Loading...
HomeMy WebLinkAbout2009-07-08 Conservation Commission Minutes Conservation Commission Meeting Minutes July 8, 2009 Members Present: John J Mabon, Chairman, Louis A Napoli, Vice Chairman, Joseph W Lynch, Jr , Sean F McDonough Scott L Masse, Deborah A Feltovic Members Absent: Albert P Manzi, Jr Staff Members Present: Jennifer A Hughes, Conservation Administrator, Donna M Wedge, Conservation Secretary Deborah A. Feltovic arrived at the meeting at: 7:40 P.M. Scott L. Masse arrived at the meeting at: 7.45 P. M. Pledge of Allegiance Meeting came to Order at: 7:10 P. M. Quorum Present. General Business 242-1366, Extension Request,326 Campbell Road (Swiniarski) The applicants Edward &Danielle Swmiarski was present A motion to issue a one-year extension was made by Mr McDonough, seconded by Mr Napoli Unanimous 242-1111, Request for a Partial Bond Release, 200 Chickering Road (Kitteridge Crossing) No one was present Mr Napoli discussed there is no information but this letter and no amount mentioned how much to release Mr McDonough made a motion because of lack of information for partial bond release need more information, seconded by Mr Napoli Unanimous 242-1398, Storm Event Update, 575 Osgood Street (Edgewood Retirement Community, Inc. The applicant Kevin Tremblay Director of Development and Construction for Edgewood Retirement Community, Inc and David M Mermelstem of Trident Project Advantage Group was present Mr Lynch discussed the cloudy water and sedimentation down stream could be going into Cochichewick Brook There should be serious consideration of a cease and desist if this drainage problem keeps continuing with in the site Ms Hughes discussed Edgewood is also going to put Floc Blocks in the large detention pond that discharges off-site in an effort to remove fines from water Mr Mabon discussed the site needs to be stabilized right away with a lot cloudy water running off site is not a good thing Mr Mabon discussed the off site run-off this is not good for the water quality is very important within the site because there could much damage downstream from this site Mr Mermelstein discussed there would be some more modification coming by the end of the summer Ms Hughes discussed the A area by the cottages there are 200 hundred people working on the site at one time this site needs to be stabilized up by the cottages with haybales, check dams to hold the water flow down from going down stream the pollution to off site houses or Cochichewick Brook 1 Small Project NACC955, 31 Oxbow Circle (Ferres) The applicant Mr Ferres was present Ms Hughes discussed the proposal is to replace 4 x 4' landing with an 8x 8 foot deck addition This may still qualify as a 4 4 2 A the deck would be less than 300 s f Ms Hughes discussed beyond the wall and fence there is old sod that needs to be cleaned up this would be written within the small project letter A motion to accept this project as a 4 4 2A was made by Mr McDonough, seconded by Mr Lynch Unanimous A motion to accept this filing as a small project was made by Mr McDonough, seconded by Mr Lynch Unanimous No Recess Public Hearings: 8:05 PM 242-1453,Annual Road Maintenance (Division of Public Works)(Weston & Sampson Engineers, Inc.)(cont. from 6/24/09) No one was present A motion to close and issue a decision within 21 days was made by Ms Feltovic, seconded by Mr Napoli Unanimous 242-1453,Brook, Elmwood, Fernwood, Harwood, and Jetwood (Division of Public works)(Westin & Sampson Engineers, Inc.)(cont. from 6/24/09) No one was present No Quorum No Action 242-1455, Rea's Pond, Bridle Path,Winter Street (Sewer Manhole Rehabilitation)(Division of Public Works)(Tutela Engineering Associates, Inc.) Thomas Keeffe of Tutela Engineering Associates was present Mr Masse read the legal notice Mr Keeffe discussed the manholes would be razed up 3-feet to 4-feet to prevent water entering the sewer line that could cause overflow of sewage within the area Ms Hughes discussed this filing submitted to Natural Heritage and this area is within habitat of Blanding turtles so the project would have to be done when the turtle are not nesting in April Mr Keeffe discussed the Town of North Andover received grant money to fund this project would not start till next April of 2010 Ms Hughes discussed the flags on Bridle Path need to be checked because there is a person that own a parcel on Bridle Path and he wants to build on the lot but this easement runs right thru his property A motion to set up escrow account for third party review of the wetland line on Bridle Path in the amount of $3,000 was made by Mr Lynch, seconded by Ms Feltovic Unanimous A motion to continue to July 22, 2009 meeting was made by Ms Feltovic Unanimous 242-1428,Lot 4N-A Turnpike Street(Merrimack Condominiums)(One Hundred Fourteen Trust)(Patrick C. Garner Company, Inc.)(Request to cont. to 10/21/09) No one was present Mr McDonough has to leave the meeting abutter to project Mr Masse discussed the applicant should just withdraw his project because this has open for more than a year Mr Masse discussed the applicant must come the next meeting and present a plan to see how far they have come A motion to continue to July 22, 2009 was made by Mr Masse, seconded by Mr Lynch 5 to 1 Vote Mr McDonough retuned to the meeting 2 Decisions 242-1452,North Ramp Road A motion to accept the Order of Conditions as drafted was made by Mr Lynch, seconded by Ms Feltovic Unanimous 242-1451, Autran Avenue A motion to accept the Order of Conditions as amended was made by Mr Lynch, seconded by Ms Feltovic Unanimous 242-1454, Sutton Street and High Street A motion to accept the Order of Conditions as amended was made by Mr McDonough, seconded by Ms Feltovic Unanimous A motion to adjourn the meeting at: 9:40 PM was made by Mr. Lynch, seconded by Mr. Napoli. Unanimous. 3