HomeMy WebLinkAbout242-1917, 989 Salem Street OOC - Permits #242-1917 - 989 SALEM STREET 10/27/2025 Provided by MassIDER,
Massachusetts Department of Environmental Protection
242-
Bureau of Resource Protection - Wetlands 1917 .......
sDEP,pile#
WPA Form 51 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
City/Town
A. General Information
Please note: North Andover
this form has i. From�- ....... ...........
been mo�dified Conservation,Commission
with added 2. This issuance is for
space to a. Order of Conditions b. EJ Amended Order of Conditions,
accommodate (check one)-
the Registry
of Deeds 3. To: Appllicant-
Requirements
Colin Moriarty
a. First Name b. Last Name
III poftant:
When filling ............ ...............
out forms on c.Organization
the
405 Wa,l'tham Street, Suite 318
computer,
use only the d1.Mailing Address
tab key to, Lexington MA 02420
move your e.City/Town f, State g.Zip Code ..........
cursor,-do
not use the 4. Property Owner(if different from applicant)*
return key.
Jon�athan &Ariad�na Clemens
........... ..................
tab
a. First Name b. Last Name
c.Organization
9189 Salern
d.Mailing Address,
North Andover MA 01845
e.City/Town f.,State g.Zip Code
5. Project,Location':
989 Salern Street North Andover
a.Street,Add ress, b.City/Town
Map 65 Lot 19
c.Assess,ori—Map/ "I at Number d. Parcel/Lot_N.u.m.ber
Latitude and Longitude, if known- 42091'rnH,oils 7104'mH"s
d. Latitu�de e. Longitude
wpaform5.doc-rev 5/18/2020, Page I of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1917
� WPA Form 5 Order of Conditions MassDEP File#
1
Massachusetts Wetlands Protection Act M.G.L. c. 1 31, §40 eDEP Transaction#
North Andover
.................-.--
City/Town
A. General information (cunt.)
6. Property recorded at the Registry of Deeds for(attach additional information if more than
one parcel):
Northern Essex
a. County b.Certificate Number(if registered land)
17262 210
c.Book d. Page
August 27, 2025 October 08, 2025 October 27, 2025
�' Dates: a. Date Notice of Intent Filed b. Date Public Hearing Closed c. Date of Issuance
8. Final Approved Plans and other Documents (attach additional plan or document references
as needed):
Wetland Permitting Plan
a. Plan Title
Stamski & McNary, Inc. Joseph March, PLS & George
b. Prepared By Dimakarakos, PE
September 29, 2025 1 11=201
d. Final Revision Date e.Scale
See Attached List of Approved Documents
f.Additional Plan or Document Title g. Date
B. Findings
i. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information
provided in this application and presented at the public hearing, this Commission finds that
the areas in which work is proposed is significant to the following interests of the Wetlands
Protection Act(the Act). Check all that apply:
a. ZPublic Water Supply b. Land Containing Shellfish c' Z Prevention of
pp Y ❑ g Pollution
Private Water
d. Z Priv e. Fisheries f. Z Protection of
at Supply pp y
Wildlife Habitat
g. ® Groundwater Supply h. ® Storm Damage Prevention i. Z Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. Z the following conditions which are necessary in accordance with the performance
standards set forth in the wetlands regulations. This Commission orders that all work shall
be performed in accordance with the Notice of Intent referenced above, the following
General Conditions, and any other special conditions attached to this order. To the extent
that the following conditions modify or differ from the plans, specifications, or other
proposals submitted with the Notice of Intent, these conditions shall control.
wpaform5.doc•rev 5/18/2020 Page 2 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242- 917
€ MassDEP File#
WPA Form 5 -- Order of Conditions
{ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
City/Town
B. Findings (cont.)
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth
in the wetland regulations. Therefore, work on this project may not go forward unless and
until a new Notice of Intent is submitted which provides measures which are adequate to
protect the interests of the Act, and a final order of Conditions is issued. A description of
the performance standards which the proposed work cannot meet is attached to this
Order.
C. ❑ the information submitted by the applicant is not sufficient to describe the site, the work,
or the effect of the work on the interests identified in the Wetlands Protection Act.
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are
adequate to protect the Act's interests, and a final order of Conditions is issued. A
description of the specific information which is lacking and why it is necessary is
attached to this order as per 310 CMR 1 o.o5(5)(c).
3. H Buffer Zone Impacts: Shortest distance between limit of project 4'
disturbance and the wetland resource area specified in 310 CMR 1 g.42('l)(a) a.linear feet
Inland Resource Area Impacts: Check all that apply below. (For Approvals only)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. ❑ Bank a. linear feet b. linear feet c. linear feet d. linear feet
5. ❑ Bordering
Vegetated Wetland a.square feet b.square feet c.square feet d.square feet
6. ❑ Land Under
Waterbodies and a.square feet b.square feet c.square feet d.square feet
Waterways
e.cly dredged f.cly dredged
7. ❑ Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet
8. El Isolated Land
Subject to Flooding a.square feet b.square feet
Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
9. El Riverfront Area a.total sq.feet b.total sq.feet
Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet
Sq ft between 00-
200 ft g.square feet h.square feet i.square feet j.square feet
wpaform5.doc•rev 5/18/2020 Page 3 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242--1 g17
MassDEP File#
F WPA Form a - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, 4o eDEP Transaction#
North Andover
City/Town
B. Findings (cunt,)
Coastal Resource Area Impacts: Check all that apply below. (For Approvals only)
Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
10. ❑ Designated Port Indicate size under Land Under the ocean below
Areas '
11. ❑ Land Under the
Ocean a.square feet b.square feet
c.c/y dredged d.c/y dredged
Indicate size under Coastal Beaches and/or Coastal Dunes
��. ❑ Barrier Beaches below
cu yd cu yd
13. Coastal Beaches a.square feet b.square feet c. nourishment d. nourishment
cu yd cu yd
14. EJ Coastal Dunes a.square feet b.square feet c. nourishment d. nourishment
15. ❑ Coastal Banks a. linear feet b. linear feet
16. ❑ Rocky Intertidal
Shores a.square feet b.square feet
17. [:] Salt Marshes a.square feet b.square feet c.square feet d.square feet
18. ❑ Land Under Salt
Ponds a.square feet b.square feet
c.c/y dredged d.c/y dredged
19. El Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under
the Ocean, and/or inland Land Under Waterbodies and
Waterways, above
a.c/y dredged b.c/y dredged
21. ❑ Land Subject to
Coastal Storm a.square feet b.square feet
Flowage
22. ❑ Riverfront Area a.total sq.feet b.total sq.feet
Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-
200 ft g.square feet h.square feet i.square feet J.square feet
wpaform5.doc•rev 5/18/2020 Page 4 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1917
