Loading...
HomeMy WebLinkAbout1999-09-21 Application for Modification & Sewer Permit I,o Application for Modification (MGL c.41, §81W) 3 Applicant: Mesiti-Moore's Falls, LLC 11 Old Boston Road Tewksbury, MA 01876 Property: Forest View Subdivision, located off Turnpike Street, North Andover, MA (91 single family residential lots, 1 playground lot, and roadways, all as shown on the Approved Definitive Subdivision Plan) Original Approval: Planning Board Conditional Approval dated April 13, 1998 Application is hereby made to the North Andover Planning Board, pursuant to MGL c.41, §81W, to modify one condition as set forth in the Original Approval dated April 13, 1998, namely: to amend Condition 5(b) of the Definitive Subdivision Plan Approval for Forest View Subdivision dated April 13, 1998 to allow (once the requirements Condition 5(c) have been met with respect to the off-site sewer in Route 114) to begin Site Work within the Subdivision. The reasons supporting this Application for Modification are set forth on Exhibit A attached hereto. Signed as of the 16th of February, 1999. Applicant: Mesiti-Moore's Falls, LLC by its Attorneys Devine, Millimet & Branch, P.A. By: ;Aoberh�V-Lavoie, Esq. G:\REAL,FS'nMESITI\FORSTVW.APP I ATTACHED SHEET TO ACCOMPANY APPLICATION FOR MODIFICATION OF CONDITION 5(b) A. Background 1. By Decision dated April 13, 1998, the Planning Board granted Conditional Approval for Forest View Estates Definitive Subdivision. The Notice of Decision, and the 11 page attachment containing findings and conditions, was filed with the North Andover Town Clerk on April 13, 1998. 2. The Approval contains a Section 5, which currently states the following: 5) Prior to ANY WORK ON THE SITE, b) "the Rt. 114 Sewer Line and all necessary appurtenances must be constructed in accordance with the approved plans, Department of Public Works requirements and the Planning Board Consultant Engineer review." 3. At the time that Condition 5(b) was written, the construction design and sequencing of the off-site sewer and Rt. 114 was substantially complete, but was not completely finalized; in addition DEP had not yet issued a Conditional Sewer Extension Permit for the off-site sewer. On November 18, 1998, DEP issued the Conditional Sewer Extension Permit attached hereto as Exhibit A. In addition, final design plans and sequencing of construction have advanced to the point that the Applicant, the Town and the Department of Public Works have reached consensus on the appropriate sequencing of construction activities; see November 10, 1998 DPW letter attached hereto as Exhibit B. 4. If Condition 5(b) were to be left unmodified, the requirement that the off-site sewer construction be completed before any site work could be commenced would work a severe hardship on the Applicant and would be an unnecessary restriction on the Applicant's construction activities. B. Requested Modification 5. The Applicant suggests that a more appropriate statement of the Town's reasonable requirements would be that Site Work not begin before the Applicant is authorized to begin work on the off-site sewer in Rt. 114 under Condition 5(c). (It should be recalled that Condition 4(f) already requires a Site Opening Bond in the amount of$15,000.00 be posted to cover any contingencies that might affect the public welfare such as site I opening, clearing, erosion control and performance of any other Condition contained in the Approval, prior to the posting of the Roadway Bond as described in Conditions 60)). 6. Consequently, it is hereby respectfully requested that the following Modification to Condition 5(b) of the Approval be approved by the Planning Board: Replace existing Condition 5(b)with the following: 5) PRIOR TO ANY WORK ON THE SITE, b) the Applicant must have complied with the requirements of Condition 5(c) so as to be authorized to begin work on the off-site sewer in Rt. 114. Once the Permits and the Performance Bond Agreement set forth below in Sub-section 5(c) have been issued, the Applicant will be allowed (subject to all other applicable requirements) to begin Site Work associated with Phase I of the Subdivision. G:\REAL-EST\ME S ITI\MOORE'S.FLL\MODIF ICA.ADD COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION METROPOLITAN BOSTON-NORTHEAST REGIONAL OFFICE ARGEO PAUL CELLUCCI TRUDY COXE Governor Secretary DAVID B. STRUHS Commissioner Kenneth Grandstaff November 18 , 1998 Mesiti Devlpmt . Corp. 11 Old Boston Road Tewksbury, MA 01876 Sewer System Connection/Extension Permit No. 125386 Dear Mr. Grandstaff : In response to your application for a sewer connection/ extension permit to discharge into the sewer system at Amberville Rd. , Palomino Dr. and Salem Turnpike (Route 114) in North Andover, Massachusetts, and after due public notice, I hereby issue the attached final permit . No comments objecting to the issuance or terms of the permit were received by the Department during the public comment period. Therefore, in accordance with 314 CMR 2 . 