Loading...
HomeMy WebLinkAbout2022-04-26 Recorded Decision WSP ­7 4- 11-;E3V » -1 s�,1. 1- 2 0ORTF1 Town of North Andover 0 :�;��� ��.� ;��" ��. , ;� �;}�,�-��;F ' � Cif ice of the Planning Department 120 Main Street ATE North Andover,Massachusetts 01845 'SAC U IER NOTICE OF DECISION �f A tit)0 V f # -` Watershed Special Permit This is certify that twenty(20)days Any appeal shall be filed have elapsed from date of deGision without filing oyfanlaRpp within (20) days after the Date tb� date of filing this notice in Carla DawAe Wbrien the office of the Town Clerk. Town Clerk Date: April 26,2022 Date of Hearings: April 26, 2022 Date of Decision: April 26, 2022 Petition of: Paul&Heather Takesian,198 Dale Street,North Andover,Massachusetts,01845 Premises Affected: 198 Dale Street,North Andover,Massachusetts,01845 Assessor's Map 37B Lot 4 and located in the Residential I Zoning District, Referring to the above petition for a Watershed Special Permit from the requirements of the North Andover Zoning Bylaw,Chapter 195 Article 4,Part 5 Watershed Protection District and Article 10 Section 195-1.0.7, ,,- [K-a So as to allow a driveway expansion and construction of a two-story garage (24' x 40') with story ge o ' second level, and associated grading in the Non-Discharge Zone of the Watershed Protection property is located in the Residential I zoning district. After a pablic hearing given on the above date, and upon a motion by J. Simons and 2111 by A. Koenlg APPROVE the Watershed Special Permit, as amended, and based upon the following condifit.-ms, �)cte, was in favor of the application. 6 ) 0- -Tean Eruight On Behalf/of the North Andover Plane'ng Beard Eltan Goldberg John Simons Pete.-Boynton Kelly Cormier Alissa Koenig ATU S f A True.Copy T0111 L ) , p '198 Dale Street Watershed Special Permit--Construct garage Aril 26,2022 The public hearing on the above referenced application was opened on April 26, 2022 and closed by the North Andover Planning Board on April 26,2022 On April 26, 2022, upon a motion made by J. Simons and seconded by A. Koenig to GRANT a Watershed Special Permit for a driveway expansion and construction of a two-story garage (24' x 40') with storage on the second level, and associated grading in the Non-Discharge zone of the watershed Protection District. The property is located in the Residential 1 zoning district. This Special Permit was requested by Paul and Heather Takesian, 198 Dale Street, North Andover, MA 01845 on March 9, 2022. The.Applicant submitted a complete application, which was noticed and reviewed in accordance Town of North Andover zoning Bylaw and MOL Chapter 40A, Section 9. The motion to approve was subject to the FINDINGS OF FACTS and SPECIAL CONDITIONS set forth in this decision. The Planning Board vote was 5--0, unanimous,in favor. A special permit issued by the special permit granting authority requires a vote of at least four members of a five-member board. The Applicant is hereby notified that should the Applicant disagree with this decision, the Applicant has the right,under MOL Chapter 40A, Section 17,to appeal to this decision within twenty days after the date this decision has been filed with the Town Clerk. The Planning Board makes the finding that the intent of the Bylaw, as well as its specific criteria are met. This decision specifically stated by the Planning Board makes the following FINDL`*;GS OF FACT: 1) That as a result of the proposed construction in conjunction with other uses nearby,there will not be any significant degradation of the quality or quantity of water in or entering Lake Cochichewick. The Planning Board bases this finding on the following