Loading...
HomeMy WebLinkAbout20230119 Planning III-Stormwater Report Salem Forest 3DEFINITIVE SUBDIVISION PLAN HYDROLN REPORT TOWN OF NORTH ANDOVER SALEM FOREST III DECEMBER 81 1986 PREPARED BY NEVE ASSOCIATES, INC. 447 BOSTON STREET TOPSFIELD, MA 01983 TABLE OF CONTENTS I. APPLICATION FOR APPROVAL OF DEFINITIVE PLAN II. DESIGNERS CERTIFICATE III. STATEMENT OF ENVIRONMENTAL IMPACT IV. CONSTRUCTION SCHEDULE V. ABUTTERS LIST VI. HYDROLOGY AND DRAINAGE REPORT FORM D DESIGNER'S CERTIFICATE November 25 TO THE PLAWtZING BOARD OF THE TOWN OF NORTH ANDOVER: , 19 86 In preparing the plan entitled Salem Forest III I hereby certify that the above named plan and accompanying data is true and correct to the accuracy required by the current Rules and Regulations Governing the Subdivision of Land in North Andover, Massachusetts, and my source of information about the location of boundaries shown on said plan were one or more of the following: 1. Deed from Sohn Bolten to George H & Wanda H. Farr dated 1967 and recorded in the North Essex Registry in Book 1087 page 314 2. Other plans, as follows 3. Oral information furnished by No one 4. Actual measurement on the ground from a starting point established by Thomas E. Neve Associates, Inc., 447 Boston St., Topsfield MA 5. Other Sources (Seal of Engineer or Surveyor) (Registered Professional Engineer or Registered Land Surveyor) Thomas E. Neve Associates, Inc. 447 Boston St., Topsfield, MA 01983 Address SALEM FOREST III ENVIRONMENTAL IMPACT STATEMENT PHYSICAL ENVIRONMENT The topography of the site is moderately sloping, having slopes averaging 3% to 20%. (See Sheet #3). The vegetation is medium; the site primarily contains small trees averaging 30-50 feet. The site is bordered on the North and West by typical woodland areas, on the North and East by seasonal wetlands and Boston Brook, and to the East and South by residential areas of Patton Lane, Salem Forest II. The developer proposes to construct a roadway from Patton Lane through the forested area over Boston Brook and along the bordering wetland. The road shall be constructed at an acceptable grade and shall not pose a significant impact to the physical environment. This new roadway is approximately 650 feet long and shall serve five (5) lots. SURFACE WATER AND SOILS As previously mentioned, this site is bordered by Boston Brook and a wetland area that is subject to seasonal flooding. Boston Brook flows from Northwest to Southeast. The drainage pattern of the uplands is from South to North, ultimately discharging into Boston Brook. The underlying soils of the site are moderately drained, i.e., during rainfall the runoff is medium since 60 - 70% of the rainfall percolates into the existing soil. During the construction of the proposed road, erosion and sedimentation control measures shall be implemented. Conventionally staked hay bales shall be installed along the Northerly edge of the Right of Way to prevent any siltation, as a result of the road construction, from entering the wetlands areas. The proposed sideslopes of the roadway fill areas are within the regulation criteria. These areas shall be stabilized, loamed, and seeded once installed. Each of the five lots shall dispose of their sewage by conventional subsurface methods. Each dwelling shall have a leach field designed in strict accordance with the State Environmental Code and the local Board of Health Regulations. The areas of the leach field is subject to the percolation rate of the