Loading...
HomeMy WebLinkAboutHGL May 2024 Monthly Report - - HANCOCK nee.Ir Scientists Home Grown Lacrosse Monthly Environment Report, May 2024 Inspection Dates and Weather Conditions: Approximate Rainfall Preceding Each Inspection: 5/3/2024—50F, Overcast (weekly inspection) 5/3/2024—0.24" 5/10/2024—65F, Sun (weekly inspection) 5/10/2024—1.17" 5/17/2024—60F, Sun (weekly inspection) 5/17/2024—0.70" 5/24/2024—70F Sun (weekly inspection) 5/24/2024—0.78" 5/31/2024—75F Sun (weekly inspection &following 5/31/2024—2.01" storm event) Approximate Monthly Rainfall: 4.90" Summary of Activities: • Completion of foundation footings and walls. • Athletic field area back filled and compacted. • Domestic and fire service water lines installed along with site fire hydrant. • Underground utilities in process of being installed in office area of building. • Steel framing beginning to be delivered on site (observed on 5/31/24 site inspection). Summary of Environmental Compliance: • General maintenance is needed along silt fence in north eastern corner of the site. Fence has fallen over and been punctured. While maintenance is needed,fence has remained keyed into soil thus remaining effective at controlling potential erosion and sediment migration. • No sediment migration or soil degradation observed outside of erosion control fence or downgradient of soil/construction material stockpiles. • Construction entrance and island cut through observed to be clean with no site materials tracked into Terminal Road. • No dewatering practices were present. Forecast of Activities Next Month: • Beginning of steel installation (approximate 8 weeks of construction) • Installation of concrete floors • Electrical and sewer utility installation Appendix • Site Photo Map • 2022 Construction General Permit Site Inspection Report 34 Chelmsford Street, 2nd Fluor I Chelmsford, MA 01824 1 V 978-244-0110 1 F:978-244-1133 HancockAssociates.com II III R,' MCA, l.3!10S I0t,1, CI..,.II II S1!!!0RR .,.rp l.)AI',J" I..nRZ1, I` A,I?I I:I(..)R(D .:.rl I WIIII Vl °''.I .. I ..I..M R 1 I.,I .)[,J, II A I SAll II..,IIV, I\JII...l Site Photos: 5/3/24 ANSI �r6i�r%iii /rioaiii/i/lrrJi �rr,rr ,,, iro�i/�>/ �1r J�.• „ Northwest corner of lease area (approx. 575 feet along Terminal Road from intersection with Sutton St.) r y � / µ, s ! I! V R✓y, j / //j / MIjC I ,,,,,,, ///����f r, ��11➢1➢111)))) r r�i�/ r//////�„ / rii%%i%fir rrii� '/;, /�// /iii%%' rtl��'✓'///r FV!�a �ipr io,r,ri//ririri/ /� // Northeast corner of lease area Midway along eastern lease line b J i0 � IN IY W. Southern corner of lease area Construction Entrance along Terminal Road (Facing Old Clark Road) Site Photos: 5/10/24 u � s ry�f/,BHP/��rrJ�Frlia�r>' rrr pp il: r4if/y tltJ✓W�1�i`'r✓dyi�TPxifv�F✓ ✓ Y i PP,��''d� ✓� y° r� n r � r✓ � � d p. Northwest corner of lease area (approx. 575 feet along Terminal Road from intersection with Sutton St.) r v r Saar" � d✓ i 1 it 2fIG�,xl l i r i.'G,�f✓����!�''y I >��„ lid/✓/f n rah d l✓ Mf:'t r �9y � v 9 ,r� ��n"'On ip �"�� n v � ��� e y✓p !r rs rah r �iy � d�i�a rl Northeast corner of lease area Midway along eastern lease line ;� , jai�nka�ry(rrm r l°i�u �7y r6%r o fi r�'�➢,N�lli�l4b9e'Y�`8N rx ... y r i �k n r ✓�ii ri/y�k o � z i�rly�a� rir ✓r � u �i 6i� r r lrya pu y ;n��/,r" �».� u, r �r,r d�l�„ 1..�n i2."f,� �. a r dlir V✓ " r r a �"ro���7�„tit�G����Pl",f i�./������(��-,� ly�l7���(�fy�� x or i���(���i(��f�a�;+ly%��'y r✓ dr��+r rl Y ?r ����� d yr �� r�' i� I y Southern corner of lease area Construction Entrance along Terminal Road (Facing Old Clark Road) Site Photos: 5/17/24 !//�i,; /ii,,, � //i,,,,, � ,GAF✓/����'' �'1 , ���1�`lr/✓/�lie%/J11rUJ/r�r%Ir(/N�V?,,;� u,,,x.� � kl%W 'r ,. ." r / a Northwest corner of lease area (approx. 575 feet along Terminal Road from intersection with Sutton St.) �rr r Northeast corner of lease area Midway along eastern lease line /' nr r I r (' e. C � GI ,M d Pl.;y��yJ,lle�, �i �a� �/�yf✓,G,�ti Nr rr,ri dF1m D/F gs;N✓�/�F� �r,rf it H ri/l yla,i%�i6 /�i, /,i / r�rJr� r�, drr���1 �,r�y� �Y +// lJ�rr✓r/�1rf /Surd r4�1 irt�fd�kr� ��r �(j�T�/j�1� Southern corner of lease area Construction Entrance along Terminal Road (Facing Old Clark Road) Site Photos: 5/24/24 / k ' x A �wS'1�I�P" w✓' � � u3` U S� Northwest corner of lease area (approx. 575 feet along Terminal Road from intersection with Sutton St.) a� ,N^auv E���iw✓��kp(gy4� � i�u �� �} '' !k 1'f�', �6r7r�, ga� �� Northeast corner of lease area Midway along eastern lease line l Southern corner of lease area Construction Entrance along Terminal Road (Facing Old Clark Road) Site Photos: 5/31/24 a Northwest corner of lease area (approx. 