West Environmental, Inc.
ENVIRONMENTAL MONITOR
r
Project .- Campbell Forest LLC �
A Intsection ate: C///3/00
i
Permit File #: MADEP 242-8 i 6
EI #: 9809-MA �
Clients MPG
Contractor Name: Masterson Construction i
l
Contractor Interaction: �
ye�,
Silt Fence Status: , r
Clean Out Requir Location:
Repair Required: Location: I�
ewatering: Active na ti i
Water Clarity:
Last Rain vent:
4
i!V
Slope Stabilization Status:
i
Photos Taken:
r
Continents:
cl / l s
4
-Y' at(��� UYwwwNd4 dmuN\'�
k
a Q
i
48 Stevens dill head, Nottingham,NH 03290 " 603-679-8212 Fax 603-679-8232
Sent By: D; 6036798232; Apr-18-00 12:57PM; Page 3/4
+:E
WEST
�/�
EN dW]IRONMENTA L INC.
i
i
Environmental Monitoring
Detention Basins
Campbell Forest
No. Andover,MA
April 13, 2000
a
t
Y.t
Y
See attached map for basin locations.
;a
Top of bank defined as flat area at top of basin.
Bank defined as the sloped sides of the basin.
Basin One: Reseed top of bank along south side of basin and also area along basin side
near Webster Woods Lane.
Basin Two: Reseed top of bank all around the basin. Reseed bank on southeast side.
Straighten trees (saplings) and remove soil from tree base where it is too high.
Basin Three: Reseed entire top of bank and south, east and west banks. Only the north ;
bank has germination.
Basin Four: Basin has good seed germination. Only needs reseeding on south end of
bank and top of bank.
i
Basin Five: Reseed entire top of bank. Straighten out one tree that appears to have been 3
hit by equipment(it is obvious which tree this is). {
Basin Six: Reseed all basin banks. Top of bank has cover.
's
None of the wetland seed mix planted in the basin floor of the basin appears to be
germinating; however,this seed does take a long time to sprout and the floor has been
under water most of the spring. More time should be given for this seed to germinate. E
When heavy equipment is operating in close proximity of these basuis it may be wise to
flag the trees (saplings)for they are difficult to see at this time. This may prevent the
trees from being run over.
i
C
i
it
48 Stevens Hill Road, NottinghAm, NH 03290 ♦ 603-679-8212 ♦ Fax 6M-679-8232
Sent By: D; 6036798232; Apr-18-00 12:56PM; Page 1 /4
)XTST
i
f
i�
s
El v Y IRONME T ]..L ING
i
FAX
TRANSMISSION DATE: qj is 00
TO:
Y
FROM:
"k
RER TH
: [
r Y
�t
f
�F
NO, OF_PAGES ATTACHED:
aALo
4
•4 F
v / • Q „4
O i
a 6
t
1�
+:I
li-lt)ii11:�4'8stenviulempire.net �.#
48 Stevens Hill Road, Nottingham, NH 03290 e 603-679-8212 ® Fax 603-679-8232
Sent By: D; 6036798232; Apr-18-00 12:57PM; Page 4/4
is
a�
,i
LOT f�
N+.NJ SI G.i
Campbell Forest
IVo,m A ,t.
ndovar, Afaddach�seftr
GOT f0
�S
LOT t 2
Kau d LOT
• •a,ve+Jl �i
P
'll X
LOT 29
LOT /3 .a,po ar
sa.eeo u LOT 2e
Jer,h,de
IRS
dZ
LOT 3o LOT ar
eaau,r
LOT fe
rel a, LOT 7
t .d./e!ar
LOT at
LOT f6 LOT 6
MD
LOT 21
LOT t6
01.6"It
32 LOT S
Joa►,
bq y fn
LOT to
.Aare if
tar 2eOF LOT P6
er.w rr ,olaef sr LOT
LOT f9 ro>i>sr
q...JI
LOT 17 -
,o6ru,P LOT 23 NBNT '
I""dI '
1
LOT 22 i
® .lseo ar LOT 2
LOT 20 101,7SS n
lfe,0(0 Sr ti t:,,
i
ele/r r LOT 16
re,...jr LOT
n►,n.sr Ii
LOT fYA
1JAill ar .is
i.
t:
CAUP&ELL ROAD
f
•
Sent By: D; 6036798232; Apr-25-00 11 :22AM; Page 5/6
West Environmental, Inc. �E
ENVIRONMENTAL MONITOR REPORT
I
c
4
Project ID: Campbell Road Sewerline Inspection Date: Y/dU ,
'#
Permit File #: MADEP 242-906 WEI #: 9919-MA
Client: MPG
A
Contractor Name: M+E Construction
J
Contractor Interaction: c/Y 4
i�
Silt Fence Status: OK
Clean Out Required: Location:
Repair Required: ,QQ,, ✓tst "K Location: at 644d��
Dewatering: (A-6411v �
Inactive
Water Clarity: QSL40VL
Last Rain Event:
Slope Stabilization Status:
Photos Taken:
It
Comments:
vim, Inuato, 0-ddj-AA0 Cx.AJ La .
48 tevens it oa , own g�m, • 603-679-8zt2 • Fax 603-619-8232
i
Sent By: U; b03bi98232; Apr-2b-00 11 :22AM; Page 6/6
1i(�
PCX
'i
,i
i
"1
i;
I.
is
i
is
5enz by: u; 00Jb/982J2; Apr-25-00 11 :20AM; Page 2
West Environmental, Inc.