soil. Several percolation tests and deep hole observation test pits were conducted with their rates being acceptable. SUBSURFACE CONDITIONS The existing subsurface soil conditions consist of soils which have a medium infiltration rate. This soil classification was verified in the field by excavating test pits throughout the site. The pits were excavated during the permitted periods as required by the local Board of Health. The water tables observed were within acceptable ranges and do not pose a limitation on the development of this land. This soil is acceptable for both the construction of dwellings with basements as well as the construction of local roads and streets. TOWN SERVICES The proposed subdivision shall have insignificant impact regarding traffic and parking. These lots shall generate an average of 60 auto trips per day. Each dwelling shall have a garage and driveway for off street parking. The subdivision shall require the services of the Town Fire Department, Police Department, and Public Works Department. Town water and fire hydrants will be installed in the proposed road with a recommended cul-de-sac at the end of the road. Street drainage and appurtenances shall be installed in conformance with the Town of North Andover Subdivision Rules and Regulations. All wetland disturbance shall be submitted to the local Conservation Commission for their review and approval. CONCLUSION The general environmental impact of this proposed subdivision is minimal. All attempts have been made to blend good engineering design concepts with the Subdivision Rules and Regulations to generate a development which correlates with the character of the area and the attitude of the Town of North Andover. CONSTRUCTION SCHEDULE The developer anticipates the subdivision to be constructed within 24 months. Month 1: Clear and grub roadway, rough grade Month 2-7: Install all utilities, bring road up to subgrade. Month 8-9: Gravel roadway and install binder coat, rough grade and install sideslopes. Month 2-24: Clear lots, construct dwellings. Month 12-24: Finish landscape all portions of the roadway and sideslopes, install finish pavement, install road monuments. A. U C H w N 0 H z o a° W CD U) U Ln �o ,-i O of lfl l4 O d' Ln to N Qi a N ri -A W i-i r-i 61 % to �o Lo d' O m I I I 1 I I I I I I I (A U FC FC FC FC FC FC FC V U U U f!1 H I I I I I I i I I I I I W to to lfl to �o v] a o 0 o O o O o o O O O o Ww r-I r-I ri rl r-i H ri ri ri r� ri W C7 P N M M CO M r d' r-1 W P+ W ri m 61 N W N r O Ln Ln m IT IT M HN 61 (0 F 09 O O rl rn co. M Ln m co Ln r-♦ co d' O r m r O m m O ri M d' M Ln r-I N r-I r-I N Ln ,-I r-i rA of a a Ln H N co N N H 3A r� S4 � o N N rCd N ro 0 o v a a a u �• E+ i4 E N C C y N O N N }4 N N -P CO - O b1 a a 14 '� - H , r� 44 r-1 i4 Q N (4J ro • .> • ri 75 .,4 > , C C � O N > N > >•o a�ca C o 0 rd tr - o O o w> C> C O C C O U) ri 'C� H ro U) �4 -P +J 'd r1 O id 0 Ld ro m ii 'd Ld N r N N 4J 4J f. r-i '0 ?i Ri ?4 0 ii m C � 04 NC OW W J � J V w rt 1-1 w MH M faC W10 Ln r Q to O �o O td C r-I • r-I N O M N O Z r !!) r-I a' d' to 'Z. Ln ,7a N z N '7y N d' z RY ro N (d 5. 'H - W O N +) w C C •1i v U C w +J •r1 -r-II O C N C LL" 3 W C !