)688-9535 Julie Vondrak F (978)688-9542 Date: July 8, 2004 To: Carol McGravey CC: Heidi Griffin, Community Development Director Mark Rees, Town Manager Alison McKay, Interim Conservation Administrator From: Julie Vondrak, Town Planner Re: Jared IV Subdivision Enclosed is a copy of the two Planning Board decisions, the Order of Conditions, the deed for the conveyance of the open space and the letter dated July 22, 1998 from the Planning Department and the Open Space Committee. The developer is looking for the Town's acknowledgement of receipt of the Open Space property. It is my understanding the open space property has not yet been conveyed as outstanding issues, as referenced in the attached letter from the Open Space Committee, have not been satisfied. The developer is eager to transfer the land, however, he objects to the conditions placed upon him from a Committee that no longer exists. The requirements outlined in the letter are not included in either the Planning or Conservation decisions. Please feel free to call me if you have any questions. I will be discussing this project and letter with Alison McKay and Heidi Griffin next week. Thank you. BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 RECENVED 81T 9 _ 2004, September 7,2004 NORTH ANE)Ci1Ir:R PIAN1\M%Ka M_PARTPVIrr4�r Town of North Andover Office of the Planning Department 27 Charles Street North Andover,Ma. 01845 Attn: Julie Vondrak,Town Planner Dear Julie: I have enclosed copies of letters to Jack Sullivan and Mark Rees. I asked Jack for an updated cost estimate for the completion of the roadway for Jerad IV-I had provided him with a copy of the interim as-built,recently. In this regard,would you inform me of the current value -interest included-of these bonds? Jack Sullivan has indicated that the granite curbing which is planned for the cul-de-sac should be eliminated-it will pose a hazardous condition for snow plowing-particularly in a cul-de-sac,which will also lead to maintenance costs in the springtime for repair and/or replacement..I understand this item will require a modification to the plan,but I would appreciate how the board would"lean" on this matter. Also,as part of the modification and in anticipation that the"estimated cost-to-complete"may exceed the bonded value of the roadway,I would ask the planning board to consider the"contingent release" of a portion of the accrued interest and erosion control bond to meet roadway requirements. The subdivision has been stabilized for years and the erosion funding is no longer necessary. I would make the same request of the conservation bond. In summary,there are ample funds available and I request the planning board's cooperation in the successful completion of this project. Please advise me of the planning boards schedule so that we can arrange a time for the public hearing-early October would be preferable. I will contact th assessors office for an abutters list, and provide an update to the homeowners along with notice of the public hearing. Since y, Ro ert Jan z PO Box 223 East Orleans,Ma. 02643 file: na9073 September 7, 2004 Mr. John Sullivan,Dircctor of Engineering Town of North Andover Division of Public Works 384 Osgood Street ?North Andover, Ma. OIS45 Dear Mr. Sullivan: Timberland Builders has posted$113,'770.00 for the completion of Jerad IV. Of that amount, W 770.-` was for the completion of the roadway while$?0,000 was posted for erosion control. and$5,000 to NACC for the infrastructure. A copy,of the details is attached. We need w review the cost elements in light of today's costs and remaining cost of completion. To aid in this effort, t have enclosed a cost proposal from ARCO Excavators which was made after a detailed on- site review with you. 1 will contact the Planning Board to see if they would support a request for modification which would eliminate the granite curbing which is consistent with your reconunendation. In addition,I will contact homeowners concerning street trees Sincerely, �1 / -a- Robert J usz PO Box 223 East Orleans, hia. 02643 file: na90'72 G TIMBONDS CHECK JERAD IV JERAD IV DATE NUMBER DESCRIPTION AMOUNT ROAD OTHER 04/01/96 1971 SITE OPENING BOND $10,000.00 $10,000.00 04/01/96 1972 EROSION CONTROL BOND $20,000.00 $20,000-00 04101/96 1988 NACC INFRASTRUCTURE 242-757 $5,000.00 $5,000.00 08/01/96 2134 LOT RELEASE - 2& 16 $20,000.00 $20,000-00 02/25/97 2434 LOT RELEASE JIV - REMAINING LOTS $58,770.00 $58,770,00 TOTAL $113,770,00 $88,770.00 $25,000.00 JERAD IV BOND REQUIREMENTS ESTIMATED COST TO COMPLETE DIVISION OF PUBLIC WORKS STREET SIGNS $300.00 CONVEYANCE PROCEDURE $3,000.00 AS-BUILT DRAWING $5,000.00 PAVEMENT TOPPING $16,200.00 SIDEWALK $17,000.00 BOUNDS $6,000,00 STREET TREES $13,600,00 GRANITE CURB $8,470.00 GRADE, LOAM SEED $14,000.00 WATERMAIN - MAINTENANCE $2,000.00 STORM DRAINS - CLEAN C.B.' $1,200.00 STORM DRAINS - MAINT. $2,000-00 TOTAL $88,770.00 September 7, 2004 Mr, Mark Rees,Town Manager Town of North Andover 120 Main Street North Andover,Ma. 01845 Dear Mr. Rees: As a follow-up to my letter to you dated May 20, 2004,and Julie Voudrak's response dated July 15, 2004, I have not heard from Alison McKay nor town counsel concerning the issues associated with the open space parcel In Jared IV. In a telecon with Julie last week,she indicated that the town would not acknowledge the value of the eight lot contribution until the five conditions of the Open Space Committee had been resolved. I submit these are separate and distinct issues-one has nothing to do with the other. If the North Andover Conservation Corrunission does not want to accept the open space contribution it may be in violation to the terms and conditions of our agreement which is on record at the Registry of Deeds and is part of the title of the homeowners in Jerad IV. Mr. Rees, I would like the town of North Andover to verify the facts of this situation -that the donation to the town contains the value of eight two-acre lots -and, that the conditions imposed by the now defunct Open Space Committee were not part of the approval process nor accepted by me,and are not binding. As an alternative to the latter, if the conservation commission does not want to accept the open space parcel perhaps we should consider making the donation to another state sponsored non-profit organization such as Green Belt, Please advise, Sin rely, r�A&lt Robert J z 7 PO Boa 223 East Orleans,Ma. 02643 cc: Julie Vondrak V file: 9704