08, the permit becomes effective upon issuance . This Permit is an action of the Department . If you are aggrieved by this action, you may request an adjudicatory hearing. A Notice of Claim for an Adjudicatory Hearing must be made in writing and postmarked within thirty (30) days of the date this permit was issued. Pursuant to 310 CMR 1 . 01 (6) , the Notice of Claim shall state clearly and concisely the facts which are grounds for the proceeding and the relief sought . The Notice of Claim, along with a valid check payable to the Commonwealth of Massachusetts in the amount of one hundred dollars ($100 . 00) , must be mailed to: Commonwealth of Massachusetts Department of Environmental Protection P .O. Box 4062 Boston, MA 02211 The Notice will be dismissed if the filing fee is not paid, unless the appellant is exempt or granted a waiver as described in 310 CMR 4 . 00 . 205a Lowell St 0 Wilmington,Massachusetts 01887 • FAX (978) 661-7615 0 Telephone (978) 661-7600 0 TDD#(978)661-7679 -2- If you have any questions regarding this matter, please contact Ralph Lizio at (978) 661-7600 . Since y, ohn a 'ac Bureau of Resource Protection JZ/RL Enclosure CC : J. William Hmurciak, Acting Director of Public Works, 384 Osgood Street , North Andover, MA 01845 t tt 314 CMR: Division of Water Pollution Control one Winter Street Boston, MA 02108 7.2 0: PERMIT NO: APPLICATION FOR PERMIT TOWN: &Oe vE� FOR For issuing office SEWER SYSTEM EXTENSION OR CONNECTION use only: INSTRUCTIONS The application should be signed by the appropriate municipal official , and submitted in triplicate, with the original and one copy to the Division's Boston Office and one copy to the appropriate regional office. The signature of the design engineer or other agent will be-accepted only if accompanied by a letter of authorization. If connection is to be made to the MWRA sewerage system, indicate "MWRA" in item 11. If the project includes sewers, pumping stations, force mains, or syphons , construction plans must be submitted with the application. If additional space is required to properly answer any questions, please attach additional sheets ,and refer to the attachments in the space provided. (1) Name and Address of Applicant:- Mesiti Development Corporation 11 Old Boston Road Tewksbury, MA 01876 Telephone (978) 851-9395 (Z) Name of . Sewer System Owner: Town of :Ndrth Andover (Municipality or Sewer District) Sewer (Department) (3) Type of Project: �SPC*PY Fxi-PnGi nn (Sewer Extension or Sewer Connection) (4) Number of Residences to be 98 (Forest VievEstates) 'served: Route 114) (5) Number of Bedrooms : 306* 12/31/86 —- Page 1 of 7 Sewer Connections *Based on three.:bedrooms per residence. 314 CMR: DIVISION OF WATER POLLUTION CONTROL (6) . Other establishments to be served: None (a) Name Address Type of Establishment Design Flow (b) (c) (d) (7) Design Flow-Gallons Per Day: (average) - See Attachment "A" Sewage 39,270 Industrial Wastes -0- Tota l 39,270 (o) Location, Length, Size and Capacity of Sewers to be Connected to the existing system: (Attach sketch) (a) See attached Drawings and Attachment ."A". Name of Street Length of Sewer Size of Sewer Flow Full Capacity (b) (c) (d) (5) Location, Size and Capacity of Pumping Stations to be %/ Connected to the existing system: (a) Foirest .View Estates Pumping Station (PS #2) , 2 Pumps, 40 hp, 650 gpm Pump Station Location Number of Pumps Pump Size Pump Capacity (b) . Boston .Hill Pumping Station (PS f1) , 2 Pumps, 50 hp, -750 gpm 12/31/86 Page 2 of 7 Sewer Connections 314 CMR: DIVISION OF WATER POLLUTION CONTROL (10) General Description of Sewers and .Pump Stations within the existing sewer system which will transport the flow from the proposed sewer extension of connection to the receiving Wastewater Treatment Facility: Flow from the proposed subdivision will be conveyed to the Forest View Estates PS (650 gpm, 0.936 mgd) which will pump through an 8-in force main to the proposed Boston Hill PS (to be constructed under this project abut..will add only minimal .new flow) . The Boston Hill PS will pump through an 8-in-force main to the..existing .15-in gravity sewer at Hillside Avenue. All flow will then be conveyed through the North Andover collet s aystem for treatment at the GLSD. wastewater treatment plant. (11) Receiving Wastewater Treatment Facility: Greater Lawrence