575 feet along Terminal Road from intersection with Sutton St.) f� r Northeast corner of lease area Midway along eastern lease line ir a�'dyf"Pdd�g�il,� i i 1 i t c Southern corner of lease area Construction Entrance along Terminal Road (Focina Old Clark Road) 492 SUTTON STREET No th 4ndover,M­achusehs �is0 � Home Grown Lacrosse,LLC 400OsgoodSh eE D MIDWAY S Nolrila,doA,,,MA0184, ALONG EASTERN LEASE LINE` AAA IE HANCOCK curt�PROP \ / - ASSOCIATES C—NORTHEAST — a„aET,g-O" CORNER OF LEASE AREA uM11oFVROP �.� E—SOUTHERN CORNER OF L-dS.—yors LEASE AREA F.nviranmen[sl 31 ' Q. Consullxnls Aa.� V 3 VO CE E(FED)244 0110 (078)244-1133 G� W1N AlFACYIA550C TES COM 1 Y" 1 u T OF PROPOSE➢LEASE AREA v - /T OF�d? Ll '` � O VM\S Zyy \ A DATE F—CONSTRUCTION APPROVED BY XXX tCHECK BY XOD g B—NORTHWEST ENTRANCE CORNER OF ALONG LEASE AREA TERMINAL 6W)90�1N�1/jAL ROAD A/ G PHOTO EMOr A—NORTHWEST CORNER OF LEASE AREA € s s EErr,oF9XHI 1 2022 Construction General Permit Site Inspection Report Project Name: NPDES ID Number: Section A-General Information (If necessary,complete additional inspection reports for each separate inspection location.) Inspector Information Inspector Name: Brian Geaudreau Title: Professional Engineer Company Name: Hancock Associates Email: bgeaudreau@hancockassociates.com Address: 34 Chelmsford Street, Floor 2,Chelmsford MA Phone Number: 978-244-0110 Inspection Details Inspection Date:5/3/24,5/10/24,5/17/24,5/24/24,5/31/24 Inspection Location:492 Sutton Street, North Andover,MA Inspection Start Time: Varies Inspection End Time:Varies Current Phase of Construction: Phase 1 Weather Conditions During Inspection: Varies(see narrative report) Did you determine that any portion of your site was unsafe for inspection per CGP Part 4.5? ❑ Yes ® No If"Yes," provide the following information: Location of unsafe conditions: The conditions that prevented you inspecting this location: Indicate the required inspection frequency: (Check all that apply.You may be subject to different inspection frequencies in different areas of the site.) Standard Frequency(CGP Part 4.2): ❑x At least once every 7 calendar days; OR ❑ Once every 14 calendar days and within 24 hours of the occurrence of either: • A storm event that produces 0.25 inches or more of rain within a 24-hour period, or • A snowmelt discharge from a storm event that produces 3.25 inches or more of snow within a 24-hour period Increased Frequency(CGP Part 4.3.1) (If site discharges to sediment or nutrient-impaired waters or to waters designated as Tier 2,Tier 2.5, or Tier 3): ❑ Once every 7 calendar days and within 24 hours of the occurrence of either: A storm event that produces 0.25 inches or more of rain within a 24-hour period, or A snowmelt discharge from a storm event that produces 3.25 inches or more of snow within a 24-hour period Page 1 of 7 2022 Construction General Permit Site Inspection Report Project Name: NPDES ID Number: Reduced Frequency(CGP Part 4.4): ❑ For stabilized areas:Twice during first month, no more than 14 calendar days apart;then once per month after first month until permit coverage is terminated ❑ For stabilized areas on "linear construction sites": Twice during first month, no more than 14 calendar days apart;then once more within 24 hours of the occurrence of either: • A storm event that produces 0.25 inches or more of rain within a 24-hour period, or • A snowmelt discharge from a storm event that produces 3.25 inches or more of snow within a 24-hour period ❑ For arid,semi-arid, or drought-stricken areas during seasonally dry periods or during drought: Once per month and within 24 hours of the occurrence of either: • A storm event that produces 0.25 inches or more of rain within a 24-hour period, or • A snowmelt discharge from a storm event that produces 3.25 inches or more of snow within a 24-hour period ❑ For frozen conditions where construction activities are being conducted: Once per month Was this inspection triggered by a storm event producing 0.25 inches or more of rain within a 24-hour period? ❑ Yes ❑x No If"Yes," how did you determine whether the storm produced 0.25 inches or more of rain? ❑ On-site rain gauge ❑ Weather station representative of site. Weather station location: Total rainfall amount that triggered the inspection (inches): Was this inspection triggered by a snowmelt discharge from a storm event producing 3.25 inches or more of snow within a 24-hour period? ❑ Yes ® No If"Yes," how did you determine whether the storm produced 3.25 inches or more of snow? ❑ On-site rain gauge ❑ Weather station representative of site. Weather station location: Total snowfall amount that triggered the inspection (inches): Page 2 of 7 2022 Construction General Permit Site Inspection Report Project Name: NPDES ID Number: Section B-Condition and Effectiveness of Erosion and Sediment E&S) Controls(CGP Port 2.2) (Insert'additional rows if needed) If"Yes," How Many Conditions Date on Which Conditions Times(Including Type and Location of US Conditions Condition First Control Requiring Routine This Occurrence) Corrective Observed (If Description of Conditions Observed Maintenance?' Has This Condition Action?2 3 Applicable)? Been Identified? 