HomeMy WebLinkAbout1999-12-21 ENF Correspondence DEF SUB McKENZ1E ENGINEERING GROUP, INC. Professional Civil Engineering•Land Planning•Project Management 196 Central Street Saugus,Massachusetts 01906 Tel:781.941..2211 Fax:781.941.2662 Email:megi@erols.com 71 Whiting Street Hanover, Massachusetts 02339 p , 781.792.3900 Fax:781.792.0333 y 'a July 28, 1998 t, Community Development and Services Town of North Andover Planning Board f 30 School Street North Andover, MA 01845 RE: Campbell Forest Subdivision Sewer North Andover, MA Dear Environmental Reviewer: As required by the Commonwealth of Massachusetts Environmental Policy Act,we have enclosed one copy of the Environmental Notification Form for Campbell Forest Municipal Sewer project to be constructed within the approved Campbell Forest subdivision in North Andover, MA. The Filing of the ENF is required because there is more than '/2 mile of sewer mains proposed that are not located in the right of way of existing roadways. Upon your review of the enclosed ENF, please do not hesitate to contact me with questions, comments, and/or if you require any additional information. Sincerely, McKenzie Engineering Group,Inc. t119/r"' Erik D. Heyland, P.E. Enclosures cc: File Q ENVIRONMENTAL NOTIFICATION FORM in accordance with the Massachusetts Environmental Policy Act EOEA No.: EXECUTIVE OFFICE of MEPAAnalyst: ENVIRONMENTAL AFFAIRS phone: 617-727-5830 ext. Project: Campbell Forest Municipal Seiver Project Street: Campbell Road Municipality: North Andover Watershed: None Latitude and longitude: Proponent: MPG Realty Corp. Street: 11 Old Boston Road Municipality/State/Zip Code: Tewksbury, MA 01876 Estimated commencement date: August 1998 Estimated completion date: Nov. 1998 Approximate cost: .$750,000 Status of project design: 100 % complete Copies of this Environmental Notification Form may be obtained from: Name: Erik Heyland, PE Firm/Agency: AlcKenzie Engineering Group, Inc. Phone: 781-941-2211 Street: 196 Central St Fax: 781-941-2662 Municipality/State/Zip Code Saugus, MA 01906 E-mail:edhe@lerols.com Description of the Project and its alternatives (attached additional pages if necessary): T he proposed prtject consists of'the construction of approximately 4,500 if of gravity collection sewers which ►till protide seiner service to 32 homes in Campbell Forest subdivision. Campbell Forest subdivision is an approved residential subdivision project that has commenced construction in July 1998. The approval of the subdivision )Pas based oil each lot having an Ott-site subsurj ace disposal system. In April 1998, the applicant requested a modification to the subdivision plans to allow the construction of a Pylunicipal fpastefvater collection system instead of constructing Individual oil-site septic systenis. The North Andover Planning Board and Conseri,ation Commission approved this modification. Oil July 9, 1998, the DEP has trade a tentative determination to issue a sewer extension perinit for construction of the sewer system. The anticipated date of issuance of the permit is in mid-August 1998. The filing of an ENF is required because there is more than % mile of sefper mains proposed that are not located in the right of way of existing roadways. There are no other review thresholds under section 11.03 that would require the filing of an ENF, schedule (5) Wastewater is attached 7/98 This is an important noticc. Commcnt period is limitcd. For information call 617-727-5830. Schedules attached to this Environmental Notification Form: Related Permit(s) Impacts)not meeting Review Threshold(s) required from an or exceeding a Review Subject Matter of Schedule met or exceeded Agency of the Threshold or requiring (see 301 CMR 11.03) Commonwealth a Permit from an (attach a copy of each Agency of the completed Commonwealth application) (1) Land (2) Rare Species (3)Wetlands,Waterways & Tidelands (4) Water (5)Wastewater (b)3.c. DEP Sewer Ext. (6) Transportation (7) Energy (8) Air (9) Solid & Hazardous Waste (10) Historical/Archaeological Resources (11) ACECs Is this an Expanded ENF requesting: No a Single EIR? _ Yes _No (see 301 CMR 11.06(8)) a Special Review Procedure? — Yes ^No (see 301 CMR 11.09) a Waiver? _ Yes —No (see 301 CMR 11.11) List of any Financial Assistance or Land Transfer from an Agency of the Commonwealth: None Description of the Project's consistency with state, municipal, county, regional and Federal growth and infrastructure plans and policies and of its ability to facilitate sustainable economic development: Project is consistent with the Town of North Andover's master plan to pt•ovide Municipal Seaver service to residents in the area. 7/98 List of any permits, licenses, certificates,variances or approvals required from any municipal, county, regional or Federal governmental entity: DEP,Veiver Extension Permit Application Town of North Andover Conservation Commission —Notice of Intent Filing, Order of Conditions issued Town of North Andover Planning Board—Modification to approved subdivision plan granted Attachments: 1. Appropriate schedule(s) as indicated on Page 2 of this form 2. Site plan(s) 3. Original U.S.G.S. map or good quality color copy (8-1/2x 11 inches or larger) indicating the Project location and boundaries 4. GIS Coordinates, if available Certifications: I. The Public Notice of Environmental Review has been/will be published in the following newspapers in accordance with 301 CNM 11.15(1): (Name) (Date) Boston Globe 8-9-98 2. This form has been circulated to Agencies and Persons in accordance with 301 CMR 11.16(2). 