Loading...
HomeMy WebLinkAbout1998-05-21 Site Monitoring 2000 DEF SUB Sent By: D; 6036798232; Apr-18-00 12:56PM; Page 2/4 West Environmental, Inc. ENVIRONMENTAL MONITOR r Project .- Campbell Forest LLC � A Intsection ate: C///3/00 i Permit File #: MADEP 242-8 i 6 EI #: 9809-MA � Clients MPG Contractor Name: Masterson Construction i l Contractor Interaction: � ye�, Silt Fence Status: , r Clean Out Requir Location: Repair Required: Location: I� ewatering: Active na ti i Water Clarity: Last Rain vent: 4 i!V Slope Stabilization Status: i Photos Taken: r Continents: cl / l s 4 -Y' at(��� UYwwwNd4 dmuN\'� k a Q i 48 Stevens dill head, Nottingham,NH 03290 " 603-679-8212 Fax 603-679-8232 Sent By: D; 6036798232; Apr-18-00 12:57PM; Page 3/4 +:E WEST �/� EN dW]IRONMENTA L INC. i i Environmental Monitoring Detention Basins Campbell Forest No. Andover,MA April 13, 2000 a t Y.t Y See attached map for basin locations. ;a Top of bank defined as flat area at top of basin. Bank defined as the sloped sides of the basin. Basin One: Reseed top of bank along south side of basin and also area along basin side near Webster Woods Lane. Basin Two: Reseed top of bank all around the basin. Reseed bank on southeast side. Straighten trees (saplings) and remove soil from tree base where it is too high. Basin Three: Reseed entire top of bank and south, east and west banks. Only the north ; bank has germination. Basin Four: Basin has good seed germination. Only needs reseeding on south end of bank and top of bank. i Basin Five: Reseed entire top of bank. Straighten out one tree that appears to have been 3 hit by equipment(it is obvious which tree this is). { Basin Six: Reseed all basin banks. Top of bank has cover. 's None of the wetland seed mix planted in the basin floor of the basin appears to be germinating; however,this seed does take a long time to sprout and the floor has been under water most of the spring. More time should be given for this seed to germinate. E When heavy equipment is operating in close proximity of these basuis it may be wise to flag the trees (saplings)for they are difficult to see at this time. This may prevent the trees from being run over. i C i it 48 Stevens Hill Road, NottinghAm, NH 03290 ♦ 603-679-8212 ♦ Fax 6M-679-8232 Sent By: D; 6036798232; Apr-18-00 12:56PM; Page 1 /4 )XTST i f i� s El v Y IRONME T ]..L ING i FAX TRANSMISSION DATE: qj is 00 TO: Y FROM: "k RER TH : [ r Y �t f �F NO, OF_PAGES ATTACHED: aALo 4 •4 F v / • Q „4 O i a 6 t 1� +:I li-lt)ii11:�4'8stenviulempire.net �.# 48 Stevens Hill Road, Nottingham, NH 03290 e 603-679-8212 ® Fax 603-679-8232 Sent By: D; 6036798232; Apr-18-00 12:57PM; Page 4/4 is a� ,i LOT f� N+.NJ SI G.i Campbell Forest IVo,m A ,t. ndovar, Afaddach�seftr GOT f0 �S LOT t 2 Kau d LOT • •a,ve+Jl �i P 'll X LOT 29 LOT /3 .a,po ar sa.eeo u LOT 2e Jer,h,de IRS dZ LOT 3o LOT ar eaau,r LOT fe rel a, LOT 7 t .d./e!ar LOT at LOT f6 LOT 6 MD LOT 21 LOT t6 01.6"It 32 LOT S Joa►, bq y fn LOT to .Aare if tar 2eOF LOT P6 er.w rr ,olaef sr LOT LOT f9 ro>i>sr q...JI LOT 17 - ,o6ru,P LOT 23 NBNT ' I""dI ' 1 LOT 22 i ® .lseo ar LOT 2 LOT 20 101,7SS n lfe,0(0 Sr ti t:,, i ele/r r LOT 16 re,...jr LOT n►,n.sr Ii LOT fYA 1JAill ar .is i. t: CAUP&ELL ROAD f • Sent By: D; 6036798232; Apr-25-00 11 :22AM; Page 5/6 West Environmental, Inc. �E ENVIRONMENTAL MONITOR REPORT I c 4 Project ID: Campbell Road Sewerline Inspection Date: Y/dU , '# Permit File #: MADEP 242-906 WEI #: 9919-MA Client: MPG A Contractor Name: M+E Construction J Contractor Interaction: c/Y 4 i� Silt Fence Status: OK Clean Out Required: Location: Repair Required: ,QQ,, ✓tst "K Location: at 644d�� Dewatering: (A-6411v � Inactive Water Clarity: QSL40VL Last Rain Event: Slope Stabilization Status: Photos Taken: It Comments: vim, Inuato, 0-ddj-AA0 Cx.AJ La . 48 tevens it oa , own g�m, • 603-679-8zt2 • Fax 603-619-8232 i Sent By: U; b03bi98232; Apr-2b-00 11 :22AM; Page 6/6 1i(� PCX 'i ,i i "1 i; I. is i is 5enz by: u; 00Jb/982J2; Apr-25-00 11 :20AM; Page 2 West Environmental, Inc. ENVIRONMENTAL MONITOR REPORT 'i ,i , 4 Project ID: Lyons Way Inspection Date: s Permit File #: MADEP 242-933 WEI #: 9923-MA Client: MPG s Contractor Name: John Farmer Construction Contractor Interaction: t Silt Fence Status: d Clean Out Required: ,;,t<S- Location: :i Repair Required: xIA.0 ' Location: !