-1 N r-I W C N W P'' O O h � Lz w w m U) 0 4J w w +) q 44 U •-i W R, W (d W x w C us N FC •NI �v C w r-I SZ N C W 3 '-{ U) •r1 O N N N O 1 ro '0 w 0 4 C N N H4J C G' to b) rd C 0 +L S4 H a !4 (d O 0) 1n U ii LO C id N N 0i4 S4 M 0114 .0 •rl 0�4 U U) A�j - Ld N SN C SA .Crd N •ri A N 4J oC C rd LdU N H ru 'M C N Ld N cd -1 rd O S4 'O rt O N O C O N O 1•I U rt U N z 0w 0Pr4 xx wF WU hlx 04h u 0m wZ hx w 'CEipinc. HYDROLOGY AND DRAINAGE SALEM FOREST III NORTH ANDOVER, MASSACHUSETTS November 11, 1986 Prepared For: Thomas E. Neve Associates, Inc. 447 Old Boston Road Topsfield, Massachusetts Prepared By: IEP, Inc. 6 Maple Street Northborough, Massachusetts ,EPnc. Salem Forest III is a proposed 5-lot subdivision on a single cul-de-sac road off existing Patton Lane. The 12 + acre site is traversed by Boston Brook which must be crossed at one location by the proposed Hawkins Lane. A crossing presently exists at this location for a dirt road referred to as Wood Road. The existing crossing is sub -standard and would result in over -topping of Wood Road by the peak 100-year discharge of Boston Brook. The purpose of this analysis is threefold: 1) to establish the existing 100-year flood plain elevation and peak discharge in Boston Brook, 2) to design a crossing culvert to convey the peak discharge with no increase in peak flood stage and, 3) to size the proposed storm drain pipes for the 10-year storm and compare existing and post -development discharge in Boston Brook for both the 10-year and 100-year storms. SCS methods (NEH-4) were used to derive the peak discharge in Boston Brook from USGS gaging/frequency records for the Ipswich River to which Boston Brook is tributary. The HYDRP computer model was used to evaluate the peak stage of Boston Brook based on the hydraulic performance of the existing Wood Road crossing. The resulting peak stage (100 year floodplain elevation) was calculated to be 106.2 ft. NGVD, over -topping the road. It must be noted the FEMA-designated floodplain (A -Zone) is not based on a detailed study and therefore does not specify a flood stage. The HYDRP model was further used to aid in designing an improved crossing culvert. The optimal design selected was a 10' wide x 5' high precast concrete box culvert with a beveled entrance. This structure would result in a 0.4 foot decrease in the peak flood stage and would avoid over -topping the proposed road. Qi� The proposed storm drains were designed by use of the DRAINCALC program. Subcatchments 3, 4 and 5 are tributary to the proposed storm drains. Composite Curve Numbers (CN) were developed from the areal distribution of proposed impervious surface (including roods and driveways), other surface cover types and SCS-mapped soils groups. The DRAINCALC program was also used to generate composite hydrographs for the entire site. Subcatchment 1 represents the site in its existing condition whereas Subcatchment 2 represents the developed site. A 100-year hydrograph for Boston Brook was manually constructed using other SCS methods (NEH-4) because the watershed size exceeds the working limits of DRAINCALC. Comparison of these hydrographs shows that the peak discharge (10-year and 100-year) of Boston Brook would only be increased by 0.2 cfs as a result of site development. This increase is negligible owing to the significant difference in timing between the hydrograph peak of the site and that of Boston Brook. -2- ic I 6 Maple Street Northborough, MA 01532 393-8558 Job No. Sheet_ of By Date Ckd.�_ Rev. Z CfIL Cl/G f1T� PEfl,� /DO - /r4P fI �UV PFf1h- FLUUD 17/6F "le I>OJ7-0%/ I P00!