September 15, 2003 SEP 17 2003
Mesiti Development Group NORTF-i ANDOVER
100 Andover Bypass CONSERVATION COMMISSION
Suite 300
North Andover, MA 01845
Project: Campbell Forest Subdivision —Proposed Drainage Modifications
To Whom It May Concern:
I have reviewed the"As-Built Drainage Analysis"prepared by DK Engineering Associates dated July
31, 2003 for the Campbell Forest subdivision. The three corrective measures proposed to remedy the
discrepancies in the culvert construction versus the original drainage study report in 1997 appear in
methodology to be acceptable to the DPW. The hydraulics of the drainage system will require an
outside engineering consultant to provide review and comment. The DPW requests copies of the
consultants review for our permanent record. Also, the proponent for this project must submit As-Built
drawings of the drainage modifications to the DPW to insure compliance with the design plan.
If you should have any questions or comments please feel free to contact me at your convenience.
Very my ou
aek Sullivan, P.E.
Director of Engineering
Cc: Juile Parrino, Conservation Administrator
Justin Woods, Town Planner