Loading...
HomeMy WebLinkAbout2009-01-21 Conservation Commission Minutes Conservation Commission Meeting Minutes January 21, 2009 Members Present: John J Mabon, Chairman, Sean F McDonough, Vice Chairman, Joseph W Lynch, Jr , Deborah A Feltovic, Albert P Manzi, Jr , Scott L Masse, Louis A Napoli Staff Members Present: Jennifer A Hughes, Conservation Administrator, Donna M Wedge, Conservation Secretary Sean F. McDonough arrived at the meeting at: 7:15 P.M. Albert P. Manzi,Jr., arrived at the meeting at: 8:20 P. M. Pledge of Allegiance Meeting came to Order at: 7:10 P. M. Quorum Present. A motion to approve the minutes as revised 9/10/08, 9/24/08, 10/8/08; 11/5/08 was made by Ms. Feltovic, seconded by Mr. Masse. Unanimous. General Business NACC#27, COC Request 80 Holly Ridge Road (Marroni)(Hayes Engineering, Inc. (cont. from 12/17/08)(Reguest to cont. to 2/11/09) No one was present A motion to continue to February 11, 2009 meeting was made by Ms Feltovic, seconded by Mr Napoli Unanimous 242-1261,Extension Request, Cotuit & Leyden Street (Burke)(New England Engineering Services, Inc.) The applicant Mr John Burke was present Ms Hughes discussed the stormwater management plan the applicant needs to send in information about the maintenance of the dention pond on the site Mr Lynch discussed this project has come out great because of the soft market on selling houses has caused a problem for this phased projects maybe the Conservation Commission would consider doing an Enforcement Order to allow work to continue because the project is 80% done A motion to issue a one-year extension to 1/12/10 hold till stormwater management plan submitted was made by Mr Lynch, seconded by Ms Feltovic Unanimous 242-1052, COC Request, 492 Sutton Street (Gianquitto)(Christiansen & Sergi,Inc.)(cont. from 12/17/08) Tony Capachietti of Christiansen & Sergi, Inc was present Mr Napoli left the room conflict of interest Mr Capachietti discussed there had been 6 days of lapse in time from 1 St enforcement order to insurance of the seconded enforcement order Ms Hughes discussed the project has been completed and site looks good the applicant was very proactive to correct the errors that was done wrong Mr McDonough discussed the fine of 300 00 a day from then on October 8, 2008 the Conservation Commission did not have a quorum for the meeting to vote and stop the fines Mr McDonough discussed the amount of the fine is 2,100 or 1,8009 Ms Hughes discussed the 1 u amount of the fine $1,800 Mr McDonough discussed the fine amount the Conservation Commission would accept is an amount of$1,500 A motion to issue the COC and release the bond contingent the fine in the amount of$1,500 is paid before releasing any thing to the applicant was made by Mr McDonough, seconded by Ms Feltovic Unanimous Mr. Napoli returned to the meeting. 242- 1440, COC Request, 1430 Great Pond Road (Muldoon)(Merrimack Engineering Services, Inc.) No one was present Ms Hughes discussed the applicant found out the Planning Department and the Health Department denied his building permit because the applicant is in the watershed protection district and the health department required the applicant to tie into sewer Ms Hughes discussed another problem with were the wetland markers are placed right on the lawn area the applicant requested the move them onto trees The Conservation Commission was fine with reinstalling the wetland makers on the trees A motion to issue the COC and release the bond was made by Mr McDonough, seconded by Ms Feltovic Unanimous Small Project NACC#48 & 242-1412, 24 Crossbow Lane (Manning)(AHO Surveying) No one was present Ms Hughes discussed the applicant request at a last meeting to cut down four trees but was denied by the Conservation Commission because they were within the 25-foot No-Disturbance zone Mr McDonough discussed about no stumping of the trees at all A motion to accept this as small project was made by Mr McDonough, seconded by Ms Feltovic Unanimous Mr Mabon discusses the Conservation Commission needs to reconsider the vote to require no stumping of the trees A motion to reconsider the previous vote was made by Mr McDonough, seconded by Ms Feltovic Unanimous Conservation Commission had a discussion about stumping of the trees the applicant would not be able to stump trees within the ground to stabilize the site A motion to accept this, as a small project J and no stumping of the trees must leave roots in the ground was made by Mr McDonough, seconded by Ms Feltovic Unanimous Enforcement Order (s) 242-1052, Discussion, 492 Sutton Street (Gianquitto)(Christiansen & Sergi,Inc.)(cont. from 12/17/08) Tony Capachietti of Christiansen & Sergi, Inc was present Mr Napoli left the room conflict of interest Ms Hughes discussed the applicant has requested a waiver of the fines incurred when original enforcement order lapsed and a new one was in place Mr Lynch discussed the site has been completed and stabilize brought back to original filing that was approved by Conservation Commission Mr Capachietti discussed there was a modification issued for the site A motion to require the fine of$1,500 has to be paid was made by Mr McDonough, seconded Mr Lynch Unanimous Mr. Napoli returned to the meeting. 2 Recess 1 minute Public Hearings: 8:01 P. M. Notice of Intent(s) 242-1448, 506 Boston Street (Murphy)(The Neve-Morin Group, Inc.) Greg Hochmuth of The Neve-Morin Group, Inc was present Mr Masse read the legal notice Mr Napoli discussed showing the soil stockpiling area on the plan Mr Hochmuth discussed there would be installation of riprap by the driveway, wetland markers on the side of driveway A motion to continue to February 11, 2009 meeting for revised plans was made by Mr Lynch, seconded by Mr Masse Unanimous 242-1446, 575 Winter Street (Lind)(Hancock Associates)(cont. from 12/17/08) The applicant Donna Lind and Thomas J Keough Jr , of Hancock Associates were present The Conservation Commission discussed the size of the deck needs to be cut down in size to make this approval thru Conservation Commission The Conservation Commission discussed the applicant should install a picket fence The Conservation Commission discussed there is not a P E stamp on the plans needs to be stamped by P E A motion to continue to February 11, 2009 meeting was made by Mr Manzi, seconded by Ms Feltovic Unanimous 242-1445, 674 Turnpike Street (Londi)(Mistry Associates,Inc.)(cont. from 12/17/08)(Reguest to cont. to 2/11/09) No one was present A motion to continue to February 11, 2009 meeting was made by Ms Feltovic, seconded by Mr Lynch Unanimous 242-1447, 2357 Turnpike Street (Valley Realty Development,LLC)(Merrimack Engineering Services, Inc.)(cont. from 12/17/08) The applicant Anthony Mesiti of Mesiti Development Corporation and James Buchannan of Mesiti Development Corporation were present Mr Masse discussed this filing is under the jurisdiction of Zoning Board of Appeals the applicant would have to check with Zoning department to see if the smaller units would trigger refilling with the Zoning Board of Appeals Mr Buchannan discussed about the Enforcement Order would be for testing of the fire hydrants location of the water lines, heating blankets on the existing foundations putting in some footing within the next 3 weeks also West Environmental has been hired to be Environmental Monitor on the site A motion to issue a Enforcement Order to allow work to continue on the site till Order of Conditions would be issued was made by Mr Masse, seconded by Ms Feltovic Unanimous A motion to continue to February 11, 2009 meeting was made by Mr Masse, seconded by Ms Feltovic Unanimous A motion to adjourn the meeting at: 9:30 P. M. was made by Mr. Masse, seconded by Mr. Manzi. Unanimous. 3