Loading...
HomeMy WebLinkAbout1995-01-17 Certification of Action Def Sub Plan Notice to APPLICANT/TOWN CIERK .and Certification of Action of Planning Board on Definitive Subdivision Plan entitled: Woodchuck Grove By; Merrimack Engineering ServicesMEN" dated July l 1 1.9 94, The North Andover Planning Board has voted to APPROVE said pl=9 subject to the following conditions: 1. That the record owners of the subject land forthwith execute and record a "covenant running with the land", or otherwise provide security for the con- struction of ways and the installation of municipal services within said sub-- division, all as provided by G.L. c. tilt S. 81—U. 2. That all such construction and installations shall in all respects conform to the governing rules and regulations of this Board. 3. Thatf as required by the North Andover Board of Health in its report to this Board, no building or other structure sha11 be built or placed upon Lots No. as shown on said Plan without the prior consent of said Board of Health. 4. other conditions: ;CD In the event that no appeal shall have been taken from said approval twenty days from this date the North Andover Pi, Board will f orth8th= thereafter endorse its formal approval upon said plan. The North Andover Planing Board has DISAPPROVED said plans for the following reasons: NORTH ANDOVER P LkM NG BOARD r January 3 i 9 9 5 Date. BY Richard Nardella, chairman ��d r f rrpl s _ ti FORM � APPLICATION FOR APPROVAL OF DEFINITI" PLAN (MOD I F I CATION) September 1 1 19 94 To the Planning Board of the Town of North Andover: The undersigned undersignedt being the applicant as defined under Chapter 41, Section 81—L, for approval of a proposed subdivision shown on a plan entitled woodchuck Grove by Merrimack Engineering Services , Inc. dated Jul if 1994 be' land bounded as follows: 21 . 17 acres on the Southerly side of Salem St reet 644 ' West of the Salem and Foster Street intersection ............... ......... and 2 4 p 0 ' East of the Salem and Summer Street intersection. hereb-v v��.t w s A d plan as a D�F'INUTI�E plan in accordance with the Mules and N Regulations of the North Andover P1 Board and makes application to the Board for approval of said plan. 4024 Page239 & � l Title Reference: Forth Essex Deeds, Book -1 Certificate of Title Noe Registration Book� page i or Other. Said plan has(X) has not( evolved from a pre plan submitted to the Board of 19 and approved (with modifications) disapproved on , 19 ,�..• The undersigned hereby applies for the approval of said DEFINITIVE plan b the Board and in furtherance thereof hereby agrees to abide by the Board's y hereby Rules and Regulations. The undersigned y further covenants and agrees with the Town of North Andover, upon. approval of said DEFINIT plan by the Board: 1. To install utilities in accordance with the rules and regulations of the planning Board, the Public Works Department, the Highway Surveyor, the Board of Health, and all general as well as zoning by--laws of said T own, as are applicable to the insta]1.ation of utilities within the limits of ways and streets; 2. To complete and construct the streets or ways and other improvements shown thereon in accordance with Sections Iv and v of the Rules and Regulations of the P 1 Board and the approved DEFINITIVE plan, profiles and cross sections of the same. Said plant profiles, cross sections and construction specifications are specifically, by reference, incorporated herein and made a part of this application. This application and the covenants and agree meats herein shall be binding upon heiars$ executors, strators, successor5q grantees of the whole or part of said land, and assigns of the undersigned; and 3. To complete a the aforesaid i.nst ations and construction within two (2) years from the date hereof. Received by Town Clark* ' ' �;'��`� ���'�•�! � Signature of Applicant Thomas Laudani Date Time 733 Turnpike Street, Suite all Signature: Address Lsorth Andover, MA 01845 Pinewood (Formerly Woodchuck Grove) Definitive Subdivision Conditional Approval The Planning Board herein modifies the Definitive Subdivision Approval granted to Walter and Isabelle Grady; Eugene P. Willis, PP Trustee, Wilmac Realty Trust on July 31, 1989 known as Pinewood (formerly Woodchuck Grove) . This modification creates seventeen (17) lots and allows the construction of sixteen (16) new homes with the seventeenth home currently in existence. This modification was requested by Summer Street Realty Trust, 733 Turnpike Street, North Andover, MA 01845, on September 1, 19940 The area affected contains approximately 22 acres in a Residential - 2 Zone off of Salem Street. A. The Definitive Plan, dated July 1, 1994 , rev. December 12 , 1994 includes all of the information indicated in Section 3 of the Rules