HomeMy WebLinkAbout69 Milk Street - NACC #351 Small Project Approval - Permits #NACC #351 - 69 MILK STREET 10/22/2025 •
4r;}
" I
CONSERVATION DEPARTMENT
Community & Economic Development Division
Anne belly
69 Milk Street
North.Andover)TvIA off. 45 October 233 2025
69 Milk Street, North Andover
Granite Landscape Steps
Conservation Conditions of Approval, NACC #351
Pursuant to section 4.4.2 of the Nord-i Andover Wetlands r tecti n Regulations,Anne Kell
applicant/hol-ne owner, filed for a Small project Pet -it application under Category "L", for work proposed.
at 69 Millic Street,North Andover. The work involJTeS: Project consists of in ta:1-ig granite steps into a
grassy slope to accommodate connected between upper:&lower awn and safer access to the backyard.
The proposed steps will be 70 .feet from the wetland as rneasured by staff:in the field.
During the October 22, 2025 public TNneetin. , the NoMrtla.Andover Conservation Co'inini.ssion (NACC)
found this project to qualify as a Small project permit and voted unaniluously to approve this project as
g :: " Hance w*th the conditions listed below. The project is
proposed under Vale a� �� ect to �+�
approved only as it relates to the Conservation. Cormnission and and and all other~approvals should be
obtained by the applicant/h or e rn.er'.
All work shall confo in to the following:
RECORDDOCUMENTS: Small Project Filing Including,
• Application Checklist st with supporting narrative and attachments,
stamped received October 6, 202
• Cross Section Sketch;
• Excerpt 200,E As-:Built Annotated with Wetland Measurement.
The following conditions are hereby..mandated:
CONDITIONS:
.. :prior to any work starting, erosion controls in the forte of; " straw wattle shall be installed
at the base of the slope so as to envelope the work area and a pre-construction on site
meeting shall be scheduled with the contractor, homeowner and Conservation Department
staff.
2. In coordination with the Conservation Administrator,•ator, not less than three 3) wetland
markers shall be installed at the edge of the wetland and mounted on 4x4 pressure treated
posts or other weather resistant posts so as to alert of the presence of wetland resource
area.
3. A post-construction inspection shall be held by conservation Department staff to verify
compliance ce with this permit.
4. "`his permit is valid for one 1 year from the date of issuance.
9 NTE&Street----Small Project Pe �t ApprojTalCategory L
Page 1 of
The ficant a omeowner and thed at NO other work o n the
pp, ,h 'it contractors aire advise that
promm is allowed under this e it. The NACC has jurisel.etion oATer all of the wetlands and
associated 100-Fo �t buffer zones and 200 Rive front Area to the Shawsheen River on site and an work
that inNrolves ground disturbance or chan ing the current conditions, in these areas will re
permitting with the NACC. This inc lude,sbout are not limited to house additions, 'Dcols. oatios, decks,
sh,ed,s,, fence s aarden beds, landscavinLy and bridae installation, tree or veaetation cuttin /orunina. These
activities shall be held to the current standards under the Bylaw and WPA.**
Should you have any question or comments regarding the contents of this letter, please do not hesitate to
contact the undersigned at 978.6 .953o. ,,rha nk you for your anticipated cooperation Nvid-i this matter.
Respec: Uy, I
NO ANDOVER NSERVATION DEPARTMENT 1, 0 N S E RVAT
Ainy R. Ma ner
Corse Kati .Administrator
69-Nfillc Street—Small Project Permit Approval Category L
Page 2 of 2