i MassDEP File#
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, eDEP Transaction#
North Andover
C ity/Town
B. Findings (cont.)
#23. If the
project is for 23. ❑ Restoration/Enhancement*:
e
the purpose of
restoring or a.square feet of BVW b.square feet of salt marsh
enhancing a
wetland
resource area 24 ❑ Stream crossings}:
in addition to
the square
footage that a. number of new stream crossings b. number of replacement stream crossings
has been C. General Conditions Under Massachusetts wetlands Protection Act
entered in
Section B.5.c
(BVVV)or The following conditions are only applicable to Approved projects.
B.1 7.c(Salt
Marsh)above, 1. Failure to comply with all conditions stated herein, and with all related statutes and other
please enter regulatory measures, shall be deemed cause to revoke or modify this Order.
the additional
amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying
with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this
Order unless either of the following apply:
a. The work is a maintenance dredging project as provided for in the Act; or
b. The time for completion has been extended to a specified date more than three years,
but less than five years, from the date of issuance. If this order is intended to be valid
for more than three years, the extension date and the special circumstances warranting
the extended time period are set forth as a special condition in this Order.
c. If the work is for a Test Project, this Order of Conditions shall be valid for no more than
one year.
5. This Order may be extended by the issuing authority for one or more periods of up to three
years each upon application to the issuing authority at least 30 days prior to the expiration
date of the Order. An Order of conditions for a Test Project may be extended for one
additional year only upon written application by the applicant, subject to the provisions of 310
CM R 10.05(11)(f).
6. If this Order constitutes an Amended Order of Conditions, this Amended Carder of
Conditions does not extend the issuance date of the original Final Order of conditions and
the Order will expire on I unless extended in writing by the Department.
7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash,
refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath,
paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the
foregoing.
wpaform 5.doo•rev 5/18/2020 Page 5 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1917
� WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
C ityFrow n
C. General Conditions Under Massachusetts Wetlands Protection Act
8. This order is not final until all administrative appeal periods from this order have elapsed,
or if such an appeal has been taken, until all proceedings before the Department have been
completed.
g. No work shall be undertaken until the order has become final and then has been recorded
in the Registry of Deeds or the Land Court for the district in which the land is located, within
the chain of title of the affected property. In the case of recorded land, the Final order shall
also be noted in the Registry's Grantor Index under the name of the owner of the land upon
which the proposed work is to be done. In the case of the registered land, the Final order
shall also be noted on the Land Court Certificate of Title of the owner of the land upon
which the proposed work is done. The recording information shall be submitted to the
Conservation Commission on the form at the end of this order, which form must be
stamped by the Registry of Deeds, prior to the commencement of work.
10. A sign shall be displayed at the site not less then two square feet or more than three
square feet in size bearing the words,
"Massachusetts Department of Environmental Protection" or, "MassDEP"I
"File Number 242-1917 "
11. Where the Department of Environmental Protection is requested to issue a superseding
Order, the Conservation Commission shall be a party to all agency proceedings and
hearings before MassDEP.
12. Upon completion of the work described herein, the applicant shall submit a Request for
Certificate of Compliance (WPA Form 8A) to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition #13 above shall require the applicant to
inquire of the Conservation Commission in writing whether the change is significant enough
to require the filing of a new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of
Environmental Protection shall have the right to enter and inspect the area subject to this
Order at reasonable hours to evaluate compliance with the conditions stated in this order,
and may require the submittal of any data deemed necessary by the Conservation
Commission or Department for that evaluation.
15. This order of Conditions shall apply to any successor in interest or successor in control of
the property subject to this order and to any contractor or other person performing work
conditioned by this order.
wpaform5.dog•rev 5/1812020 Page 6 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242- 917
MassDEP File#
WPA Form a — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 13 §40 eDEP Transaction#
North Andover
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act (coat.)
17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated
Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be
marked by wooden stakes or flagging. once in place, the wetland boundary markers shall
be maintained until a certificate of Compliance has been issued by the Conservation
Commission.
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have
been fully stabilized with vegetation or other means. At no time shall sediments be
deposited in a wetland or water body. During construction, the applicant or his/her designee
shall inspect the erosion controls on a daily basis and shall remove accumulated sediments
as needed. The applicant shall immediately control any erosion problems that occur at the
site and shall also immediately notify the Conservation Commission, which reserves the
right to require additional erosion and/or damage prevention controls it may deem
necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this order.
19. The work associated with this order(the "Project")
(1) is subject to the Massachusetts Stormwater Standards
(2) is NOT subject to the Massachusetts Stormwater Standards
If the work is subject to the Stormwater Standards,then the project is subject to the
following conditions:
a} All work, including site preparation, land disturbance, construction and redevelopment,
shall be implemented in accordance with the construction period pollution prevention and
erosion and sedimentation control plan and, if applicable, the Stormwater Pollution
Prevention Plan required by the National Pollution Discharge Elimination System
Construction General Permit as required by Stormwater Condition 8. Construction period
erosion, sedimentation and pollution control measures and best management practices
(BMPs) shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs
unless and until a Registered Professional Engineer provides a certification that:
i. all construction period BM Ps have been removed or will be removed by a date certain
specified in the Certification. For any construction period BMPs intended to be converted
to post construction operation for stormwater attenuation, recharge, and/or treatment, the
conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that
the BMP has been properly cleaned or prepared for post construction operation, including
removal of all construction period sediment trapped in inlet and outlet control structures;
ii. as--built final construction BMP plans are included, signed and stamped by a Registered
Professional Engineer, certifying the site is fully stabilized;
iii. any illicit discharges to the stormwater management system have been removed, as per
the requirements of Stormwater Standard 1 o;
wpaform5.doc•rev 5/18/2020 Page 7 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1917
MassDEP File#
WPA Form 5 - Order of Conditions
1
Massachusetts wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
iv. all post-construction stormwater BMPs are installed in accordance with the plans
(including all planting plans) approved by the issuing authority, and have been inspected to
ensure that they are not damaged and that they are in proper working condition;
v. any vegetation associated with post-construction BMPs is suitably established to
withstand erosion.