{ % i A)ODD IeOI• 4� 1#40Wk/&r Z ^VF -3- ic?L 6 Maple Street Northborough, MA 01533 393-8558 Client 70M Alf ViE lob No. Sheet— of Subject bell) IF6 J•UB.DiU/J/a/(/ By J2— Date y ,')iQT/71 1I/i//)0 (/�F,Ir- CNd. Bev. C/ZL1611 ATC Q,00 47 Rl VrR 147- /PJ6✓/CH 800 (' {s fl /Pt�✓il/r = /{z /S� mi z. ? UJGJ QZ = mil/ too A w000 lwo = /, = Z72/ arrnf = </ z r /';'/' z /o,X9y _ / 1 / iv/-H - y �Az (�l = /D 9• G/ Csh�i Q/oo C�CCUC.�TE �X/lT//I/G PEI/,�- /DD-yE�W- FLUD6 ,J7- 6 (iPSTREff/i'/ .f/ICE OG Gt/Oo/J /?lJ/il�� ,pO.fTDA/ &'.Plo/,� V— g of swamps will'fbr`fher Supply Paper (in preparation). r withdrawals. 'Sammel, E. A., and Baker, J. A.,1962, Record of wells, materials der from the basin, mainly tests, and chemical analyses of water in the lower Ipswich River i, amount to about 5 per- basin, Massachusetts: U.S. Geol. Survey open -file report, 47 p. streamflow by 50 percent U.S. Geological Survey,1930-60, Surface -water supply of the United and 1957 this pumpage States, pt. 1, North Atlantic slope basins: U.S. Geol. Survey r short periods near the Water -Supply Papers 696, 711, 726, 741, 756, 781, 801, 821, 851, 871, 891, 921, 951, 971, 1001, 1031, 1051, 1081, 1111, 1141, 1171, 1201, surface water in the basin 1231, 1271, 1331, 1381, 1431, 1501, 1651, 1621, and 1701. Ithough some water may �nganese. 'Available in duplicated form from U.S. Geol. Survey, Boston, Mass. I 1.1 1.5 2 3 5 7 li RECURRENCE INTERVAI Frequency of flood: Flood -frequency curves can be used to predict similar hydrologic conditions continue. Thus, if given magnitude is 10 years, there is a 10 pere one year. "PSWICH RIVER B and W. N. Palmquist, Jr. 20 30 50 100 IN YEARS at Ipswich he probabilities of flood occurence if is recurrence interval of a flood of a it probability of its occurence in any .1 1.01 1.1 200 z 100 0 U W N 50 W L lL 30 W 20 m z 10 w 5 S N 3 0 1.5 2 3 RECURRENE Frequen .5 1,01 1.1 1.5 2 3 RECURRED Freque. Low -flow frequency curves can bi flows assuming no change in hydro 2.5 million gallons a day for 60 coi of once every 10 years, indicating a occur in any year. ODS And LOW FLOWS -Extremes Of Streamflows INTERIOR -OEM ' MASSACHUSETTS fG S f/1R- i94 HYDRAULIC HATING PROGRAM (C) Copyright 1.9831 Peter J. Singhofen, P.E. STRUCTURE DATA lvaoG eMb C,POJJ//UG � I?OJTON 8k001f� F!'iJ7-/1V6 y ELEMENT # 1 -> Box Culvert <- Span (inches) - 100.2 Rise (inches) --'> 49.2 Length (feet) --. 14.8 Manning's n --. .015 HW Invert (Fmsl) --. 99.5 TW Invert (fmsl) --% 99.28 Energy Loss Coef --. 1 Entrnc Loss Coef --. .5 # of Culverts/Channels --> 1 ELEMENT # 2 /76.7V k-N07Cft �POAl J /�Fs7CC� -` Broad Crested Weir/r_.+o and nr;f;,-o <_ � Crest elevation (fmsl) 105.21 Crest length (feet) --;` 35.58 �30- 93 Discharne coefficient -- 3.1 Weir exponent --> 2.5 to effective submergence - 67 Gate opening (feet) --> 999 # of end contractions --. c) Discharge coef for gate on -> 0 Circular orifice cntrin (ft) 999 Orifice diameter (ft) --:1. 0 Orifice dischrg coef --> 0 # identical orifices --> 0 fOh LD = 3s, s,F HYDRAULIC RATING PROGRAM (C) Copyright 198.3, Peter J. Singhofen, P.E. FLOW RATES (CFS) HW TW ELEM i ELEM 2 &OX V-Ai07(1! 99.500 99.280 0.00 0.00 100.000 99.280 7.21 0.00 101.000 99.280 37.60 0.00 102.000 99.280 80.85 0.00 103.000 99.2BO 133.92 0.00 104.000 99.280 195.24 0.00 105.000 99.280 263.82 0.00 106.000 99.280 330.94 61.1S 107.000 99.2BO 413.38 472.B3 D TOT 0.00 7.21 37.60 80.65 133.92 195.24 263.82 400.13 BB6.21 -7- 3 J X w CV ILn!.4 �► +-4 3a3 <>3 {1144-0 UPo sw E--o H cmr c=..agc=> =Z �CD CD c.IAC. %n i�?'w 6 Maple Street Northborough, MA 01532 393-8558 Jab No, Sheet_ of By_ Date Chtl. Rev. ZL, /JEJ'/6XI c;ejPdjr, ,Po.90 C�'cUs/r�/6 CUL UE/PT /�,4 e FG 0 o.D J 7-19 G C A1V16 NU U VFI? rUP/'/N 6 of Pk4l),00irb /2a1}OGv4v HYDRAULIC RATING PROGRAM (C) Copyright 1963, Peter J. Ginghofen, P.E. STRUCTURE DATA / / ELEMENT # I le) -> Box Culvert <- Span (inches) '-> 120 Rise (inches) ^~> 6O Length (feet) --> 60 Manning's n --> .013 UW Invert (fmsl) --> 99,5 TW Invert (fmsl) -~> 99"28 Energy Loss Coef Entrnc Loss Coef # of Culverts/Channels -11- HYDRAULIC RATING PROGRAM (C) Copyright 1903, Peter J. SinghoFen, P.E. HW TW 99. 