Sanitary District Name: Average Daily Flow: 32 Million. Gallons Per Day .. Design Flow: 52 Million Gallons Per Day (12) Does the discharge contain any industrial waste? Yes No X If yes, list any pollutants which you know or have reason to believe are discharged or may be discharged. For every pollutant you list, please indicate its approximate concentration in the discharge and any analytical data in your possession which will support your statement. Additional wastewater analysis may -be required as part of this application. (13) Does the discharge contain any industrial waste containing substances or materials which could harm the sewers, wastewater treatment process, or equipment; have an adverse effect on the receiving water; or could otherwise endanger life, limb, public property, or constitute a nuisance? Yes No X (14) Do the wastewaters receive any pretreatment prior to discharge? Yes No X 12/31/86 Page 3 of 7 Sewer Connections r 314 CMR: DIVISION OF WATER POLLUTION CONTROL (15) List, in descending order of significance, the four (4) digit standard industrial classification (SIC) Codes which best describe the facility producing the discharge in terms -of the principal products for services provided. Also, specify each classification in words. SIC CODE SPECIFY A. N/A B. C. D. (16) Is the Proposed Discharge Consistent with Existing Sewer Use Regulations : YES : X NO: (17) Is there a site of historic or archeological significance, as defined in regulations ' of the Massachusetts Historical Commission, 950 CMR 71. 00, which is in the area affected.. by the proposed extension or connection? X YES : NO: ( 18) Does this project require a filing under 301 CMR 11. 00, the Massachusetts Environmental Policy Act? YES : X NO: If yes , Has a Filing been' Made? YES: X NO: (191) Name and Address of Massachusetts 'Registered Professional Engineer Designing the Proposed System: Roger Norton, P.E. , Camp Dresser & .McKee Inc. Name Ten Cambridge Center Address . .Cambridge MA 02142 City State Zip (617) 252-8000. . 37202. Telephone Mass . P. E. Number 12/31/86 _- Page 4 of 7 Sewer Connections 314 CMR: DIVISION OF WATER POLLUTION CONTROL (20) Certification "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel- properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge . and belief, true accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment of knowing violations. " (I will be responsible for publication of public notice of the applicable permit proceedings identified under 314 CMR 2 . 06 (1) (a) through (d) . ) Richard Pelletier,__Mes.iti. Development Corporation . �Pri ted Name .o lica t Title i '7 9 Signature of Applicant Date- Signed Rog r M. Norton, P.E. Project Manager (617) 252-8000 Name of Preparer Title Phone No. 21) General Conditions (a) All discharge 'authorized herein shall be consistent with the terms and conditions of this permit and the approved plans and specifications . The discharge of any wastewater at a level in excess of .that identified and authorized by this permit shall constitute a violation of the terms and conditions of "this permit. Such a violation may result in the imposition of civil and/or criminal penalties as provided for in Section 42 of the State Act. (b) After notice and opportunity for a hearing, this permit may be modified, suspended, or revoked in whole or in part during its term for cause including, but not limited to, the following: 1. Violation of any terms or conditions of the permit; 2 . Obtaining a permit by misrepresentation or failure to disclose fully all relevant facts; and 3 . A change in conditions or the existence of a condition which requires either a temporary or permanent reduction or elimination of the authorized discharge. 01/05/90 Page 5 of 7 Sewer Connections 314 CMR: DIVISION OF WATER POLLUTION CONTROL (c) In the event of any change in control or ownership of facilities from which the authorized discharges originate, the permittee shall notify the succeeding owner or operator of the existence of this permit by letter, a copy of which shall be forwarded to the Director. Succeeding owners or operators shall be bound by all the conditions of this permit, unless and until a new or modified permit is obtained. (d) The issuance of this permit does not convey any property rights in either real or personal property, or any exclusive privileges ; nor does it authorize or relieve the permittee of any liability for any injury to private property or any invasion of personal rights; nor any infringement of Federal, State, or local laws or regulations; nor does it waive the necessity of obtaining any local assent required by law for the discharge