and Regulations concerning the procedure for the submission of plans. B. The Definitive Plan adheres to all of the design standards as indicated in Section 7 of the Rules and Regulations. C. The Definitive Plan is in conformance with the purpose and intent of the Subdivision Control Law. D. The Definitive Plan complies with all of the review comments submitted by various town departments in order to comply with state law, town by-laws and insure the public health, safety, and welfare of the town. Finally, the Planning Board finds that the Definitive Subdivision complies with Town Bylaw requirements so long as the following conditions are followed: 1. Prior to endorsement of the plans by the Planning Board the applicant shall adhere to the following. a. A no-cut line that follows the grading line behind each lot must be placed on the plans. b g The grading on Lo ts s 13 and 14 must be revised so as to IJ100" raise the elevation on Lot 14 and lower the elevation on Lot 13 . All existing trails must be shown on the plan. d.. The applicant must meet with the Town Planner in order to ensure that the plans conform with the Board' s decision. A detailed construction schedule must be submitted as 1 part of the plans. 'j f. A covenant (FORM I) securing all lots within the subdivision for the construction of ways and municipal services must be submitted to the Planning Board. Said lots may be released from the covenant upon posting of security as requested in Condition 3 (e) . { g. Right of way dedication easements for the proposed roadway shall be prepared at the applicant ' s expense :a f- and provided to the Planning Office. h. The applicant must submit to the Town Planner a FORM Ni for all utilities and easements placed on the subdivision. The Board will sign the document and it ....... , must be recorded at the Essex North Registry of Deeds. i . All drainage, water, and sewage facility designs shall be reviewed and approved by the North Andover Division of Public works. Provisions for water intrusion mitigation shall be included in the design. All drainage structures must be revised in accordance with the comments rendered by Marchionda & Associates on December 19 , 1994 as reviewed by the Division of Public Works. All application fees must be paid in full and verified .. by the Town Planner including the fees for the outside consultant. f^J A detailed street tree planting list shall be prepared listing specific material to be used. This list shall indicate quantity and size of all proposed material . 1: The Special Permit and Subdivision Decision for this project must appear on the mylars. err The plan must be endorsed by the Planning Board within ninety (9 0) days of the filing of the decision with the Town Clerk ' s office or this approval will be automatically rescinded. All documents shall be prepared at the expense of the applicant, as required by the Planning Board Rules and Regulations Governing the Subdivision of Land. Endorsement of the plans is proof of satisfaction of the above conditions . 2 . Prior to the start of construction. a. The plans must be endorsed by the Planning Board and 2 s a ' recorded by the applicant at the Essex North Registry of Deeds. Two copies of the recorded plan must be submitted to the Planning Department. b. All erosion control must be in place as outlined in the Erosion and Siltation Control Program dated October 4 , 1994 . c. Throughout the site, tree cutting shall be kept to a minimum in order to minimize erosion and preserve the natural features of , the site. Accordingly, the developer in conjunction with a registered arborist, shall submit a tree cutting and reforestation plan for the areas of substantial cutting and filling consistent with the provisions of Section 5. 8 of the North Andover Zoning bylaw to be reviewed by the Planning Board. This plan shall explicitly include specific trees to be retained. d. All catch basins shall be protected with haybales to prevent siltation into the drain lines during construction. 3. Prior to any lots being released from the statutory covenants: a. A complete set of signed plans, a copy of the Planning Board decision, and a copy of the Conservation Commission order of Condition must be on file at the Division of Public Works prior to issuance of permits for connections to utilities, The subdivision construction and installation shall in all respects conform to the rules and regulations and specifications of the Division of Public Works. b. All site erosion control measures required to protect off site properties from the effects of work on the lot proposed to be released must be in place. The Town Planning Staff shall determine whether the applicant has satisfied the requirements of this provision prior to each lot release and shall report to the Planning Board prior to a vote to release said lot. c. Prior to releasing lots the Planning Board must make a findingthat the Erosion and Siltation control Program is being adhered to and that any unforseen circumstances have been adequately addressed. The applicant must submit a lot release FORM J to the Planning Board for signature. 