facts: a) The Project is located within an extremely environmental sensitive area and in close proximity to a wetland resource area that drains to Lake Cochichewick. The final design reflects discussions between the Town and Applicant to ensure the continued protection of Lake Cochichewick and the safety and welfare of the residents of North Andover. b) The construction has been reviewed by Town Staff and the Town's stormwater management consulting engineer, Horsley Witten, and with the application of the erosion control measures and modifications to the drainage and stormwater management designs, the consultant concluded that there will not be significant degradation to the quality or quantity of water in or entering Lake Cochichewick. The Site drainage system and stormwater management design are designed in accordance with the Town Bylaw requirements and Best Engineering and Management Practices. The plan has been reviewed by the outside consulting engineer, Janet Carter Bernardo, P.L., as evidenced by letters dated March 24, 2022 and April 8, 2022 and response correspondence from Ranger Engineering Croup, LLC dated April 7, 2022. Further, adequate safeguards have been provided to mitigate pollutants from. entering Lake Cochichewick through the installation/implementation of the following Best Management Practices relative to an addition to a single-family dwelling: i) Stormwater management for the proposed improvements includes a subsurface infiltration system consisting of concrete galleys and crushed stone. A total. of 660 square feet of additional impervious area is proposed on site. ii) Best Management Practices(BNT)will be followed with regard to maintenance of the drainage systems and structures,including drain pipes, as stated in the document titled "Long-Term Pollution Prevention Plan, 198 Dales Street,North Andover,MA 01845". 2 Y 198 hale Street 8 Watershed Special Permit--Construct garage Aril 26,2022 provided by Ranger Engineering Group,LLC. These BMPs include maintenance of the pavement sweeping, catch basin sumps and drain manholes, drain pipes,buried detention structures,graded slopes and rip rap outlets. The"Long--Term Pollution Prevention Plan, 198 Dales Street,North Andover,MA.01845"document with the approved Site Plan referenced herein will be considered part of this Notice of Decision. iii) Fertilizers are limited to those which are either organic or slow-release nitrogen and phosphorous-free. This restriction will be noted on the deed. c) The existing structure is connected to the Town sewer and water systems. d) The application was reviewed by Town staff as evidenced by email communications from Amy Maxner, Conservation Administrator, dated March 9, 2022 and April 7, 2022, email communication from Lt. Dan Lanen,NAPD, dated March 10, 2022, email communication from Tim Willett, DPW Operations,dated March 10,2022,and Lt.Bob Kilcoyne,NAPD,dated March 9,2022. e) Erosion control, consisting of a silt fence with wood stakes and 6"x 6"trench with backfill in place, will be installed prior to construction and will remain in place throughout construction. The location of these controls is noted on the Plan. 2) There is no reasonable alternative location outside the General, Non-Disturbance, and the Non- Discharge.Zones for any discharge, structure or activity as the entire parcel is located the Non-Discharge .Zone. In accordance with Section 195-10.7 of the North Andover Zoning Bylaw, the Planning Board makes the following FINDINGS OF FACT: 3) The specific Site is an appropriate location for the proposed use as all feasible stormwater and erosion controls have been placed on the Site; 4) The use will not adversely affect the neighborhood as the lot is located in a Residential 1 Zoning District; S) There will be no nuisance or serious hazard to vehicles or pedestrians; 6) Adequate and appropriate facilities are provided for the proper operation of the proposed use; 7) The Planning Board also makes a specific finding that the use is in harmony with the general purpose and intent of the North Andover Zoning Bylaw. 