Loading...
HomeMy WebLinkAboutSigned Illicit Discharge Statement Standard_9: Operation and Maintenance Plan A long-term operation and maintenance., plan shall be developed and implemented to ensure that stormwater management systems function as designed. Operation and Maintenance plan has been developed and submitted as a standalone document. Standard M. Illicit Dlschar es to Drainage System All Illicit discharges to the stormwater management system are prohibited. Measures to prevent Illicit discharges are Included In Standard 4 &8 of this report, It Is the responsibility of the owner post construction to uphold this standard. A no Illicit discharges statement has not been attached but will be submitted by the owner prior to discharge of stormwater to post construction BM Ps, !!heft Discharge Compliance Statement To the best of my knowledge no Illicit discharges currently exist on the site and no future Illicit discharge will be allowed, Including wastewater discharges and discharges of stormwater contaminated by contact with process wastes, raw materials, toxic pollutants, hazardous substances, oll, or grease. Signed by Owner Date