500 99.280 100.000 99.2BO 101..000 99.2BO 102.000 99.200 103.000 99.280 1.04.000 99.280 1.05.000 99.2BO 106.000 99.200 107.000 99.280 FLOW RATES (CFS) ELEM 1 0 TOT 0. 00 0.00 10.41 10.41 53.96 53.96 1.16.10 116.10 192.44 192.44 200.55 280.555 379.09 379.09 457.04 487.04 604.45 604.45 -12- Illinois Illinois :-� &s4.-'1 C:> 3 r-N C� Ln -13- I L k o � vv w o � o �I' It Qj J Q � V � q, .o iE?n, 6 Maple Street Northborough, MA 01532 393-8558 Job No. Sheet_ of Date _2Y S/?Z-- J701?I/ 1)lPYl/N P/f'II f%f/.la rXiJT//L'G 1441b Pl>Jy"- T leoltlUlr6 /J/sC.y�9�GE f4k' /U YF�2 AivQ -14- SUBCATCHMENT/WATERSHED DATA IC1� SUBCATCHMENT NO. r l?-r) befit A ON SITE /Z,:(? PROJECT: 11mnll AOFF SITE 0 CONDITION: jFX1,f71N6 ATOTAL CN CALCULATION COVER TYPE SOILS CN AON SITE AOFFSITE ATOTAL CNA f�i2� rr - A 217 Q , `7¢ 0.7 % /B,S- B si- (0,¢9 �i,y9 3s4.9 C 70 3, 27 D 77 2, 0 / z, 0/ /s9.k 1�pE �v� vaJ A 9 P B 9k C 9k D A B C D A B C D A B C D TOTALS 1760,a' CN=boo„>'/12,s3 CN'= HYDRAULIC LENGTH, L= 16eC CALC. BY: DATE: SUBCATCHMENT SLOPE, S= 7 Y / CHECK BY: DATE: TIME OF CONCENTRATION To SOURCES:7-01POa�o -15- SUBCATCHMENT/WATERSHED DATA ICP SUBCATCHMENT NO. 2 (",rNr1,QE .1rl7£) /Rcv A ON SITE PROJECT: 4/4,P7H 1gNbovE,P ; JACfin F0,01--fr-Za AOFF SITE CONDITION: ATOTAL CN CALCULATION COVER TYPE SOILS CN AON SITE AOFFSITE ATOTAL CNA B si- c, -76 9F D F-01lrf7'11 k11V A 32 �,�� �:c x �,.� 7•� B S8 �S;<<' k7 ?fO f D 7� A B C D A B C D TOTALS /2,13 iz,53 PZo.k JCN HYDRAULIC LENGTH, L= MY? CALC. BY: 2 DATE: SUBCATCHMENT SLOPE,S= U °/ CHECK BY: DATE: TIME OF CONCENTRATION, Tc = l Sl SOURCES:S rc Tom f UdGl 0✓AD �•� - c .,;t -16- SUBCATCHMENT/WATERSHED DATA IC� SUBCATCHMENT NO. 3 (7,e/a 7o rllrrlv6 <8J, PgWN LN) A ON SITE 6 PROJECT: vm7# AOFF SITE Z/,71 CONDITION: ��IWN6 ti PdJ7-e�Fa ATOTAL y,7/ CN CALCULATION COVER TYPE SOILS CN AON SITE AOFFSITE ATOTAL CNA FU/2f:T - A 2S B si- c -7D D - 77 ouj, A 9p B 9F C 9� D Reel 6FN7/A1 A / O,a9F Z,/ B G8 (),72,r p,�-, D 99 G7,3 C -79 04'?7 /-U 6 1,60. 04,y D A B C - D A B C D TOTALS 4, 7/ 30/•8 CN=3o/,8/q,71= 64./ CN`_ HYDRAULIC LENGTH, L= 6,5T CALC. BY: Z DATE: SUBCATCHMENT SLOPE, S= 4•tle/u CHECK BY: DATE: TIME OF CONCENTRATION, To = �C/ SOURCES:s is 70� I U.f/•I QUAD -17- SUBCATCHMENT/WATERSHED DATA ICP SUBCATCHMENT NO.4 (7,els io ,aPooatED CBf,J'>vorz4�) AON SITE D,/S/ PROJECT: 41OP7N .gN4omce)Z46fln foPF'(T--zzz AOFF SITE 0,o73 CONDITION: I'oJT- 4r�l ATOTAL CN CALCULATION COVER TYPE SOILS CN AON SITE AOFFSITE ATOTAL CNA FU/?�tT - A Zs- !'t2 6,dIS 0,073 /,Y-? B si- c -76 D 77 imoE�v�vuJ A 9P / Q,o-79 0,079 1174 B 9� C 9P D rai2cl71LfIOv& A Ez 41 6,o72 ololl2 2130 B E? C 'Z D �8 A B C D A B C D TOTALS CN=//Y7/0-7Z9=S3,0 CN'= HYDRAULIC LENGTH, L= 160' CALC. BY:.7- DATE: SUBCATCHMENT SLOPE, S= 2.4 o CHECK BY: DATE: TIME OF CONCENTRATION, Tc = (P SOURCES:S rc !