Loading...
HomeMy WebLinkAboutRecorded Decision Site Plan Review Special Permit .?ILI �-• ' Bk 1791 �• + was �°� r �s��.-� �+6�e-•ti.��,.���� � Wit;.ew� Town of North Andover • ,> Office of the Planning Department Community Development and Services Division 120 Main Street ` " �. Forth Andover,Massachusetts 01845R NOTXCE OF DWISXON S)(Ji`E PLAN REVIE,W SPECML PERM1T This is certify that Monty(20)days have elapsed from date of d vision Any appeal shall be filed µrrihoukflling of an a p date Iran within(20)clays after-the Carla lea e date of filing this notice in Town Clark the office of the Town Clerk- Date: December 5,2023 Date of Hearing: November 1,2023, November 21,2023,December 5,2023 Date of Decision: December 5,2023 Petition of: Homegrown Lacrosse,LLC 400 Osgood Street North Andover,MA 01845 Premises Affected: 492 Sutton Street,North Andover MA.,Assessor's 075.0-0001:-0000.B;also identified as 034.A 0075-0001.B Referring to the above application for a Site Plan Review Special Permit Article 8 Supplementary Regulations,Part 3 Site Plan Review and Article 10 Administration 195-10.7 of the North Andover Zoning Bylaw. The Applicant proposes development of a 2.5+1-acre leased area on the Lawrence Municipal Airport property fronting on Sutton Street and situated between Terminal Road(i.c,the Airport access driveway)and Old Clark Road,to include construction of a 39,100+l-SF athletic facility with office space,parking lot,utilities and drainage improvements.The project is located within the Industrial 2 Zoning District. After a public Dearing given on the above dates,and upon a motion by P.Boynton and 2`d by S.Kevlahan to APPROVE the Site Plan Review Special Permit and subject to the following conditions.Vote was (5-0) in• favor of the application. Jean 1';might On behalf of the North�A'li�met-Tibuning Board Sy a.'I%-dG 1�id-CK,�hairman lolm.Simons i Bk 17913 Pg2 #542 492 Sutton Street Site Plan Review Spacial Permit Construction of a 3 9,10 0+1-athletic facility December 5,2023 The Planning Board heroin APPROVES the Site Playa Review. Special permit to allow for the development of a 2.5+/-acre leased area on.the Lawrence Municipal Airport property fronting on Sutton Street and situated between Terminal Road(i.e.the Airport access driveway)and Old Clark Road,to include construction of a 39,100+l-SF athletic facility with office space,parking Iot,utilities and drainage improvements.The Project is located within the Industrial 2 Zoning District. The Project is located at 492 Sutton Street,North Andover,Massachusetts, 01845,Assessors Map 075.0-0001-OOOO.B; also identified as 034.A-0075-0001.B.This Special Permit was requested by the Applicant,Homegrown Lacrosse,LLC,400 Osgood Street,North Andover,MA 01845. The,application was filed by the Applicant with the Planning Board on October 5,2023. The Applicant submitted a complete application, which was noticed and reviewed in accordance with the requirements of the North Andover Zoning Bylaw,Article 8 Supplementary Regulations,Part 3 Site Plan Review,.Article 10 Administration Section 195-10.7 and MOL Ch.40A,Sea 9. The public hearing on the above referenced application was opened on November 7, 2023 and closed on December 5,2023. The Planning Board voted unanimously(by a vote of 5-0)to grant the Site Plan Review Special Permit, A special permit issued by the Planning Board,as special permit granting authority,requires a vote of at least four members of a five-member board. The Applicant is hereby notified that should the Applicant disagree with this Notice of Decision ("Decision"),the Applicant has the right,under MGL Chapter 40A, Section 17,to appeal this Decision within twenty days after the date this Decision has been filed with the Town Clerk. The Planning hoard makes the,following findings as required by the North Andover Zoning Bylaws Article 8,Part 3 Site Plan Review and Section 195-10.7,the Planning Board makes the funding that the intent of the Bylaw,as well as its specific criteria,are met. This decision specifically stated by the Planning Board makes the following FINDINGS OF PACT: FMINGS OF PACT 1) The spNific Site is an gppMpriato location,for sugh,1 iise,structure or condition. The proposed use is allowed and consistent with current uses in the area. It is a convenient and centrally located area for the proposed recreational use,not far from schools. 