Loading...
HomeMy WebLinkAboutPlan Approval - Correspondence - 0 WINTER STREET 9/22/2025 I I 16:IYI�r ��f jlril��iV 4� North Anclover Health Department (ommunity and Economic Development Division September 2, 2025 Trinity Home Builders, WLLC 429 South Main Street Andover, MA 0 1 1 1 O 5. Re nsits Wastewater System flan for 0 Winter Street (Map 104C, Lot 15) To Whom. it May Concern: The proposed onsite wastewater systemm design plan for the above site dated June 8, 2025 with a final revision date of July 15, 2025 his been approved for 'issuance f, ,Disposal System Construction Permit DSC P . Once issued, a DSC P will authorize the eonstruetion.of the onsite wastewater system per the plan referenced above and as allowed under Title 5 of the Massachusetts Environmental Code 3 10 CMR 15.000). You will need involvement from the designer of the onsite wastewater yst m throughout the installation process so you should be sure to coordinate with them... The design has been approved for use in the construction of a new -site wastewater system for a 5-bedroom maximum 11-room) home utilizing the proposed effluent filter in the septic tanl and a standard stone-and-pipe soil absorption system indicated on the design plan. This design plan approval is valid for 2 years from the above date. :During this time, a licensed. septic system installer should obtain a permit and complete this wort{, and a Certificate of Compliance he endorsed by the installer, designer and the Town of North Andover. If these activities are not completed within this time period then it is possible a new design plan will need to he completed and submitted for review. This approval is subject to the following conditions. Please be sure to review these with the designer and installer. Prior to the issuance ofa Disposal System Construction Permit: a. Three additional paper copies ofthe design plan are to be provided to the office 120 Mal"n Street o North Andover o Massachusetts 0 1845, Phone: www.northandoverma.gov o Fax: (978) 688-9542 Paget of3 b., The area of the proposed Soil Absorption System (SAS) is to be staked and flagged to identify the location(s) and to prevent activities which might damage the soil absorption system. Stockpiling of materials and equipment within the SAS area is prohibited c. The applicant must submit afoundation as-built at the same scale as the approved plan with the proposed onsite wastewater system components also depicted along with ties to the foundation d. Prior to the issuance of the Disposal System Construction Permit, the applicant must submit the floor plans of the proposed dwelling showing no greater than 5 bedrooms or a total of I I rooms,. Throughout the project: a. If site conditions are found in the field to be different from those indicated on the design plan, installation of the onsite wastewater system shall stop and the designer and this office notified within 24 hours b. The brand and model of of uent filter specified on the design plan is to be utilized. The installer is to demonstrate these have been made part of the onsite wastewater system c. If groundwater is present at the bottom portion of the excavation for the soil absorption system (SAS) the excavation,is to be dewatered prior to the placement of any fill. No fill is to be placed for the SAS during rain or snow storms. Prior to placement of any needed fill in the SAS, the bottom is to be scarified and relatively dry and the fill material is to be stockpiled at the edge of the excavation and filled in gradually d. Inspections are to be performed by the designer of the onsite wastewater system as needed to properly oversee and document construction. At a minimum these are the initial excavation, prior to backfilling, and during back filling as well as any other component of the construction which the designer wishes to examine e. Inspections are to be completed by the Town of North Andover at a minimum as follows: i. Bed bottom 11, Tank bottom ill. Final installation of components, confirmation of proper component selection, examination of construction methodology, and system operation iv. Final grade v. Sand fill will be collected from at least one location and analyzed for compliance with specifications in.Title 5 f. No components are to be covered until a final component inspection has been completed No excavation for or work associated with construction of the soil absorption system is to occur from November 30 to April I After construction-, h. Within 30 days of completion of construction the installer and designer are to confirm if the installation work was completed in compliance with.the design plan .............................. 