/d'GJ Q✓AD SUBCATCHMENT/WATERSHED DATA ICP SUBCATCHMENT NO, s(7PIE 70 R-`4POJFG eTsl r�4 2 A ON SITE Z 7 4 PROJECT: 2/am, 4N4oVE',P) S44 E,,n AOFF SITE CONDITION: POST- Lev ATOTAL 2.7 y CN CALCULATION COVER TYPE SOILS CN AON SITE AOFFSITE ATOTAL CNA FU/2�:T - A 2,7 B SJ- -0,13 29,/ C 76 D 77 lm�Ewi0as (�nc� Z NUUJeJ y'�,�, r� A 9P 6'a 00/ D,0/ h0 B 9k 4-?d C 13, 7 D Fo1?E,rr11'4 11v A Y F 0 • / 1 Deli U/ o/ U --? B SF I 39,?J- /- -T d /,37 W'- C '12 33; ;, d, i, 1 d,z 19, f D 7� A B C D A B C D TOTALS ? Z4 D s3 7' /g72 HYDRAULIC LENGTH, L= 7 CALC. BY: -7- DATE: SUBCATCHMENT SLOPE, S= Co, S % CHECK BY: DATE: TIME OF CONCENTRATION, Tc = // SOURCES: ri Tom f UdGJ 0✓AD -19 I.E.P., Inc. PROJECT:SALEM FOREST III 10YR ------------------ SUBCATCHMENT DATA SUBCAT # 1 AREA= 1.2.53 ACRES CN= 60.7 TC= 21. MIN PEAL. FLOW= 12.7 CFS RAINFAL..L= 4.5 INCHES VOL.= 1..01. AC.FT. SUBCAT # AREA= 4.71. ACRES CN- 64.1. TC= 16 MIN PEAK FLOW= 6.1 CFS RAINFALL.== 4.5 INCHES VOL.== .45 AC.FT. SUBCAT # 5 AREA 2.79 ACRES CN= 67.1. TC= 11 MIN PEAK FLOW= 4.9 CFS RAINFALL_== 4.5 INCHES VOL...= .3 AC.FT. ROUTING DATA REACH # 1 PEAL+. FLOW= 6.1. CFS MAX. FLOW POSSIBLE= 6 CFS MAX. WATER DETAINED= 0 AC.FT. REACH # _ PEAK FLOW 6.2 CFS MAX. FLOW POSSIBLE:= 6 CFS MAX. WATER DETAINED= 0 AC.FT. MEMORY DATA SUBCAT # 2 AREA= 12.53 � ACRES CN= 63.5 TC= 18 MIN PEAK FLOW= 17.4 CFS RAINFALL== 4.5 INCHES VOL== 1.3 AC.FT. SUBCAT # i4 AREA= ..224 ACRES CN= 53 TC=; 6 MIN PEAK FLOW= CPS RAINFAL..L.= 4.5 INCHES VOL- 0 AC.FT. REACH # 2 PEAK FLOW= 6.2 CFS MAX. FLOW POSSIBLE= 6 CFS MAX. WATER DETAINED= 0 AC.FT. REACH # 4 PEAK FLOW= 4.9 CFS MAX. FLOW POSSIBLEi= 6 CFS MAX. WATER DETAINED= 0 AC.FT. -20 - ------------ c MMn TMM nAVA u om n� n i nn i inn 'u IAlll�nI III■ IYIIIIII . lk -•2.1 - is?� 6 Maple Street Northborough, MA 01532 393-0550 Job No. Sheet_ of By Date ljfl/FGOP /00-5�E%�P� SC..f h'/�O.t'OG,Z'i9PH Leh' fj= 4,Z.�- lkii 2 = 2720 a<kf IN /FF7,FIV T/ M1 S = (Al _ i 0 Z116 L= �-/)0,7- (27)750)O,Y(3G8i 07 1906 %°'s 19oo (0,9)0, L = S-,/7 hrl T(= S?L 7)= Gz Gas D6l2s17/401V OF "F(/P ZWFrf�) D --0,/3,7 T = 0,/,? 40 z, L = /S ti%r 7/ME 7-0 PFxlr- � Z`� _ �� T = 2�, (Y.G z ) = !�, 7`i h •/ e0/pP0//vT OF R'eFCiIc" reF.ff = //,Y?G.s /IV,61?06Pi9Pf/ F7,IP7 � T 7- XF44 7/A)c 7� z7 �P t e`,r = S,79 71//,3/ = /70rl,-� —22- is?r� 6 Maple Street Northborough, MA 01532 393-8558 ,E',g77oJ OF 7H5- S(J Job No. Sheet_ of By- Date Ckd. Rev. 7/111,t-- ,9.UD ,O)JC//.9/?64' (/i(/ / 7- 6/e4/�>/-/ /t f 1 7 1 & P 6,0 U,0 //,3/ D-000 6,0 01/ ds7 //1S'If 01030 /3,77 0.2 0,/U0 eI6•s8 O,3 /,7Z 0,/90 X�Is o 0.4 2,.7o 11,61 021/ 9 14446 0,S" 2,X7 /4 /F 0,476 2/Y,7Y 014 ?144 /9, 7s- 0,(nG U 20 /•9.? 0,7 4oz /S-/a7 0,X20 ysl,- 16 aff le/,5y /S,90 0,930 43,?,/% OJ S./7 /614�1 0,5I0 40•/11 1,0 s•79 /7,0 /,0aa C4Gs,b� /,/ 6121 /7•G z 0,990 plc!/y /,z 6189 /X,7 o D-93D 4.7?, /9 /,3 7 4U0•s9 0,7F0 3G3,3z 8-41 /51,V p,6go 016.74 /G 9,/8 20,41 0,500 2(1d•BS /,7 0.4Ga 2,0 0.2so Z,z 2.-1 0,/y7 2•(l 0,167 Z,g 0,071 3.o O,oss �z D•vgv 24 318 9-0 0,0// 4,.- 0•o0s s,o 0,006 -231- I.E.P., Inc. PROJECT:SALEM FOREST" III 100YR ----------------- SUBCATCHMENT DATA SURCAT # 1 AREA= 12.53 ACRES CN= 60.7 TC= 21. MIN PEAK F=LOW== 27.6 CFS RAINFALL= 6.5 INC:HES VOL== 2.21 AC.FT. SUBCAT .p AREA= 4.71 ACRES CN= 64.1. TC= 16 MIN PEAK FLOW- 1.2.7 CFS RAINFALL= 6.5 INCHES VOL- .94 AC.FT. SUHCAT # 5 AREA== 2.79 ACRES CN= 67.1 TC= 1.1 MIN PEAK FLOW== 9.7 CFS RAINFALL== 6.5 INCHES VOL= .61 AC.FT,. SUPCAT # 2 AREA= 12.53 ACRES CN= 65.5 TC= iS MIN PEAK FLOW= 35.7 CFS RAINFALL 6.5 INCHES VOL._ 2.65 AC.FT. SUHCAT # 4 AREA= .224 ACHES CN= 53 TC= 6 MIN PEAK FLOW .6 CFS RAINFALL= 6.5 INCHES VOL.