Loading...
HomeMy WebLinkAbout1998-05-21 Sewer ENF 9/14/1998 -i1 ( )p � -..iI a ARGEO PAUL CELLUCCI Tel: (617) 727 9800 GOVERNOR MEETING NOTICE Fad (f17) 727-2754 TRUDY COXE wnet .ma.us/envir SECRETARY TO: Distribution FROM: Laura Rome, MEPA Unit J' 2,5 a DATE: August 24, 1998 SUBJECT: Campbell Forest Municipal Sewer Projec EOEA # : 11757 ---------- ------------------------------------------------------- An Environmental Notification Form has been submitted for this project . According to MGL Chapter 30, Section 62, the Secretary of Environmental Affairs must issue a determination regarding the significance of the potential environmental impacts of this project, and must determine whether an Environmental Impact Report should be required to document these impacts and all feasible means to reduce damage to the environment . A consultation meeting will be held to receive advice and comment from agencies, officials, and citizens regarding which environmental issues, if any, are significant for this project . The meeting is scheduled as follows : DATE: September 14 , 1998 TIME: 10 : 00 a.m. LOCATION: Meet at the site near the intersection of Salem Street and Campbell Road in North Andover The meeting will include a brief presentation of the MEPA process by the staff, a brief presentation of the project change by the proponent, with periods for questions, answers, and open comment and a discussion of environmental issues . Additional comments will be welcome (preferably in writing) until September 15, 1998 . Questions on the meeting may be answered by contacting Laura Rome of the MEPA staff at (617) 727-5830 ext . 234 . Pursuant to the requirements of the Americans With Disabilities Act this Meeting Notice is available in alternative formats upon request. 4 Printed on Recycled Stock 2o%Post Consumer Waste cory-'I��O FOWN OF NORTH ANDOVUR DIVISION OF RURLIC WORKS 384 OSGOOD STREET NORTH ANDOVER, MASSACHUSETTS 01845 J, William Hmurciak, Director JwnesRand, Jr. 'tj0RTfj Telephone (978)685-0950 't"101 Direcfi)r of Engineering Fax(97,S) 088-95 73 41 November 5, 1998 Mr. Jack Masterson,President J. Masterson Construction Corp. P.O.Box 165 Hathome,MA 01937 RE: Campbell Forest Subdivision Dear Mr.Masterson; It has been brought to my attention that your company did not request an inspection of the sub-grade prior to fill being placed in the roadway. This is a very serious problem. Since we have not observed the sub-grade we cannot approve the placement of fill or any utilities in the fill areas of the roadway. Since these portions,of the roadway,affect the total roadway we will not be able to approve any of the roadway and will require a 100%bond if a bond is requested.Inspections such as these were discussed at a meeting several months ago,a Mr. Bill Peach was in attendance. Also,I understand an extra Sewer Manhole was added without Town approval and in fact,after I informed the Staff Engineer that this was not acceptable.My understanding,is that you did not want to enter Campbell Road and this was a matter of convenience for you. The Town will ultimately assume the maintenance of this sewer system and we do not need unnecessary structures. This is a change from the approved plan,all changes MUST be approved by this Department and/or the Planning Board prior to the change being made. These two items are very serious and need to be addressed immediately.I would suggest a meeting of all concerned parties be established at once.Please,schedule regular and required inspections with Mr.Tim Willett, Staff Engineer, kcey,--Sirel , ce James Ran�d�,Jr., Director of Engineering. JJ"s CC: I William Ffinurciak,Director Tim Willett,Staff Engineer Kathleen Colwell,Town Planner Ken Grandstaff,A.Mesiti,Co, C;\WORD\CANW13ELLFOREST\fvWTERSO1V0I CC Herbert P. Phillips, P.C. LAW OFFICES OF Michael A. Gerstein Stuart M. Holber Ys f MAY „_- n Russell S. Channen Th4s, 6o �` Jane M. Owens Triano Kevin P. Rauseo 25 Kenoza Avenue ■ Haverhill, MA 01830 Daniel J. Norris Tel: (978) 374-1131 /(800) 457-6912 ■ Fax: (978) 372-3086 Of Counsel. Gerald M. Lewis Harold N. Mack