HomeMy WebLinkAbout1999-12-21 ENF Correspondence DEF SUB McKENZ1E
ENGINEERING
GROUP, INC.
Professional Civil Engineering•Land Planning•Project Management 196 Central Street
Saugus,Massachusetts 01906
Tel:781.941..2211
Fax:781.941.2662
Email:megi@erols.com
71 Whiting Street
Hanover, Massachusetts 02339
p ,
781.792.3900
Fax:781.792.0333
y 'a
July 28, 1998
t,
Community Development and Services
Town of North Andover Planning Board
f
30 School Street
North Andover, MA 01845
RE: Campbell Forest Subdivision Sewer
North Andover, MA
Dear Environmental Reviewer:
As required by the Commonwealth of Massachusetts Environmental Policy Act,we have
enclosed one copy of the Environmental Notification Form for Campbell Forest
Municipal Sewer project to be constructed within the approved Campbell Forest
subdivision in North Andover, MA. The Filing of the ENF is required because there is
more than '/2 mile of sewer mains proposed that are not located in the right of way of
existing roadways.
Upon your review of the enclosed ENF, please do not hesitate to contact me with
questions, comments, and/or if you require any additional information.
Sincerely,
McKenzie Engineering Group,Inc.
t119/r"'
Erik D. Heyland, P.E.
Enclosures
cc: File
Q ENVIRONMENTAL NOTIFICATION FORM
in accordance with the Massachusetts Environmental Policy Act
EOEA No.:
EXECUTIVE OFFICE of MEPAAnalyst:
ENVIRONMENTAL AFFAIRS phone: 617-727-5830 ext.
Project: Campbell Forest Municipal Seiver Project
Street: Campbell Road
Municipality: North Andover
Watershed: None
Latitude and longitude:
Proponent: MPG Realty Corp.
Street: 11 Old Boston Road
Municipality/State/Zip Code: Tewksbury, MA 01876
Estimated commencement date: August 1998 Estimated completion date: Nov. 1998
Approximate cost: .$750,000
Status of project design: 100 % complete
Copies of this Environmental Notification Form may be obtained from:
Name: Erik Heyland, PE
Firm/Agency: AlcKenzie Engineering Group, Inc. Phone: 781-941-2211
Street: 196 Central St Fax: 781-941-2662
Municipality/State/Zip Code Saugus, MA 01906 E-mail:edhe@lerols.com
Description of the Project and its alternatives (attached additional pages if necessary):
T he proposed prtject consists of'the construction of approximately 4,500 if of gravity collection
sewers which ►till protide seiner service to 32 homes in Campbell Forest subdivision.
Campbell Forest subdivision is an approved residential subdivision project that has commenced
construction in July 1998. The approval of the subdivision )Pas based oil each lot having an Ott-site
subsurj ace disposal system. In April 1998, the applicant requested a modification to the
subdivision plans to allow the construction of a Pylunicipal fpastefvater collection system instead of
constructing Individual oil-site septic systenis. The North Andover Planning Board and
Conseri,ation Commission approved this modification. Oil July 9, 1998, the DEP has trade a
tentative determination to issue a sewer extension perinit for construction of the sewer system. The
anticipated date of issuance of the permit is in mid-August 1998.
The filing of an ENF is required because there is more than % mile of sefper mains proposed that
are not located in the right of way of existing roadways. There are no other review thresholds under
section 11.03 that would require the filing of an ENF, schedule (5) Wastewater is attached
7/98 This is an important noticc. Commcnt period is limitcd. For information call 617-727-5830.
Schedules attached to this Environmental Notification Form:
Related Permit(s) Impacts)not meeting
Review Threshold(s) required from an or exceeding a Review
Subject Matter of Schedule met or exceeded Agency of the Threshold or requiring
(see 301 CMR 11.03) Commonwealth a Permit from an
(attach a copy of each Agency of the
completed Commonwealth
application)
(1) Land
(2) Rare Species
(3)Wetlands,Waterways & Tidelands
(4) Water
(5)Wastewater (b)3.c. DEP Sewer Ext.