= .01 AC.FT. ROUTINE; DATA ------------ MEMORY DATA PONDING DATA -24- I.E.F., Inc. PROJECT:SALEH FOREST III I('OVR HYDROORPFH FOR SUOCATCHMENI k 1 ENi//2E f/%E- EXIPYA16 CUBIC FEET PER SECOND k xxxxxxkk xxx xkxxxxxwN HOUR 10.0 * 0.5 10.1 * 0.5 10.2 * 0.6 10.3 x 0.6 10.4 * 0.7 10.5 * 0.7 10.6 * 0.7 10.7 * U.e 10.0 x 0.0 L).9 N* 0.9 11.0 N* 0.9 11.1 Nx 1.0 11.2 *x 1.0 11.3 vxk 1.7 11.4 xxx 1.5 11.5 *xN* 1.9 11.6 xxxx.. 2.8 11.7 kxxxk%%kk kxkk 5.5 11.8 kxxx NN xxxNNkx wx kNNxxxxx vx kxxx 12.4 11.9 kkNkNkkkk XkXkXxx x%NCxk xkXxNMxx Xkkxkkkkw kk kxwX Y.xMXk%%xw 22.8 12.0 kMM%XkrxX kx%xk%kxkkXM xN kxxxXkxxxkk%xkxM%k%Mxx%Mx%kN kkkkkxXx xxkk wxk 27.6 12.1 kXXXxXNNM xk kxM kN kNXYMxXYkrNkkxMNkXXMxXkx xx wxM kMkkX krkX NXxM%x 25.2 12.2 NXN kkM kxxxkkkkx NNNMxk kx kM xXxX%kxkx kkNNNkxxkk IH.7 12.7, xXNxxxxxXkkkk kY kkxN%XN kkkxX kkwk 13.2 12.4 xk***xxxrvXwxux k**Y xxxx 9.8 12.5 kXkkkMMNkk kxN Nk wkx 7.7 12.6 xxNkx%N kx kk xxxx 6.3 12.7 XkM kxx%NNxxk 5.2 12.8 NxNxx.k xxx 4.3 12.9 xxX%x%Xkx 1.8 13.0 *xx***** 3.4 1311 ******k 3.2 13.2 kkxx k* 2.9 13.3 kkxx*. 2.7 13.4 xN*** 2.5 13.g *.*** 2.4 13.6 xxkkk2.2 13.7 k*k*x 2.1 13.B k*** 2.0 13.9 x.x* 1.9 14.0 kk** 1.9 14.1 *N*x 1.8 14.2 *xx. 1.7 14.3 %xxx 1.7 14.4 xNx 1.6 14.5 xkN 1.6 14.6 **k 1.5 14.7 *xk 1.5 14.8 xxx 1.4 14.9 kxX 1.4 15.0 xx* 1.4 15.1 xx* 1.7 15.2 *x* 1.3 15.3 kkx 1.3 15.4 x* 1.2 15.5 ** 1.2 15.6 ** 1.2 15.7 *k 1.1 15.8 xN 1.1 15.9 *k 1.1 16.0 *x 1.1 16.1 wk 1.1 16.2 N* 1.1 16.3 X* 1.0 16.4 k* 1.0 16.5 N* 1.0 16.6 *x 1.0 16.7 w* 1 0 16.0 xx 1.0 x I O 17. U x* 1, x* f.0 17.2 kN 0.9 17.3 wk 0.9 17.4 Nx 0.9 17. f, xx n.9 17.6 wN 0.1 17.7 *k 1i,9 17.6 kx 0.9 17.9 * 0.8 1 B.0 x 0.8 18.1 k ,.0 10.2 Y 0.0 IS." * J.0 -25- I8.4 * O.S S.E.F., Inc. FROJECT:SRLEM FOREST III 10OYR HYDROGRAPH FOR 5UBCAICHMEMT N 2 1-/171ef lr/TF CUBIC FFET FER SECOND kx xk kxkXXkkkk%kkxxk%x HOUR 10.0 x 0.6 10.1 w 0.7 10.2 x 0.7 10.3 N 0.0 10.4 k II,B 10.5 x 0.9 10.6 x 0.9 10.7 X I 0 I C..S x I 10.9 kx 1.1 I I.0 kx 1.1 11.1 xk 1.2 11.2 %x 1.3 11.3 kk 1.6 11.4 kkk 2.0 11.5 wxXx 2.3 11.6 kkkkx xx 3.0 11.% xkNxMww Xw%%k kw 7.6 I1.A %kwk xx k%xxkXw ww%Xk kkkx kx kkxkkx%w 17.6 f 11.9 Xkwwkxkx kkXwkk%%xkwwXXkkkx xwkwXkkxkw wx xkkkk kkwx wX wxkk kxkww 31.8 12.0 XNk kXY%xkkXNkx kM%YM XN xYk XXX xNNNk%MxkX kwxNNkkkMxXxNX kXxk wk xXx%xkXkk 35.7 12.1 xkkXwwkkkkk xw xw%kkxMww%kkwkk%xkM kkNkkw kkkNxkkxwwww k%k 29.11 12.2 YXkX xkX xwkkkkkkkwXxNkkk xXXwxwk kk%kx xX 20.2 12.3 kkxw wN kx N%kkxxkxkk YkwYxYx 13.6 12,4 xXkk%N kNXxXx%NY Nkk 111, 11 12.5 XXYx%%k%YXx xkk 13.0 12.6 NNXk XXxXx kkk 6.7 12.7 kXY%%k kkww Ma4.7 NkYX XMXk •J 12.9 xxYkXkk 4.2 13.(, %kx Nxkk 3.8 13.1 kkxwxx3.5_ 13.2_- 13.3 13.4 XkN kk 7.9 13.5 xxx kx 2.8 13.6 Xx%% 2.6 13.7 xxNw 2.4 13.8 kwwx 2.3 13.9 kkkk 2.3 14.0 kNkx 2.2 14.1 kwkx 14.2 wxk 2..1� 14.3 kX% 2.1 14.4 xxk 7.0 14.5 xwx 1.6 14.6 xxx 1.0 14.7 xxk 1.7 14.H xxk 1.7 14.9 wx 1.6 15.C, kk 1.6 15.1 wx 1.6 15.2 kx 1.6 15.$ xk 1.5 15.4 xX 1.5 15.5 kt 1.4 15.6 kx 1.4 15.7 Mk 1.4 15.8 xk 1.4 15.9 xk 1.3 16.0 ww 1.3 16.1 xw 1.3 16.2 kx 1.3 16.3 xw 1.2 16.4 xx 1.2 16.5 kx 1.2 16.6 wX 1.2 16.7 kk 1.2 16.8 kk 1.2 16.9 Xk 1.2 7.0 k% 17.1 ww 1.1 17.2 xx 1.1 17.3 kx L. i 17.4 xx 1.1 17'.5 Nk I.i 17.6 kw 111 17.7 kx 1.1 17.8 kk 1.1 17.9 k 1.0 I B.0 x 1.0 IB.1 x 1.0 10.3 x I.0 _26_ I H.4 x 1.0 PkOJ ECT:5HLEM FOREST I11 tOVf2 HYDROGRHF'H FOR SUBCHTCHMENT 0 1 r V 7/RE d/ 7E - r,,k 7//V 6 ------------------------------- CUBIC FEET PER SECOND N kx wwkkxk kkN xxXNM*kwk HOUR I0.0 * 0.2 10.1 * 0.2 10.2 x 0.3 10.3 * 0.3 10.4 w 0.3 10.5 k 0.3 10.6 k 0.7 10.7 xk 0.4 10.El ** 0.4 10.9 ** 0.4 11.0 x* 0.4 11.1 ** 0.5 11.7 w* J.5 t1.3 XXX 0.6 11.4 *** 0.7 11.5 XkYN 0.9 11.6 *NN*xk 1.3 11.7 *xxkwwkkN**xx 2.6 I I.H xk*%k kXxNw kXY *xNXX Wx x**xx WMx*N $.