2) The use as developed will not adversely affect the nei hborhood character. Building and development will be consistent with surrounding buildings. The project provides appropriate building,landscaping,and screening set back from adjacent properties. The character of the architectural style of the proposed building will complement the style of the other buildings on the airport campus. 3) There will be no nuisance or serious hazard to vehicles or pedestrians. Driveways have been located to utilize existing internal access ways on the airport campus and to allow for adequate firelsafety access to the building. 4) Adequate and appropriate facilities will be provided fax the proper_operation of the proposed use, The Project is appropriately and adequately serviced by necessary facilities and utilities to address the needs of the Project, 2 Bk 17913 Pq3 #542 3 . •r . 492 Sutton Street Site Plan Review Speoial Permit Construction of a 39,100+/-athletic facility December 5,2023 5) The use is in harmony with the enoralpuMgso and intent of this Zonin B law. The proposed Project is centrally and cofiveniently located for parents and students and the proposed use is consistent with existing nearly properties and uses. The Project allows for the use of existing access,adequate fire/safety access,causes no harm to the watershed or any resourse areas,and the project will enhance the aesthetic of the property with new building design, landscaping and screening.The Project,as shown on the plans, will comply with the North Andover Zoning Bylaw as the Zoning 1.3oard of Appeals granted a special.permit to allow for the use at their November 14,2023 meeting. 6) Per the North Andover Zoning Bylaw Ch. 195-4.14.1 Recreational uses,including swimming club,tennis club,health club,indoor ices skating facility,and indoor/outdoor athletic recreation facility are allowed by special permit. At their regularly scheduled meeting on Tuesday,November 14,2023 the Zoning Board of Appeals granted a special permit to allow for the recreational use at the Site. 7) The Site is currently undeveloped and relatively flat,consisting of maintained grass fields,disturbed earth from removal of stockpiling,and some woods. A portion of the Site is located within the Watershed Protection District including the 325 foot Non- Discharge Zone. 8) Maintenance obligations shall be stated in the property lease. 9) The Project will require an,Airspace review by MassDOT's Aeronautics Division and review by the FAA based upon its location and elevation. 10) The Project-will require aNational Pollutant Discharge Elimination System(NPDES) Construction General Permit:(CGP)to be filed with and obtained from the'United States Environmental Protection Agency. 11) Stormwater Management;The stormwater management design for the proposed development includes constructing a porous pavement parking lot with a subsurface reservoir to infiltrate runoff from the building roof and parking lot. The reservoir overflows to the municipal stormwater system on Sutton Street,Town Bylaw requirements and Best Management Engineering and Practices,and the most recent version of the MA DEP Stormwater Handbook,and has been reviewed by the Town's outside consulting engineer,Horsley Witten. There were extensive discussions between the Town's outside consultant engineer and the Project engineer related to the overall design and Stormwater Operations and Management Plan(See correspondence from Horsley Witten dated October 18,2023,November I6,2023(2)and November 28,2023 and response correspondence from Hancock Associates dated November 1,2023, November 16,2023 and November 27,2023). 