c) The landowner is responsible for BMP maintenance until the issuing authority is notified
that another party has legally assumed responsibility for BMP maintenance. Prior to
requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible
party (defined in General Condition 1 8(e)} shall execute and submit to the issuing authority
an operation and Maintenance Compliance Statement("O&M Statement) for the
Stormwater BMPs identifying the party responsible for implementing the stormwater BMP
Operation and Maintenance Plan ("O&M Plan") and certifying the following:
i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of
Compliance, and
ii.)the future responsible parties shall be notified in writing of their ongoing legal
responsibility to operate and maintain the stormwater management BMPs and
implement the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in
accordance with the long-term pollution prevention plan section of the approved
Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by
the National Pollution Discharge Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility, the landowner, or owner of any
drainage easement, assumes responsibility for maintaining each BMP. To overcome this
presumption, the landowner of the property must submit to the issuing authority a legally
binding agreement of record, acceptable to the issuing authority, evidencing that another
entity has accepted responsibility for maintaining the BMP, and that the proposed
responsible party shall be treated as a permittee for purposes of implementing the
requirements of Conditions 18(f) through 18(k)with respect to that BMP. Any failure of the
proposed responsible party to implement the requirements of Conditions 18(f) through
18(k)with respect to that BMP shall be a violation of the order of Conditions or Certificate
of Compliance. In the case of stormwater BM Ps that are serving more than one lot, the
legally binding agreement shall also identify the lots that will be serviced by the stormwater
BMPs. A plan and easement deed that grants the responsible party access to perform the
required operation and maintenance must be submitted along with the legally binding
agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance
with the design plans, the O&M Plan, and the requirements of the Massachusetts
Stormwater Handbook.
wpaform5.doc-rev 5/18/2020 Page 8 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1917
WPA Form 5 -- Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
Cityrrown
C. General Conditions Under Massachusetts wetlands Protection Act (cunt.)
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three (3) consecutive
calendar years of inspections, repairs, maintenance and/or replacement of the
stormwater management system or any part thereof, and disposal (for disposal the
log shall indicate the type of material and the disposal location),
2. Make the maintenance log available to MassDEP and the Conservation
Commission ("Commission") upon request; and
3. Allow members and agents of the MassDEP and the Commission to enter and
inspect the site to evaluate and ensure that the responsible party is in compliance
with the requirements for each BMP established in the 4&M Plan approved by the
issuing authority.
h) All sediment or other contaminants removed from stormwater BM Ps shall be disposed
of in accordance with all applicable federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04
are prohibited.
j) The stormwater management system approved in the order of Conditions shall not be
changed without the prior written approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site
Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1,
Low Impact Development Site Design Credits) shall not be altered without the prior written
approval of the issuing authority.
1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld.
Any fencing constructed around stormwater BMPs shall include access gates and shall be
at least six inches above grade to allow for wildlife passage.
Special Conditions (if you need more space for additional conditions, please attach a text
document):
20. For Test Projects subject to 310 CMR 10.05(11), the applicant shall also implement the
monitoring plan and the restoration plan submitted with the Notice of intent. If the
conservation commission or Department determines that the Test Project threatens the
public health, safety or the environment, the applicant shall implement the removal plan
submitted with the Notice of Intent or modify the project as directed by the conservation
commission or the Department.
wpaform5.doc•rev 5/1812020 Page 9 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242--1917
f MassDEP File#
A
WPA Form 5 -- Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
City/Town
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes [:1 No
2. The North Andover hereby finds (check one that applies):
Conservation Commission
a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a
municipal ordinance or bylaw, specifically:
1.Municipal ordinance or Bylaw 2. Citation
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides measures which are adequate to meet these
standards, and a final order of Conditions is issued.
b. 0 that the following additional conditions are necessary to comply with a municipal
ordinance or bylaw:
North Andover Wetlands Protection Bylaw & Regulations Chap. 190
1.Municipal ordinance or Bylaw et.seq.
3. The Commission orders that all work shall be performed in accordance with the following
conditions and with the Notice of Intent referenced above. To the extent that the following
conditions modify or differ from the plans, specifications, or other proposals submitted with
the Notice of Intent, the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows (if you need
more space for additional conditions, attach a text document):
North Andover Conservation Commission Findings & Special Conditions (see attached)
wpaform5.doc-rev 5/18/2020 Page 10 of 13
4
Massachusetts Department of Environmental Protection Pr ovided by assDEP:
Bureau of Resource Protection -I Wetlands, 242-1917
MassDEP File#
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPI Transaction#
North Andover—..---
City/Town
E. Signatures,
This Order is valid for three years,, unless otherwise specified as a,special'
condition pursuant to General Conditions#4, from the date of issuance. 1.Date of Issuance
Please indicate the number of members who will sign this form.
This Order must be signed by a majority of the Conservation Commission., 2.Number of Signers
The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office,, if not filing electronically, and the property owner, if different
from applicant.
Signat6LQ/ Printed Name
Signature Printed Name
Jill,
jo,N
.Aga
Signa Printed Name
OR ..........
Akmf
,
4;
Signa Printed Name
0,
A o"I
�C . ?�i Al
44
............
re Pr' ted Name
�` ,r ��.
eo
A
...........
