Loading...
HomeMy WebLinkAbout1992-05-29 Engineer Review DEF SUB 9/15/2003 TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS 384 OSGOOD STREET NORTH ANDOVER, MASSACHUSETTS 01845-2909 J. WILLIAM HMURCIAK, DIRECTOR, P.E. John (Jack) Snllivmr, P.E. NORTH q Telephone (978) 685-0950 IV Directorof�Engineering °°``'t. °`' °� Fax (978) 688-9573 Q t p ��SSACHus�t�y RECEIVED September 15, 2003 SEP 17 2003 Mesiti Development Group NORTF-i ANDOVER 100 Andover Bypass CONSERVATION COMMISSION Suite 300 North Andover, MA 01845 Project: Campbell Forest Subdivision —Proposed Drainage Modifications To Whom It May Concern: I have reviewed the"As-Built Drainage Analysis"prepared by DK Engineering Associates dated July 31, 2003 for the Campbell Forest subdivision. The three corrective measures proposed to remedy the discrepancies in the culvert construction versus the original drainage study report in 1997 appear in methodology to be acceptable to the DPW. The hydraulics of the drainage system will require an outside engineering consultant to provide review and comment. The DPW requests copies of the consultants review for our permanent record. Also, the proponent for this project must submit As-Built drawings of the drainage modifications to the DPW to insure compliance with the design plan. If you should have any questions or comments please feel free to contact me at your convenience. Very my ou aek Sullivan, P.E. Director of Engineering Cc: Juile Parrino, Conservation Administrator Justin Woods, Town Planner File r'i AN�vi iG -np/AR9riv, �vr , t .