March 15, 1999 RECEIVED Mr. William Scott MAR 1 6 1999 Director of Planning Town of North Andover NOYI-1-1-1 ANDOVER 146 Main Street PLANNING DEPAFATI NT N. Andover, MA 01845 RE: Campbell Forest Subdivision Dear Mr. Scott: I wish to confirm that I represent MPG Realty Corp. with regards to the above approved Subdivision and which property is currently deeded to Campbell Forest, LLC. I wish to confirm that a modification to said Subdivision was approved and recorded with the Town Clerk on May 21, 1998, a copy of which I am enclosing herewith, and which further required a revised Form M to be recorded at the Registry of Deeds. Please find enclosed a proposed Form M Revision of Conveyance of Easements and Utilities that my client intends to execute and record although I did want to make sure it is satisfactory to you and the Planning Board. Please confirm same so that I might record the modification documents and the revised Form M as quickly as possible. It is my understanding that all necessary plans on such modifications are presently with the Planning Board which I would intend to record with all required recording documents, Very truly yours, Michael A. Gerstein MAG/j cm enc. cc: Kenneth Grandstaff Elmer Pease All attorneys admitted in Massachusetts. Holber, Rauseo and Norris admitted also in New Hampshire. Holber admitted also in Maine. Other office: 32 Saco Avenue, P.O. Box W, Old Orchard, ME 04064 Reply to Haverhill office only i h Town of North Andover � NoRrw OFFICE OF o}o�t„`D 14,6aa4m COMMUNITY DEVELOPMENT AND SERVICES 41 27 Charles Street North Andover, Massachusetts 01845 sgcEHu����y WILLIAM J. SCOTT Director (978)688-953 1 Fax (978) 688-9542 September 28, 1999 Mr. Eric Heyland Engineering Alliance, Inc. 196 Central Street Ell Saugus, MA 01906 t Re: Lot 16 Campbell Forest ., Dear Mr. Heyland: The enclosed plans, application and check are being returned to you because of an incomplete submittal. The site evaluation form is incomplete and lacking a signature. In addition,this subdivision was approved by the North Andover Planning Board as one that is on sewer, not individual septic systems. If you have any questions, please call 978-688-9540. Sincerely, Sandra Starr,R.S. Health Administrator cc: Mesiti Development H. Griffin W. Scott BOH File YA BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Dept.of Public Works Phone 978-685-0950 384 Osgood Street Fax 978-688-9573 North Andover,MA 01845 i To: Heidi Griffin,Town Planner � From: Jim Rand,Jr., Director of Engineering CC: J. William Hmurciak, PE, Director DP IV, in?Willett, Staff Engineer, Date: October 6, 1999 -�° Re: Campbell Forest Estates I am in receipt of a request for a bond figure for Campbell Forest Subdivision made to your office on October 1, 1999 by Mesiti Development Corp. We must inform you that we cannot supply you with a bond figure at this time,for the following reasons. 1. The offsite drainage for the Campbell Forest Subdivision on Campbell Road has not been designed, reviewed or approved at this time.Also,there are questions if the drainage system can be installed without relocating existing utilities. The developer has known of this situation for several months and has not taken any action on this matter. 2. Campbell Forest subdivision is dependent on two (2) large offsite sewer projects neither of which are complete and may not get completed this year. They both have serious issues that must be addressed prior to their being acceptable and are as follows: CAMPBELL FOREST OFFSITE SEWER EXTENSION A. The contractor has encountered a considerable amount of ledge, which has delayed his progress. As of this date, the contractor has 300 LF +/- of gravity sewer, 16 +/- sewer services, 2,300 LF +/- of force main and one pump station to install. Also, the gravity sewer system,the 2,300 LF of force main and the pump station need testing.This volume of work to be completed may prove impossible to finish prior to the stopping of all non-emergency roadwork for the winter. I believe that the developer may want to install a gas main on Campbell Road. FOREST VIEW