12) The application was reviewed by John Borges!,Town Engineer,as evidenced by email communications dated November 16,2023,November 21,2023,and November 30,2023 and response to comments from Hancock Associates dated November 27,2023,along with a revised Operation&Maintenance Plan Dated N6veznber.27,2023. 13) The application was reviewed by Town staff as,evidenced by email communications from Amy Maxner,Conservation Administrator,dated October 10,2023,Lt,Bob Kilcoyne, 3 Bk 17913 Pg4 #542 i 492 Sutton Street Site plan Review Special Permit 1 Constraetion of a 39,100+/-atble#o facility December 5,2023 Fire Prevention Officer,dated November 1,2023,and Tim Willett,DPW Operastions, dated October 19,2023. Finally,the Planning Board finds that this Project generally complies with the Town of North Andover Zoning Bylaw requirements as listed in Section 195-8.14,as well as Part 3 Site Plan Review, 195-10.7. The Planning Board hereby grants an approval to the Applicant provided the following conditions are met: SPECIAL CONDMONS: 14) For the purposes of the decision, the Planning Board approves the following Permit Definitions: a.) The "Locus" or"Site" refers to the parcel of land with land fronting on Sutton Street shown on Assessor's Map 075.0-0001-0000.B; also identified as 034.A- 0075-0001.13,and known as 492 Sutton Street,North Andover,Massachusetts. b) The"Plans" refer to the Plans prepared by Hancock Associates, 34 Chelmsford Street,Chelmsford,MA 01824 entitled"Permit Site plan Home Grown Lacrosse Sports Facility and Offices",dated August 30, 2023 and revised to November 6, 2023 consisting of sheets Al—A 10. c) The"Project"refers to the proposed development of a 2.5+/-acre leased area on the Lawrence Municipal Airport property fronting on Sutton Street and situated between Terminal Road(Le:the Airport access driveway)and Old Clark Road,as depicted on the Plans, to include construction of a 39,100 +1 SF athletic facility with office space, parking lot, utilities and drainage improvements under the requirements of the North Andover Zoning Bylaw, Article 8 Supplementary Regulations,Part 3 Site Plan Review,Article 10 Administration Section 195-10.7 and MOL Ch.40A,See 9.The Site is located within the Industrial 2(I2)zoning district. d) The"Applicant"refers to Homegrown Lacrosse,LLC,the Applicant for the Site Plan Review Special Permit,its successors and assigns. e) The"Project Owner"refers to the person or entity holding the fee interest to the title to the Locus from time to time,or the leasehold interest to the Project and the fee interestto the building from time to time,as the context may require,and which can include but is not limited to the Applicant,developer, and owner. 15) All stormwater management best practices shall be,maintained as specified in the approved Operation and Maintenance flan,dated November 27,2023 16) Per the North Andover Zoning Bylaw §195-8.11.A(3) Developments which require site plan review: include,"Any construction,site improvements,new uses is existing structures or developments which contain new processes not normally associated with the existing use and which result in changes in the potential nuisance to adjacent property; traffic circulation; stormwater drainage onto or off of the Site; and/or the application of the parking standards of Part 1 indicate the need fer five or more new or additional parking spaces". If in the future any of these criteria apply a Modification to the Site flan Review Special Permit will be warranted. 17) The Town Planner shall approve any changes made to these plans. Any changes deemed substantial by the Town Planner would require a Public Hearing and modification to the Special Permit by the Planning Board. PRYOR TO ISSUANCE OF SITE WORK,BUILDING PER14IXT,OR CONSTRU'CnON 4 i Bk 17913 Pg5 #542 • I 492 Sutton Street Site Plan Review Special Permit Construction of a 39,100+/-athletic facility December 5,2023 18) The Applicant will provide copies of all Decisions,Notification,and Orders of Conditions,if any,from the North Andover Conservation Commission. 