Loading...
HomeMy WebLinkAbout69 Milk Street - NACC #351 Small Project Approval - Permits #NACC #351 - 69 MILK STREET 10/22/2025 • 4r;} " I CONSERVATION DEPARTMENT Community & Economic Development Division Anne belly 69 Milk Street North.Andover)TvIA off. 45 October 233 2025 69 Milk Street, North Andover Granite Landscape Steps Conservation Conditions of Approval, NACC #351 Pursuant to section 4.4.2 of the Nord-i Andover Wetlands r tecti n Regulations,Anne Kell applicant/hol-ne owner, filed for a Small project Pet -it application under Category "L", for work proposed. at 69 Millic Street,North Andover. The work involJTeS: Project consists of in ta:1-ig granite steps into a grassy slope to accommodate connected between upper:&lower awn and safer access to the backyard. The proposed steps will be 70 .feet from the wetland as rneasured by staff:in the field. During the October 22, 2025 public TNneetin. , the NoMrtla.Andover Conservation Co'inini.ssion (NACC) found this project to qualify as a Small project permit and voted unaniluously to approve this project as g :: " Hance w*th the conditions listed below. The project is proposed under Vale a� �� ect to �+� approved only as it relates to the Conservation. Cormnission and and and all other~approvals should be obtained by the applicant/h or e rn.er'. All work shall confo in to the following: RECORDDOCUMENTS: Small Project Filing Including, • Application Checklist st with supporting narrative and attachments, stamped received October 6, 202 • Cross Section Sketch; • Excerpt 200,E As-:Built Annotated with Wetland Measurement. The following conditions are hereby..mandated: CONDITIONS: .. :prior to any work starting, erosion controls in the forte of; " straw wattle shall be installed at the base of the slope so as to envelope the work area and a pre-construction on site meeting shall be scheduled with the contractor, homeowner and Conservation Department staff. 2. In coordination with the Conservation Administrator,•ator, not less than three 3) wetland markers shall be installed at the edge of the wetland and mounted on 4x4 pressure treated posts or other weather resistant posts so as to alert of the presence of wetland resource area. 3. A post-construction inspection shall be held by conservation Department staff to verify compliance ce with this permit. 4. "`his permit is valid for one 1 year from the date of issuance. 9 NTE&Street----Small Project Pe �t ApprojTalCategory L Page 1 of The ficant a omeowner and thed at NO other work o n the pp, ,h 'it contractors aire advise that promm is allowed under this e it. The NACC has jurisel.etion oATer all of the wetlands and associated 100-Fo �t buffer zones and 200 Rive front Area to the Shawsheen River on site and an work that inNrolves ground disturbance or chan ing the current conditions, in these areas will re permitting with the NACC. This inc lude,sbout are not limited to house additions, 'Dcols. oatios, decks, sh,ed,s,, fence s aarden beds, landscavinLy and bridae installation, tree or veaetation cuttin /orunina. These activities shall be held to the current standards under the Bylaw and WPA.** Should you have any question or comments regarding the contents of this letter, please do not hesitate to contact the undersigned at 978.6 .953o. ,,rha nk you for your anticipated cooperation Nvid-i this matter. Respec: Uy, I NO ANDOVER NSERVATION DEPARTMENT 1, 0 N S E RVAT Ainy R. Ma ner Corse Kati .Administrator 69-Nfillc Street—Small Project Permit Approval Category L Page 2 of 2