}� Dewatering: Active nac e ! Water Clarity: Last Rain Event: Slope Stabilization Status: i Photos Taken: ,4 w i Comments; , s � 070 ?o J i i e i 48 Stevens Hill Road,Nottingham, NH 03290 " 603-679-8212 * Fax 603-679-8232 i • 1' Sent By: 0; 6036798232; Apr-25-00 11 :21AM; Page 4/6 ;i ,E West Environmental, Inc. ENVIRONMENTAL MONITOR REPORT i' 14 i!E Project ID: Campbell Forest LLC Inspection Date: Y/f 0 i Permit File #: MADEP 242-816 WEI #: 9809-MA ! !I Client: MPG Contractor Name: Masterson Construction i, Contractor Interaction: Silt Fence Status: C)K4 f Clean Out Required: / -.e' Location: Repair Required: Location: OtA-lJII'd fQ��° Gt `'� Dewatering: Active activ d Water Clarity: Last Rain Event: o�> `i Slope Stabilization Status: ()K Photos Taken: Q� U � Comments: O.� l f f � ., 48 Stevens Hill Road, Nottingham, NH 03290 603-679-82(2 R Fax 603-679-8232 Town of North Andover �40 TH OFFICE(')1 0 COMMUNnY DEVELOPMENT AND SERVICES 27 C.harles Strect 4 North Aiidover, Massachusetts 01845 WILLIAM J. SCOTF CHUS Direelor (978)688-953 1 Fax (978)688-9542 June 29,2000 Alison Lescarbeau Planning Board Chair Planning Office 27 Charles Street North Andover,Ma.01845 Dear Mrs.Lescarbeau; At your meeting on December 21, 1999,1 strongly expressed my concern of releasing lots where the offsite sewer was not clearly completed.My concern for the Campbell Forest subdivision was that in the event the offsite work was not completed a homeowner who received building permit and completed the home would not be allowed occupancy without proof of sewage disposal. Further,I was concerned that Town Counsel prior to signature did not review the surety. The Board was satisfied as to the developers verbal explanation of the offsite progress and the performance guarantees available for the offsite work.Further the Board and the developer expressed that the buyer should be and will be made aware of the infi-astructure circumstances, essentiality I believe the phrase"buyer beware"was used. Specifically my concern at that meeting was that a person would be placed in the position of being at a closing without an occupancy permit if the offsite work was not completed. In fact this has occurred. The attached e-mail to our building department is representative of what may happen to all of the lots recently released. It appears from the e-mail that no one explained that the occupancy permit was dependent on the offsite sewer. Since no one in my department has contact with prospective homeowners(they do not pull the building permits the contractor does.)until a problem such as this occurs, I assumed from the content of the discussion on the 21'that the developer would inform homeowners of the offsite sewer circumstances. This letter is sent to restate my concern that offsite work that is dependent on completion prior to an occupancy permit should be completed prior to the lot releases. Despite what the developer and the Board assume no one in the Community Development Office has control over the negotiations regarding the completion of off-site infrastructure.Therefore in the absence of an approval for the use of the sewers I would have rather treated the sewer as not available until signed off by the DPW, as I expressed at your meeting. As a result we have no way in issuing an occupancy permit without actions by either the developer and or the DPW. I would rather that the Board issue lot releases in a manner that places the Community Development Division in the position of being able to solve problems for the homeowners. Now we are in the untenable position of waiting for others to act while the homeowner possibly contemplates legal action for the not issuing an occupancy permit. Regardless of how the Board feels about the awareness of the prospective buyers and"buyer beware",the eventual hardship of a homeowner falls to my staff to solve, and in this case without the power to act. Sincerely, ........... 0 William J.Scott BOAM)OF APPEALS 688­9541 BUILDING 688-9545 CONSE'R MION 688-9530 HEALTH 688-9540 PLANNINGr 688-9535 William Scott From: Town Man. Secretary Sent: Wednesday, June 28, 2000 1:09 PM To: Jeannine McEvoy; Mike Mcguire; William Scott Cc: Terri Ackerman Subject: Campbell Forest-Cob Wittstein Importance: High Hi Jeannine and Michael, I recieved a phone call today around 12:30 this afternoon from a Bob Wittstein and family. They were supposed to close on the first house in the development(Campbell Forest)this Friday. He said the Town and the developer seem to be fighting about sewers and his family is in the middle being punished. It's a Holiday weekend and he has no where to live as of July 1. He is renting and came from out of state. His movers will not be available for another few weeks as they are booked and his rate lock in for mortgage Is in jeopardy also. The biggest problem...is where to live???? His Cell#978-7644801 Home(Wife should be there)978-546-6267 Office #978-2824188 Thank you for helping me with this call. (Kathy O'Neill)