19) Two(2)copies of the signed,recorded decision and with endorsed plans attached must be delivered to the Planning Department, 20) In consultation with the Director of Planning,the Applicant shall designate an Independent Environmental Monitor.The monitor shall read,sign,and return to the Planning Director the Letter of Agreement for Independent Monitors.The Environmental Monitor must be available upon four(4)hours' notice to inspect the Site with the Planning Board designated official.The monitor shall make weekly inspections of the Project,provide monthly reports to the Planning Department throughout the duration of the Project,and detail any areas of non-compliance and corrective actions.The monitor will also provide reports following heavy rain events. 21) A copy of the property lease shall be provided to the Planning Department, It is expected that the lease shall include but is not limited to Identifing obligations for construction, maintentance for the stormwater management system,sidewalks,parking spaces,utilities and landscaping. 22) The Project will be subject to the US EPA NPDES Construction General Permit (CGP) requirements and require a Stormwater Pollution Prevention Plan(SWPPP). A copy of the CGP and SWPPP shall be submitted to the Planning Department. 23) A copy of all local,state and federal permits required for the Project shall be submitted to the Planning Department. 24) A construction schedule shall be submitted to the PIanning Staff for the purpose of tracking the construction and informing the public of anticipated activities. 25) The Applicant shall sign the Illicit Discharge Statement included in the Stormwater Operations and.Maintenance Plan and return a copy ofthe signed document to the Planning Department. 26) The Applicant shall sign the Stormwater Operation and Maintenance flan dated November 27,2023, i 27) A bond in the amount often thousand dollars(S10,000.00)shall be posted for the purpose of insuring that the Site is constructed in accordance with the approved plan and that a final as-built plan is provided,showing the location of all on-site structures(Site utilities,structures,curb cuts,parking spaces and drainage facilities,including invert elevations of all stormwater structures). This bond shall be in a form acceptable by statute. 28) All erosion control measures as shown on the Plan must be in place and reviewed by the Town Planner and Conservation Department. 29) A pre-construction meeting must be hold with the developer,their construction employees, Planning Department(and other applicable departments)to discuss scheduling of inspections to be conducted on the Project and the construction schedule. 5 Bk 17913 Pg6 #542 492 Sutton Street Site flan Review Special Permit Construction of a 39,100+/-athletic facility December 5,2023 DURING CONSTRUCTION 30) Dust mitigation must be performed weekly,or more frequently as directed by the Planning Director,throughout:the construction process. The Site must be kept clean and swept regularly. 31) Any stockpiling of materials(dirt,wood,construction maternal,ate.)must be shown on a Plan and reviewed and approved by the Planning Staff. Any approved piles must remain covered at all times and fenced off to minimize any dust problems that may occur with adjacent properties. 32) It shall be the responsibility of the developer to assure that no erosion from the construction Site shall occur which will cause deposition of soil or sediment upon adjacent properties or public ways,except as normally ancillary to off-site construction. Off-site erosion will be a basis for the Planning Board making a finding that the Project is not in compliance with the Plan;provided,however,that the Planning Board shall give the developer written notice of any such finding and seven days to cure said condition. PRIOR TO A CERTIFICATE OF OCCUPANCY 33) The Applicnt must submit a letter from the Project engineer of the Project stating that the building,landscaping,lighting and Site layout substantially comply with the Plans referenced at the end of this decision as endorsed by the Flaming Board and that the stormwater management structures are functioning as designed. 