authorized herein. (e) The provisions of this permit are severable, and the invalidity of any condition or subdivision thereof shall not make void any other condition or subdivision thereof. (f) All information and data provided by an applicant or a permittee identifying the nature and frequency of a discharge shall be available to the public without restriction. All other information (other than effluent data) which may be submitted by . an applicant in connection with a permit application shall also be available to the public unless the applicant or permittee is able to demonstrate that the disclosure of such information or particular part thereof to the general public would divulge methods or processes entitled to protection as trade secrets in accordance with the provisions of M.G.L. c. 21, s . 27 (7) . Where the applicant or permittee is able to so demonstrate, the Director shall treat the information or the particular part (other than effluent data) as confidential and not release it to any unauthorized person. Such information may be divulged to other officers, employees , or authorized representatives of the Commonwealth or the United States Government concerned with the protection of public water or water supplies. (g) Transfer of Permits 1. Any sewer system extension or connection permit authorizing an industrial discharge to a sewer system is only valid for the person to whom it is issued, unless transferred pursuant to 314 CMR 7 . 13 . Such permits shall be automatically transferred to a new permittee if:• 12/31/86 —- Page 6 of 7 Sewer Connections 314 CMR: DIVISION OF WATER POLLUTION CONTROL A. The current permittee notifies the Director at least 30 days in advance of the proposed transfer date; and B. The notice includes a written agreement between the existing and new permittee containing a specific date for transfer of permit responsibility, coverage, and liability between them. 2 . Any sewer system extension or connection permit not subject to 314 CMR 7 . 13 (1) automatically transfers to a subsequent owner, operator, or occupant. (22) Special Conditions N/A SEE ATTACHED DEP/DWPC SPECIAL CONDITIONS c - PPR L R�COMM ED: Signature and itle of Appropriate �u_niicipal Official (Phone) J\LTzlliam Hmurciak, Director of Public Works 685-0950 (FOR ISSUING OFFICE USE ONLY) DATE ISSUED PtZECTC4 ISIOiATER POLLUTION CONTROL �0 EFFECTIVE DATE O PERMIT 12/31/86 —- Page 7 of 7 Sewer Connections Attachment "A" Mesiti Development Corporation Forest View Estates Sewers Route 114 Pumping Stations and Force Mains Sewer Extension Permit Data No. of No. of Estimated Pipe Pipe Full flowing Street Name Houses Bedrooms* F ow** Length Diameter Material pipe capacity (gpd) (feet) (inches) (MGD) Rt. 114 (force main) 0 0 0 15,340 8 DI --------- Rt. 114 (sewer) 4 12 1,540 1,620 12 PVC 2.00 Amberville Rd. 44 132 16,940 2,650 8 PVC 1.04 Palomino Dr. 40 120 15,400 2,050 8 PVC 0.48 Garnet Circle 4 12 1,540 600 8 PVC 0.48 Anvil Circle 10 30 3,850 300 8 PVC 1.06 Totals: 102 306 39,270 22,560 *assumes three bedrooms per house **assumes 3.5 people per household and 110 gpcd (22) SPECIAL CONDITIONS PERMIT NO. 125386 1 . This permit authorizes an initial discharge of 8 , 800 gallons per day from twenty (20) residences . A dry sewer may be constructed for project completion, but discharge in excess of 8 , 800 gallons per day may not commence until sufficient credit for the removal of infiltration and inflow has been obtained from the North Andover "sewer bank" . The construction of the proposed sewer project shall be completed within five (5) years of the date of issue of this permit . 2 . The project shall be constructed according to the plans received by the Department consisting of (51) sheets and titled as follows : Title : Forest View Subdivision LOCATION: Amberville Rd. , Palomino Dr. , Salem Turnpike (Route 114) MUNICIPALITY: North Andover ,APPLICANT: Mesiti Devlpmt . Corp. ENGINEER: Frank Montero, P.E. #36341 Roger Norton, P.E. #37202 DATE (LAST REVISION) : September 22 , 1998 (1/14/98) Any deviation from the approved plans shall require review and approval from the Department . 3 . Any future Sewer Connection that will : a. discharge 15, 000 gallons or more per day; or b. include a pump station except those serving one or more single family dwellings on a single lot; or Shall be subject to a new and separate sewer connection permit application as required by 314 CMR 7 . 00 and 310 CMR 4 . 00 . 4 . All engineering design and construction shall insure against inflow and infiltration of the sewer system. 5 . Manholes shall be inspected for water tightness prior to placing into service . 