8) The Applicant has communicated that there is potential for replacement of the fence surrounding the existing pool and that the poles will be hand-dug. It is understood that this work is not part being considered during this project. Approvals by other Town Boards/Commissions may be required. Upon reaching the above findings,the Planning Board approves this Special Permit based upon the following SPECT_4,T1 CONDITIONS: 9)Permit Definitions: a) The"Locus" or"Site"refers to the 41,000 SF parcel of land with frontage on Dale Street as shown on Assessors Map 37B,Parcel 4,and also known as 198 Dale Street,North Andover, Massachusetts. 3 C L Y L 198 Dale Street Watershed Special Pennit--Construct garage Aril 26,2022 b) The"Plans"refer to the Plans prepared by hanger Engineering Group,LLC, dated March 9, 2022 and revised to April 7, 2022, entitled"Site Plan 198 Dale Street North Andover,Massachusetts", prepared for Paul and Heather Takesian. Sheets 1 of 1. c) The"Project" or"l98 Dale Street"refers to a driveway expansion and the construction of a two- story garage (24' x 40')with storage on the second level, and associated grading in the Non-Discharge Zone of the watershed Protection District. The property is located in the Residential X zoning district. d) The"Applicant"refers to Paul and Heather Takesian,the Applicant for the Special Permit. e). The"Project Owner"refers to the person or entity holding the fee interest to the title to the Locus from time to time,which can include but is not limited to the Applicant, developer, and owner. 10)The Project proposes removal of seven(7)white pines and one(1)oak tree along the east property line. The Plan calls for replacing the white pines with arborvitae. Seven(7) six to eight feet tall arborvitae shall be planted. 11) The Town Planner shall approve any changes made to these Plans. Any changes deemed substantial 4. by the Town Planner would require a public hearing and modification by the Planning Board. 12) In no instance shall the Applicant's proposed construction be allowed to further impact the Site than as proposed on the Plan referenced in Special Condition#8. 13)Prior to issuance of a building permit: a) A performance guarantee bond of four thousand dollars ($4,000.00) made out to the Town of North Andover must be posted to ensure that the construction, erosion control, measures, and performance of any other condition contained herein will take place in accordance with the Plans and the conditions of this decision and to ensure that the as-built plans will be submitted. b) In consultation with the Planning Director, the Applicant shall designate an independent environmental monitor. The monitor shall read, sign, and return to the Town Planner the Letter of Agreement for Independent Monitors. Upon the start of Site work the monitor shall make weekly inspections of the Project(any suspension in monitoring due to inactivity on the Site shall be pre-approved by the Planning Director), provide monthly reports to the Planning Department, and detail any areas of non-compliance and corrective actions. The monitor will also provide reports following heavy rain events. The monitor must also be available upon notice to inspect