Loading...
HomeMy WebLinkAbout2009-09-23 Conservation Commission Minutes f Conservation Commission Meeting Minutes September 23, 2009 Members Present: Louis A Napoli, Vice Chairman, Deborah A Feltovic, Sean F McDonough, Scott L Masse, Albert P Manzi, Jr Members Absent: John J Mabon, Chairman, Joseph W Lynch Staff Members Present: Jennifer A Hughes, Conservation Administrator, Donna M Wedge, Conservation Secretary Pledge of Allegiance Meeting came to Order at. 7.20 PM Quorum Present. General Business 242-683,PCOC Request, 130 Weyland Circle (Lot 36)(Johnson)(Scalise,Esq.) • Administrator presents there are no wetlands within 100-feet on this lot • Motion to grant the PCOC was made by Ms Feltovic, seconded by Mr McDonough • Vote unanimous 242-1213, 17 Wildwood Circle (Klipfel)(New England Engineering Services, Inc.)(cont. from 9/9/09)(request to cont. to 10/7/09) • Administrator presents that there would be a meeting on site next week to discuss ways to bring the property into compliance • Motion to grant the request for a continuance was made by Ms Feltovic, seconded by Mr Manzi • Vote unanimous 242-1386, COC Request, Woodberry Lane, Thistle Road, Sutton Hill Road, (North Andover Division of Public Works)(SEA Consultants, Inc.)(cont. 9/9/09) • Administrator presents the erosion controls have been removed of site • Mr Press discusses the changes that had occurred while the contractors the berm was not built and riprap installed in place in the area instead • Administrator presents there was additional sewer connections in the area but outside of 100- foot buffer zone • A motion to grant the COC and release the bond was made by Mr McDonough, seconded by Ms Feltovic • Vote unanimous 242-1343, COC Request,Dale Street, Great Pond Road, (North Andover Division of Public Works)(cont. from 9/9/09) • Administrator presents the erosion controls have been removed • Mr Press discusses there were some minor changes the drainage as proposed was not constructed 1 • Mr Manzi discusses there has been many discussion on a drainage being fix in this area of the roadway for many years not surprised the work was not done • A motion to grant the COC and release the bond was made by Ms Feltovic, seconded by Mr McDonough • Vote unanimous 242-1414, COC Request,226 Stevens Street(Mittelstaedt)(The Neve-Morin Group, Inc.) • Administrator presents there is sewer easement on the edge of the property near Stevens Pond The applicant had cleaned up the site over the past weekend • Mrs Martha Mittelstaedt discusses we did clean up the yard over the past weekend and there can be some plantings installed in the area of concern on the site • A motion to grant the request for a continuance was made by Ms Feltovic, seconded by Mr Manzi • Vote unanimous 242-1115, COC Request, Maritimes & Northeast Pipeline-Phase 111 (Maritimes & Northeast Pipeline, LLC) (TRC)(cont. from 9/9/09) • Administrator presents believe the restoration areas have met the standards for success • A motion to grant the COC and release the bond was made by Ms Feltovic, seconded by Mr Manzi • Vote unanimous Enforcement Order Update 58 Colgate Drive (Winne) • The applicant Robert Winne present Administrator presents should stop mowing up to 25- foot No-Disturbance zone let this area retreat back natural state let the plantings grow back 3 wetland makers on the site • Mr McDonough discusses the area needs to have a permanent barrier in this area stonewall or post and rail fence • Mr Winne discusses the post and rail fence would be fine to install in this area and submit restoration plan • A motion to grant the requirement of restoration plan and wetland markers 3 on the site was by Mr Manzi, seconded by Ms Feltovic • Vote unanimous Public Hearings: 8:20 PM. Request for Determination of Applicability Route 125, Route 133 (MAHighway)(Bayside Engineering) • Andrea Norton represented the applicant • Administrator presents this filing is for replacement of traffic signals 8 in total • A motion to grant a negative determination#3 was made by Mr McDonough, seconded by Ms Feltovic 2 1 • - . • Motion passes (3 in favor, 2 opposed(Mr Manzi and Mr Masse) Notice of Intent(s) 242-1462, 240 Stevens Street (Beaumont Realty Trust)(The Neve-Morin Group, Inc.)(cont. from 9/9/09) • A motion to grant and close and issue a decision within 21 days was made by Mr McDonough, seconded by Ms Feltovic • Vote unanimous 242-1462, 85 Granville Lane (Lot 6)(855 Realty Trust)(Andover Consultants,Inc.) • George Schruender, Jr of 855 Realty Trust and William S MacLeod of Andover Consultants, Inc and Abutter Darrin Manke present • Mr Manzi read the legal notice • Mr McDonough discusses there should be permanent barrier at the 25-foot No-Disturbance zone • Administrator presents the wetland line reviewed an made some changes received new plans today did not have time to review the plans • Mr Schruender presents that he has talked to abutter Mr Manke about building this house for my daughter and he has no problem with the project for building a new house in this area • A motion to grant and close and issue a decision within 21 days was made by Mr Manzi, seconded by Ms Feltovic • Vote unanimous • 242-1459, 1001 Turnpike Street(Orchard Village, LLC)(Christiansen & Sergi, Inc.)(cont. from 9/9/09)(Request to coat. to 9/30/09) • A motion to grant the request for a continuance was made by Mr McDonough, seconded by Ms Feltovic • Vote unanimous Decision 242-1461,240 Stevens Street • Administrator presents bond amount $1,000, row of staked haybales backed by trenched silt fence, 8 extra haybales on site, wetland makers 4 marked every 25', no stockpiling of soil within 100', construction sequence pre-approved prior to phased construction, the slope would not be disturbed, submit planting plan with native to Essex County and non-invasive • A motion to grant the Order of Conditions as amended was made by Mr Manzi, seconded by Ms Feltovic • Vote unanimous A motion to grant to adjourn the meeting at 9 30 PM was made by Mr Manzi, seconded by Mr McDonough • Vote unanimous 3