120 Main Street * North Andover * Massachusetts 0 1 84,5 Phone: (978) 688-9540 * www.i,iorthandoveriiia,.gov o TM (978) 688-9542 Page 2 of 3 referenced in the DSCP and with Title 5, and if so, shall certify this on a Certificate of Compliance form i. If changes,have been made to the approved plans, then preparation of an as-built plan is required to be completed by the designer. If no, changes have been made to the approved plans, then the approved plan shall be modified by the designer to show the distances from a known structure to the system components. J. No sewage shall be discharged to the onsite wastewater system until a Certificate of Compliance has been issued by this office k. No application for a Certificate of Occupancy may be requested from the Building Inspector until a Certificate of Compliance has been issued by this office In addition, you should be aware of the long-term operation guidelines of an onsite wastewater system (these are not part of the DiSCP but are mentioned below as information for the property owner): 1. An onsite wastewater system can function as an integral part of the infrastructure of the property if it is properly operated and maintained. This is the responsibility of the owner of the property and is generally not specified by regulation. You are encouraged to contact a wastewater system pumper/service provider to partner with you to implement steps needed to assure the longevity of the onsite wastewater system being installed at this, location 2. The design plan specifies, the use of an effluent filter inside the tank. This component is required to be examined at least annually and cleaned as needed *11 The issuance of a DSCP does not construe and/or imply compliance with any permits, approvals or,licenses which might be needed from other agencies such as the Conservation Commission, 4, Zoning Board, Planning Board, Building Inspector, Plumbing Inspector and/or Electrical Inspector. Please feel free to contact the office with any questions you may have. We look forward to working with you to obtain a wastewater treatment and dispersal system which will be in 4. compliance with all regulations and assure protection of public health and the environment of North Andover., S incerely, oe 00' 00J 0? Brian J. LdGrasse, CENT Director of Public Health Encl. Installers list cc: Building Inspector John Sullivan, P.E. Pile ............ 120, Main Street North Andover Massachusetts 0 1845 Phone.- ('9178) 688-9540 * vv-"r-vv.noir,thandoveriiia.govo Fax, (978), 688-9542 Page 3 of 3 2`025 SEPTIC INSTALLERS Record# lApplicant Name Business Name Street Address city State Zip Code Telephone 41884 Bill Hall Bill Hall Inc 4 Viviana Street Methuen MA 01844 978-689-3711 53744 Brendan Larkin Larkin&Larkin Development Corp 709 Lowell Street Methuen MA 01844 781-944-7808 72916 Daniel Briscoe Briscoe Services LLC 17 Lindsays Way Groveland MA 01834 978-375-6465 70046 Daniel Glard Glard Septic&General Services Inc. 130 Appleton St N Andover MA 01845 978-686-7653 40683 James Boraczek Boraczek's Septic and Drain 4 Hazel Cr Hampstead NH 03841 978-479-5236 40939 James Currier James Currier Construction 131 Forest Street Middleton MA 01949 978-774-6685 38208 James Heider Heider Building Associates 12 Forest Ave Tewksbury MA 01876 978-606-1435 80694 Jared Clark D.F.Clark,, Inc. PO Box 265 Ipswich MA 01938 978-356-5638 41853 John Cl ongris Woodhill Contracting 129 Haggetts Pond Andover MA 01810 508-509-9442 51726 John L. Di Vincenzo AS Development Corp.d/b/a 58 So Kimball St Bradford MA 01835 978-372-7471 1 Stewart Septic Svc. 57751 John T.Shaw III Wildwood Excavation 233 Holt Road Andover MA 01810 978-815-7411 41536 Joseph Watson JW Watson Jr. Excavating 43 Lowell Junction Rd Andover MA 01810 978-475-3262 66657 Kyle Sawyer Arco Excavators.,inc. 7 Prevere Rd Raymond NH 03077 603-895-0111 82698 Mark Finn The Hunter Group 120 Asbury St Tops field MA 01983 978-857-5161 82321 Michael Reilly F P Reilly and Sons, Inc. 206 Andover Street#11 Andover MA 01810 978-475-1237 54883 Peter Breen Peter Breen Excavatin, Inc. 15 Lorraine Ave. N Andover MA 01845 978-687-7774 84084 Sam Salib SAS Landscaping LLC 117 Millville Circle Salem NH 03079 603-401-8282 82675 Tim Quinlan Quinlan &Rand Builders 34 Trinity Court N Andover MA 01845 978-457-0528 41417 Todd Bateson Bateson Enterprises Inc. 111 Argilla Road Andover MA 01810 978-815-2703 64048 William Rodenhiser Rodenhiser Excavating 70 Bartzak Dr Holliston MA 01746 508-429-9553 2025-Septic Installers.xlsx 2025.05.20