(6) Transportation
(7) Energy
(8) Air
(9) Solid & Hazardous Waste
(10) Historical/Archaeological Resources
(11) ACECs
Is this an Expanded ENF requesting: No
a Single EIR? _ Yes _No (see 301 CMR 11.06(8))
a Special Review Procedure? — Yes ^No (see 301 CMR 11.09)
a Waiver? _ Yes —No (see 301 CMR 11.11)
List of any Financial Assistance or Land Transfer from an Agency of the Commonwealth:
None
Description of the Project's consistency with state, municipal, county, regional and Federal growth and
infrastructure plans and policies and of its ability to facilitate sustainable economic development:
Project is consistent with the Town of North Andover's master plan to pt•ovide Municipal Seaver
service to residents in the area.
7/98
List of any permits, licenses, certificates,variances or approvals required from any municipal, county,
regional or Federal governmental entity:
DEP,Veiver Extension Permit Application
Town of North Andover Conservation Commission —Notice of Intent Filing, Order of Conditions
issued
Town of North Andover Planning Board—Modification to approved subdivision plan granted
Attachments:
1. Appropriate schedule(s) as indicated on Page 2 of this form
2. Site plan(s)
3. Original U.S.G.S. map or good quality color copy (8-1/2x 11 inches or larger) indicating the
Project location and boundaries
4. GIS Coordinates, if available
Certifications:
I. The Public Notice of Environmental Review has been/will be published in the following
newspapers in accordance with 301 CNM 11.15(1):
(Name) (Date)
Boston Globe 8-9-98
2. This form has been circulated to Agencies and Persons in accordance with 301 CMR 11.16(2).
04
Date Sig��4W sp66ble Officer Date '"'reparing
, , 9p Re Signature of"person p
or Proponent ENF (if different from above)
Kenneth Grandsta Erik D. ffiqlan d, PE
Name (print or type) Name (print or type)
Finn/Agency MPG ReaML12!r p—. Firm/Agency McKenZLe Engineering Group, Inc.
Street 11 Old Boston Road Street 196 Central St
Municipality/State/Zip Tewksbury, MA 01876 Municipality/State/Zip Saugus. AM 01906
Phone ( 978 ) 851-9395 Phone (781 ) 941-2211
7/99
Schedule 5 --Wastewater(attach additional pages if necessary)
l. Description and assessment of the Project's wastewater impacts, including(as applicable):
A. new or expanded wastewater treatment and/or disposal facility
B. new interbasin transfer of wastewater
C. new sewer mains
D. new sewer service by an Agency of the Commonwealth to a municipality or sewer
district
E. new or expanded discharge of sewage, industrial waste water, or untreated stormwater
to an outstanding resource water, a sewer system, surface water, or groundwater
F. new or expanded capacity for storage, treatment, processing, combustion or disposal of
sewage sludge, sludge ash, grit, screenings, or other sewage sludge residual materials
Approximately 4,500 LF of 8"gravity server main will be constructed within the subdivision.
2. Description and assessment of the Project's other wastewater impacts:
Mastervater flow generated in the Campbell Forest Subdivision will be conveyed through an 8"
gravity server system to a proposed offsite server system, in an existing right of rvay, which will flow to
a proposed pump station. Wastewater flow will then be conveyed through a force main along
Campbell Road to a sewer system (proposed and designed by others) on Route 114. Approximately 21
horses along Campbell Road will be tied into the proposed server system
3. Description and analysis of alternative plans or designs for the Project or aspects thereof that
would avoid or nununuze wastewater impacts:
Onsite septic systems would avoid wastewater impacts to the existing server system, however, that is
not a desirable alternative given soil t3 pes, and the need to eliminate potentially failing existing and
proposed septic systems in this area.