[i 11.9 xxNNxw*w*Xxx*wkM%xx Xwkkk %xYwX kw kkN *xwwNxwkk; xxNww W*kxXx 10.6 12.11 NX wY wXXkN xxwX%XxXxNwWNM wNNxXkkxNxXxxXwMXN NN xY Yxxk xNMxNx%MX X%kYX kxY 12.7 12,1 xwww Mk*W*xN%XkkXXXM x%N XNx X%%N %xXxw X%xkkk xN NWww wk kN *MX kNkNkN 11.5 12.2 kxX*XxXxkWk XXNN%YYN Y.X kx%*xxYXXkW**YNNNxWkWXW G.5 12.7, kkxk Xx XMXkXN MAXX NxXNX NM %M NY *Xkx 6.0 12.4 XXN MX XY XM NXYXNMYXMXkXX 4.4 12.5 kNXXWM xMNNkNXXxMYX ,� 12.6 NXxxx WXxxNXXx%k 2.9� 12.7 xNX kxXY xx xk% 2.4 12.0 XXXNXNNX XN 2.0 12.9 XkN NkXYk 1.7 13.0 kkrN*x** 1.6 j 1. ( ***Yx** 1.5 13.2 %*N*** I.3 13.3 kN**** 1.2 17.4 kx*Xxk 1.2 13.5 N***x 1.1 13.6 -KKK* L 0 13.7 ***** i.0 13.9 XYXX 0.9 13.9 *Y** 0.9 14.0 k*** 0.9 14.1 ***x 0.8 14.2 NxwW Cl.6 14.3 k*** 0.0 14.4 W*X 0.7 14.5 *** 0.7 14.6 *Nw 0.7 14.7 k** 0.7 14.8 *w* 0.7 14.9 **w 0.6 I5.i, **x 0.6 15.1 *k* 0.6 15.2 **x 0.6 15.3 N*X 0.6 15.4 **k 0.6 15.5 *x 0.5 15.6 *X 0.5 15.7 %X 0.5 15.8 Xk 0.5 1 15.9 *X 0.5 j6.0 *x 0.5 16.1 ** 0.5 16.2 ww 0.5 16.3 k* 0.5 16.4 *X 0.5 16.5 ** 0.�, 16.6 X* 0.5 16.7 wx 0.5 16.8 x* 0.4 16.9 X* O.4 ** 4 17.2 ** 0.4 17.3 x* 0.4 17.4 ** 0.4 17.5 ww 0.4 17.6 xW 0.4 17.7 ** 0.4 17.6 ** 0.4 17.9 ww 0.4 _27_ 18.(1 wk 0.4 18.1 ** 0.4 18.2 NW 0.4 IB.3 kw 0.4 111.4 rx 0.4 18.5 kk 0.4 I.E.F., Inc. PROOECT:SPLEM FOREST III IOYR HYDROBRAPH FOR SOBCRTCHMENT It 2 FN?/,eC .rlrr- ?os -dEi/Fiella4i Nr CLINIC FEET TER SECOND X kwkNkkkkkXkXXMXXx kXk HOAR 10.0 N 0.3 10.1 k 0.3 10.2 N 0.3 10.3 + 0.4 10.4 w 0.4 10.5 w 0.4 111.6 k 11.5 10.7 X 0.5 /0.8 k 0.5 10.9 X 0.5 I1.0 YN 0.6 11.1 kk 0.6 11.2 wx 11.6 11.3 wwk 0.8 11.4 rNN 1.0 11.5 kNxX 1.1 11.6 XkXkNX 1.0 11.7 Xx xw NNw x-X kkNkk 3.7 11.8 iFXN kx kwwwwwkwkkxk kkkxxXN kkkkXwww 8.5 11.9 XX4N Y.x xXkkxXM kN XkkkNk kMNkk kXX XXXMYXXM MN kNwkkXwXkN NX kkN Yk%X 15.4 12.0 kkX wXxkXxkkkXk kMX kk kwkM NkXXkkNXxx XxN XNkxwxw MN kkN kk kN N'-kkkkM kXNkxkxN 17.4 12.1 XkXXXXNX kNNk XXNxk NXXXXxxkk Y.NX XX XXkXwkkkX%XkXXXxNkkX%XX 14.3 12.2 NwxkkkMkNx kkXkNNXXM kMxXwkkkXkXkXXXkxN TO..) 12.3 XX kN%Mkkkw YkX%NXXx kNN Xk kk 6.3 12.4 xN XMkXXx NkXMXXwMNX S.0 12.5 MxXYN NX Y.N kM MkXY 4.11 12.6 wMN NM xN kXMkk 3.4 12.7 Y.X kXMX CxXk 2.8 12.0 XYN YxNNN 12.9 kkM YNXN 2.1' 171.0 xXMkNMx 1.9 13.1 kXNNXk 1.8 13.2 kxr Nkk 1.6 17.3 XMxkkw 1.6 13.4 xwxxx 1.4 13.5 kkX%♦ 1.4 13.6 wxXw 1.3 13.7 XXkN 1.2 ' 1 �•.B wkkk 1.1 13.9 kXNk 1.1 14.0 Xkkk 1.1 14.1 wwwk 1.1 14.2 kXk 1.0 14.3 XXX 1.0 14.4 Nxx 1.0 14.5 XXk 0.9 14.6 wwX 0.9 14.7 rXx 0,9 14.8 XXx 0.8 14.9 Xkw 0.0 15.0 wNk 0.8 15.1 kwX 0.8 15.2 wXk 0.8 15.3 xX 0.7 15.4 wx 0.7 15.5 XX 0.7 15.6 XN 0.7 M.7 Xx 0.7 15.8 k% 0.7 15.9Nw 0.6 16.0 NX 0.6 16.1 kw 0.6 16.2 kx 0.6 16.3 XX 0.6 16.4 xX 0.6 16.5 Yx 0.6 16.6 xN 0.6 , 16.7 xX 0.6 16.6 xk 0.6 16.9 wk 0.6 .0 Nw 17.1 XX 0.6 17.2 Nx 0.6 17.3 0.6 17.4 kN 0.6 17.5 k 0.5 17.6 w 0.5 17.7 X 0.5 17.8 N 0.5 17.9 X 0.5 18.0 I8.1 IB. k 0.5 18.3 r 0.3 -2$- 18.4 x 0.5 18.5 X 0.5 Subject iC?� 6 Maple Street Northborough, MA 01532 393-8558 Jet) ND. Sheet_ of By Date Ckd. Bev. %�UYyOFF //�/C,PCf�f'F CDA/CL UJ'/0/t/ 80J74N B,P44/� A r e✓ 04-O Rd/IL4) ,rriJ7/N6 4�ploe) = #Gj r, CC 17DS/lrr so.?7,P,W r F, IsrIA)6 JITF 4)1,10P 1704 �-v 4G4•� ��s l,Z c{J AD.1) RO fr IFS JirE Q/V6 /7aa ti f q6G• 0 Cc�J IONT dl�✓• Q4J701V ,F,t'o0/i,� o IJO b1,1(/NR/2Gr/NI1"1IJ'F — 0, 2 cvJr POJT-Ofy�G���FNT f//hiLfi2L /� /D YR 41SO14 edt /tie e4'l9.tc = 0,4 -0,4 = 0,2 CV.r —29—