34) All stormwater structures shall be cleaned,in accordance with the approved Stormwater Operation and Maintenance Plan. PRIOR TO TEE RELEASE OF THE PERFORMANCB BOND 35) The Applicant shall submit an as built plan stamped by a Registered Professional Engineer in Massachusetts that shows all construction,including stormwater structures and other pertinent Site features.This as-built plan shall be submitted to the Town Planner for approval and must be provided iu paper form as well as in SDF(Standard Digital File)format. 36) The Planning Board must by a majority vote make a finding that the Site is in conformance with the approved plan. GENERAL CONA)tT1tONS 37) Any plants,tree,shrubs,or fencing that have been incorporated into the Plans approved in this Notice of Decision that die or fall into disrepair must be replaced by the Project Owner in perpetuity. 3 8) The contractor shall contact Dig Safe at Ieast 72 hours prior to commencing any excavation. 39) Gas,Telephone,Cable and Electric utilities shall be installed underground as specified by the respective utility companies. 40) The hours for construction shall be limited to between 7:00 a.m. and 5:00 p.m. Monday through Friday,and between 8:00 a.m, and 5:00 p.m.on Saturday. 6 Bk 17913 Pg7 #542 k 492 Sutton Street Site Plan Review Special Permit Construction of a 3 9,100+/-athletic facility December 5,2023 41) No open burning shall be dune except as is permitted during burning season under the Fire Department regulations. 42) The provisions of this conditional approval shall apply to and be binding upon the Applicant,its employees,and all successors and assigns in interest or control. 43) Any action by a Town Board, Commission,or Department,which requires changes in the Plans or design of the building, as presented to the Planning Board, may be subject to modification by the Planning Board. 44) Any revisions to the Plans shall be submitted to the Staff Planner for review. 1f these revisions are deemed substantial,the Developer must submit revised plans to the.Planning Board for approval. 45) Pursuant to the North Andover Zoning Bylaw Section 195-10.7, this Special Permit approval shall be deemed to have lapsed December S,2025(two years from the date of issuance)exclusive of the time required to pursue or await determination of any appeals, unless substantial.use or construction has commenced within said two-year period. Substantial use or construction will be determined by a majority vote of the Planning Board, 46) The following information shall be deemed part of the decision: Flan titled: Permit Site plan Dome Grown Lacrosse Sports Facility and Offices" Prepared for. Home Grown Lacrosse,LLC 400 Osgood Street North Andover,MA 01845 Sheets: A-1 —A A-10 Prepared by. Hancock Associates 34 Chelmsford Street Chelmsford,bLl 01824 Date: August 30,2023,revised to November 6,2023 Stormwater Management Report Prepared for: Home Grown Lacrosse,LLC Prepared by: Brian Geaudreau,PE Morgan Seale Hancock Associates Date August 30,2023,revised to November 27,2023 Stormwater Operations&Maintenance Plan Prepared by: Hancock Associates 34 Chelmsford Street Chelmsford,MA 01$24 Date: November 27,2023 cc: .Applicant Engineer Abutters Owner 7 ...................... ....................... Bk 17913 Pg8 #542 492 S=ON PERMIT SITE- PLAN MIEFIT w*tQ&&m HOME GROWN LACROSSE SPORTS FACILITY AND OFFICES ome Grovm 492 SUTTON STREET LHacrossc�,LLC NORTH ANDOVER MASSACHUSETTS FOR HOME GROWN LACROSSE, LLC HANCOCK ASYMI—Mm ASSOCIATES ARt &sm& IW&C=61.O ANMIIIfVlAEt 0X= AMC.S IIS'II rA%iRL1CIdId Q&gff.1gyA IR cmelum ME or Xg I EMIR r.=-- w rimm 7 00 juxv at f m i mrg=nwm cuww AC07YAM CULMMNEM $096,twor #AM=ASSOaM N*MM5-ZM SnWr fZ=R 2 MaT TALE SHEETChMZ&G;Z;M AA SMAQl==MEN 4AKRDVX XWWa XRga?r A=HffECM 02-%q=SMEr sRmr 2-- ZX71"COWMV RM 800.0=PRO"rMNAM RWN AMM#A ON45 MaT a--LA Y&M&&A T&WS AM TIME MPGWOWL" M= QUO=MWAM&MLMZ9 PW SHEU jo a fims svmgr R=W4 am law law AFEWCA i sY&�74�--M=v AW 297doMMW CaMM P4V hi==W LAM=UC MW AM LaMWAW tta 4w oso=SVZMT -'WMr 7---agIM70V AM A"MMA&W AM NMrd NWM OVA OIL14S AMU-V=A==aWPUN Down cmv"so= JWMr v-----AaAM ZMT I OF 2 A A-1-W&7.'A--.VZrAX SMIT.1 Vol 4� 4A 55e g ^�,+^' .ems,•' `;;A ti � � � 4;L � � _ $ it N IM r T• •`fir""V ,2� °S 1j 1 w��J _,��� �� �• ---- 'r 'E\, ' �t gge�l �1 � � r.