6 . Required distances from water mains and service lines shall be maintained. 7 . Watertight construction methods and materials shall be used throughout sewer construction. 8 . All necessary Wetland permits shall be obtained before construction begins . (22) Special Conditions Cont . PERMIT NO. 125386 9 . Solid, gasketed and lockable manhole covers should be used in areas designated as a buffer zone of any wetlands or in any area designated as a 100-year flood plain. 10 . All sewer piping and or structures crossing within the buffer zone (100 feet) of any wetlands should be built using watertight construction methods and materials . 11 . All sewer piping and/or structures crossing under or within 100 feet of any surface waterbody of stormwater impoundment should be built using watertight construction methods and materials . TOWN OF NORTH ANDOVER, MASSACHUSETTS DIVISION OF PUBLIC WORKS 384 OSGOOD STREET, 01845 J.WILLIAM HMURCIAK, P.E. Telephone(978)685-0950 DIRECTOR Fax(978)688-9573 � t.10R7k q O tt,[o 6* ti ht a O ti m November 10, 1998 `r gATEU PP,`•(cJ �SSRCHUSE� Meski-Moore's Falls,LLC c/o Mesiti Development Corporation 11 Old Boston Road Tewksbury,MA 01876 Re: Forest View Subdivision and Off- Site Sewer along;.Route 114,No. Andover Gentlemen: This will confirm that the Division of Public Works (DPW)is in receipt of the final revisions to the Route 114 off-site sewer and pump station plans. The revisions are shown on Sheet No 16, 18 and 19 of the plans and in Specification Sections 02576, 11304 and 11390. We have completed a final review and hereby approve the plans and specifications as submitted. Upon your receipt from the Massachusetts Department of Environmental Protection(DEP)of your State Sewer Extension Permit, and subject to the following conditions, this will confirm DPW's authorization to construct the off-site sewer system along Route 114 in accordance with the Final Plans, and to connect(over time, consistent with condition(1)below)the 91 house lots in the subdivision known as Forest View to the North Andover Municipal Sewer System. (1) The sewer extension will be subject to the policies of the DPW regarding mitigation of groundwater infiltration and inflow;into the receiving system. NOTE: This will confirm that Forest View Subdivision is currently on the waiting list for residential house lots, and that at the present time sufficient flow exists in our sewer capacity bank to allow, per your request, that 20 house lots in the Forest View Sub Division be connected to municipal sewer. You may make additional application for flow,which is currently available, based on our sewer capacity bank allocation policy. (2) You execute a DPW Street Opening Permit and Performance Bond Agreement and provide a surety bond from a licensed surety bond company regarding the construction of the route 114 sewer line and all necessary appurtenances in accordance with the Final Plans. (3) The sewer extension will be subject to the terms and conditions of the DEP Administrative Consent Order ACO-NE-1004 executed June 8, 1998, and any amendments there to. (4) The sewer extension shall be subject to pumping restrictions as outlined in our conditional approval of the Route 114 Sewer(Item 4) on June 26, 1998. Given the time of year, the issuance of a DPW Street Opening Permit is not practical. This will confirm that you may apply for the permit for issuance in the spring of 1999 for the sewer work and subdivision roadways. Very truly yours, r � to v✓ J. William Hmurciak, PE Director of Public Works cc: Kathleen Colwell James Rand Dennis Bedrosian Dept.of Public Works Phone 978-685.0950 384 Osgood Street Fax 978-688-9573 North Andover;MA 01845 To: Heidi Griffin,Town Planner From: Jim Rand,Jr., Dir. of Engineering CC: Tim Willett, Staff Engineer, Date: September 22, 1999 Re: Forest View Estates—Pump Station Location This Department has reviewed the plans for the new location of the Forest View Pumping Station. We find the new location satisfactory and acceptable to this department. This location also elimanates one (1) building lot. Our specific comments are as follows: 1. All drop sewer manholes must be five-(5)foot diameter. 2. All drops must be inside drops, standard detail needs to be submitted. 3. We would prefer if lot 2 was eliminated and became part of the open area with a utility easement to the DPW. This could be achieved with a "Form A" plan showing the elimination of both the Northerly and Easterly property lines of lot 2.This would also increase the open area. 4. We reserve the right to alter and or amend the planting/screening in the field if conditions warrant, Thank you for your consideration in this matter. MEMOHEI0107 0 Page 1