V
Sigh"a iV(
Printed Name
Signature Printed Name
Signature Printed Name
by hand delivery on by certified mail, return receipt
requested, on
7 7
Date Date
wpaform5.doc-rev 8/3/2023 Page 11 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1917
—� MassDEP File#
r' WPA Form 5 -- Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131
� a 40 eDEP Transaction#§
North Andover
City/Town
F. Appeals
The applicant, the owner, any person aggrieved by this order, any owner of land abutting the
land subject to this order, or any ten residents of the city or town in which such land is located,
are hereby notified of their right to request the appropriate MassDFP Regional office to issue a
Superseding order of Conditions. The request must be made by certified mail or hand delivery
to the Department, with the appropriate filing fee and a completed Request for Departmental
Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from
the date of issuance of this order. A copy of the request shall at the same time be sent by
certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is
not the appellant.
Any appellants seeking to appeal the Department's Superseding order associated with this
appeal will be required to demonstrate prior participation in the review of this project. Previous
participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a Superseding
Order, or providing written information to the Department prior to issuance of a Superseding
Order.
The request shall state clearly and concisely the objections to the order which is being
appealed and how the order does not contribute to the protection of the interests identified in
the Massachusetts Wetlands Protection Act(M.G.L. c. 131, §40), and is inconsistent with the
wetlands regulations (310 C M R 10.00). To the extent that the order is based on a municipal
ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the
Department has no appellate jurisdiction.
wpaform5.doc•rev 5/18/2020 Page 12 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1917
MassDEP File#
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
City/Town
G. Recording Information
Prior to commencement of work, this Order of Conditions must be recorded in the Registry of
Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, the Final order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land subject to the Order. In the
case of registered land, this Order shall also be noted on the Land Court Certificate of Title of
the owner of the land subject to the Order of Conditions. The recording information on this page
shall be submitted to the Conservation Commission listed below.
North Andover
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation
Commission.
---------------------------------------------------------------------------------------------------------------
To:
North Andover
Conservation Commission
Please be advised that the order of Conditions for the Project at:
989 Salem Street 242-1917
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
Northern Essex
County Book Page
for: Jonathan &Ariad na C lamens
Property Owner
and has been noted in the chain of title of the affected property in:
17262 210
Book Page
n accordance with the order of Conditions issued on:
10-27-25
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform5.doc•rev 5/18/2020 Page 13 of 13
DEP FILE #242 . 1917 989 Salem Street
North Andover Conservation Commission.Findings of Fact:
The project site consists of a 1.16-acre residential lot developed with an existing single family
house built in 1970, driveway with S" culvert at the mouth, lawn &landscaped areas,
wooded wetland areas.
The NACC agrees with the delineation of the following wetland resource areas as reviewed
in the field by the Conservation Field Inspector and reflected on the approved plan. The
applicant has not attempted to overcome the presumption of significance of these resource
areas to the identified interests in the Act and Bylaw.
a. Bordering Vegetated wetland (BVW) -wetland Flag Series 1-12 &51-63
b. 100-Foot Buffer zone to BVw
c. The project site does not lie within NH ESP Priority Habitat or within 1.00 feet of
vernal pools
d. The project site does not occur within the 100-year floodplain
e. The project site does not occur within 200-Foot Riverfront Area
Project Site Permit His
• The property has not been subject to previous permitting with.the NACC.
Therefore, the North Andover Conservation Commission (hereafter the "NACC") hereby
finds that the following conditions are necessary, in accordance with the Performance
Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect
those interests noted above. The NACC orders that all work shall be performed in
accordance with said conditions and with the Notice of Intent referenced below. To the
extent that the following conditions modify or differ from the plans, specifications or other
proposals submitted with the Notice of Intent the conditions shall control.
GENERAL CONDITIONS
21. The proposed work includes: Full depth reclaim., regrading, expansion and repaving
of existing residential driveway, grading at the front lawn, installation of front
walkway and steps, construction of a retaining wall, mitigation plantings and
stabilization seeding of slope. Selective removal of dead or dying trees that threaten
safety and/or power lines are also allowed under this Order of Conditions.
The work falls within the 25' NDZ and 50' NBz, the applicant requested a waiver to
allow work within these zones and offered 805 s.f. of buffer zone mitigation plantings
and slope stabilization seeding. .After review and consideration, the NACC voted to
grant the waiver as it found the applicant demonstrated no practicable alternatives to
moving thework outside these zones without greater impacts to the resources as well
as locations and proximity to wetlands of existing driveway and other constraining
DEP#242-1917 Findings&Special Conditions
989 Salem Street
Page I of 14
DEP FILL #242— 1917 989 Salem Street
features on site. Further, the NACC found that the proposed plantings results in a
1.3:1 ratio of mitigation to incursion and adequately mitigates for said work.
22. The work shall conform to the following (except as noted in the remainder of this
document where revisions may be required):
Applicant: Colin Moriarty
405 Waltham Street, Suite 318
Lexington, MA 02420
Property Owner: Jonathan & Ariadna Clamens
989 Salem Street
North Andover, MA.01845
Project Representative: Robert Melvin, EIT
Stamski &McNary, Inc.
1000 Main Street
Acton, MA 01 720
Site Plans prepared by: Stamski & McNary, Inc.
"Wetland Permitting Plan", signed and stamped by
Joseph March, PE & PLS, scale 1"=20%final revision
dated September 29, 2025;
Other Documents: September 29, 2025 letter with Runoff Curve
Calculations and watershed Map, prepared by
Stamski & McNary, Inc, signed by Robert Melvin
EIT &Joseph March, PE, PLS
23. The term."Applicant" as used in this Order of Conditions shall refer to the owner, any
successor in interest or successor in control of the property referenced in the Notice of
Intent, supporting documents and this Order of Conditions. The NACC shall be
notified in writing within 30 days of all transfers of title of any portion of property that
takes place prior to the issuance of a Certificate of Compliance.
24. The conditions of this decision shall apply to, and be binding upon, the applicant,
owner, its employees and all successors and assigns in interest or control. These
obligations shall be expressed in covenants in all deeds to succeeding owners of
portions of the property.