1.Silt Fence&Straw \� ® Yes El No Yes ® No 5 31 24 e Wattle 2. Catch Basin Filter Bags ❑ Yes ® No ❑ Yes ® No �A\y\\ \e \\\�\ \v VWW,_\,,—,,%\0\ ��' 3. Construction Entrance ❑ Yes ® No ❑ Yes ❑x NoAt \\\\ yy\� \\ \ \\ No 4. ❑ Yes ❑ No ❑ Yes ❑ No 5. ❑ Yes ❑ No ❑ Yes ❑ No If the same routine maintenance was found to be necessary three or more times for the same control at the same location(including this occurrence), follow the corrective action requirements and record the required information in your corrective action log, or describe here why you believe the specific condition should still be addressed as routine maintenance: Routine maintenance includes minor repairs or other upkeep performed to ensure that the site's stormwater controls remain in effective operating condition, not including significant repairs or the need to install a new or replacement control. Routine maintenance is also required for specific conditions: (1) for perimeter controls,whenever sediment has accumulated to half or more the above-ground height of the control (CGP Part 2.2.3.c.i); (2)where sediment has been tracked-out from the site onto paved roads, sidewalks,or other paved areas (CGP Part 2.2.4.d); (3) for inlet protection measures,when sediment accumulates,the filter becomes clogged,and/or performance is compromised (CGP Part 2.2.10.b):and (4)for sediment basins, as necessary to maintain at least half of the design capacity of the basin (CGP Part 2.2.12.f) 2 Corrective actions are triggered only for specific conditions (CGP Part 5.1): 1.A stormwater control needs a significant repair or a new or replacement control is needed,or,in accordance with Part 2.1.4.c,you find it necessary to repeatedly(i.e.,three (3) or more times) conduct the same routine maintenance fix to the same control at the same location (unless you document in your inspection report under Part 4.7.1.c that the specific reoccurrence of this same problem should still be addressed as a routine maintenance fix under 2.1.4); or 2.A stormwater control necessary to comply with the requirements of this permit was never installed,or was installed incorrectly;or 3.Your discharges are not meeting applicable water quality standards;or 4. A prohibited discharge has occurred (see CGP Part 1.3);or 5. During the discharge from site dewatering activities: a.The weekly average of your turbidity monitoring results exceeds the 50 NTU benchmark(or alternate benchmark if approved by EPA pursuant to Part 3.3.2.1o);or b.You observe or you are informed by EPA,State,or local authorities of the presence of the conditions specified in Port 4.6.3.e. 3If a condition on your site requires a corrective action,you must also fill out a corrective action log found at htfps://www.epa.gov/npdes/construction-general-permit- resources-tools-and-templates.See CGP Part 5.4 for more information. Page 3 of 7 2022 Construction General Permit Site Inspection Report Project Name: NPDES ID Number: Section.C-Condition and Effectiveness of Pollution Prevention (P2) Practices and Controls(CGP Part 2:3) (Insert additional rows if needed) If"Yes," How Many Conditions Date on Which Conditions Times(Including Type and Location of P2 Requiring Condition First Practices and Controls Requiring Routine This Occurrence) Corrective Observed (If Description of Conditions Observed Maintenance?' Has This Condition Action?2.3 Applicable)? Been Identified? 1. n/a ❑ Yes ❑ No ❑ Yes ❑ No 2. ❑ Yes ❑ No ❑ Yes ❑ No 3. ❑ Yes ❑ No ❑ Yes ❑ No 4. ❑ Yes ❑ No ❑ Yes ❑ No 5. ❑ Yes ❑ No ❑ Yes ❑ No If the same routine maintenance was found to be necessary three or more times for the same control at the same location(including this occurrence), follow the corrective action requirements and record the required information in your corrective action log, or describe here why you believe the specific condition should still be addressed as routine maintenance: Page 4 of 7 2022 Construction General Permit Site Inspection Report Project Name: NPDES ID Number: Section D=Stabilization of Exposed Soil(CGP Part 2.2 14} (Insert additional rows if needed), Specific Location That Has Stabilization MethodStabilization Final Stabilization Final Stabilization Been or Will Be Stabilized and Applicable Initiated? Criteria Met? Photos Taken? Notes Deadline 1. n/a ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No If "Yes," date If "Yes," date initiated: criteria met: 2. ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No If "Yes," date If "Yes," date initiated: criteria met: 3. ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No If "Yes," date If "Yes," date initiated: criteria met: 4. ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No If "Yes," date If "Yes," date initiated: criteria met: 5. ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No If "Yes," date If "Yes," date initiated: criteria met: Page 5 of 7 2022 Construction General Permit Site Inspection Report Project Name: NPDES ID Number: Section E 7 Description of Discharges(CGP Part 4 b.2) (Insert additional rows if needed) Was a discharge(not including dewatering)occurring from any part of your site at the time of the inspection?4 ❑ Yes ❑x No If"Yes,"for each point of discharge,document the following: • The visual quality of the discharge. • The characteristics of the discharge, including color; odor;floating,settled, or suspended solids;foam; oil sheen;and other indicators of stormwater pollutants. • Signs of the above pollutant characteristics that are visible from your site and attributable to your discharge in receiving waters or in other constructed or natural site drainage features. Discharge Location Observations 1. 2. 3. 4. 5. 4 If a dewatering discharge was occurring,you must conduct a dewatering inspection pursuant to CGP Part 4.3.2 and complete a separate dewatering inspection report. Page 6 of 7 2022 Construction General Permit Site Inspection Report Project Name: NPDES ID Number: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information contained therein. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information contained is,to the best of my knowledge and belief,true,accurate, and complete. I have no personal knowledge that the information submitted is other than true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." MANDATORY:Signature of Operator or"Duly Authorized Representative:" Signature: Date: Printed Name: Brian Geaudreau Affiliation: Civil Engineer/ Environmental Monitor OPTIONAL: Signature of Contractor or Subcontractor Signature: Date: Printed Name: Affiliation: Page 7 of 7 General Tips for Using This Template This Site Inspection Report Template is provided to assist you in preparing site inspection reports for EPA's 2022 Construction General Permit (CGP). If you are covered under the 2022 CGP,you can use this template to create a site inspection report form that is customized to the specific circumstances of your site and that complies with the minimum reporting requirements of Part 4.7 of the permit. Note that the use of this form is optional;you may use your own site inspection report form provided it includes the minimum information required in Part 4.7 of the CGP. This template does not address the CGP's inspection reporting requirements related to dewatering activities.A separate inspection template has been developed specifically for dewatering activities and is available at https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates. Keep in mind that this document is a template and not an "off-the-shelf" inspection report that is ready to use without some modification.You must first customize this form to include the specifics of your project in order for it to be useable for your inspection reports. Once you have entered all of your site- specific information into the blank fields,you may use this form to complete inspection reports. The following tips for using this template will help you ensure that the minimum permit requirements are met: • Review the inspection requirements. Before you start developing your inspection report form, read the CGP's Part 4 inspection requirements.This will ensure that you have a working understanding of the permit's underlying inspection requirements. • Complete all required blank fields. Fill out all blank fields. Only by filling out all fields will the template be compliant with the requirements of the permit. (Note: Where you do not need the number of rows provided in the template form for your inspection, you may delete these or cross them off as you see fit. Or, if you need more space to document your findings, you may insert additional rows in the electronic version of this form or use the bottom of the page in the field version of this form.) • Use your site map to document inspection findings. In several places in the template,you are directed to specify the location of certain features of your site, including where stormwater controls are installed and where you will be stabilizing exposed soil.You are also asked to fill in location information for unsafe conditions and the locations of any discharges occurring during your inspections. Where you are asked for location information, EPA encourages you to reference the point on your SWPPP site map that corresponds to the requested location on the inspection form. Using the site map as a tool in this way will help you conduct efficient inspections,will assist you in evaluating problems found, and will ensure proper documentation. • Complete the inspection report within 24 hours of