the Site accompanying a Planning Department designated official. c) Applicant shall sign an Illicit Discharge Compliance Statement. d) Applicant shall sign and date the Long Term Pollution Prevention Plan, 198 Dale Street, North Andover,MA.,01845. e) This watershed Special Permit Notice of Decision with the Long Term Prevention Plan, 198 .Dale Street, North Andover, MA, 01845 and the approved Plan shall be recorded at the North Essex Registry of Deeds. Evidence of said recording shall be provided to the Planning Department. I) All erosion control measures as shown on the Plan must be in place and reviewed by the Town. Planner. 4 198 Dale Street e Watershed Special Permit—Construct garage Aril 26,2022 g) A pre--construction meeting must be held with the developer, their construction employees,to and p Y Planning Department (and other applicable departments) to discuss scheduling of inspections to be conducted on the Project and the construction schedule. h) The .Applicant will provide copies of all Decisions, Notification and Orders of Conditions from the North Andover Conservation Commission. i) The Applicant shall incorporate the following conditions as a deed restriction and a copy of the recorded deed restriction shall be submitted to the Town.Planner and included in the file. i. Fertilizers are limited to those which are either organic or slow-release nitrogen and phosphorous-free. ii. The use of coal tar-based pavement sealants is prohibited. 14) Prior to release of the Performance Bond: a) The Applicant shall submit an as-built plan stamped by a Registered Professional Engineer in Massachusetts that shows all construction, including stormwater management systems and other pertinent Site features. This as--built plan shall be submitted to the Town Planner for approval. The Applicant must submit a certification from the design engineer that the Site was constructed as shown on the approved Plan. b) The Planning Board must by a majority vote make a fording that the Site is in conformance with the approved Plan. 15) No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 16) The Contractor shall contact Dig Safe at least 72 hours prior to commencing excavation. 17) The provisions of this conditional approval shall apply to and be binding upon the Applicant, it's employees and all successors and assigns in interest or control. 18) This Special Permit approval shall be deemed to have lapsed April 26,2024 (two years from the date of issuance) exclusive of the time required to pursue or await determination of any appeals, unless substantial use or construction has commenced within said two-year period. Substantial use or construction will be determined by a majority vote of the Planning Board. 19) This decision must be filed with the North Essex Registry of Deeds. The following information is included as part of this decision: a) Plan titled: Site Plan 198 Dale Street North Andover,Massachusetts Prepared for: Paul and Heather Takesian 198 Dale Street North Andover,MA 01845 Prepared by: Ranger Engineering Group,L.LC 13 Red Roof Lane, Suite 203 Salem,NH, 03079 Scale: 1"=2W Date: March 9,2022 and revised to April 7, 2022 Sheets: 1 5 8 198 Dale Street Watershed Special Permit--Construct garage Aril 26,2022 b] Report Title: Long Term Pollution Prevention Plan 198 Dale Street,North Andover MA 01845 Prepared for: Paul and Heather Takesia.n Prepared by: Ranger Engineering group,LLC 0 Stormwater Management Report: 198 Dale Street,Noah Andover,MA 01845 Prepared by: Ranger Engineering Group,,LLC Dated: March 9,2022,revised April 7,2022 cc: Town Departments Applicant Engineer Abutters Assessor i TP'i ❑RAI1U1GE STR!lCTLlR1= WAX) a NOTES: DEPTH HORIZON #EJCTLTRI; COLORIV#OTTtENG a4r '.: T. ALL SECTIONS SHALL flE 1W-4IrZW'WDODSTAKE 763Q- FILL VARIES-3c A ISTYIt Ili DESIGNED FOR HS-20 LOADR:G. ORAPPROVED EQUAL 30-41' 1I LS lRYR4!6 A A HTRICCCHE 2 PROVIDE'V KNOr.KOSS£SFOR SILTP�ICC 4x4 C CL: 10YR Sd tS' TI PIPES WITH r IWUL CLEARANCE XD" '"'�`�HO �0 jrx 24•SGUARE TO OUTSIDE OF PIPE.MORTAR OPENING LTYP.j ALL PIPE CONNECTIONS. 