Loading...
HomeMy WebLinkAbout2009-08-26 Conservation Commission Minutes Conservation Commission Meeting Minutes August 26,2009 Members Present: John J Mabon, Chairman, Louis A Napoli, Vice Chairman, Joseph W Lynch, Jr , Deborah A Feltovic, Sean F McDonough Members Absent: Scott L Masse, Albert P Manzi, Jr Staff Members Present: Jennifer A Hughes, Conservation Administrator, Donna M Wedge, Conservation Secretary Pledge of Allegiance Meeting came to Order at: 7:05 PM Quorum Present. General Business 242-1399, Modification Request, 245 Berry Street(Lot2)(Stack)(Christiansen & Sergi, Inc.)(cont. from 8/12/09)(request to cont. to 9/9/09) • A motion to grant the request for a continuance was made by Mr Lynch, seconded by Ms Feltovic Vote unanimous 242-1111, Request for Partial Bond Release, 200 Chickering Road (Kitteridge Crossing)(Terra Properties, LLC)(Merrimack Engineering Services, Inc.) • Ms Feltovic recused from voting left the meeting room • Administrator presents the yearly maintenance reports have not been submitted • Mr Lynch discusses the infiltrators to eastern side of the property would require 50-year • storm • And to function to prevent flooding down by Chestnut Green Condo units • Mr Lynch discusses there should have been 2-year monitoring on stormwater management • Plan the O &M plan is very important to have been monitored • Mrs Mmicucci discusses we had GZA on board for along time monitoring the site • Mr Mabon discusses the planting plan • Mr Lynch discusses the affidavit should have been signed every time they sold a unit • The Conservation Commission must receive proof of the affidavit being signed by • The new owners • Mr Lynch discusses post construction should have zero increase of water flowing • A motion to grant the partial bond release of$15,000 was made by Mr Lynch, seconded by • Mr Napoli Vote 4-0-1 c 1 r 242-1343, COC Request, Dale Street, Great Pond Road (North Andover Division of Public works)(SEA Consultants, Inc.)(request to cont. to 9/9/09) • A motion to grant the request for continuance was made by Mr Lynch, seconded Ms Feltovic • Vote unanimous 242-1386, COC Request, Woodberry Lane, Thistle Road, Sutton Hill Road (North Andover Division of Public Works)(request to cont. to 9/9/09) • A motion to grant the request for a continuance was made by Mr Lynch, seconded by Mr • Napoli • Vote unanimous 242-1279, 189 Willow Street(Chatterjee)(cont. from 8/12/09)(request to cont. to 9/9/09) • A motion to grant the request for a continuance was made by Ms Feltovic, seconded by Mr Napoli • Vote unanimous 242-1414, COC Request,226 Stevens Street(Mittelstaedt)(The Neve-Morin Group, Inc)(request to cont to 9/9/09) • A motion to grant the request for a continuance was made by Ms Feltovic, seconded by Mr Napoli Unanimous Small Project NACC#59 20 Bridges Lane (Bianchi) • Administrator presents the project for deck enlargement to 6 x 14 feet this would less 300 s f also open slotted deck • A motion to accept as a 4 4 2 A was made by Ms Feltovic, seconded by Mr Lynch • Vote Unanimous (Mr McDonough abstain) • A motion to accept this filing as small project with condition post-construction was made • Ms Feltovic, seconded by Mr Lynch Vote Unanimous (Mr McDonough abstain) NACC#60 172 Summer Street (Lot 2)(D' Angelo)(Christiansen & Sergi, Inc.) • Administrator present the violation on the site cutting trees, clearing shrub up to • The 25-Foot No-Disturbance zone • Mr D' Angelo addressed the Conservation Commission that I did not know this was protected land the project would consist of deer fence installation with the small project The other master plan would in-ground pool, cabana, patio The Conservation Commission discussed the clearing of the lot The Conservation Commission would require of an RDA filing by October 15, 2009 and Enforcement Order to require restoration plan of all disturbed areas on the site • The restoration plans for 50-foot and 25-Foot No Disturbance zone and the vernal pool protection A motion to issue an Enforcement Order for the restoration of the planting plan and stabilize the site was made by Mr McDonough, seconded by Ms Feltovic A motion to 2 1 accept as small project for the deer fence 4 4 2 H with condition of post construction meeting was made by Mr McDonough, seconded by Ms Feltovic • Vote unanimous • No Recess • Public Hearings: 8:15 PM. • Request for Determination of Applicability 120 Duncan Drive, (Webster)(Arrow Environmental,LLC) • Ms Feltovic read the legal notice • Administrator present presentation of the installation of an above ground pool, brick patio erosion controls only silt fence very level area where the pool would be installed • Mr McDonough makes a motion to issue a negative determination(0) Motion seconded by Ms Feltovic Vote unanimous 242-1461, 240 Stevens Street(Beaumont Realty Trust)(The Neve-Morin Group, Inc.) • Ms Feltovic read the legal notice • Administrator presents there is very steep slopes where the applicant wants to cut down a significant amount of trees and shrubs • Mr Hochmuth answers questions from the Commission • Mr Lynch discusses the applicant should submit a landscape plan • A motion to grant the request for a continuance was made by Ms Feltovic, seconded by Mr Napoli • Vote unanimous 242-1458 Waverly Road (North Andover Division of Public Works)(Woodard & Curran)(cont. from 8/12/09) • Administrator presents new plans reviewed by stormwater review committee • Mr Lynch discusses the swale upgrade channel the water the other way because there has been sheet flow from Woodridge ridge line so the water can flow into catch basin rather sheet flowing into abutters yards on Waverly Road • Mr Mabon discusses about the big storms and sewer problem this project probably fix the sewer problem to the abutters on Waverly Road • Mr McDonough discusses this is area this tends puddle in this area • Mr Raferty answers question from the Commission • A motion to grant the request for a continuance for revised plans was made by Ms Feltovic, seconded by Mr Napoli • Vote unanimous 242- 1460, 119 Liberty Street (Pavlik)(Merrimack Engineering Services, Inc.)(cont. from 8/12/09 • Administrator presents still no word from Natural Heritage also vernal pool certification, and removal of brush pile on the site 3 • A motion to grant the request for a continuance was made by Mr McDonough, seconded by Ms Feltovic • Vote unanimous 242-1459, 1001 Turnpike Street (Orchard Village,LLC)(Christianscn & Sergi, Inc.)(cont. from 8/12/09) • Administrator presents there is high ground water on this site even though this is 40B project there still has to be aware of the wetland restoration areas on the site • Mr Mabon discusses vegetation removal the Commission would require a planting plan with native wetland plantings • Mr Lynch discusses the elevations of the 100 year flood rain event is needed and stormwater management plan the O & M plan and TSS removal requirements BMP storage impact to stormwater run off has to be addressed • A motion to grant the request for a continuance was made by Mr Lynch, seconded by Mr Napoli A motion to withdraw previous continuance was made by Mr Lynch, seconded by Mr Napoli • Mr Lynch discusses the Commission would check with Town Counsel to see if the Commission can set up and outside escrow account for stormwater review by third party • A motion to grant the request for a continuance Mr McDonough, seconded by Mr Lynch • Vote unanimous A motion to adjourn the meeting at: 10:30 P. M. was made by Mr. Lynch, seconded by Mr. Napoli. 4