completing a site inspection.You must complete an inspection report in accordance with Part 4.7.1 of the CGP. • Include the inspection form with your SWPPP. Once your form is complete, make sure to include a copy of the inspection form in your SWPPP in accordance with Part 7.2.7.e of the CGP. • Retain copies of all inspection reports with your records.You must also retain in your records copies of all inspection reports in accordance with the requirements in Part 4.7.3 of the CGP.These reports must be retained for at least 3 years from the date your permit coverage expires or is terminated in accordance with the requirements in Part 4.7.4 of the CGP. Instructions for Section A Inspector Name Enter the name of the person that conducted the inspection. Include the person's contact information (title, affiliated company name, address, email, and phone number). Inspection Date and Time Enter the date you performed the inspection and the time you started and ended the inspection. Weather Conditions During Inspection Enter the weather conditions occurring during the inspection, e.g.,sunny, overcast, light rain, heavy rain, snowing, icy,windy. Current Phase of Construction If this project is being completed in more than one phase, indicate which phase it is currently in. Inspection Location If your project has multiple locations where you conduct separate inspections,specify the location where this inspection is being conducted. If only one inspection is conducted for your entire project,enter"Entire Site." If necessary,complete additional inspection report forms for each separate inspection location. Unsafe Conditions for Inspection (CGP Part 4.5.7) Inspections are not required where a portion of the site or the entire site is subject to unsafe conditions. These conditions should not regularly occur and should not be consistently present on a site. Generally, unsafe conditions are those that render the site (or a portion of it) inaccessible or that would pose a significant probability of injury to applicable personnel. Examples could include severe storm or flood conditions, high winds, and downed electrical wires. If your site, or a portion of it,is affected by unsafe conditions during the time of your inspection, provide a description of the conditions that prevented you from conducting the inspection and what parts of the site were affected. If the entire site was considered unsafe,specify the location as "Entire Site." Inspection Frequency Check all the inspection frequencies that apply to your project. Note that you may be subject to different inspection frequencies in different areas of your site. Inspection Triggered by a Storm Event If you were required to conduct this inspection because of a storm event that produced 0.25 inches or more of rain within a 24-hour period, indicate whether you relied on an on-site rain gauge or a nearby weather station (and where the weather station is located).Also, specify the total amount of rainfall for this specific storm event. If you were required to conduct this inspection because of a snowmelt discharge from a storm event that produced 3.25 inches or more of snow within a 24- hour period, then indicate whether you relied on an on-site measurement or a nearby weather station (and where the weather station is located).Also, specify the total amount of snowfall for this specific storm event. Instructions for Section B Type and Location of Erosion and Sediment(E&S)Controls Provide a list of all erosion and sediment (E&S) controls that your SWPPP indicates will be installed and implemented at your site.This list must include at a minimum all E&S controls required by CGP Part 2.2. Include also any natural buffers established under CGP Part 2.2.1. Buffer requirements apply if your project's earth-disturbing activities will occur within 50 feet of a discharge to receiving water. You may group your E&S controls on your form if you have several of the same type of controls (e.g.,you may group "Inlet Protection Measures," "Perimeter Controls," and "Stockpile Controls" together on one line), but if there are any problems with a specific control,you must separately identify the location of the control,whether routine maintenance or corrective action is necessary, and in the notes section you must describe the specifics about the problem you observed. Conditions Requiring Routine Maintenance? Answer"Yes" if the E&S control requires routine maintenance as defined in footnote 1 of this template. Note that in many cases, "Yes" answers are expected and indicate a project with an active operation and maintenance program.You should also answer"Yes" if work to fix the problem is still ongoing from the previous inspection,though necessary work must be initiated immediately and completed by the end of the next business day or within seven