25. Failure to comply with all conditions stated herein, and with all related statutes and
other regulatory pleasures, shall be deemed cause to revoke or modify this Order.
DEP#242-1917 Findings&Special Conditions
989 Salem Street
Page 2 of 14
DEP FILE #242-- 1917 989 Salem Street
26. This order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of property rights. However, the
NACC, agent of the NACC or the Department of Environmental Protection (DEP)
reserves the right to enter and inspect the property at all reasonable times until a
Certificate of Compliance is issued, to evaluate compliance with this order of
Conditions, the Act (310 CMR 10.00), the North Andover Wetland ByLaw and
Regulations, and may require any information, measurements, photographs,
observations, and/or materials, or may require the submittal of any data or
information deemed necessary by the NACC for that evaluation. Further, work shall
be halted on the site if the NACC, agent or DPP determines that any of the work is not
in compliance with this order of Conditions. Work shall not resume until the NACC
is satisfied that the work will comply and has so notified the applicant in writing.
27. This order does not relieve the permittee or any other person of the necessity of
complying with all other applicable federal, state or local statutes, ordinances, by--laws
or regulations. The Conservation Department will be copied on any permits or
approvals from the Army Corp of Engineers as part of the General Permit process.
28. The work authorized hereunder shall be completed within three Years from the date of
this order.
29. This order may be extended by the issuing authority for one but not more than two
periods of up to one year each upon application to the issuing authority at least thirty
days (30), prior to the expiration date of the order (Refer to Section 8.3 of the North
Andover Wetland Regulations).
30. The NACC reserves the right to amend this order of Conditions after a legally
advertised public hearing if plans or circumstances are changed or if new conditions
or information so warrant.
31. Where the Department of Environmental Protection (DPP) is requested to make a
determination and to issue a Superseding order, the Conservation Commission shall
be a party to all agency proceedings and hearings before the Department.
32. The NACC finds that the intensive use of the upland areas and buffer zone proposed
on this site will cause further alteration of the wetland resource areas. In order to
prevent any alteration of wetland resource areas a twenty five foot 25` No-
Disturbance.done and a f if t foot 50' No-Construction Zone is established from the
edge of the adjacent wetland resource area as shown on the herein referenced plan..
The Conservation Administrator and/or other agents of the NACC do not have the
authority to waive these setbacks as established under the local bylaw.
DEP#242-1917 Findings&Special Conditions
989 Salem Street
Page 3 of 14
DEP FILE # 242— 1917 989 Salem Street
33. This document shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors,
and other personnel performing the permitting work are fully aware of the permits
terms and conditions. Thereafter, the contractor will be held jointly liable for any
violation of this order resulting from failure to comply with its conditions.
PRIOR To CONSTRUCTION
34. No work shall be undertaken until all administrative appeal periods from this order
have elapsed or, if such an appeal has been filed, until all proceedings before the
Department or Court have been completed.
35. This Order shall be recorded by the applicant at the Registry of Deeds, in its entirety,
immediately after the expiration of all appeal periods. No work shall be undertaken
until the Final Order has been recorded in the Registry of Deeds or the Land Court for
the district in which the land is located, within the chain of title of the affected
property. In the case of recorded land, the Final order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the
proposed work is to be done. In the case of registered land, the Final order shall also
be noted on the Land Court Certificate of Title of the owner of the land upon which
the proposed work is to be done. The recording information shall be submitted to the
North Andover Conservation Commission on the form at the end of this order prior
to commencement of the work. Any order not recorded by the applicant before work
commences may be recorded by the NACC at the applicant's expense.
36. A check payable to the Town.of North Andover shall be provided in the amount of
two thousand five hundred. dollars ($2,500), which shall be in all respects satisfactory
to Town Counsel, Town Treasurer, and the NACC, and shall be posted with the North
Andover Town Treasurer through the NACC before commencement of work. Said
deposit of money shall be conditioned on the completion of all conditions hereof, shall
be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall
be released after completion of the project, provided that provisions, satisfactory to the
NACC, have been made for performance of any conditions which are of continuing
nature. The applicant may propose a monetary release schedule keyed to completion
of specific portions of the project for the NACC's review and approval. In any event,
the entirety or remaining balance of the performance bond shall not be released until a
full and complete Certificate of Compliance is issued and duly recorded at the
Registry of Deeds. This condition is issued under the authority of the local Bylaw.
37. A sign shall be displayed, not less than two square feet or more than three square feet
in size bearing the words "Massachusetts DEP, File Number 242-1917."
DEP 4242-19 17 Findings&Special Conditions
989 Salem Street
Page 4 of 14
DEP FILE ##242-- 1917 989 Salem Street
38. Prior to construction the applicant shall permanently mark the No Disturb Zone as
deemed appropriate by Conservation Department staff in the field. Not less than with
16 (sixteen) 4x4 pressure treated post (weather resistant monuments), shall be installed
at 35--foot intervals beginning at the north, east and west property boundaries, bearing
markers reading. "Protected wetland Resource Area" at a ratio of one square marker
for every three round markers. This will designate the wetland resource sensitivity
and assure no further inadvertent encroachment into the wetland. Prior to installation
in the field, the placement of these permanent markers shall be subject to review and
approval by the Conservation Administrator. The applicant shall instruct all agents to
explain these markers to buyers/lessees/landscapers and all persons taking over the
property from the applicant. These markers shall remain posted and be replaced as
necessary in perpetuity. Said markers are available for purchase in the Conservation
Department at Town lull.
39. Any changes in the submitted plans caused by the applicant, another Board's decision
or resulting from this order of Conditions must be submitted to the NACC for
approval prior to implementation. If the NACC finds said changes to be significant,
the NACC will call for another public hearing (at the expense of the applicant). within
21 days of the close of said public hearing the NACC will issue an amended or new
Order of conditions. Any errors found in the plans or information submitted by the
applicant shall be considered as changes. No work shall begin on a project until
written approval has been granted by the NACC.
40. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all
conditions of this order of Conditions are complied with. The project engineer and
contractors are to be provided with a copy of this order of Conditions and referenced
documents before commencement of construction.
41. This document shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors,
and other personnel performing the permitting work are fully aware of the permit's
terms and conditions. The contractor and applicant/owner will be held jointly liable
for any violation of this order and approved plans as they relate to the contractor's
scope of work. Thereafter, the applicant/owner will be held liable for any violation of
this order resulting from failure to comply with its conditions, including on-going
perpetual conditions.
42. wetland flagging shall be checked prior to start of construction and shall be re-
established where missing. All wetland flagging shall remain visible and enumerated
per the approved plan(s) throughout the life of the project and until a Certificate of
DEP#242-1917 Findings&Special Conditions
989 Salem Street
Page 5 of 14
DEP FILE #242 — 1917 989 Salem. Street
Compliance is issued so that erosion control measures can be properly placed and
wetland impacts can be monitored. The proposed limit of work shall be shall be
clearly .,narked with erosion controls or temporary fencing and shall be confirmed by
the NACC. Such barriers shall be checked and replaced as necessary and shall be
maintained until all construction is complete. Workers should be informed that no use
of machinery, storage of machinery or materials, stockpiling of soil, or construction
activity is to occur beyond this line at any time.
43. At a minimum erosion control shall consist of 12" mulch sock stared and backed
by entrenched siltation fence shall be installed as shown on the herein referenced
plans and as determined necessary by the NACC or its agent. The erosion controls
will be properly installed and placed as shown on the plans approved and referenced
herein and shall be inspected and approved by the NACC or its agent prior to the start
of construction and shall remain intact until all disturbed areas have been
permanently stabilized to prevent erosion. All erosion prevention and sedimentation
protection measures found necessary during construction shall be implemented at the
direction of the NACC or its agent. The NACC reserves the right to impose additional
conditions on portions of this project to mitigate any impacts which could result from
site erosion, or any noticeable degradation of surface water quality discharging from
the site. For example, installation of erosion control measures may be required in
areas not shown on the plan(s) referenced in this Order of Conditions. Should such
installation be required by the NACC, they shall be installed within 48 hours of the
Commission's request.
44. All existing catch basins within 50' of the work and on public right of ways shall be
protected by Silt Sacks to prevent sediment from entering the drainage system. Silt
Sacks or other catch basin protection shall be maintained and regularly cleaned of
sediments until all areas associated with the work permitted by this order have been
permanently stabilized and. the NACC and/or Conservation Department has formally
approved their removal.
45. The applicant shall have on hand at the start of any soil disturbance, removal or
stockpiling, 50 feet of additional mulch sock with sufficient staking., protected from
the elements. Said erosion control shall be used only for the control of emergency
erosion problems and shall not be used for the normal control of erosion.
46. The applicant shall designate a Wetland Scientist (or other environmental professional
as approved by the NACC or its agent) as an"Erosion Control Monitor" to oversee
any emergency placement of controls and regular inspection or replacement of
sedimentation control devices. The name and phone number of the erosion control
monitor must be provided to the NACC in the event that this person has to be
contacted, due to an emergency at the site, during any 24-hour period., including
weekends. Proof of the retained monitor must be submitted to the Conservation
DEP#242-1917 Findings&Special Conditions
989 Salem Street
Page 6 of 14
DEP FILE 4 242— 1917 989 Salem Street
Department on letterhead by the retained consulting firm. This person shall have the
authority to stop construction for erosion control purposes and direct actions for
remedies. The Environmental Professional will immediately notify the Conservation
agent of any matter that requires attention by the Commission or the agent. The
erosion control monitor will be required to inspect all such devices and oversee
cleaning and the proper disposal of waste products. Cleaning shall include removal of
any entrapped silt.
47. At least once during each week in which construction activities occurs on-site and for
as long thereafter as ground remains unstabilized, the applicant shall submit a written
report with photos from the "Erosion Control Monitor" to the NACC certifying that,
to the best of his/her knowledge and belief based on a careful site inspection, all work
is being performed in compliance with this Order of Conditions and that approved
setbacks are being adhered to. The erosion control monitor must visually inspect all
sedimentation/erosion control measures and assume responsibility for their
maintenance on a weekly basis and that they are functioning as intended. In addition,
all wetland resource areas must be visually inspected for siltation, turbidity, and/or
other water quality impacts. The Erosion Control Monitor shall be on site during
and/or following storm events of 1/2" inch of rain or greater (24 hour event) to ensure
that soils remain stable, and erosion controls are adequate and secure.
48. The applicant and/or the legal owner of that portion of land upon which these,Orders
of Conditions have been placed shall provide to the NACC prior to transferring, or
assigning any portion of said land to another party, subject to said Orders of
Conditions, the "Compliance Certification Form Affidavit" attached via "Appendix
A" signed under the pains and penalties of perjury, stating that said applicant and/or
owner has read these Orders of Conditions and is in compliance with each and every
condition. This document shall apply to each of the conditions referenced herein and
shall be provided to the Conservation Department at least five (5) business days prior
to the closing of said land transaction.
49. Once these above mentioned pre-construction requirements are complete, the
applicant shall contact the Conservation Office prior to site preparation or
construction and shall arrange an on-site conference with an NACC representative, the
contractor,the engineer,wetland scientist/monitor and the applicant to ensure that
all of the Conditions of this Order are understood. This Order shall be included in all
construction contracts, subcontracts, and specifications dealing with the work
proposed and shall supersede any conflicting contract requirements. The applicant
shall assure that all contractors, subcontractors and other personnel performing the
permitted work are fully aware of the permit's terms and conditions. Thereafter, the
contractor will be held jointly liable for any violation of this Order of Conditions
resulting from failure to comply with its conditions. The applicant or contractor shall
notify the NACC in writing of the identity of the on-site construction supervisor hired
DEP#242-1917 Findings&Special Conditions
989 Salem Street
Page 7 of 14
DEP FILE #242— 1917 989 Salem Street
to coordinate construction and to ensure compliance with this order. A reasonable
period of time shall be provided as notice of the pre-construction meeting (e.g. 72
hours).