OFFSITE SEWER EXTENSION A. The contractor is progressing slowly and it appears that he may complete the road construction prior to the ending of roadwork for the winter. Testing may not be completed and if deficiencies are found repairs cannot be made until spring. However, the two most critical outstanding issues follow. a. The developer is moving the Boston Ski Hill Pump Station. This Department has not received any plans to review. Therefore, if this pump station cannot be built in the approved location,the developer does not have an approved plan. 0 Page 1 H. Griffin October 6, 1999 Campbell Forest Estates b. Some of our staff traveled to the manufactures' construction site to review the Forest View Pump Station and found differences from what was approved and what was built. I informed Mr. Richard Pelletier of this and other than a phone call, which was inconclusive, no action has been taken.This is a very important matter. c. I could not even begin to predict when this line would be operational. Also, I feel that the following questions need to be addressed prior to bonding and the issuing of any building permits. A. Will this be a cash or paper bond? B. Will credit be given for work completed? C. Length(time)of bond? D. Should all offsite improvements be completed and operational prior to bonding and/or building permits being issued? E. If permits are issued, how do we insure that Certificate of occupancies are not issued, prior to all offsite work being completed. F. Have all sewer mitigation been paid? We are very concerned about allowing connections to our water distribution system, if there is no means to discharge the water. This department would welcome discussion and comments on these concerns from you and the Planning Board. MEMOHEIDIOB 0 Page 2 S.E.C. Surveying Engineering & Consulting July 15, 2003 r North Andover Planning BoardC/o North ( ti 27 Charles Streeter Planning Department P,_VviN - Alt) � North Andover, MA 01845 � l�� I i RE: Campbell Forest Dear Sir/Ms: This is to certify that the roadway monumentation associated with Campbell Forest in North Andover have been set as noted on the Cambell Forest Roadway As-built plans for Webster Woods Lane and Avery Park Drive. The above referenced plans prepared by S.E.Cummings &Associates Inc. dated July 3, 2003. Sincerely, P'V�N °F MgsX o yG A.BERT T ` AUDEL. Albert Trudel P.L.S. # 36869 ��� NO 686® s�®SAL LAN��' P.O. BOX 1337 216 MAIN STREET PLAISTOW,N.H. 08365 TELE: (603)382-5065 FAX (603) 382-5216 RECEIVED DEVELOPMENT GROUP NORTHANDOV'-n T RAN S M I T T A L TO:JUSTIN WOODS, TOWN From: Kenneth Ahern,Project Manager EANNER CONIPANY:NORTH ANDON7ER -IT k'KTKTT'K JULY 25, 2003 J-10NINITN6 FAX NUMB11"R; 978-688-9542 TOTAL NO.OF PAGES INCLUDING covjliz: 2 978-688-9535 Office 978-687-5300 Fax 978-557-8160 Cell 978-423-1521 RE: Confirination of recording the convey Campbell Forest Subdivision -ance of Parcel A as noted on Sheet 6 North Andover,MA 01845 of Definitive Subdivision Plan#12784 URGE-NT ® FOR YOUR USE CONINHI`NT n 11],EASE REIPLY [:] PPI'R YOUR RHQLJPST NOTHS/CONINIENTS: Justin, Please firid attached a certified cop),of the confirmatory lot release document recorded today at the E.N.D.R.D. at instrument#45489. The lots released are on the document as 1,2,3,4,5,6,7,8,8B, 9,10,11,12,13,14,14B, 15,16,17A, 18,19,20B,20C,21A,22,23,24,25,26C,27B,27C,28B,28C,29A,30A, 31A and 32A. This confirmatory lot release was used to correct an incorrect page citation of an earlier recorded confirmatory lot release that cited the earlier covenant. For your convenience I've included an earlier note requesting the renewed confirmatory lot release below: "please see an attached note from an Attorney Russell Bodnar relative to a wrong page number reference on a Confirmatory Lot release document recorded at Book 6761 Page 261.Atty. Bodnar is a closing attorney involved with the sale of Lot 20C which is occurring today. The confirmatory lot release document at Book 6761 Page 261 refers to a Covenant recorded at Book 4452 Page 51 when the actual Covenant is recorded at page 47 in the same Book. 