calendar days if documented in accordance with CGP Part 2.1.4.b. If"Yes," How Many Times(Including this Occurrence) Has this Condition Been Identified? Indicate how many times the routine maintenance has been required for the some control at the some location. Conditions Requiring Corrective Action? Answer"Yes" if you found any of the conditions listed in footnote 2 in this template to be present during your inspection (CGP Part 5.1). If you answer"Yes," you must take corrective action and complete a corrective action log,found at https://www.epa,gov/npdes/construction-general-permit-resources-tools- and-templates.You should also answer"Yes" if work to fix the problem from a previous inspection is still ongoing, though the operator must comply with the corrective action deadlines in CGP Part 5.2. Date on Which Condition First Observed (If Applicable)? Provide the date on which the condition that triggered the need for routine maintenance or corrective action was first identified. If the condition was just discovered during this inspection,enter the inspection date. If the condition is a carryover from a previous inspection, enter the original date of the condition's discovery. Description of Conditions Observed For each E&S control and the area immediately surrounding it, describe whether the control is properly installed and whether it appears to be working to minimize sediment discharge. Indicate also whether a new or modified control is necessary to comply with the permit. Describe any problem condition(s) you observed such as the following: 1.Failure to install or to properly install a required E&S control 2.Damage or destruction to an E&S control caused by vehicles,equipment, or personnel, a storm event, or other event 3.Mud or sediment deposits found downslope from E&S controls, including in receiving waters, or on nearby streets, curbs, or open conveyance channels 4.Sediment tracked out onto paved areas by vehicles leaving construction site 5.Noticeable erosion or sedimentation at discharge outlets or at adjacent streambanks or channels b.Erosion of the site's sloped areas (e.g.,formation of rills or gullies) 7.E&S control is no longer working due to lack of maintenance 8.Other incidents of noncompliance Describe also why you think the problem condition(s) occurred as well as actions (e.g., routine maintenance or corrective action) you will take or have taken to fix the problem. For buffer areas, make note of whether they are marked off as required,whether there are signs of construction disturbance within the buffer,which is prohibited under the CGP, and whether there are visible signs of erosion resulting from discharges through the area. If routine maintenance or corrective action is required, briefly note the reason. If routine maintenance or corrective action has been completed, make a note of the date it was completed and what was done. If corrective action is required, note that you will need to complete a separate corrective action log describing the condition and your work to fix the problem. Routine Maintenance Need Has Been Found to be Necessary Three(3)or More Times for the Same Control at the Same Location(Including this Occurrence) If routine maintenance has been required three (3) or more times for the same control at the same location, the permit requires (CGP Part 2.1.4.c) you to fix the problem using the corrective action procedures in CGP Part 5 or to document why you believe the reoccurring problem can be addressed as a routine maintenance fix. If you believe the problem can continue to be fixed as routine maintenance, describe why you believe the specific condition should still be addressed as routine maintenance. Instructions for Section C Type and Location of Pollution Prevention(P2) Practices and Controls Provide a list of all pollution prevention (P2) practices and controls that are implemented at your site.This list must include all P2 practices and controls required by CGP Part 2.3 and those that are described in your SWPPP. Conditions Requiring Routine Maintenance? Answer"Yes" if the P2 practice or control requires routine maintenance as defined in footnote 1 of this template. Note that in many cases, "Yes" answers are expected and indicate a project with an active operation and maintenance program. You should also answer"Yes" if work to fix the problem is still ongoing from the previous inspection, though necessary work must be initiated immediately and completed by the end of the next business day or within seven calendar days if documented in accordance with CGP Part 2.1.4.1b. If"Yes," How Many Times(Including this Occurrence) Has this Condition Been Identified? Indicate how many times the routine maintenance has been required for the same practice or control at the same location. Conditions Requiring Corrective