Loading...
HomeMy WebLinkAbout2009-04-22 Conservation Commission Minutes Conservation Commission Meeting Minutes April 22,2009 Members Present: John J Mabon, Chairman, Sean F McDonough, Vice Chairman, Deborah A Feltovic, Albert P Manzi, Jr , Louis A Napoli Members Absent: Joseph W Lynch, Jr , Scott L Masse Staff Member Present: Donna M Wedge, Conservation Secretary Staff Member Absent: Jennifer A Hughes, Conservation Administrator Pledge of Allegiance Meeting came to Order at: 7:06 P. M. Quorum Present. General Business 242-634, PCOC Request, 43 Oxbow Circle (Broadhurst)(New England Engineering, Services, Inc.)(cont. from 4/8/09)(Reguest to cont. to 5/6/09) No one was present A motion to continue to May 6, 2009 meeting was made by Mr McDonough, seconded by Mr Napoli Unanimous Enforcement Order(s) 242-1279, 189 Willow Street(Lot 4)(Chatteriee) No one was present Mr Mabon discussed the last item on the Enforcement Order, the monitoring report was completed on April 10, 2009 All the items on the Enforcement Order including the removal of soil piles and stabilization was complete on 4/7/09 A motion to fine the applicant$3,900 for not being in compliance with the Order of Conditions with condition#35 & #61 was made by Mr McDonough, seconded by Mr Manzi Unanimous A motion to issue a second Enforcement Order to require as-built plan for condition#35, for 609 s f of replication area shall be planted in accordance with the Wetland Replication Plan as proposed, condition #61, the erosion control monitor shall be on site at all times during the wetland crossing for construction of the access drive and installation of the box culvert an as-built plan done by a P E was made by Mr McDonough, seconded by Mr Manzi Unanimous A motion to continue to May 6, 2009 meeting was made by Mr McDonough, seconded by Mr Manzi Unanimous 57 Long Pasture Road (Lot 5)(Cooper) The applicants Mr & Mrs Howard Cooper were present Mr Mabon discussed the owner has installed erosion controls between the wetland and the site and has installed a stone construction entrance The driveway has been swept and filter fabric has been installed in the street catch basin The extra erosion controls are on site to block the driveway and divert flows into lawn area during heavy storm event The owners should be required to remove sediment accumulated at the stormwater outlet by hand and dispose of it properly The owners should also be required to clean the downstream catch basin once the site has been stabilized Mrs Cooper discussed she 1 could clean out the catch basin by hand Mr Manzi discussed the catch basin is very deep you would never be able to reach the bottom you would have to hire a company to come in to clean the catch basin Mr Mabon discussed that he has done a site visit and the area looks much better since the erosion controls have been installed The erosion controls are working very well This was a none jurisdictional lot because the house is being built on top of a hill but the problem was there were no erosion controls to stop sedimentation from coming down the long driveway with all kinds siltation running down and into the stormwater management structures within the Long Pasture Subdivision A motion to issue a second Enforcement Order to allow the applicant to continue to clean up of the site was made by Mr McDonough, seconded by Ms Feltovic Unanimous A motion to continue to May 6, 2009 meeting was made by Mr McDonough, seconded by Ms Feltovic Unanimous No Recess Public Hearings: 8:15 P. M. Notice of Intent(s) 242-1445, 674 Turnpike Street (Londi)(Christiansen & Sergi, Inc.) No one was present A motion to accept the withdrawal was made by Mr Napoli, seconded by Mr McDonough Unanimous A motion to adjourn the meeting at: 8:30 P. M. was made by Mr. Manzi, seconded by Ms. Feltovic. Unanimous. 2