��•`�avv -�tv` Wb'+Oii4rnS lUff HN6 LaOa#YrAlTYm�pzvmt) WWI 411 FA ' oil ° � � � b aI k vLn Ln a � i p f ssU_�Q 1 �1 I�MN�jy�r✓�!X✓ ', 1og Ailr ff f � Alt% � it 1 um fr lµ��31YE+�0e ILI VIA IV \ r E + E / V • w.c CevG 133tlLS NOVn-TUl ° r e � sg�l,d 51+.. k�►Y. 7�,.. L C'1 1� 9k S 4 ,Y. ,►� Aid A►. { A►• � r 8 i a ' SO • 'y �� �'yjh�'iylpIl�p��lSltt .,l�4, F'rr`i \ �f R NJ a1 L t Pq '.. r ? oto �io-sv RQgp r 1 tl EE sirf�� 1 jWll 6 ♦r 1S11i �•1 l 7 Z 4 Iwl �i � 1 ��t•� ram'4�i E 1 . , 610 I Age Ir ells r §d c5C wswpw�ftw ■wa 1-1aw� ^S y A A R M I k .�+ C`1 ag 5 } g I hu�; 111,11 , p x v Iltkt I a�5t$ i„x9 x � �6XC��� Q{ p k " "Nr �` 4 i�� �*ap�a M 3a� �5;�g � g` k; all r 9���ji7i��� �� 6� �i4� p�7t}5}y9 i 9 i 3l x a all M�$ %R¢19e INS x, ���}}� j`� �a �,sE ll t g8ipp s$$gllif� f a e a < > €R kA yg�R R r $��° 1 IEAx ifk r 7I litii 0 k '11 X$ 5 a k Et �1 R�6 � g y a 1 16 + z� tt,t � 1 I pl 1 1rF1 @ V j,; i�10E ROM ,t a � .1 , aa�+� r 10.4, i`11t1 y, .Ny,, • , +6 iO4 010 ha a� a� �w+ , err. •qF�'d V r �1 �l '��rk4 H K �y s its 1 t_ a' a�{ R q fil Si hh 0s3�[[tt ' � r Ij OLD }� k ROti P 4 4 L u' 'MAsp Fr "N �! �31lG. Alyce^✓� w 1. ' iL =' 1. is L t. • life' f it 4 tt 1 ,ail ;I! ' 6 �M� J• L ar ^�a��- �, s5515 'ri! Ij i_ N. 4 1 8 Ni' Nro� 8 •i i# � Si�a.� ire FA n � _�,f � �t Y• W Ln a E .+-w. •...R .«rays � ' Ilk n Ito � �s a ak gaRO I It Rk � "fie a 'el70�yy��, \ ! O , i k f �� `oyj 1p•ru � ! p a°ilk $@ 1 ko Nq Ff I 444 i.� 1 f! r � >r � g s m 4 .................... ................................................................................... ................................................... .................................... Bk 17913 PgI5 #542 492 SUTTON STREET N*fth Andover IDW tAdddr 4 E J4 WE M ,6 rU ZY1. Urne Of P SAWP-J*Angle(VIAUXA) .a Home Grown Lacrosse,LLC Tim HANCOCK ASSOCIATES IVA a car ot mwaac nwo SWEPr PAIH ANALYSIS MD STAMO PLAN sum 1, umm -8 a m 9=I,or w A �1 9 g •� eta; �� Ca 1.0 lit join, i� ne ut,vat C � q�paty��p}ga� PC A MF �� R fxI "wee s as va wfnw",r a�� a�w rxr.t f! y � sus amr �1 •� � p � 31 I.y V oil i 13 p V M it 4 i ro N g i Ul a � II Hill b 1144 ,1 s HIM fi"4 F Alt A A P& P A A I. H h p7• I. N 7 Rif 8 �Fr• z @ g x cl td tag LO Q� � � q +aar�+avawo,crcc.w,ar »� ro w FA a n •�` �Y w x 3 U7 Bk 17913 Pg18 #542 Standard : Operation and MaintenancePlan A long-term operation and maintenance plan shall be developed and Implemented to ensure that stormwater management systems function as designed. STOMAWATA R OPERATION AND MAINTENANCE PLAN—11/27/2023 j prelimin=Stormwater Operation and Maintenance Budget Estimated yearly costs=$2,000 annually -Covers cleaning and maintenance of porous pavement,roof leaders,outlet control structures, and grass swale. Corporate Certification (Home Grown Lacrosse,LLC--Owner/Developer) Y certify under penalty of law thatthe Owner/Developer and its associated entities established for purposes of ownership,operations and maintenance ofthe leased area located at 492 Sutton Street,North Andover,is solely and Iegally responsible for implementing the Stormwater Operation and Maintenance plan. The Owner/Developer has reviewed said plan and fully accepts all responsibilities inherent therein;including inspection,maintenance,repair,modification and/or replacement of the recharge systems as may be required to maintain intended recharge functions.The Owner/Developer shall f le yearly maintenance reports including annual certification that the plan has been fully implemented as outline herein and shall provide copies of inspection reports and receipts to the Town of North Andover if requested.Furthermore,the Owner/Developer understands various stormwater management systems have a certain life expectancy and that replacement of system components will be required. The Owner/Developer accepts all financial responsibilities associated with future replacements. Name: Title: Date: `f HGR Lacrosse 400 Osgood Street North Andover,MA.01945 (978)208-2300 Bryan@hgriacrosse.com Bk 17913 Pg19 #542 ' I Porous Pavement Frequent cleaning and maintenance are required for the pavement surface to prevent clogging as the surface acts as the pretreatment to the stone reservoir below.To keep the surface clean,frequent vacuum sweeping, annually at minimum,along with periodicjet washing ofasphalt and concrete pavement is required.No winter sanding shall be conducted on the porous surface,For proper maintenance: -Minimize salt use during winterrnonths, -No winter sanding, -Deep landscaped areas nearby well maintained to prevent soil being transported onto the pavement, -Clean the surface minimal annually with vacuum sweepingmachines, -Inspect surface and inspection ports after storm events to insure proper drainage, -Never reseal or repave with impermeable material, -Inspect annually for deterioration or spalling, -Monitor to ensure that the paving surface drains properly after storms--as needed -Clean surface using powers washer to dislodge trapped particles and vacuum sweep area—as needed -Inspect surface annually for deterioration -Assess exfiltration capability at least once ayear.When exfiltration capacity is foundto decline, implement measures from the Operation and Maintenance plan to restore original exflltration capacity. , Inspection&Maintenance Report Attach additional pages as required to fully document conditions and maintenance performed. Date Inspector Condition Maintenance Performed* *Receipts must be attached to the report showing payment for maintenance performed. F Bk 17913 Pg20 #542 Crass Swale Inspect semi-annually the first year,and at Ieast once a year thereafter.Inspect the grass for growth and the side slopes for signs oferosion and formation drills and gullies.Plant an alternative grass species Ifthe original grass cover is not successfully established,Ifgrass growth is Impaired by winter road salt or other deicer use,re- establish the grass in the spring,Trash/Debris Removal;Remove accumulated trash and debris prior to mowing, Sediment Removal-Check on ayearly basis and clean as needed,Use hand methods(i.e.,aperson with a shovel) when cleaning to minimize disturbance to vegetation and underlying soils. Annual Inspection&Maintenance Report .Attach additional pages as required to fully document conditions and maintenance performed. Date Inspector Condition Maintenance Performed* `Receipts must be attached to report showing payment for maintenance performed . Bk 17913 Pg21 #542 Outlet Control Structure Inspect or clean outlet control structures four times per year at the end of the foliage and snow removal seasons. Sediments must also be removed when the depth of deposits is greater than or equal to one half the depth from the bottom of the lowest pipe in the basin. Vacuum trucks are to be used to remove trapped sediment and supernatant. Although catch basin debris often contains concentrations of oil and hazardous materials such as petroleum hydrocarbons and metals,MassDEP classifies them as solid waste. Any contaminated materials must be evaluated in accordance with the Hazardous Waste Regulations,310 CMR 30.00,and handled as hazardous waste. MassDE11 regulations prohibit landfills from accepting materials that contain free draining liquids. Annual Inspection&Maintenance Report Attach additional pages as required to fully document conditions and maintenance performed. Date Inspector Condition Maintenance Performed* *Receipts must be attached to report showing payment for maintenance performed. Bk 17913 Pg22 #542 Roof Drain Leaders Routine roof inspections shall be performed two times per year.The roof shall be kept clean and free of debris,and the roof drainage system shall be kept clear.Gutter and downspouts shall be cleaned at least twice per year,or mor frequently as necessary. Annual Inspection&Maintenance Report Attach additional pages as required to fuIIy document conditions and maintenance performed. ]"late Inspector Condition Maintenance Performed* wE *Receipts mu-st be attached to report showing payment for maintenance performed.