Action? Answer"Yes" if you found any of the conditions listed in footnote 2 in this template to be present during your inspection (CGP Part 5.1). If you answer"Yes," you must take corrective action and complete a corrective action log,found at https://www.epa.gov/npdes/construction-general-permit-resources-tools- and-templates.You should also answer"Yes" if work to fix the problem from a previous inspection is still ongoing, though the operator must comply with the corrective action deadlines in CGP Part 5.2. Date on Which Condition First Observed (If Applicable)? Provide the date on which the condition that triggered the need for maintenance or corrective action was first identified. If the condition was just discovered during this inspection,enter the inspection date. If the condition is a carryover from a previous inspection, enter the original date of the condition's discovery. Description of Conditions Observed For each P2 control and the area immediately surrounding it, describe whether the control is properly installed, and whether it appears to be working to minimize or eliminate pollutant discharges. Indicate also whether a new or modified control is necessary to comply with the permit. Describe any problem condition(s) you observed such as the following: 1.Failure to install or to properly install a required P2 control 2.Damage or destruction to a P2 control caused by vehicles, equipment, or personnel, or a storm event 3.Evidence of a spill, leak, or other type of pollutant discharge, or failure to have properly cleaned up a previous spill, leak, or other type of pollutant discharge 4.Spill response supplies are absent, insufficient, or not where they are supposed to be located 5.Improper storage, handling,or disposal of chemicals, building materials or products,fuels, or wastes b.P2 control is no longer working due to lack of maintenance 7.Other incidents of noncompliance Describe also why you think the problem condition(s) occurred as well as actions (e.g., routine maintenance or corrective action) you will take or have taken to fix the problem. If routine maintenance or corrective action is required, briefly note the reason. If routine maintenance or corrective action has been completed, make a note of the date it was completed and what was done. If corrective action is required, note that you will need to complete a separate corrective action log describing the condition and your work to fix the problem. Routine Maintenance Need Was Found to be Necessary Three(3)or More Times for the Same Control at the Same Location(Including this Occurrence) If routine maintenance has been required three (3) or more times for the same control at the some location, the permit requires (CGP Part 2.1.4.c) you to fix the problem using the corrective action procedures in CGP Part 5 or to document why you believe the reoccurring problem can be addressed as a routine maintenance fix. If you believe the problem can continue to be fixed as routine maintenance, describe why you believe the specific condition should still be addressed as routine maintenance. Instructions for Section D Specific Location That Has Been or Will Be Stabilized List all areas where soil stabilization is required to begin because construction work in that area has permanently stopped or temporarily stopped (i.e.,work will stop for 14 or more days), and all areas where stabilization has been implemented (CGP Part 2.2.14). Stabilization Method and Applicable Deadline For each area, specify the method of stabilization (e.g., hydroseed,sod, planted vegetation,erosion control blanket, mulch, rock). Specify also which of the following stabilization deadlines apply to this location: 1.5 acres or less of land disturbance occurring at any one time at site: Complete no later than 14 calendar days after stabilization initiated. 2.More than 5 acres of land disturbance occurring at any one time at site: Complete no later than 7 calendar days after stabilization initiated. 3.Arid, semi-arid, and drought-stricken areas: See CGP Part 2.2.14.1b.i. 4.Unforeseen circumstances:See CGP Part 2.2.14.1b.ii. 5.Discharges to a sediment-or nutrient-impaired water or to a water identified as Tier 2, 2.5, or 3 for antidegradation purposes: Complete no later than 7 days after stabilization initiated. Stabilization Initiated? For each area,indicate whether stabilization has been initiated. If "Yes," then enter the date stabilization was initiated. Final Stabilization Criteria Met? For each area, indicate whether the final stabilization criteria in CGP Part 2.2.14.c have been met. If"Yes," then enter the date final stabilization criteria were met. Final Stabilization Photos Taken? Answer"Yes" if you have taken photos before and after meeting the stabilization criteria as required in CGP Part 8.2.1.a. Notes For each area where stabilization