1 e. A Performance Security (Roadway Bond) in an amount to be determined by the Planning Board, upon the 3 s recommendation of the Department of Public works, shall be posted to ensure completion of the work in accordance with the Plans approved as part of this conditional approval . Items covered by the Bond may include, but shall not be limited to: i, as-built drawings ii . sewers and utilities iii. roadway construction and maintenance iv. lot and site erosion control v, site screening and street trees vi. drainage facilities vii. site restoration viii. final site cleanup f. All proper documents and easements required through Condition 1 shall be in place. 90 Three (3) complete copies of plans and two (2) copies of all recorded documents must be submitted to the Town Planner as proof of recording. 4 . Prior to a FORM U verification for an individual lot, the following information is required by the Planning Department: a. The Planning Board must by a majority vote make a finding that the Erosion and Siltation Control Program is being adhered to and that any unforseen circumstances have been adequately addressed. b. A plot plan for the lot in question must be submitted, which includes all of the following: i , location of the structure, ii . location of the driveways, location of the septic systems if applicable, iv. location of all water and sewer lines, V. l o c a t 'ion of wetlands and any site improvements required under a NACC order of condition, vi . any grading called for on the lot, vii . all required zoning setbacks, viii. location of any drainage, utility and other easements . C. All appropriate erosion control measures and drainage facilities for the lot shall be in place. Final determination of appropriate measures shall be made by the Planning Board or Staff. d. All catch basins shall be protected and maintained with 4 d 5 hay bales to prevent siltation into the drain lines during construction. e. The lot in question shall be staked in the field. The location of any major departures from the plan must be shown. The Town Planner shall verify this information. f. Lot numbers, visible from the roadways must be posted on all lots. 5. Prior to a Certificate of occupancy being requested for an individual lot, the following shall be required: a. The Planning Board, must by majority vote, make a finding that the Erosion and siltation control Program is being adhered to and that any unforseen circumstances have been adequately addressed. Upon making such finding, the Planning Board, by majority vote , will direct the Planning Staff to verify additional certificates of occupancy. b. The roadway must be constructed to at least binder coat of pavement to properly access the lot in question. Prior to construction of the binder coat, the applicant shall ensure that all required inspection and testing of water, sewer, and drainage facilities has been completed. The applicant must submit to the Town Planner an interim as-built, certified by a professional engineer, verifying that all utilities have been installed in accordance with the plans and profile sheet. c. All necessary permits and approvals for the lot in question shall be obtained from the North Andover Board of Health, and Conservation commission. d. Permanent house numbers must be posted on dwellings and be visible from the road. e. All slopes on the lot in question shall be stabilized, as solely determined by the Planning Board in regards to erosion, water run off, and safety. f. All lots must be raked, loamed and seeded, sodded, or mulched if the weather does not permit seeding or sodding. g. There shall be no driveways placed where stone bound monuments and/or catch basins are to be set. It shall be the developer ' s responsibility to assure the proper placement of the driveways regardless of whether individual lots are sold. The Planning Board requires 5 any driveway to be moved at the owners expense if such driveway is at a catch basin or stone bound position. h. The Planning Board reserves the right to review the site after construction is complete and require additional site screening as it deems necessary and reasonable. 