ENVIRONMENTAL MONITOR REPORT
'i
,i
,
4
Project ID: Lyons Way Inspection Date:
s
Permit File #: MADEP 242-933 WEI #: 9923-MA
Client: MPG s
Contractor Name: John Farmer Construction
Contractor Interaction: t
Silt Fence Status: d
Clean Out Required: ,;,t<S- Location:
:i
Repair Required: xIA.0 ' Location: !}�
Dewatering: Active nac e !
Water Clarity:
Last Rain Event:
Slope Stabilization Status:
i
Photos Taken:
,4 w i
Comments;
,
s �
070
?o J
i
i
e
i
48 Stevens Hill Road,Nottingham, NH 03290 " 603-679-8212 * Fax 603-679-8232
i
• 1'
Sent By: 0; 6036798232; Apr-25-00 11 :21AM; Page 4/6
;i
,E
West Environmental, Inc.
ENVIRONMENTAL MONITOR REPORT
i'
14
i!E
Project ID: Campbell Forest LLC Inspection Date: Y/f 0
i
Permit File #: MADEP 242-816 WEI #: 9809-MA !
!I
Client: MPG
Contractor Name: Masterson Construction
i,
Contractor Interaction:
Silt Fence Status: C)K4 f
Clean Out Required: / -.e' Location:
Repair Required: Location: OtA-lJII'd fQ��° Gt `'�
Dewatering: Active activ
d
Water Clarity:
Last Rain Event: o�>
`i
Slope Stabilization Status: ()K
Photos Taken: Q�
U �
Comments:
O.� l f
f
� .,
48 Stevens Hill Road, Nottingham, NH 03290 603-679-82(2 R Fax 603-679-8232
Town of North Andover �40 TH
OFFICE(')1
0
COMMUNnY DEVELOPMENT AND SERVICES
27 C.harles Strect 4
North Aiidover, Massachusetts 01845
WILLIAM J. SCOTF CHUS
Direelor
(978)688-953 1 Fax (978)688-9542
June 29,2000
Alison Lescarbeau
Planning Board Chair
Planning Office
27 Charles Street
North Andover,Ma.01845
Dear Mrs.Lescarbeau;
At your meeting on December 21, 1999,1 strongly expressed my concern of releasing lots where the offsite
sewer was not clearly completed.My concern for the Campbell Forest subdivision was that in the event the
offsite work was not completed a homeowner who received building permit and completed the home would
not be allowed occupancy without proof of sewage disposal. Further,I was concerned that Town Counsel
prior to signature did not review the surety. The Board was satisfied as to the developers verbal
explanation of the offsite progress and the performance guarantees available for the offsite work.Further
the Board and the developer expressed that the buyer should be and will be made aware of the
infi-astructure circumstances, essentiality I believe the phrase"buyer beware"was used.
Specifically my concern at that meeting was that a person would be placed in the position of being at a
closing without an occupancy permit if the offsite work was not completed. In fact this has occurred. The
attached e-mail to our building department is representative of what may happen to all of the lots recently
released. It appears from the e-mail that no one explained that the occupancy permit was dependent on the
offsite sewer. Since no one in my department has contact with prospective homeowners(they do not pull
the building permits the contractor does.)until a problem such as this occurs, I assumed from the content of
the discussion on the 21'that the developer would inform homeowners of the offsite sewer circumstances.
This letter is sent to restate my concern that offsite work that is dependent on completion prior to an
occupancy permit should be completed prior to the lot releases. Despite what the developer and the Board
assume no one in the Community Development Office has control over the negotiations regarding the
completion of off-site infrastructure.Therefore in the absence of an approval for the use of the sewers I
would have rather treated the sewer as not available until signed off by the DPW, as I expressed at your
meeting. As a result we have no way in issuing an occupancy permit without actions by either the
developer and or the DPW. I would rather that the Board issue lot releases in a manner that places the
Community Development Division in the position of being able to solve problems for the homeowners.
Now we are in the untenable position of waiting for others to act while the homeowner possibly
contemplates legal action for the not issuing an occupancy permit. Regardless of how the Board feels
about the awareness of the prospective buyers and"buyer beware",the eventual hardship of a homeowner
falls to my staff to solve, and in this case without the power to act.
Sincerely,
...........
0
William J.Scott
BOAM)OF APPEALS 6889541 BUILDING 688-9545 CONSE'R MION 688-9530 HEALTH 688-9540 PLANNINGr 688-9535
William Scott
From: Town Man. Secretary
Sent: Wednesday, June 28, 2000 1:09 PM
To: Jeannine McEvoy; Mike Mcguire; William Scott
Cc: Terri Ackerman
Subject: Campbell Forest-Cob Wittstein
Importance: High
Hi Jeannine and Michael,
I recieved a phone call today around 12:30 this afternoon from a Bob Wittstein and family. They were supposed to close
on the first house in the development(Campbell Forest)this Friday. He said the Town and the developer seem to be
fighting about sewers and his family is in the middle being punished. It's a Holiday weekend and he has no where to live
as of July 1. He is renting and came from out of state. His movers will not be available for another few weeks as they are
booked and his rate lock in for mortgage Is in jeopardy also.
The biggest problem...is where to live????
His Cell#978-7644801
Home(Wife should be there)978-546-6267
Office #978-2824188
Thank you for helping me with this call. (Kathy O'Neill)