has been initiated, describe the progress that has been made and what additional actions are necessary to complete stabilization. Note the effectiveness of stabilization in preventing erosion. If stabilization has been initiated but not completed, make a note of the date it is to be completed. If stabilization has been completed, make a note of the date it was completed. If stabilization has not yet been initiated, make a note of the date it is to be initiated and the date it is to be completed. Instructions for Section E You are only required to complete this section if a discharge is occurring at the time of the inspection (CGP Part 4.6.2). Was a discharge(not including dewatering) occurring from any part of your site at the time of the inspection? During your inspection, examine all points of discharge from your site, and determine whether a discharge is occurring. If a dewatering discharge was occurring, you must conduct a dewatering inspection pursuant to CGP Part 4.3.2. If there is a discharge, answer"Yes" and complete the questions below regarding the specific discharge. If there is not a discharge, answer"No" and skip to the next page. Discharge Location (Repeat as necessary if there are multiple points of discharge.) Specify the location on your site where the discharge is occurring.The location may be an outlet from a stormwater control or constructed stormwater channel, a discharge into a storm sewer inlet, or a specific point on the site. Be as specific as possible; it is recommended that you refer to a precise point on your site map. Observations Document the visual quality of the discharge and take note of the characteristics of the stormwater discharge,including color; odor;floating,settled, or suspended solids;foam; oily sheen; and other indicators of stormwater pollutants. Also, document signs of these some pollutant characteristics that are visible from your site and attributable to your discharge in receiving waters or in other constructed or natural site drainage features. Instructions for Section F Each inspection report must be signed and certified to be considered complete (CGP Part 4.7.2). Operator or"Duly Authorized Representative"-MANDATORY (CGP Appendix G Part G.11.2 and CGP Appendix H Section X) At a minimum, the site inspection report must be signed by either (1) the person who signed the NOI, or (2) a duly authorized representative of that person. The following requirements apply: If the signatory will be the person who signed the NOI for permit coverage, as a reminder, that person must be one of the following types of individuals: • For a corporation: By a responsible corporate officer. For the purpose of this subsection, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-or decision- making functions for the corporation, or(ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations;the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. • For a partnership or sole proprietorship: By a general partner or the proprietor,respectively. • For a municipality, State, Federal, or other public agency: By either a principal executive officer or ranking elected official. For purposes of this subsection, a principal executive officer of a Federal agency includes (i) the chief executive officer of the agency, or(ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrator of EPA). If the signatory will be a duly authorized representative, the following requirements must be met: • The authorization is made in writing by the person who signed the NOI (see above); • The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager,operator of a well or a well field,superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and • The signed and dated written authorization is included in the SWPPP.A copy must be submitted to EPA, if requested. Sign, date and print your name and affiliation. Contractor or Subcontractor- OPTIONAL Where you rely on a contractor or subcontractor to complete the site inspection report,you should consider requiring the individual(s) to sign and certify each report. Note that this does not relieve you,the permitted operator, of the requirement to sign and certify the site inspection report as well. If applicable, sign, date, and print your name and affiliation. Note While EPA has made every effort to ensure the accuracy of all instructions contained in this template, it is the permit, not this template,that determines the actual obligations of regulated construction stormwater discharges. In the event of a conflict between this template and any corresponding provision of the CGP, you must abide by the requirements in the permit. EPA welcomes comments on this Site Inspection Report Template at any time and will consider those comments in any future revision.You may contact EPA for CGP-related inquiries at cap@epa.gov