STORMWATER MANAGEMENT CONDITIONS
50. There shall be no increase in the post development discharges from the storm drainage
system or any other changes in post development conditions that alter the post
development watershed boundaries as currently depicted in the Notice of Intent and
approved by this order of Conditions, unless specifically approved in writing by the
Commission.
51.. water quality in down gradient BVw's shall not differ significantly following
completion of the project from the pre-development conditions. There shall be no
sedimentation into wetlands or water bodies from discharge pipes or surface runoff
leaving the site.
52. Issuance of these Conditions does not in any way imply or certify that the site or
downstream areas will not be subject to flooding, storm damage or any other form of
water damage.
MITIGATION PLANTING PLAN
53. No later than May 30, 2026, the proposed mitigation planting plan and slope
stabilization seeding shall be undertaken and completed in the field. Final native
plant selection list shall be submitted to the Conservation Administrator for approval.
The wetland scientist shall conduct annual monitoring of the restoration area for two
(2) full growing seasons following installation. For the purposes of this order, a ftill
grozving season is defined as the period from early April through mid-October. If
plantings are installed after May 30, the two full growing seasons shall commence the
following spring (April/May).
54. All aspects of the restoration planting plan shall be overseen and supervised by the
wetland scientist.
55. The wetland scientist shall conduct annual monitoring of the restoration area for two
(2) full growing seasons following installation. For the purposes of this order, a furl
grort2ing season is defined as the period from late April or early May through mid-
October. If plantings are installed after May 30, the two full growing seasons shall
commence the following spring (April).
DEP#242-1917 Findings&Special Conditions
989 Salem Street
Page 8 of 14
DEP FILE 9 242— 1917 989 Salem Street
56. The seeded slope shall receive sufficient coverage of 100% biodegradable erosion
control blanketing (NO plastic netting) to protect and incubate sown seed.
57. Annual reporting by wetland scientist shall be submitted to the Conservation
Department. This reporting can be incorporated into erosion control inspection
reports.
58. Dead or dying plants shall be replaced as they are observed.
59. After 2 full growing seasons post plant Installation, the shrubs shall exhibit an overall
survivorship of at least 75% and any trees shall exhibit 100% survivorship. The final
monitoring report submitted by the wetland scientist shall verify these conditions. A
full and complete Certificate of Compliance will not be issued unless and until these
parameters are satisfied.
60. The mitigation planted area and the seeded slope shall be left to naturalize without
being subject to routine residential landscape maintenance such as mulching, pruning,
fertilizing etc.
DURING CONSTRUCTION
61. Selective removal of dead or dying trees that threaten safety and/or power lines are
allowed under this Order of Conditions upon consultation with the Conservation
Administrator.
62. All existing materials, gravel, soils,fines slated to be scraped/removed from the
driveways in order to establish a stable base for paving shall be immediately
transferred to a waiting dump truck for transport off site.
63. Upon beginning work, the applicant/monitor shall submit written weekly progress
reports detailing what work has been done in or near resource areas, and what work is
anticipated to be done over the next period. This will update the construction
sequence. Deports shall be submitted in as part of the weekly environmental
monitoring report.
64. Associated pavement and roadways shall be swept at daily or as directed by the
Erosion Control monitor, the Site Supervisor, Project Manager, or Conservation staff
for as long as the site remains exposed and un-stabilized.
65. Any fill used in connection with this project shall be clean fill, containing no trash,
refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire,
lath, paper, cardboard, pipe, glass, processed glass aggregate, concrete, recycled
DEP 4242-1917 Findings&Special Conditions
989 Salem Sheet
Page 9 of 14
DEP FILE #242— 1917 989 Salem Street
concrete aggregate, tires, ashes, refrigerators, motor vehicles or parts on any of the
foregoing. Any fill im orted to the site must be accompanied by a certificate of on in
or an analysis certif in cleanliness -- whichever is most applicable as determined b
the Conservation Commission or its staff.
66. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized,
or loamed, seeded and mulched, with a layer of mulch hay. All disturbed areas must
be graded, Ioamed and seeded prior to November 1st of each year. Outside of the
growing season, exposed soil finish grade surfaces shall be stabilized with a layer of
mulch hay until climate conditions allow for seeding. During construction, any area of
exposed soils that will be left idle for more than 30 days shall be stabilized with a layer
of mulch hay or other means approved by the NACC.
67. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal:
vertical) unless otherwise shown on the approved plan set. Slopes of steeper grade
shall be rip-rapped to provide permanent stabilization.
68. There shall be no stockpiling of any materials within 25 feet of any resource area. All
stockpiled material shall be contained within erosion controls, and at the Conservation
Administrator's direction surrounded by separate erosion controls if deemed
necessary. Excavated material not suitable for re-use shall be trucked off-site.
69. All waste generated by, or associated with, the construction activity shall be contained
within the limit of work, and away from any wetland resource area. There shall be no
burying of spent construction materials or disposal of waste on the site by any other
means. The applicant shall maintain dumpsters (or other suitable means) at the site
for the storage and removal of such spent construction materials off-site. However, no
trash dumpsters will be allowed within 50" of areas subject to protection under the Act
or local Bylaw.
70. Accepted engineering and construction standards and procedures shall be followed in
the completion of the project.
71. During and after work on this project, there shall be no discharge or spillage of fuel, or
other pollutants into any wetland resource area. If there is a spill or discharge of any
pollutant during any phase of construction the NACC shall be notified by the
applicant within one (1) business day. No construction vehicles are to be stored
within 100 feet of wetland resource areas, and no vehicle refueling, equipment
lubrication, or maintenance is to be done within 100 feet of a resource area.
AFTER CONSTRUCTION
........... ........................................................... Z:1
DEP#242-1917 Findings&Special Conditions
989 Salem Street
Page 10 of 14
DEP FILE #242- 1917 989 Salem Street
72. No underground storage of fuel oils shall be allowed on any lot within one-hundred
(100) feet of any wetland resource area. This condition shall survive this order of
Conditions and shall run with the title of the property. This condition is issued under
the authority of the Town's wetland protection Bylaw.