04 Date Sig��4W sp66ble Officer Date '"'reparing , , 9p Re Signature of"person p or Proponent ENF (if different from above) Kenneth Grandsta Erik D. ffiqlan d, PE Name (print or type) Name (print or type) Finn/Agency MPG ReaML12!r p—. Firm/Agency McKenZLe Engineering Group, Inc. Street 11 Old Boston Road Street 196 Central St Municipality/State/Zip Tewksbury, MA 01876 Municipality/State/Zip Saugus. AM 01906 Phone ( 978 ) 851-9395 Phone (781 ) 941-2211 7/99 Schedule 5 --Wastewater(attach additional pages if necessary) l. Description and assessment of the Project's wastewater impacts, including(as applicable): A. new or expanded wastewater treatment and/or disposal facility B. new interbasin transfer of wastewater C. new sewer mains D. new sewer service by an Agency of the Commonwealth to a municipality or sewer district E. new or expanded discharge of sewage, industrial waste water, or untreated stormwater to an outstanding resource water, a sewer system, surface water, or groundwater F. new or expanded capacity for storage, treatment, processing, combustion or disposal of sewage sludge, sludge ash, grit, screenings, or other sewage sludge residual materials Approximately 4,500 LF of 8"gravity server main will be constructed within the subdivision. 2. Description and assessment of the Project's other wastewater impacts: Mastervater flow generated in the Campbell Forest Subdivision will be conveyed through an 8" gravity server system to a proposed offsite server system, in an existing right of rvay, which will flow to a proposed pump station. Wastewater flow will then be conveyed through a force main along Campbell Road to a sewer system (proposed and designed by others) on Route 114. Approximately 21 horses along Campbell Road will be tied into the proposed server system 3. Description and analysis of alternative plans or designs for the Project or aspects thereof that would avoid or nununuze wastewater impacts: Onsite septic systems would avoid wastewater impacts to the existing server system, however, that is not a desirable alternative given soil t3 pes, and the need to eliminate potentially failing existing and proposed septic systems in this area. 4. Description and assessment of proposed measures that would mitigate wastewater impacts: 7/98 ENF Distribution List Trudy Coxe, Secretary Environmental Reviewer Executive Office of Environmental Affairs MHD-District 4 100 Cambridge Street, 20''Floor 519 Appleton Street Boston, MA 02202 Arlington,MA 02174 Ms. Luisa Paiewonsky Director North Andover Conservation Commission Public/Private Development Unit 30 School Street Massachusetts Highway Department North Andover, MA 01845 10 Park Plaza, Room 3510 Boston, MA 02116-3966 Environmental Reviewer Community Development and Services Department of Environmental Protection Town of North Andover Planning Board One Winter Street 30 School Street Boston, MA 02108 North Andover, MA 01845 Environmental Reviewer DEP/NE Regional Office 10 Commerce Way Woburn, MA 01801 Environmental Reviewer Executive Office of Transportation & Construction 10 Park Plaza, Room 3510 Boston, MA 02116-3966 Massachusetts Historical Commission 220 Morrissey Boulevard Boston, MA 02125 7/98 Forms of Notice http:/h"tixNv.ma.onet.state.ma.usVmepa,noticc.),tr. Commonwealth of Massachusetts Executive Office of Environmental Affairs - MEPA Office 100 Cambridge St. - 20th fl., Boston, MA 02202 617-727-5830 FORMS OF NOTICE The following should be completed and submitted to a local newspaper: PUBLIC NOTICE OF ENVIRONMENTAL REVIEW PROJECT: Campbell Forest Municipal Sewer LOCATION: North Andayer i MA PROPONENT:MPG Realty Corp. The undersigned is submitting an Environmental Notification Form ("ENF") to the Secretary of Environmental Affairs on or before July 30, 1 998(da/e) This will initiate review of the above project pursuant to the Massachusetts Environmental Policy Act ("MEPA", M.G.L. c. 30, s.s. 61, 62 62H). Copies of the ENF may be obtained from: McKenzie FnTi neeri ng group, in 196 Central Street Saugus, MA 01906 ( 7.81_)941a 2211 (Name, address,phone number of proponent or proponent's agent) Copies of the ENF are also being sent to the Conservation Commission and Planning Board of North Andover (Municipality) where they may be inspected. The Secretary of Environmental Affairs will publish notice of the ENF in the Environmental Monitor, will receive public comments on the project for 20 days, and will then decide, within ten days,if an environmental Impact Report is needed. A site visit and consultation session on the project may also be scheduled. All persons wishing to comment on the project, or to be notified of a site visit or consultation session, should write to the Secretary of Environmental Affairs, 100 Cambridge Street, Boston, Massachusetts 02202, Attention: MEPA Unit, referencing the above project. BY MPG RealtyCorp- (Proponent) loft 7/28/98 1 L•06 Y)v 1 . .�r�� /-;ill � .`� �-_.:•- --••,,.��`j� � , .r �\- "�1 j Evil Prt s•.. -4. NA :• a S rATE FOREST �`' 7 J - a (411 STy�. clam A I-� Vona 1 y. J ern BM 31.6 QQ lid �,,gg ATE Pat --- FOREST- n ��•.. SITE J+: r Q �jo 40 `''fir \y � ..- a...- :� •l� � �.INK, t/ 'N" STATI `: N1 e S�REs FOREST " p� 1`•.. 'iAk6l PARILER \ f :+ a NCaRTK,AK! .4VE oil cl re$rldprsf 1 r� ,, KER S'TATE ifp <�? M75 1\ \`� 7 ( : , �r.r'''i�'. '! U,t �i :�o �,.. > : ta1(' s> .``�/rE\, _ MN tTN 4 I/2 1 MILE — 10. I 1000 D 1000 2000 3000 �000 FEET