6 . Prior to the final release of security retained for the site by the Town, the following shall be completed by the applicant. a. The Planning Board will , by a majority, vote to release any security retained. b. The open Space Parcel must be transferred to either the State or the Town. C. An as-built plan and profile of the site shall be submitted for review and approval . The as-built plans shall include topographic plans of all detention ponds as well as plan and profiles of Salem Street. d. The applicant shall petition Town Meeting for public acceptance of the street. Prior to submitting a warrant for such petition the applicant shall review the subdivision and all remaining work with the Town Planner and Department of Public works. The Planning Board shall hold a portion of the subdivision bond for continued maintenance and operations until such time as Town Meeting has accepted (or rejected in favor of private ownership) the roadways , It shall be the developer' s responsibility to insure that all proper easements have been recorded at the Registry of Deeds. e. The Town Planner shall ensure that all Planning, Conservation commission, Board of Health and Division of Public works requirements are satisfied and that construction was in strict compliance with all approved plans and conditions . f. Two to two and one half inch caliper (2-2 , 511) street trees are to be placed every fifty (501 ) feet along both sides of all new roadways. g. Sidewalks are to be constructed along one side of the roadway. 7 . The Town Planner will review any signs utilized for this project. The applicant must obtain a sign permit as required by Section 6 of the Bylaw. The Planning Board shall approve any entrance structures. Any lighting used 6 for the entrance signs must be removed prior to acceptance of the subdivision by the Town. 8 . The applicant shall adhere to the following requirements of the Fire Department: a. open burning is allowed by permit only after consultation with the Fire Department. b. Underground fuel storage will be allowed in conformance with the Town Bylaws and State Statute and only with the review and approval of the Fire Department and Conservation Commission. 9 . The applicant shall adhere to the following requirements of the North Andover Police Department: a. Adequate site distance must be maintained at the exit of the project onto Salem Street. b. Permanent intersection warning signs are to be poste along Salem Street, 350 feet in either direction from the entry into Pinewood. C A stop sign shall be placed at the exit to the roadway onto Salem Street. 10. There shall be no burying or dumping of construction material on site. i�x The location of any stump dumps on site must be pre-approved by the Planning Board. 1 The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. Gas Telephone, Cable, and Electric utilities shall be installed as specified by the respective utility companiese 140 f action b a Town Board Commission, or Department which Any y requires changes in the roadway alignment, placement of any easements or utilities, drainage facilities, grading or no cut lines, may be subject to mod ification by the Planning Board. 15 , Due to the severe slo Pes on this site, the following waivers rhave been granted by the Planning Board: Section 7 A 1 h Centerline radii greater than 150 feet (Centerline radii of 100 feet approved) , Section 7 A 4 a Dead end street in excess of 600 feet 7 (length of road to top loop is 1, 042 . 51 feet) These waivers have been granted in an effort to minimize the amount of cutting and filling required on the slope of the hill thereby decreasing the amount of erosion and siltation on site. 16. This Definitive Subdivision approval is based upon a Special Permit granted in accordance with Section 4 . 125, 10. 3 and 10. 31 of the North Andover Zoning Bylaw. The Special Permit and Definitive Subdivision approvals are both based upon the following information: 1. Erosion and Siltation Control Program Pinewood Subdivision, North Andover, Massachusetts 01845 October 4 , 1994 Prepared for: Summer Street Realty Trust P.D. Box 6700 North Andover, Massachusetts 01845 Prepared by: Wetlands Preservation Inc. 569 North Street Georgetown, Massachusetts 01833 2 . Drainage Analysis for Pinewood Subdivision on Salem Street North Andover, Massachusetts Dated: July 24 , 1994 and December 12 , 1994 Prepared for: Summer Street Realty Trust 733 Turnpike Street, Suite 209 North Andover, Massachusetts 01845 Prepared by: Merrimack Engineering Services, Inc. 66 Park Street Andover, Massachusetts 0181.0 3 . Plans: Modification to the Definitive and Special Permit Plan Woodchuck Grove in North Andover, Mass. Drawn by: Summer Street Realty trust 733 Turnpike Street - Suite 209 North Andover, MA 01.845 Prepared by: Merrimack Engineering Services, Inc. 66 Park Street Andover, Massachusetts 01810 Scale: as noted Dated: July 1, 1994 ; rev. December 12 , 1994 Sheets: 1 through 8 CC. Conservation Administrator Director of Public Works Health Administrator Building Inspector 8