73. Fertilizers utilized for landscaping and lawn care shall be slow release, low-nitrogen
types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and
herbicides shall not be used within 100 feet of a wetland resource area. No road salt,
sodium chloride or other de-icing chemicals shall be used on paved surfaces within
100 feet of a wetland resource area. This condition shall survive this order of
Conditions and shall run with the title of the property. This condition is issued under
the authority of the Town's wetland Protection Bylaw and shall remain in perpetuity.
74. The use of coal tar-based pavement sealants is prohibited on the property, as they
have been determined to contribute high levels of polycyclic aromatic hydrocarbons
(PAHs) to storm.water runoff. This condition shall survive the order of Conditions and
shall run with the title of the property.
75. There shall be no dumping of leaves, grass clippings, brush, or other debris into a
wetland resource areas or the 25-foot No-Disturb zone. This condition shall remain in
perpetuity.
76. Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion. This shall be done by
foaming and seeding according to NRCS standards. Stabilization will be considered
complete once full vegetative cover has been achieved.
77. Upon approved site stabilization by Conservation staff, the erosion controls shall be
removed and properly disposed of and all exposed unvegetated areas shall be seeded.
78. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
a. wPA Form 8A - "Request for a Certificate of Compliance."
b. A letter from the applicant requesting a Certificate of Compliance.
c. The name and address of the current landowner.
d. Signed statements from the individual property owners shall be submitted with
the request for a Certificate of Compliance indicating that they read and
understood the recorded order of Conditions prior to purchasing their property.
e. The name and address of the individual/trust or corporation to whom the
compliance is to be granted.
f. The street address and assessor's map/parcel number for the project.
g. The DEP file number.
DEP#242-1917 Findings&Special Conditions
989 Salem Street
Page 11of14
DLP FILL #242 1917 989 Salem Street
h. A written statement from.a Registered Professional Civil Engineer (and/or
Registered Professional Land Surveyor) of the Commonwealth certifying that the
work has been conducted as shown on the plan(s) and documents referenced
above, and as conditioned by the Commission.
i. An "As-Built" plan of the new portions of the sewer pipes and pump station shall
be prepared and signed and stamped by a Registered Professional Civil Engineer
(P.E.) (and/or Registered Professional Land Surveyor) of the Commonwealth, for
the public record. This plan will include:
➢ "As-Built" post-development elevations of all drainage & stormwater
management structures constructed within 100 feet of any wetland resource
area. Specifically, "As-Built" plans should include inverts of all drainage
structures above and below grade (also to be provided in table format), and
an engineer's certification that the drainage system has been constructed
and is functioning in accordance with the approved design. NOTE: If
portions of the stormwater systems exist partially within the Buffer zone
then the entire structure must be depicted to accurately verify compliance.
➢ "As-Built" post-development elevations and grades of all filled or altered
wetland resource areas including the encompassing buffer zone which is
regulated as a resource area under the local wetland Protection Bylaw.
➢ Distances from structures to wetland resource areas. Structures include (but
are not limited to) septic systems, additions, fences, sheds, stone walls,
pools, retaining walls, subsurface utilities and decks.
➢ A line showing the limit of work and the extent of existing erosion control
devices. "work" includes any disturbance of soils or vegetation.
➢ Location of all subsurface utilities entering the property.
79. The following special conditions shall survive the issuance of a Certificate of
Compliance (COC) for this project:
➢ 25' No-Disturbance zone and a 50' No-Construction zone. Future work
within 100' of existing wetland resource areas will require a separate filing
with the NA.CC of the Regulations for performance standards within these
zones) The Conservation Administrator and/or other agents of the NACC
do not have the authority to waive these setbacks as established under the
local Bylaw (Condition #32);
➢ wetland markers on posts to remain in good condition (Condition#38),
➢ Mitigation planting/seeded slope shall be allowed to naturalize (Condition
#60).
DEP#242-1917 Findings&Special Conditions
989 Salem Street
Page 12 of 14
DLP FILL 9 242— 1917 989 Salem Street
Discharge or spillage of pollutants (Condition#71);
Prohibition of underground fuels (Condition #72);
Limitations on the use of fertilizers, herbicides, pesticides, sodium.-based ice
control (Condition#73);
➢ Prohibition on the use of coal tar based sealants (Condition #74);
➢ No dumping of leaves, grass clippings, brush, or other debris into a wetland
resource areas or the 25--foot No-Disturb Zone (Condition#75).
DEP#242-1917 Findings&Special Conditions
989 Salem Street
Page 13 of 14
DEP FILE #242— 1917 989 Salem Street
APPENDDC A-AFFIDAVIT
I, on oath do hereby depose and state:
(authorized agent applicant and/or current owner)
(PLEASE CHECK ATLEAST ONE BLOCK)
1. I am the of
(position with applicant) (applicant name or company name)
the applicant upon whom Order of Conditions
have been placed upon by (DEP or NACC number)
the North Andover Conservation Commission.
&/or
2. I an the of
(position with owner) (owner name)
the owner upon whose land Order of Conditions
have been placed up by (DEP or NACC number)
the North Andover Conservation Commission.
3. I hereby affirm and acknowledge that I have received said Order of Conditions
and have read the same and understand each
(DEP File#) and every condition which has been set forth
in said Order of Conditions.
4. I hereby affirm and acknowledge that on this day of 20
I inspected said property together with any and all improvements which have
been made to the same and hereby certify that each and every condition set
forth in Order of Conditions are presently in compliance.
(DEP File #)
5. I hereby affirm and acknowledge that this document will be relied upon by the
North Andover Conservation Commission as well as any potential buyers of
said property which is subject to said Order of Conditions
(DEP File#�
Signed under the pains and penalties of perjury this day of 20
(Signature-authorized agent of applicant or owner)
DEP#242-1917 Findings&Special Conditions
989 Salem Street
Page 14 of 14