1 am attaching both page 47 and page 51.As you can see Page 47 refers to a covenant whereas page 51 refers to a dedication of easement. I will appreciate any assistance you can render on this matter. If tl-iis document is still on the Planning departments word processor,just changing the page# from 51 to 47 should suffice to cure this matter." Please do not hesitate to call if I can be of further assistance. ke,V, 7q" 231 Sutton Street,Suite 2F,North Andover,NA 018,15 (978)687-53(X) Fax:(978)557-8160 k,iliciii(i)nic,si6,groLip.corri T � own (A' Nortlk Andover Conimunity Development and Services Division 27 Charles Street �° North Andover,Massachusetts 01845 �„ , tii July 30, 2002 Ken Ahern Mesiti Development Corp. Via Fax: 978-557-8160 Dear Ken, This letter acknowledges my opinion with respect to the proposed change regarding the Campbell Forest subdivision. The proposed change includes the change from vertical wood supports on guardrails to steel. The areas of change are limited to railing that is proximate to retaining walls. In all other areas the guardrails will remain entirely wood. Additionally, these areas were the change is proposed, the horizontal bars will also remain wood. It is reported that the installation will reduce long-term maintenance cost and meet or exceed safety factors in these areas. Based on the above, it is my opinion that the change is minor in nature and does not require a modification of the subdivision approval. If you have any further questions,please do not hesitate to contact me. Very,truly yours, ,A ClayMitchell cc: File N C) :6 ¢Al' P,wq. Pb •r54'� ➢ 1N�,R'7 ¢u�bib�w- ,�bw `� x�°;��V'h"C"➢ Y d��& �' `i.�`,b HF,FhLT11698- 540 M"M,AI NBC(3 u'r88-9 3 Town of North Andover NORTF/ Office ®f the Planning Department Community Development and Services Division 27 Charles Street * °+>• - North Andover,Massachusetts 01845 ��sSACHUSEt�� CIay1V11tC11e11 iterirn Town Planner Telephone(978)688-9535 Fax(978)688-9542 July 30, 2002 Ken Ahern Mesiti Development Corp. Via Fax: 978-557-8160 Dear Ken, This letter acknowledges my opinion with respect to the proposed change regarding the Campbell Forest subdivision. The proposed change includes the change from vertical wood supports on guardrails to steel. The areas of change are limited to railing that is proximate to retaining walls. In all other areas the guardrails will remain entirely wood. Additionally, these areas were the change is proposed, the horizontal bars will also remain wood. It is reported that the installation will reduce long-term maintenance cost and meet or exceed safety factors in these areas. Based on the above, it is my opinion that the change is minor in nature and does not require a modification of the subdivision approval. If you have any further questions,please do not hesitate to contact me. 0 r- tchell cc: File BOARD OF APPEALS 688-954I BUILDINTG 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 FfiF- DEVELOPMENTell 5, QO G R O U P AW S �#! NNI I H ANr)()1 L`N T R A N S M I T T A L TO: JACK SULLIVAN, DIRECTOR From: Kenneth Ahern,Project Manager OF ENGINEERING :O1,4PANY:NO. ANDOVER DPW DATE:AUGUST 22, 2003 FAX NUMBER: 978-688— 9573 TOTAL NO.OF PAGES INCLUDING COVER: NUMEROUS PI IONL;NUnIBER: 978-685-0950 Office 978-687-5300 Fax 978-557-8160 Cell 978-423-1521 RE: PROJECT Recent As-Built Drainage Study in Campbell Forest Subdivision comparison to Approved Plans & No.Andover,MA 01845 Con. Comm. 97' drainage study URGENT ® FOR YOUR USE ❑ PLEASE COAINIENT N PLEASE REPLY PER YOUR REQUEST NOTES/C01b41,1ENTS: Mr.Jack Sullivan, In pursuing a Certificate of Compliance at Campbell Forest,the Conservation Commission requested an As-Built Drainage study to determine the impact of 4 addittional homes within the Campbell Forest subdivision may have on the original approved plans and drainage study. To my surprise,and I'm sure many others,we discovered 3 culvert detail discrepancies between those in the drainage report from those depicted on the approved plans.We built the drainage according to the approved plans. Dan Koravos P. E. of DK Engineering