4. Description and assessment of proposed measures that would mitigate wastewater impacts:
7/98
ENF Distribution List
Trudy Coxe, Secretary Environmental Reviewer
Executive Office of Environmental Affairs MHD-District 4
100 Cambridge Street, 20''Floor 519 Appleton Street
Boston, MA 02202 Arlington,MA 02174
Ms. Luisa Paiewonsky Director North Andover Conservation Commission
Public/Private Development Unit 30 School Street
Massachusetts Highway Department North Andover, MA 01845
10 Park Plaza, Room 3510
Boston, MA 02116-3966
Environmental Reviewer Community Development and Services
Department of Environmental Protection Town of North Andover Planning Board
One Winter Street 30 School Street
Boston, MA 02108 North Andover, MA 01845
Environmental Reviewer
DEP/NE Regional Office
10 Commerce Way
Woburn, MA 01801
Environmental Reviewer
Executive Office of Transportation
& Construction
10 Park Plaza, Room 3510
Boston, MA 02116-3966
Massachusetts Historical Commission
220 Morrissey Boulevard
Boston, MA 02125
7/98
Forms of Notice http:/h"tixNv.ma.onet.state.ma.usVmepa,noticc.),tr.
Commonwealth of Massachusetts
Executive Office of Environmental Affairs - MEPA Office
100 Cambridge St. - 20th fl., Boston, MA 02202
617-727-5830
FORMS OF NOTICE
The following should be completed and submitted to a local newspaper:
PUBLIC NOTICE OF ENVIRONMENTAL REVIEW
PROJECT: Campbell Forest Municipal Sewer
LOCATION: North Andayer i MA
PROPONENT:MPG Realty Corp.
The undersigned is submitting an Environmental Notification Form ("ENF") to the Secretary of
Environmental Affairs on or before
July 30, 1 998(da/e)
This will initiate review of the above project pursuant to the Massachusetts Environmental Policy
Act ("MEPA", M.G.L. c. 30, s.s. 61, 62 62H). Copies of the ENF may be obtained from:
McKenzie FnTi neeri ng group, in
196 Central Street
Saugus, MA 01906 ( 7.81_)941a 2211
(Name, address,phone number of proponent or proponent's agent)
Copies of the ENF are also being sent to the Conservation Commission and Planning Board of
North Andover (Municipality) where they may be inspected.
The Secretary of Environmental Affairs will publish notice of the ENF in the Environmental
Monitor, will receive public comments on the project for 20 days, and will then decide, within ten
days,if an environmental Impact Report is needed. A site visit and consultation session on the
project may also be scheduled. All persons wishing to comment on the project, or to be notified of
a site visit or consultation session, should write to the Secretary of Environmental Affairs, 100
Cambridge Street, Boston, Massachusetts 02202, Attention: MEPA Unit, referencing the above
project.
BY MPG RealtyCorp- (Proponent)
loft
7/28/98 1 L•06 Y)v
1 . .�r�� /-;ill � .`� �-_.:•- --••,,.��`j� � , .r �\- "�1 j
Evil
Prt s•.. -4.
NA
:• a S rATE FOREST �`' 7 J -
a
(411
STy�.
clam A
I-� Vona 1
y.
J ern
BM 31.6
QQ
lid
�,,gg ATE Pat ---
FOREST- n
��•.. SITE
J+: r Q �jo
40
`''fir \y � ..- a...- :� •l� � �.INK,
t/ 'N"
STATI `: N1 e
S�REs FOREST " p� 1`•..
'iAk6l PARILER \ f :+ a
NCaRTK,AK! .4VE
oil
cl
re$rldprsf
1 r�
,, KER S'TATE ifp <�? M75 1\ \`�
7 ( : , �r.r'''i�'. '! U,t �i :�o �,.. > : ta1(' s> .``�/rE\, _
MN tTN 4 I/2 1 MILE —
10. I 1000 D 1000 2000 3000 �000 FEET