99 9.Imo'- 'r'' 1 "UrSEALANTEErWEEN Ranger En(ilnealinQ Grovp,Inc- +4.DikMfl&7 PRECAST SECTIONS SHALL BE s]R�QRnWI+r,Aa43I3 ,� a PREFORMED GifM RUBBER XF 1M # ASTEBMTETOP&LAB TitsTs.2at1att ' n;lTIN4Y ��~ 4. CATCH iiAEtN Oil MANHOLE YVOf{1S AI4J=40f75 ��~~ FRAMES SHALL BE S"IN FULL 56iI'16TTI'W �4• MORTAR BED.ADJUST TO ARIIA OTt ZYATHCLAYBRICKAND ! SEE NOTE 4 MORTAR(2 4MCK C"WS FtAY� 19 TYPTCALL:.:r BTl'•CKCOUR= CONCENTRIC MAXIMUM) STRAW !� CONE SECTIONvvADOCE III {SE 7 S,„„) WE NOW 3 GP _I 4r izk om) OUTLET V� 7gPCF III Y PR ow Jd'G�uww"E7axRLAC r GROUND #II F RISER SECTIONIM HOOD r ____ __.__ ] ] AS REQUIRED ' _ III STAPLE sEE IM Ei NNECTtGN a� p cw 'r ruZsr�A4A= sAs�s>cslare '�' �' r COMPACTED STONE M201.t 1 tl b x4pi'SLGr� 1TYp1 PLACE C0FFAWU0 ##ISTAPLE QWiGt •,• � FP ALONGTRF.HCHAMY ##I WOODSTAW V ` LcAOIP i it �ol�rfll=rA,L �q�,� rz AWr fC Rot WPRavF W f ] 4nossow CB WITH HOODZ4fACjf p $ � A4W�iBLOTa CATCH BASIN ( } s+vrTa SILT FENCE BARRISR 0 rlKLErFR0MCATCHakM 2 trrtss S'INL1:TFROM ROOF lDRAIN STEEL STRAP [[ a� FA F INV+gE�00 {TY1'3 ICTETt FABRIC To n WRAP LIMIT OF STONE .. 1 la WAP JWAV1w--� n sxo' e- z� cC 1 LIWWW-2 CAP BOTTOM (L \ , .- - INCH WASHM a �- ty,�r `- - CRUM", } kk 4 a-SCK40Pv vm ANcd11ARSTGNIE �, ,,,,,..__._.,.__� CEMENTEO.O TTS ^ 1 I IwAll 1��-_+val�.err HO XVFLOWCONTROLTFE d MKA7 t r �] r OUTLET' as I ■ j VS/ ��.� 1 I INv.9s sG 7t at t �A . ssAnars�Teesra++>c 11L `t 0-1TLE-7 sRatOFs TE-T A- IR h rAverw� _ _ � . _�a� WT.CO RM PAVEMENT � SURFACE CAPECODBERM �COTRq TREATMENT ate. 1 l L T � _ •_�_� �+i�.., - /,1 VARIES BIT:COMM PAVEAWNT MB DER COURSE) uw=LOTa �.r.. y ___ 4 ! j 1 �c' r L 1 �.�I GAUEY SY51 EM Pi ROM OF 4 GALLEY CHAMBERS � ►.—f r �= •'• III � /\ S .or.o.� r I I M*7ZAW,&ff US7 CABTIROH FRATHCAIIDSOYERSETTH �� t FULL 11TORTARB$O ARJiIvTTpOHROE >. r�Y•1 .��c� ..is;; 'i ti �+,'�0��.y� J 11SRSHIPRECAST003 TERMeRRINDOR �ti #,�a '- . + $ j ~• #1 ~�-_�_-� fOd 6TdF�:f7N1- CLAY BRICKAND MORTAR 'r (I aRICKCOLTRSI?STYPKJy ,. jr,`+t;r"�s ti-.•, yr rF?", •y { �r ` r" ''• r ' 1 _6YTAW St•IAULCA.+"TBiON INSPECTION r �` +.N ►;, i I 1 1 6 BRICKCOURSMUA1q r,y n33 xGF �4lrq.=a3 � • �� ] # .S •t .•,' x ; ��+, 1G0'/Y�AISTTJRIWV�ILY� l�lA�hsOIECG�EfttASELLI7'DH111N` '•WEkT[I].OUT1.E'f] :�•4� �'*•• 1i+v} r?b' ' '•Sad-'4'� '~. -...r] , . ` {H417P5F1LT72L'1YLSU^9?7atiYj FILTERFABRSC •S +"} r i f �'g•c r` S•. �. t ram•-- _ l CRITSHED Omm 90.6 MIN C 1 \ 1. - GRANULAR OACKRLL I PREG+w"I tiONCRaTE k \ \ R!gRAPOITTT>TPROTECTION STOP (72-ATINy OALCASrC NCR % �� i FIr9 B{V-73�Q0 LIDER COMPACTED ORAVCL �ynp�� !S 25TORY �\ t (111WMAIL STONE SIM GRAMC ■ `' `' Ff tidtt�f ; yd EITOV rTCOKTR,CLSILY S FEN=VWHSTRKWWADOLE T+:• s• COMPACTED 99 37 LF OF V HDPE SUBOPADE F °F tvQ \t TEST PIT I CAP GAD BERMd@ 1 Atl - �J Murrurwa QALLEY srcTElr 0 LTa:rIT OF DIS1TXt$AI , PAVED 2 ROWS OF 4 QALLEYS EACH ROW p � 4"x4WCALLIMBOTELEVv43-Q RLTCRFABRIC: NW_S R VYHTTE PINE TO BE RFI<dOVED 701 T3-+ +'+•�,I;'~fr`f-' tl�M1 f tT1fP.OF 7)AND REI AC£D TO WRAP CRU8I4EOSfOt1E I. GR4L1A I?1C OliAULRT►^T SURVEY i70tIZ BYRAHGEHP?AGB1EERii1[i WITH AR94RV TAE 24,?Gd1. IZ DSEO REFSRIw BKSM PO IOQ Ip^'EXNORTN ROSTRY DF OMOS A•�`F �tVti `"�� � t� ti ; ��� DAKTRET708iREf/,OVEII��-•� fiamr - 9. PLAITR NCEr E n#2= PL•2I41 r Y or 1 �Y, r�-�~-�- O plVURBAN^� (tRC4ITSO�F4 GALLEYS} � t I - txss "' 21-209 gym• y • PLrYOF CAPECOD"I � F.SSg]C Ht'^.TN REGI.r*TRYOF DEEDS ?AZ24m it i r { NO PORTION OF MRLDIN0=LOCAIM IN A,FLOMHAZOW ZONE AS s' ` Cam' 1 r HOPES FROM r FILTETt FABIW vart+4re+tC eITUMINOIIS_f DALE STREET cATmmsw ><A vvo'�T �7 EFFECTM DAOMjuLrIiI.Y'3,�m'""`4' s�'crwrro. � CONCRETE (PTA'w-HTLrTA�I I'AR��a) RIM-10 b rs A usl"w rr ado s pR%TWAY ECLR OF M" irPVC tw OUT w Gi.S S 7XTLAND DWNEATEOISYHEN hW N Q OSGOODJR AF LHAUOU4T7 j s' n 27 tG _ SI=CTiL7I4 VlEllhls r � � TRkESTC1RELWN -`f. R THlSPROYpRTr WASCTiEATEDdNPilNI�pQFSSpLGOUNTYNORI7{ I REGISM OF OECCS DATED MRUAFtY2il isw L �* r�J; 1 x! �'1 T. VYETLAND FLAG A4[REMOVED SHEET 1 OF S jff i I { a LOANG TERM POLUT ON PREVENTION PLAN 196 DALE STREET, NO H ANDOVER MA, 01845 As part of the-constrti ctio n of anew garage, pavad driveway,-and closed for ater:systern, it is the ro.sponsibility of the property owner to propefly maintain the drain2,qQ systems and Structures, including drain pf'pes. The current property owner Is Paul & Heather Takesian who W111 oversee tong term maintenance of the stormwater system rand will be respo rtsIb le ib r compliance With the Long Term Pollution Provention Plan. e utar maintenance is to include the following: Pavem4an l su maces shall be swept a minimum of twice per year, preferably just after snow molt and late 'in the fall, 2-f Catch Basin Sumps and DrWin Manholes Inspect bt-a nn ua l y for the evidence of structural damage, silt accu m ulatlon and improper function. Remove accumulated sediment and debris from catch basin sump when sump is more than %U1 andlor a nnual fy just after snow molt 3. Drain Pipes Inspect annually for the evidence of structural damage, t11 acoumulatiDn and improper function. G1ea n pipes when sediment occupies more then 20%of pipe dia rnoter. 4. Burled Deter ti o n Structures fnapect twice per year for evidence of struckiral damage, erosion, and sediment accumulation. Inspect outlet structure for groper opetion and cloggingA 5. GradW Slopes and R 1p Rap outtats fnspe t-every spring for erosr'on. Repsfr any erosion by p r ing team and seed an slopes and r1prap in outlet. Nurtured freshly seeded are. to ensure proper germination and establishment of turf, Each of the stormwater structms Usted above is shoimi one plan attached as Attachment A. Inspections shall be performed by a geared person with knowledge of stormwater&ucturos and oonve any systems A report of inspections shall be submitted to the Town of North Andover an an annual basis Vithin 30 days of the end of each caterder year. The requirement and responsibility for the Inspection and maintenance of the stormwater systa rn will oont rue to any subsequent ownerd of the property. Current Property Owner who will be response a for the ape 11 maintenance, and emergency repairs of the stormwater system. DECLARAT ION OFF RESTRICTION This Declaration of Restriction is made and entered into as of this 1 9th day of May, 2022 by Paul Takesian (hereinafter "Takesian") of 198 Dale Street, North Andover, MA 01845, the owner of a certain parcel of land located at 19 Dula Street, North Andover, MA 0 1845 with the deed referenced in Book 5401 Page . WHEREAS, Takesian has applied to the Planning Board of the Town of North Andover for a Watershed Special Permit; WHEREAS, Takesian agrees, for himself, his, successors, and assigns, that.- 1., Fertilizers are limited to those that are either organic or slow-release nitrogen and phosphorus free. , 2. The use of coal tar-based pavement sealants is prohibited. Signed as sealed instrument on the date s,eth forth above, I k(1 ark N. U