has proposed a remedy for these particular 3 culverts discrepancies to match the design for the approved project..At this time I am primarily concerned with your review of a particular medlod for remedy for this discrepancy.There is an attached 3 sheet detail for steel plates to reduce the size of the opening to 3 culverts attached. The Conservation Commission is going to send the new Drainage study out to there consulting engineer after your office approves only in the method of remedy. In other words, assuming everth ing in the drainage study is accurate and true and the method of remady actually does what it says it does,at the end of the day does the anchoring of the galvanized steel plates not offend the DPW acceptable methodology.At this time we are not asking for your acceptance of the new Dranage study findings or remedy accuracy.We are asking if you do not object to the galvanized steel method prior to our sending the new drain study and appurtenant documents to the Con Comm.'s consulting engineer. Despite the foregoing limited request,ultimately you may need to advise the Planning Board on this matter.Therefore Iam attaching the following: Please find attached the July 31,2003 Drainage Study by DK Engineering; 3 sheet detail of steel plate attachment tp 3 culverts; Some summary pages of the July 31,2003 and April 23, 1997 Drainage study for comparison; 13 sheets of Plans that you already possess but in separate groupings. In this package I have grouped together the following for relevance to the matter at hand: Campbell Forest Definitive Subdivision Cover Sheet,Conditions Sheet,Sheets 13 -21 of the Campbell Forest Definitive Subdivision Approved Plans. Of the aforesaid sheets,sheets 17 -21 are also called sheets 1 to 5 of 5. These 1 thruogh 5 sheets were give the name "Record Copy MDH 5/20/98 Mod." following the addition of sewer on the site. 1 W Andover Bypass,Suite 3W,North Andover,Mass.01845()78)687-53W Fax:()78)557-8160 k.ihern@mesifigroup.com Also in the grouping is the As-Built drainage at the Campbell Rd and Salem St intersection dated 9/21/01.This plan shows the additional 7'x 5' box covert under Salem St. and the control structure and an additional 18" drain line we installed that outlets to the east side of Salem St. after the outfall of the 7'x 5' culvert. The pre-existing drain lines are also shown.Lastly there is a Composite Site Plan by DK Engineering Assoc. dated 7/7/2003' showing the 5 distinct drainage collection areas and the control points that connect these interacting drain areas. I can provide the Approved Record Drainage study(Record Copy 5/5/97) and the Notice of Intent documents should you determine their necessity at some future date. If you need further assistance or have any questions,please can me on my cell#978-423-1521. cc..Justin Woods,Town Planner,this 2 page transmittal and 13 sheets of plans only! KeAk 74" WWI D E V E L O P M E N T G R O U P T RAN SMITTAL TO:JUSTIN WOODS, TOWN From: Kenneth Ahern,Project Manager PEANN-ER COMPANY:NORTH ANDOVER DATE:AUGUST 26, 2003 PLATT7TT T7i iTG 9EPT- FAR NUbI13ER: 978-688-9542 TOTAL NO.OF PAGES INCLUDING COVER: 10+�- PIIONE NUMBER: 978-688-9535 Office 978-687-5300 Fax 978-557-8160 Cell 978-423-1521 RI: PROJL'C'I' As-Built Plan&Street Layout Plan re- Campbell Forest Subdivision visions pursuant toCert of Completion North Andover,MA 01845 &Road Acceptance ❑ URGENT ® FOR YOUR USE ❑ PLEASE COMMENT ® PLEASE REPLY ❑ PLR YOUR REQUEST NOTES/COMUENTS_ Justin, Please find attached a revised paper copies of the Street Layout Plans amd As-Built Plans for Campbell Forest for your review.There is no hurry on this particular review while we are still working on resolving the culvert issue with the Conservation Commission. Nevertheless,your comments as to any plan revisions your office may recommend will be appreciated. Please do not hesitate to call if I can be of further assistance. cc Jack Sullivan,DPW Kew. A" 1411C U 6 2003 NON'M ANDO11ER MANNING DLG.PAR MGNT 231 Sutton Street,Suite 2F,Noah Andover,NIA 01845 (978)687-53(H) Fax:()78)557-8160 kalieni@tnesi6,group.com